Power & Steam Mapping in PP

Hi,
I am having a query regarding POWER and STEAM.
We have just upgraded from 4.6c to ECC6.
They have a in-house Power and Steam Generation which is so far not mapped. At present POWER and STEAM is being added as a Activity in Routing.
But now they want to track the Power and Steam Generation as a separate plant (manufacturing unit). Hence they want to put the same into BOM instead of Routing.
Is it advisable to go for the same?, as I think that Power and Steam is a Utility and is a part of Routing than of the BOM, as it is difficult to relate Power Unit with the qty. FERT produced and also we cannot declare it as a Stock material (need to define it as a Pipeline Material).
Can you suggest what is the best practice in such a scenario ?
Thanks in advance,
Harris Panchal
Edited by: Harris Panchal on May 27, 2009 5:06 PM

Dear Harris,
check this link,
http://www.sap-img.com/production/set-parameter-and-work-center-formula.htm
In your case if you know the exact power consumption for productwise then an activity type can be
created to capture the same along with the costing part.
But in general the fuels like water,gas or steam will be considered as Pipeline materials which will be
always available.
Check and revert back,.
Regards
Mangalraj.S

Similar Messages

  • Represent polygons in Power View Maps

    Hi.
    Is there any way to represent polygons in a Power view map? 
    This in order to relate the map with the oders reports in Power view. I have the spatial database with the polygons in SQL Server 2012.
    Thank's very much.

    Hello,
    If I understand correctly, you want to change the bubbles in the map.
    Based on my test, Power view map is not support to modify the bubbles. The circle bubbles in the map is by default. There is an article about Create Map-based Power View Reports, you can refer to it.
    http://office.microsoft.com/en-001/excel-help/tutorial-create-map-based-power-view-reports-HA104075403.aspx
    Alternatively, I recommend you that submit a feedback to the Microsoft Connect at
    https://connect.microsoft.com/SQLServer/Feedback. Your feedback is valuable for us to improve our products and increase the level of service provided.
    If there are any misunderstanding, please feel free to let me know.
    Regards,
    Alisa Tang
    If you have any feedback on our support, please click
    here.
    Alisa Tang
    TechNet Community Support

  • Gauges for Excel - Power View

    Hi,
    does anyone know free gauges for Excel/Power View like speedometer, thermometer, etc.
    Many thanks

    Hi,
    As far as I know, the error message "Bing error: Map tiles not found. A connection to Bing could not be established " will pop up when Powerview map can't access the Bing map server. (Quote From: https://connect.microsoft.com/SQLServer/feedback/details/774162/cache-power-view-map )
    Thus, I suppose that this issue might be caused by your Network environment changed. When you used the power view map in your company desktop, it might be set some proxy server to connect the Bing map server, but when you put the daskboard to your laptop,
    the proxy server had not been set, the powerview map can't find the right port to access the Bing map server. Please check the different network/proxy server settings between work computer and laptop computer.
    Hope it's helpful.
    Regards,
    George Zhao
    TechNet Community Support
    It's recommended to download and install
    Configuration Analyzer Tool (OffCAT), which is developed by Microsoft Support teams. Once the tool is installed, you can run it at any time to scan for hundreds of known issues in Office
    programs.

  • Exporting to and from Power Point

    When I export to and from power point, the mapping of bullets does not seem to be one for one. My bullets in iwork seem to map to bullets with numbers in them in power point. How can I figure out which bullets in Power Point map to which bullets in iwork?

    Hi,
    Hope you are doing the following:
    1. Create a pptx
    2. Save and click on Presenter ->Publish.
    3. Select the tab 'Adobe Connect'
    4. Configure the server by clicking on 'Edit server'
    5. Click on Add and enter name (any name) and URL of server ('http://<server name like my.adobeconnect.com>)
    6. Press Ok and then Publish.
    Are you redirected to Connect server login screen ?
    If still you are not able to publish, please provide the name and URL of server you entered.
    Thanks
    Alpi Agarwal
    Adobe Presenter Engineering Team

