hi,
Co- product is cost relevant (cost relevancy indicator is ticked)..
If you look at a petro chemical refining industry their main input material will be "Crude oil" during refining they get "Petrol", "Diesel", "Kerosene", "Naptha" & "Water" etc...
So the whole of the production cost should not go to "Petrol" alone, as Diesel, Kerosene and "Naptha" are also sellable. Water is not sold out, but is being used internal for the operation.
In this scenario "Petrol". "Diesel", "Kerosene" and "Naptha" are defined as co-products in the material master. And the cost which needs to be distributed among them are in the ratio 30:30:20:20, so in the joint production details we select the apportionment structure, and here we define the equivalence number by entering the materials and numbers as required by us as 30:30:20:20.
Now BOM is defined for the main product "Petrol" and Diesel", "Kerosene", "Naptha" and Water are defined in -ve quantity. Here the definition of water goes as "BiProduct". Crude oil is defined as component in +ve quantity. Now during order costing/product costing/settlement considers the entire cost of production based on the crude oil cost and infrastructure cost and it splits into the ratio defined in the equivalence number.

Similar Messages

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • Material with BOM

    Hi
    I would like to know if there are any tcodes or tables where I can findout materials that have BOM for a particular material type and  material group.
    Thanks
    Subhash.

    Hi,
    Check the following tables.
    STAS;BOMs - Item Selection
    MAST:Material to BOM Link
    STKO:BOM Header
    STPO:BOM item
    There is no standarad transaction code available.
    Regards
    Ravi shankar.

  • The standard report for BOMs of a material with a selected period?

    Hi Gurus
    Is there any  standard report for BOMs of a material with a selected period?

    Hi,
    You will have to develop a report for your requirement,
    The following tables will be used for the report
    MAST-WERKS
    STPO-MATNR
    MARA-MAKTX
    STPO-BMENG
    STPO-POSNR
    STPO-IDNRK
    STPO-MAKTX
    STPO-DATUV
    STPO-MENGE
    STKO-MEINS
    STPO-AVOAU
    Regards
    Merwyn

  • Problem with BOM (packaging material) in order change

    Hi Gurus,
    In my b2b shop, i have created an order with BOM material and that order contains one main material and a sub item material after update or order. When i open the same order and click on change, when i click on update, a new sub item is getting added as a main item.
    Details:
    item 10 is 12007492 (main material)
    item 20 is 12007491(sub item for the main material)
    when i click on update,again one more sub item 30 is getting added.
    When i check the logs, all the items guids are getting passed to IN of crm_isa_basket_changeitems functions module. But when check it in runtime using external debuggin mode, the sub item guid is blank.
    Then the main material is again getting exploded and the sub item is coming at item 20 and actual sub item before update is shifting to item 30 as new item.
    Please help me in this regard why it is happening like this.
    Thank you
    Lakshman

    Hello Lakshman,
    I had the same issue, however my backend system was ERP and not CRM. In any case, the logic might be the same.
    When a BOM material is sent to the backend system for simulation/save, only the header needs to be sent. By this, backend system will explode the material and send 2 items back. I guess in your case, ISA is sending both items to SAP and that is the reason you are getting back 3 items.
    Simplest approach is to write some logic in your backend class to avoid sending this subitem to SAP. You can achieve this by manupulating the items table sent to SAP
    Suppose salesDoc is the ISA document and itemsTable is the JCO table that is sent to SAP as a table parameter:
                   ItemList itemList = salesDoc.getItems();
                   for (Iterator iter = itemList.iterator(); iter.hasNext();) {
                        ItemSalesDoc itemSalesDoc = (ItemSalesDoc) iter.next();
                        TechKey parentKey = itemSalesDoc.getParentId();
                        if(null!=parentKey){
                             if (!parentKey.getIdAsString().equalsIgnoreCase("")) {
                                //Here remove it from the tables parameter which is sent to SAP
                                               itemsTable.deleteRow(i);
    I am not too sure how it would work for CRM, but works in ERP.
    Pradeep

  • MD04 issue with BOM Material

    HI
    We have a scenario where Sales order is Created with BOM Material. Sales order has been saved, delivered and Billed.
    But still the BOM Material is shown in MD04, we tried running the Correction program SDRQCR21, but still the BOM Material shown in MD04.
    Can anyone help on this issue.
    Thanks

    hi,
    please check,
    whether TECO has been done for production order from PP perspective.
    after this the requriment from MD04 should disappear and finally refresh it.
    you are requested to search the FORUM sir.
    regarsds,
    balajia

  • GR for BOM Material with Serial number

    Hi all
    I have 2 serialised materials A and B, A is the Parent Material and B the child material (BOM Scenario), both having serial numbers
    I want to do GR without PO (501movement type) for the A material with the serial number, while doing GR i want BOM to be trigerred and at the same time i need to enter the serial number for the child material also.
    This is not a subcontracting scenario, here i am not issuing any goods to vendor, i am getting some used parts which i want to track individual accessiroes wise with serial numbers.
    Kindly suggest the backend settings
    Regards
    Amuthan M

    Try MASE. it hold the last serial number.

