Power Supply switching

Hi,
I am not sure whether this is the correct forum to post this question but I think it may be a problem which may be common and someone may be able to help.
I am currently using a TTi TSX3510P DC power supply to drive a simple electro-magnet. One end of the windings goes to the positive and one to the negative of the supply (obviously) which allows me to ramp the current up through lab view to +10 amps crteating a magnetic field.The problem is I would now like to drive the current to -10 amps, the simple solution is to obviously switch the wires around on the supply but I wish to perform an automatic sweep utilising lab view from -10 to +10 amps. I am sure that there is circuitry out there to perform this operation. If anyone knows where and how to utilise this circuitry with labview I would be much obliged.
Thanks
Regards
Marc

You might want to check into NI's USB based DAQ. Since you are ramping using GPIB to control the supply I'm presuming that it is changing relatively slowly, which would allow the USB DAQ. I don't know what their price is in the UK, they start out around $245US with both analog and digital. You would also need a relay with: contacts rated at the maximum current expected, which should also be powered by a separate power supply and have its own driver circuitry (DAQ cards generally don't supply sufficient current to run relays directly). A US company, ELK products, makes a relay card with the appropriate circuitry, for about $20 US. I know that one model, ELK-924, has contacts rated to 7A @ 30VDC, I don't know if that is "hot switched" or just what they are rated for. I think hot switched as they have a separate 10A @125VAC rating. You would need a small 12V @~1A power supply to provide it with power (a "Wall Wart" supply should be fine), but it only requires the control signal to supply 1.2mA, with most DAQ digital I/O capabilities. You would need to be careful not to switch the relay while the electromagnets full current was flowing, the field collapse would generate a large voltage/current across the relay's contacts. The normal method of putting a reverse diode across the windings wouldn't work with your required polarity reversals.
Hope this helps,
P.M.
Putnam
Certified LabVIEW Developer
Senior Test Engineer
Currently using LV 6.1-LabVIEW 2012, RT8.5
LabVIEW Champion

Similar Messages

  • Router power supply: Switch mode or linear?

    I need to replace a failed power supply for a router - which model doesn't really matter but the router is a WRT54GS (12V 1000mA). Which is best - a switch mode or a linear power supply? Will either be just as good? Please only answer if you DEFINITELY know the answer. Cheers, Mike

    Power adapter uses External, 12V DC, and 0.5A...

  • Power Supply Switch!

    Okay, here's the scenario. i bought an Apple iMac a few years ago in the UK where their power supply is around 220v. Since then i have moved country where the voltage system has changed to 120v instead.
    Currently i use a transformer to convert voltage system from 120v to 220v so that i can run my iMac. So i'm wondering if anyone might know if there might be a switch that i can flick to allow my iMac to run on the same 120v so that i don't have to use a heavy cumbersome transformer.
    looking forward to any replies on this topic.
    ^Ch@mber^

    Hello and Welcome to Apple Discussions. 
    As Stedman suggests all iMacs (with the exception of some US bought early iMac G5s) have dual power supplies and will work on 100-250volts or so.
    mrtotes

  • Slimline S5-1060 auto power supply switching

    I just recently move to Australia from the US and brought my slimline s5-1060 with me.  I think I can just plug it in to the Australian 240v system with a proper plug adapter or changing out the cord .  The sticker for the power supply is below.  Can you tell me if it is safe to plug in to the Australian power system.  There is no little red switch from 110 to 220 like I have seen in the past on previous desktop computers.  Thank you for your help.

    Hi,
    I can't read the label on the power supply.  However, if it indicates 120/240 volts and 50-60 cycles then you should be OK as most of the new power supplies are auto sensing and no longer require a voltage switch.
    You can further review the power supply specifications here.
    HP DV9700, t9300, Nvidia 8600, 4GB, Crucial C300 128GB SSD
    HP Photosmart Premium C309G, HP Photosmart 6520
    HP Touchpad, HP Chromebook 11
    Custom i7-4770k,Z-87, 8GB, Vertex 3 SSD, Samsung EVO SSD, Corsair HX650,GTX 760
    Custom i7-4790k,Z-97, 16GB, Vertex 3 SSD, Plextor M.2 SSD, Samsung EVO SSD, Corsair HX650, GTX 660TI
    Windows 7/8 UEFI/Legacy mode, MBR/GPT