  • Cannot MESH Multiple MAPs to Single RAP

    Hello,
    Our environment consisits of ~200 1552E APs.  Up until recently we have used either Cat6 or fiber to connect them to our network.  Recently we have begun meshing APs instead of running the Cat6 or fiber.  The meshed APs have been single MAPs connected to single RAPs.
    This week I have started testing multiple MAPs.  Painfully, I have not been successful with meshing more than one MAP to a RAP.  For instance, I have set up a RAP with a BGN of "MESH_TEST" and two MAPs with the same BGN.  If I power the RAP with MAP #1, the meshed link works like a charm.  If i power on MAP #2 and power down MAP #1, the mesh between MAP2 and RAP works great.  If I attempt to power both MAPs, only one of the MAPs will establish a connection to the RAP while the other cycles through it's discovery for meshed neighbours and WLC.
    Have I overlooked anything?
    On the contrlloer I have executed the following command - debug capwap events enable
    What I see in the log is the following line that continues to occur for the MAC address of the unconnected MAP.
    *RRM-DCLNT-2_4: May 15 14:05:20.520: d4:d7:48:6d:6c:60 Unable to find data structure for AP  D4:D7:48:6D:6C:60
    I have searched the forums and documentation for this error/message and cannot locate any reference to it.
    Thanks for any assistance.
    Cheers,
    André

    This should work and in my view you have not left anything here.

  • MAP not joing RAP

    Hi there
    I am using 2106 controller and 1522 APs. I am priming the APs. The RAP joins the controller easily and so does MAP when I connect it via ethernet to the network for priming but afterwords, the MAP is unable to joing RAP over wireless and even there are no debug outputs for MAP. Can anyone suggest whtat should be reason for that. I have check settings like mobility group name and WLC name in MAP settings but everything looks fine. Although I have tested this priming method many times but this is the first time I am having this problem.

    Few things
    -Have you put the MAC address of the APs in the MAC filter
    -what software code are you running
    -have you factory defaulted the controller and put a fresh configuration on the 2106
    -are you using a static IP address on the APs or DHCP as there is a bug with the 1522's using static IP addresses, you need to ensure a DHCP is available on the network for the MAPs
    -How are you power the MAPs?
    -also can you console onto the 1522 APs and see whats happening and whether there are any errors
    -when you primed the 1522 did you set its role to Mesh AP
    Hope this helps,

  • Goods issue in REM process

    hi sir,
    I am new to SAP, so plz guide me.
    in Paper industry this is the actual
    Business Process:
    In  papers industry  they have different varieties of paper production in which they are characterized by the GSM (thickness), sizes  and  grades. These characteristics are not given by customer, they are pre-defined and are fixed i.e based on the available variety of paper that is produced in paper  mill the customer makes the order for sheets or reels(FG). The different customer makes the order for different grades and GSM of paper. In 7th day of  every month they compile the orders in order to get the net quantity of paper quality type  to be produced and based on that the production is done. Remaining materials like pulp, power, steam, water treatment production are continuously takes place without any reference to the FG(paper) to be produced. There is fixed production lines.
    Eg:
    A,B, C are the grades of paper.  If for A-10MT,5MT,15MT are the orders and for B-4MT,2MT similarly for C-15MT,20MT are the orders. Then totally for A-20MT, B-6MT and for C-35MT planned to produce in a month.
    Note: If the customer needs the new variety or changes in the paper variety that is already available then R & D is made on that variety and a new name is given to it.
    Hence, this is Make To Stock  with Repetitive manufacturing process.  Is this process is right??
    As per SAP best practices in repetitive process scenario, there will wont be conversion of planned order to production/process order, based on planned order the production takes place and then we will do the Operative backflushing.
    Here, the client requirement is on what basis the goods issue has to be done for production?? as there will be no production/process orders.

    Hi,
    REM process has been developed by SAP for less complicated scenarios. I mean where product varieties are less and process is less complex.
    That is the reason there is no concept of order. Cost is getting captured on the product cost collector lever rather individual order level(In discrete).
    Goods issue is on planned order which is of PE type (Once order is LA type you can assign the material to planning table. Then it will be PE)
    GI happen through back flush.
    Please refer the above links for better idea.
    Regards,
    Krishnendu.