  • While creating SO with BOM material, plant is getting grayed out.

    Hi,
    I am trying to create a sales order with BOM material.
    As soon as I give the material, sub items are getting added but I am not able to modify the plant for main item, fields such as plant, item category are gettinh grayed out.
    Is this related to item category or any other setting,
    Please help me.
    Thanks,
    Pramod.

    Hi,
    The field is getting greyed, because you created BOM for perticular plant and it's unique.
    Second is about to item category, when explode bom in sales order then main item become HIGHER LEVEL ITEM,and all other are child or sub item,once it is at higher level it is in display mode,
    Kapil

  • Costing run for a material with alternative BOM

    Hi Friends,
    My requirement is to have product costing for a material with 3 different BOMs, in CK11N i can change the alternative BOM number to have costing run for 3 differesnt boms, but in ck24 how to proceed, My client requirement is such that the standard price should be the average price of the costing run from 3 different boms, and they are not interested in manual price change in MR21
    Regards,
    Arun Kumar R V

    Hi Arun,
    You can have a Standard cost estimate based on only one of the alternative BOM and Routing. This alternative is selected based on the business ie., whichever alternative is generally used in production frequently. This will be the std cost and whenever you do the production using the other alternatives, the difference in cost will be captured as Variance.
    There is no option of having average or cost estimate for each alternative at the same time.
    There is absolutely no use in maintaining price in MR21 for an in house produced material, since during Prod Order process the planned costs will be arrived at based on the quantity structure of BOM & Route only.
    Thanks & Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 7, 2009 8:57 AM

  • Same material with some valuation type does not post accounting documeents

    Hi Experts,
    For a finished goods material has two valuation types and each assigned to a different valuation class.
    For example Valuation type PLANT is with valuation class PROD, Valuation type EXTERNAL is with valuatioin class RESL.
    When I post any material document, accounting document is getting created only for valuation type EXTERNAL.
    The automatic account determination is configured properly with both valuation classes for Transaction event key BSX.
    Also the simulation of the account determination (OMWB) is showing perfect and hitting the required accounts.
    Where is the setting to control this? How to make the system to create an accounting document even if the material is received/issued with Valuation type PROD?
    Thanks in advance.

    Hi,
    I checked up this scenario and is working alright. Acc docs are created for all the valuation types.
    Here the issues are:
           1. Check the configuration and master data for valuations.
           2. System is not giving any error for any material document. It means that  
               the transaction is clear. Check the price for val type PLANT is not zero.
    regards,
    sreenivas

  • Material with moving average price ,while posting grn act as standard price

    hi gurus
    i have a material with a moving average price , according to moving average price during grn posting no price difference account should be created at any circumstance , but while i posted grn , i am getting stock account - wip 14407.98 , GRIR - DM 16800 -
    Price difference  matl trns - 2392.02 WHY THESE PRICE DIFFERENCE CREATED  i have maintained only moving average price in  accounting view
    regards
    Leo

    hi
    In SAP we have two price control  moving average price and standard price
    In MMR if u using Moving average Price  if any difference in price it will post it to stock account
    but in case of standard price it post it o PRD account (Price diff Account)
    Regards
    AKM

  • Post Goods Issue with BAPI with reference to BOM

    Hi All,
    I want to post Goods Issue with BAPI / FM with reference to BOM.
    The requirement is like to replicate what we can do with MB1A with reference to BOM with BAPI / FM.
    Please give ur suggestions.
    Thanks in advance.
    Chintan.

    https://www.sdn.sap.com/irj/scn/advancedsearch?cat=sdn_forums_rm&query=kanban&adv=false&sortby=cm_rnd_rankvalue&sortmode=true&searchmode=similar&similardocsuri=/forumsrm/1_category/42_category/50_forum/34196_thread/322837_message