  • Power supply control

    Hi
    I have to control 10 gear boxes at a time and I have used E3436A power supply to supply 5.3V dc to all gear boxes. Once I start test gearboxes will powered on and generates the analog out pulses.
    Now I have to cut  the power supply to gearbox once it  produces the 40 analog pulses / min (even less time its fine). After some time say 5 to 6 sec again I need to power on the gearboxes to continue the test..Its repetitive over period of time.
    To power off the supply of individual gearbox  I am using USB 6009 Digital IO ports with enabling and JFETS or relays.
    The problem is.
    1. I have to check the status of  all gearboxes(10) have generated 40 pulses /min.
    2. If the gearbox 1 is generated 40 analog pulses in 30 sec I have to cut the supply to particular gearbox  and wait for 1 minute,  same way I have to  off  all 10 gearboxes using DIO and relays .
    3.if the gearbox taken more than 1 min  to generate 40 pulses ...It indicated fail..
    4. After completion of one cycle (1 min)  I have  to start the all the gearboxes simultaneously ( No DIo and Relay used..Direct supply from the E3466A ) .
    Pl let me know logic for controlling the gearboxes.
    Thanks in advance

    You were told in another post http://forums.ni.com/t5/LabVIEW/Power-supply-switching/m-p/2490462 to come up with your own code.
    Nothing has changed.
    If you don't know LabVIEW take a class

  • 21 September, 2014: MD513AE/A  iPad Wi-Fi-16GB White - Model A 1458 I have purchase this from Dubai, UAE, some 2 years back. ---- I am NOT able to switch it on; when connected to power supply, the battery icon comes in but no signs of charging.

    21 September, 2014, from India.
    MD513AE/A  iPad Wi-Fi-16GB White - Model A 1458
    I have purchase this from Dubai, UAE, some 2 years back.
    I am NOT able to switch it on; when connected to power supply, the battery icon comes in but no signs of charging.
    After some times the ‘Apple’ icon comes in. Tried simultaneous operation of Sleep and Power buttons, but of no use.
    Sometimes a picture of cable and ITunes comes in; but not able to connect to
    P C as there is no battery charge.

    Hi madhu254,
    Thank you for visiting Apple Support Communities.
    If your iPhone is not charging, please check out this article.
    iPhone and iPod touch: Charging the battery
    There's a Resolving issues section, but you may want to read it all.
    Best regards,
    Nubz

  • CiscoWorks how many switches in stack + dual Power supply usage

    Hi,
    Please tell me that is it possible to see in CiscoWorks that device with dual power supplies is using both or just one. e.g 6500
    Also I need to count the total number of physical switches in the company but I am only able to generate a inventory report that only shows logical devices, but it do not show if the switch is stack then how many physical switches are in stack.
    Is it also possible to count the total number of physical devices in the company instead of just logical devices.
    I am using the
    LMS: 1.2.0
    RME: 4.3.0
    CS:    3.3.0
    CM:   5.2.1
    DFM: 3.2.0
    Thanks.

    Thanks for reply.
    In the detailed device view I am able to see that switch has 2 power supply, but but unable to see that its using either only one or both. But I understand your point that if its not visible here then its not possible.
    Explainantion of my second query: My company want to know that how many physical switches has been installed. We manage over 2500 logical switches in the company and management want to have a report showing that how many total physical switches exist.
    Is it possible to generate a report which shows that each logical switch contains how many physical swithes and/ or total number of physical switches in the company. 
    e.g MLS001 (logical switch) contains sw1 (physical switch), sw2 (physical switch), sw3 (physical switch), sw4 (physical switch)
         MLS002 (logical switch) contains sw1 (physical switch), sw2 (physical switch)
    CiscoWorks generate a report shows that 6 physical switches exist.
    Please reply ASAP. Thanks

  • Use SNMP to monitor the power supply status of stacked switches

    Does anybody know how to use SNMP to monitor the status of the internal power supplies of a group of stacked Cisco 3750 switches?
    The switch stack has three 3750-48PS-E switches inter-connected by Cisco StackWise cable. IOS ver 12.1(19)EAlc. A single IP address is used to identify the switch stack. Every time I poll the OID chassisPs1Status (1.3.6.1.4.1.9.5.1.2.4.0 in CISCO-STACK-MIB), I only got the status for the Master switch of the switch stack. Is there any way to poll the power supply status of other switches in the switch stack?
    Thanks a lot!