  • Monthly Performance Report PP

    Hi BWers,
            I need give an monthly performance Report on PP. Can you please tell me wether these fields are from PP only orelse I need to go for any other modules for datasources. Please let me know which datasources , Fields and Cubes I should use exactly for this report.
    This is the end user Requirement.
    Daily Production
    Day Worked
    Profit
    Total Profit/Loss
    Details of Difference
    Efficiency
    Due to Grasim Power
    Power Failures
    Non/Better availability of Power
    Grasim Load Shedding
    Shifting of Power to Membrance Cell
    Due to less power availability (EC-1 fire 19th)
    Water Crisis
    Breakdown
    Shutdown
    Due to higher CL2 Stock
    Sub Total
    CL/HCL Prod. In comparison to Purta Mix
    Power & Steam Consumption
    Quantity Gain/Loss
    Cell Power
    Aux. Power
    Steam
    Current Density
    Rate Gain/Loss
    Power Rate Loss due to higher average power rate
    Steam
    Sub Total
    Raw Material & Aux. Material
    Quantity Gain/Loss
    Salt
    Sulphuric Acid
    Brine Purification Cost
    CL2 Disposal
    Rate Gain/Loss
    Salt
    Soda Ash
    Realisation
    Caustic
    Quantity Gain/Loss
    Outside Parties & All Group Units
    Rate Gain/Loss
    Outside Parties & All Group Units
    Own Consumption
    Chlorine
    Quantity Gain/Loss
    Rate Gain/Loss (Excl cost of Pkg)
    Hydrochloric Acid
    Quantity Gain/Loss
    Rate Gain/Loss
    Gain/Loss in Special Repairs due to lower/higher repairs (Land filling expenses)
    Gain/Loss in Interest (Working Capital)/Term Loans
    Gain/Loss due to less/more Selling & ADM Overheads
    Other Income (EC-1 Fire Claim)
    Gain/Loss due to decr./incr. in Stock/Valuation
    Gain/Loss due to less/more Salary/Wages
    Thanks & Regards
    KLC

    HI
    i think first you need to check where exactly this is stored in R/3 for example go to the screens where they are storing then it will be easy for you to identify functional areas as well as the tables involved in
    and i don't think we have any fields like salt, hydrocholic acid...they all come under material which are used for production..
    so better first go like this
    thanks and regards
    Neel

  • Activity confirmation issue

    Dear Gurus,
    We are facing issue in confirmation of Activity such as power , steam. As in process industry output is variable.
    accordingly at the time of confirmation activity viz power , steam should varies is it possible?
    In transaction cor6 we can enter manually units actually consumed.
    My second query is
    In T-code CORK and COID  How to / where to enter actually consumed unit of Power and steam in screen? As users  are using all the 3 T-code for confirmation.
    Please guide me as we are facing cost variance in Process order confirmation due to activity.
    Regards,
    J.H.Pert

    COID is just reporting transaction.
    COR6N is single screen entry transaction
    CORK is header confirmation
    When you do confirmation using CORK, all the confirmable phases in the order gets confirmed to the yield qty mentioned in the screen, this also take care of activity confirmation.No option to post activity seperately.
    cor6 you can post actual activities seperately

  • Problem in choosing the datasources

    Hi Bwers,
             I need to give an monthly performance Report on PP. Can you please let me know wether these fields are from PP only orelse I need to go for any other modules for datasources. Please let me know generally which standard datasources,Fields and Cubes are used. I should use exactly for this report.
    This is the end user Requirement (Report Format).
    Daily Production
    Day Worked
    Profit
    Total Profit/Loss
    Details of Difference
    Efficiency
    Due to Grasim Power
    Power Failures
    Non/Better availability of Power
    Grasim Load Shedding
    Shifting of Power to Membrance Cell
    Due to less power availability (EC-1 fire 19th)
    Water Crisis
    Breakdown
    Shutdown
    Due to higher CL2 Stock
    Sub Total
    CL/HCL Prod. In comparison to Purta Mix
    Power & Steam Consumption
    Quantity Gain/Loss
    Cell Power
    Aux. Power
    Steam
    Current Density
    Rate Gain/Loss
    Power Rate Loss due to higher average power rate
    Steam
    Sub Total
    Raw Material & Aux. Material
    Quantity Gain/Loss
    Salt
    Sulphuric Acid
    Brine Purification Cost
    CL2 Disposal
    Rate Gain/Loss
    Salt
    Soda Ash
    Realisation
    Caustic
    Quantity Gain/Loss
    Outside Parties & All Group Units
    Rate Gain/Loss
    Outside Parties & All Group Units
    Own Consumption
    Chlorine
    Quantity Gain/Loss
    Rate Gain/Loss (Excl cost of Pkg)
    Hydrochloric Acid
    Quantity Gain/Loss
    Rate Gain/Loss
    Gain/Loss in Special Repairs due to lower/higher repairs (Land filling expenses)
    Gain/Loss in Interest (Working Capital)/Term Loans
    Gain/Loss due to less/more Selling & ADM Overheads
    Other Income (EC-1 Fire Claim)
    Gain/Loss due to decr./incr. in Stock/Valuation
    Gain/Loss due to less/more Salary/Wages
    Cheers
    K L C