  • Material with  item cat.group ERLA impact on costing and sales pricing

    Hello,
    I would like to know if a material which is defined as item category group ERLA and which has two sub-items posted in the BOM with usage 5 with its respective std cost could  be calculated for costing or not?
    Can I have some information about the impact on  costing and pricing in sales?
    Thanks in advance
    AB

    No the material type should be a FG : it is relevant for sales reporting. For example I call it material "A". In the material master data within the sales screen the item category group ERLA is assigned to "A" . The material A is a grouping material with a sales BOM which contains some sub-items for example B and C which are picked and shipped together. The grouping material is not handled as stock material: only the sub-items are stocked and moved.
    The customer could  only require the material A with its price and receive phisically the two sub-items with a unique package unit or with two separate ones.
    In this scenario the FG with ERLA item could be estimated for standard cost or not?
    Thanks in advance
    Andrea

  • Subcontracting with BOM

    Dear all,
    Can anyone tell me the method of creating PO with BOM
    i mean what are the additional fields should be maintained in Material Master???
    How to create Material BOM using Tcode CS01??
    Is CS01 Tcode is for to create for maintaining Bill of Materials for a Finished product??
    pls tell me in detail step by step to Create BOM and subcontracting BOM
    Thanks a lot in advance??

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product )
    (material provided to Vendor is now charged to expense)
    (5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to becreated for the material(2) calling for material(1)
    4. Inforecord and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Regards
    Ravi

  • BAPI_GOODSMVT_CREATE - Error while posting a Material Document

    Hi Experts,
    We are  trying to do the material document posting using the transaction "MB1C" manually in SAP. The movement type which we are using for the same is "261".  While doing this is, it is asking for a work order number and the Recipient number. We gave the Recipient Number as "123". Material document is created successfully.
    Again using the same transaction  "MB1C" , we are trying to do the reversal of the material document which we posted previously against another work order number for the same material and the serial number if the material is serialised and as well as for the non serialised material.
    Both this case, in SAP the material document is created succesfully. This is done manually in SAP.
    When we are trying to create the material document using the BAPI 'BAPI_GOODSMVT_CREATE', for the above scenario, posting the material document '261' movement type for one work order and the reversal for another work order '262' movement type for the same material (whether it is a serialised or non serialised) we are getting the eror as "RE Qty. transferred exceeded 1 PC: 50,003,695 C001 USED 1200".
    We are passing the following at the item level. MATERIAL Number, Plant, STGE_LOC, ENTRY_QNT, MOVE_TYPE, BATCH, ORDERID, RESERV_NO,  RES_ITEM, ACTIVITY, XSTOB for reversal.
    We are passing the GM_CODE as '05'.
    Please let us know what needs to be changed inorder to create the material document properly without getting errors.
    Thanks in Advance,
    Mohan.

    Hi,
    We fixed this issue by removing the reservation number of the material when we are trying to post the material document with the movement type "262".
    The reason for removing the reservation number for the movement type "262"
    The reservation number is getting created against a work order when we trying to create the work order in IW32. This reservation number is used for validating the stock while we are trying to consume and doing the reversal.
    SAP is allowing us to reverse the consumed quantities only based on the reservartion number and hence we got this error.
    To fix this error, if we are trying to reverse a particular material against a different work order for which it has been consumed previiously, remove the reservation number and item number and try posting the material document.
    Hope this solution will solve your issue:)
    Thanks and Regards,
    Mohan.

Maybe you are looking for

  • End of page in Grid alv.

    Hello Everyone, I populate event table in grid alv display.But End_of_page Event is not working.Can anyone tell me why End_of_Page is not working.

  • Can I move photoshop to one OS to another

    I'm thinking of get photoshop with monthly subscription, but im buying a mac soon, is it possible to keep the same photoshop on PC but move over to the Mac without canceling and losing money?

  • Uploading HR mini master

    Hello, I would like to know what the best way is to upload HR mini master records. We are doing a CATS project and I need employee numbers with infotypes: 0000, 0001, 0007, 0105, 0315. Can anyone provide me information on what BAPI's or other to use.

  • Migrate AD from 2003 to 2012

    Hi, I'm looking migrate an AD from windows server 2003 to windows server 2012 but i can't find all the requirement to do it. I find that my Domain and Forest level have to be at least 2003 but anything else. I will thanks any information to make succ

  • Highlight superscript/reference indicator

    Hi, Is it possible to highlight any 'superscript number'/'reference indicator' with the help of scripting? Can I use regular expression for the same. If yes, plese advise how to do it. With regards, Anil Yadav