    Sorry to refresh such an old topic - but I am stuck with exactly this: Monitoring power supplies of a stacked Cisco Catalyst 3750-E.
    I'm using the exact same OID's as described, but the problem is, the information shown on the SNMP output is not correct.
    This morning, a power supply of the first switch failed and switched to RPS. Here the information I got on SNMP:
    snmpwalk -v 2c -c public 192.168.1.50 1.3.6.1.4.1.9.9.13.1
    SNMPv2-SMI::enterprises.9.9.13.1.1.0 = INTEGER: 13
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.2.1006 = STRING: "SW#1, Sensor#1, GREEN "
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.2.2006 = STRING: "SW#2, Sensor#1, GREEN "
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.3.1006 = Gauge32: 41
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.3.2006 = Gauge32: 40
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.4.1006 = INTEGER: 59
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.4.2006 = INTEGER: 59
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.5.1006 = INTEGER: 0
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.5.2006 = INTEGER: 0
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.6.1006 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.3.1.6.2006 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.4.1.2.1060 = STRING: "Switch#1, Fan#1"
    SNMPv2-SMI::enterprises.9.9.13.1.4.1.2.2059 = STRING: "Switch#2, Fan#1"
    SNMPv2-SMI::enterprises.9.9.13.1.4.1.3.1060 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.4.1.3.2059 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.2.1059 = STRING: "Sw1, PS1 Normal, RPS NotExist"
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.2.2060 = STRING: "Sw2, PS1 Normal, RPS NotExist"
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.3.1059 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.3.2060 = INTEGER: 1
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.4.1059 = INTEGER: 2
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.4.2060 = INTEGER: 2
    As you see, both PS1 (for both switches) are appearing normal. It doesn't even recognize RPS:
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.2.1059 = STRING: "Sw1, PS1 Normal, RPS NotExist"
    SNMPv2-SMI::enterprises.9.9.13.1.5.1.2.2060 = STRING: "Sw2, PS1 Normal, RPS NotExist"
    The first switch's power supply died and now the cable is disconnected. LED's of the power supply are out. And still: The switch happily announces by SNMP it's power supplies are up.
    Is this a known bug? If yes, has it been fixed?
    Model  WS-C3750E-48TD
    Firmware 12.2(37)SE1
    /* Style Definitions */
    table.MsoNormalTable
    {mso-style-name:"Table Normal";
    mso-tstyle-rowband-size:0;
    mso-tstyle-colband-size:0;
    mso-style-noshow:yes;
    mso-style-priority:99;
    mso-style-qformat:yes;
    mso-style-parent:"";
    mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
    mso-para-margin:0cm;
    mso-para-margin-bottom:.0001pt;
    mso-pagination:widow-orphan;
    font-size:11.0pt;
    font-family:"Calibri","sans-serif";
    mso-ascii-font-family:Calibri;
    mso-ascii-theme-font:minor-latin;
    mso-fareast-font-family:"Times New Roman";
    mso-fareast-theme-font:minor-fareast;
    mso-hansi-font-family:Calibri;
    mso-hansi-theme-font:minor-latin;
    mso-bidi-font-family:"Times New Roman";
    mso-bidi-theme-font:minor-bidi;}

  • Severe Incompatibility between Mac Pro 2012 power supply and Tripp Lite 2400 watt Line Conditioner [switching transformer].

    Severe Incompatibility between Mac Pro 2012 power supply and Tripp Lite LC2400 [switching transformer].
    The Mac Pro will not power on when connected to the Tripp Lite LC2400. The Power Supply makes continuous clicking noises and repeatedly resets the Mac Pro every 3 seconds.
    The same Mac Pro connected to an outlet with no Tripp Lite starts up with no problem.

    Hi,
    I've the same notebook. I've not had any hardlocks so far, but I've not seen so much flash movies yet. Anyway, I just tried closing running youtube-video tab on Kde4 + enabled desktop effects -> Everything's fine.
    Anyway, perhaps we can collect some issues and solutions in this thread. Here are problems, that I encounter:
    - restart does not work
    - errors during boot:
    [ 2.399277] pnp 00:0b: [irq 23]
    [ 2.399308] pnp 00:0b: Plug and Play ACPI device, IDs SMO8800 (active)
    [ 2.932179] pnp 00:0c: can't evaluate _CRS: 12311
    [ 14.616662] iTCO_wdt: Intel TCO WatchDog Timer Driver v1.07
    [ 14.616771] iTCO_wdt: Found a Cougar Point TCO device (Version=2, TCOBASE=0x0460)
    [ 14.616792] iTCO_wdt: cannot register miscdev on minor=130 (err=-16)
    [ 14.616904] iTCO_wdt: probe of iTCO_wdt failed with error -16
    [ 9.262898] sdhci-pci 0000:0b:00.1: SDHCI controller found [1217:8321] (rev 5)
    [ 9.262920] sdhci-pci 0000:0b:00.1: PCI INT B -> GSI 18 (level, low) -> IRQ 18
    [ 9.262966] sdhci-pci 0000:0b:00.1: Invalid iomem size. You may experience problems.
    [ 9.263176] sdhci-pci 0000:0b:00.1: setting latency timer to 64
    Issued solved:
    - in order to make nvidia graphics working you have to disable Optimius in BIOS.
    - Battery not recognized -- fixed after recend updates
    - grub2 does not work. As soon as grub2 loads, the laptop reboots. -> stick to grub1  --  works now (either I did sth wrong the first time or a new version of grub2 fixes this issue)
    - in order to make the touchpad work properly install psmouse-elantech from AUR
       update: this is only a half-solution. vertical scrolling on the right edge works but graphical tools which rely on x11-input-synpatics still don't work. However, everything works fine with kernel 3.3. Once this in the main arch repos you won't need psmouse-elantech anymore.
    Last edited by knue (2012-03-06 23:26:26)