    Hi There,
    Have you checked the 2LIS_04_xx datasources from the transaction RSA6 or LBWE to see if these are suitable?
    For example 2LIS_04_P_COMP, 0PP_WCCP, 0WORKCENTER, 0WRKCT_CATG , 0WRKCT_RESP

  • Some one give me MSBI base BI project idea or scenario for BS.CS final year project/

    j have experiance in sql 2012 datawarehose design,ssis,ssas,ssrs,sharepoint 2013 reporting services (power peviot,power view,map,excel,performance point) .i practice with sample databases Adverture works 2012,Adverture
    works oltp 2012,Adverture works dw2012 so if any one have any big or intresting idea bi on the basis of these databases or othe sample db orazure saple free data sample based idea so plz help me .i have only
    10 days to submit project related details.

    The following link is used to download some sample database
    http://msftdbprodsamples.codeplex.com/

  • Re: Unit of measure for Activity Type

    Dear All,
    I am using 4 activity types i.e. POWER/MACHINE/STEAM/LABOUR.
    MACHINE & LABOUR are calculated using same formula: like
    Machine=machine*(SAP_09/SAP_08)
    Labour=Labour*(SAP_09/SAP_08)
    & for POWER & STEAM  I am using:
    Power=(Power(machine(SAP_09/SAP_08)))
    Steam=(Steamr(machine(SAP_09/SAP_08)))
    But on seeing the lof for cost while creating a process Order I am getting only the machine & labour correct,The steam & Power are getting calculated wrongly.
    For example
    If my base SAP_08=1200000
    & SAP_09=1200000
    & my activity values in the recipe =
    Machine= 16 Hr
    Labour= 64 hr
    Steam= 127 Kg/Hr
    Power=388 KW
    Please advice how to resolve this issue.
    Regards,
    Vivek

    HI
    can u plz explain why for one routing Base  unit are different?
    As per my knowledge the base qty should be the same which is same as BUM in case of routing and depends upon client requirement in case of Rate routing.
    For  Power consumption formula should be like (base unit/power consumption for base unit)* total qty of process order * rate
    Check and revert
    regards
    Anupam Sharma

  • OS 6.0.2 Battery Issues

    Is there way to revert back to the old version? I wasn't having a wifi issue like many other users here. I am now finding myself trying to charge my phone whenever possiable to just keep a charge for 1 day. This was never an issue befoere 6.0.2

    I am getting very acceptable battery life from my new iPhone 5 running 6.0.2 - 2 days per charge minimum.  The key (as it has been for a few years) is to close inactive applications that use location services.  There is a short delay in opening these power hungry apps when you want them, but that is more than compensated for in not having to worry about running out of battery power.
    Maps are the worst battery drainers and navigating from place to place will burn power rapidly.  I use a car charger during navigation. Some apps have been worse than other - Groupon was bad at first, and Cyclemeter or MapMyRide (fitness apps) will drain the battery even when not active.  I leave Safari running full time without problem.  Some apps are more efficient than others so I suggest experimenting.
    To close applications double click to launch the app switcher, press and hold any application until they all jiggle, then touch the red close button of the apps you don't want running.
    Hope this helps!

  • Can I plot 2 locations at the same time for each record in a table

    I'm trying to plot 2 Locations (2 points on a Power View Map) at the same time for each record/project in a table
    I can plot 1 location for each project of course with no problem
    but I'm trying to show the Begin Point and the
    End Point for each project at the same time
    Is this even possible?