  • Power supply error, Cisco switch 3750

    Hello,
    Can someone help me with a  power supply problem...?
    Switch cisco WS-C3750-24P is showing "Unavail" from sh env all
    Switch3750#sh env all
    FAN is OK
    TEMPERATURE is OK
    SW  PID                 Serial#     Status           Sys Pwr  PoE Pwr  Watts
    1  Built-in                                         Unavail
    2  Built-in                                         Good
    3  Built-in                                         Good
    4  Built-in                                         Good
    Does it means that power supply 1 was removed? failed?
    Do you know about another command to see more details?
    Thanks,

    Hi All,
    Can you please help to fix the issue,
    sw03#sh env all
    FAN is OK
    TEMPERATURE is OK
    Temperature Value: 45 Degree Celsius
    Temperature State: GREEN
    Yellow Threshold : 58 Degree Celsius
    Red Threshold    : 68 Degree Celsius
    SW  PID                 Serial#     Status           Sys Pwr  PoE Pwr  Watts
    1  Built-in                                         Unavail
    SW  Status          RPS Name          RPS Serial#  RPS Port#
    1   Active          <>
    sw03#sh env st
    SWITCH: 1
    FAN is OK
    TEMPERATURE is OK
    Temperature Value: 45 Degree Celsius
    Temperature State: GREEN
    Yellow Threshold : 58 Degree Celsius
    Red Threshold    : 68 Degree Celsius
    POWER is FAULTY
    RPS is SUPPLYING
    As per the sh env stack, seem like power is faulty ?. Can Someone please tell how to rectify the problem.
    Madan

  • CNA & "switch redundant power supply"

    Just configured trunking between these switches:
    2950T-48-SI
    3508G-XL
    3548-XL
    The traffic appears to be flowing correctly through both the default VLAN and also my additional VLAN.
    Now, ALL of the 2950 switches on my network display this message: "switch redundant power supply failed" when I connect to them using the Cisco Network Assistant.
    Seems like the error message must be related somehow to the VLAN configuration I did.
    In a nutshell, I configured all connected Gigabit ports this way:
    switchport mode trunk
    switchport trunk encapsulation dot1q
    I only configured SOME of my switches for the trunking and additional VLAN - must all of them be configured the say way, even if I don't anticipate needing the additional VLANS on those switches?
    Thanks, Susan

    Hi Susan,
    Do you have redundant power supplies connected to the 2950s?
    If not, you are probably running into a cosmetic bug, CSCee96721.
    We can confirm this by issuing a "show env" in the CLI.
    You should see something like this:
    "switch#sho env all
    FAN is OK
    Internal POWER supply is OK
    RPS is NOT present
    RPS is FAULTY"
    Note that the last line indicates that the RPS is faulty, even though the line above it indicates that no RPS is present.
    If that applies to you as well, then you are hitting this bug. CNA is polling the same information, which is why you are seeing "switch redundant power supply failed" in CNA.
    The fix is in 12.1(22)EA3 and later.
    HTH,
    Bobby
    *Please rate helpful posts.

  • HP DV2025TU laptop start as soon as switch on power supply. XP SP3, BIOS : F.39, help required.

    My HP DV 2025 TU model laptop start automatically as soon as i switch on power supply from power adaptor (Note : as my battery is totally gone so always need to start from power supply with power adapter)
    OS : XP SP3
    BIOS : F.39
    Please help me by providing solution.

    Suspend has always been problematic under Linux. It seems to be hit or miss for the most part, but here are some things you can try:
    Use an LTS kernel, tuxonice, pm-utils, etc. See Suspend and Hibernate
    Try a different graphics driver
    Tweak the driver module parameters or build your own driver.
    Unfortunately I don't have experience with the radeon driver, so I can only give you ideas.

  • HT1490 When my macbook is fully charged, does the charger switch the power supply off, or does it continue to 'charge'?