    First of all THANKS this worked!
    But now I stumbled on another issue. So I actually have 3 tables (and I've adopted them to the file you sent)
    Table 1 => TripData
    Trip
    LongLat
    Location
    Type
    TypeCode
    Size
    NW Tour
    47.568077, -122.320800
    Seattle, WA
    Begin
    0
    1
    NW Tour
    47.035608,   -122.884812
    Olympia,   WA
    End
    1
    1
    Cali Trip
    37.808848, -122.412580
    San Francisco, CA
    Begin
    0
    1
    Cali Trip
    32.682611, -117.178348
    San Diego, CA
    End
    1
    1
    Table 2 =>
    TripInfo
    Trip
    OneLongLat
    NTP
    NW Tour
    47.568077, -122.320800
    1/1/2015
    Cali Trip
    37.808848, -122.412580
    1/5/2015
    Table 3 =>
    ALLTrips
    Trip
    Stop
    Owner
    NW Tour
    1
    Owner1
    NW Tour
    2
    Owner2
    NW Tour
    3
    Owner3
    NW Tour
    4
    Owner4
    NW Tour
    5
    Owner5
    Cali Trip
    1
    Owner6
    Cali Trip
    2
    Owner7
    Cali Trip
    3
    Owner8
    Cali Trip
    4
    Owner9
    Cali Trip
    5
    Owner10
    Cali Trip
    6
    Owner11
    This is how the Diagram View looks like in PowerPivot
    Trip Data => Trip Info <= ALLTrips
    Since I don't know how to post pictures
    The MAP FIELDS are as follows
    SIZE - Count of Stop(s)
    LOCATIONS - OneLongLat followed by
    LongLat (drill down feature)
    COLOR - Trip
    The problem now happens with the drill down feature
    You can either plot OneLongLat which is the general location for each trip
    Or LongLat of each trip which shows the begin and end points
    But you can't use the drill down feature???
    If instead of OneLongLat you use a
    State Column it actually works!!!
    I wonder if it has to do with the fact that both locations used for the drill down are Long/Lat numbers???
    Any suggestions???
    And again Thanks for the response!

  • PP/SD/CO/MM-power and steam

    Dear All,
    In my power plant, Steam and power is produced.
    I want to map the scenario. But how can i saw power production and sell to different units. As power, we can not keep in stock as it is directly issued/consumed/sold. So are there any specific things are provided by SAP for power production and selling?
    If you have any idea plesae share the same as I want to produce steam and power and want to sell the same to different plants within client or may be to supplied to govt in future.
    FYI in my company, Descrete manufactuting is there. Version 4.6 C
    In PP/SD/CO/MM side, what transactions may be followed to achieve this?(steam and power production and sell).
    so how to map this scenario. pl. suggest.
    Regards,
    Vijay Modasiya

    Hi, YOu can use REM to capture the production cost of the power and steam. Create as halb materials but make sure that the process is mapped in such a way that stock is consumed to full at the month end processing....
    1) if we generate steam and power and stock it , how to clear it. : depend on your process, if the consumption for steam and power is booked at end of shift, just before that do a GR for the equivalent power and consume it....
    3) What will be the implications on cost , if we stock steam and power. - you can do a standard cost estimate.

Maybe you are looking for

  • Exchange 2007 - The XML document ended unexpectedly.

    Hello, I'm trying to connect with a exchange server 2007 sp3 through EWS.  I can connect but when I try to retrieve a calendar item I'm getting this error:  The XML document ended unexpectedly. It seems that the EWS/Exchange isn't well configurated.

  • Raid Cache Vol Disabled

    Hi, I have a problem here. Every time I start my computer, it appears with white letters and black background.. saying some things, one of them is that my RAID Cache_VOL 18.9GB is disabled ? disabled is in yellow color... something is wrong.. how to

  • InDesign CS 2 crash when moving pages

    OS: Xp Sp2 Program Indesign CS2 Problem: While editing average sized indesign document ~50 pages or so I was normally re arranging the order of pages in the document when suddenly InDesign froze, it looks like code somehow loops around forever. It cr

  • Zen micro on/off sliding button probl

    I have my micro for 2 months and I started to note that the on/off sliding button isn't functioning well... Its hard to turn on and off the micro and sometimes I can't turn it off... I wonder if maybe with or 2 more months of usage it will stop worki

  • Questions From A Potential New User

    I am currently using Lightroom, but am excited about the new features in Aperture 1.5. Here are a few questions: 1) When referencing files to their hard drive location on import, can I later move the files on the hard drive using Aperture to do the m