    When my macbook is fully charged, does the charger switch the power supply off, or does it continue to 'charge'?
    (If I leave my laptop to charge whilst I'm out and it reaches 'fully charged' but is still switched on, will this continue to 'charge' my laptop? Or will it destroy my batter over time?)

    When the charge cycle completes, the pilot light on the MagSafe connector changes from orange to green. At that point the battery will be kept in standby mode, and the computer will be kept running with electrical power from the charger. If you want to keep an eye of where the power is coming from, get the latest release of the Coconut Battery utility: http://www.coconut-flavour.com/coconutbattery/

  • Prime Infrastructure 2.1 - Power supply alarms on switchs

    Hi,
    How can i manage to get a email if one of my power supply on a switch die (see the attached file).
    I tried to activate all snmp traps possible on my switch and all i can get is configuration management events on PI.
    I changed the Severity Configuration on PI for Environmental monitor detects a testpoint reaching a critical state to critical.
    Any ideas?
    Sorry for grammar, english is not my native language.
    *** Prime Infrastructure 2.1, we will upgrade for 2.2 in few weeks***

    Hello,
    It's tracked by the following bug:
    CSCui46231    Processing Alarm on power supply failure and Fan failure conditions 
    Should be resolved in PI 2.2
    Ram

  • %PLATFORM_ENV-1-FRU_PS_ACCESS: FRU Power Supply is not responding on 2960XR Switches? what

    Hi all,
    my customer has a lot of WS-C2960XR-24PS-I  (15.0(2)EX4) 24 and 48 Port switches, some are in a stacks, others not. All have 2 Powersupplies.(each 640 Watt)
    Now he notice this message every 5 minutes, but not on all switches.
    Looking at the switch, the PS seems to be ok.
    There is a known issue, but this one only mention the problem during insertion, not during normal runningtime.
    What can be the problem here?
    Thanks
    Willem
    Additional Information:
    CustomerSwitch#
    Nov 27 09:28:44.622 CEST: %PLATFORM_ENV-1-FRU_PS_ACCESS: FRU Power Supply is not responding
    CustomerSwitch#
    Nov 27 09:33:44.642 CEST: %PLATFORM_ENV-1-FRU_PS_ACCESS: FRU Power Supply is not responding
    CustomerSwitch#
    CustomerSwitch#
    CustomerSwitch#sh env all
    FAN PS-1 is OK
    FAN PS-2 is OK
    SYSTEM TEMPERATURE is OK
    System Temperature Value: 41 Degree Celsius
    System Temperature State: GREEN
    Yellow Threshold : 67 Degree Celsius
    Red Threshold : 75 Degree Celsius
    POWER SUPPLY 1A TEMPERATURE: OK
    POWER SUPPLY 1B TEMPERATURE: OK
    SW PID Serial# Status Sys Pwr PoE Pwr Watts
    1A PWR-C2-640WAC DCB1728B1K2 OK Good Good 250/390
    1B PWR-C2-640WAC DCB1738B2A1 OK Good Good 250/390
    CustomerSwitch#
    --- ende -------
    Release Notes for Catalyst 2960-X and 2960-XR Series Switches, Cisco IOS Release 15.0(2)EX5
    ---SNIP---
    CSCuh65397
    During the insertion or removal of a power supply, the following message might be displayed on the console:
    %PLATFORM_ENV-1-FRU_PS_ACCESS: FRU Power Supply is not responding
    There is no functional impact. There is no workaround.
    ---SNIP---

    Hi ,
    As per the Bug note, (see the Further Problem Description:)
    Workaround:
    NA
    Further Problem Description:
    If this log is repeated even after OIR, It should be different issue. It has to be debugged separately
    Thanks,
    VS.Suresh

Maybe you are looking for

  • Pros and Cons of using JBDC Adapter with XI

    Hi Experts,     Can somebody help me understand pros and cons in using different JDBC adapters with XI?    I would be really greatful to you. Thanks & Regards Gopal

  • Commapi Returns 3 Char Hex String.

    Hi Every body, I'm using the COMMAPI to talk to a serial port, and I'm getting the reponse the form of a 3 char string, with each of the char being in the range 0-F (obviously a Hex Digit). So Far I'm converting the string into a char array and loopi

  • Sorting reminders?

    Hi out there. My question is following. Is it possible to sort reminders in list view by alert date and not only the end date? The list view is a problem when you create a reminder with a different start and finish date. Thanx Tom

  • Can't record video's in iOS7 on iPAD 3th generation

    I just upgraded my iPAD 3th generation to iOS7 ( it seems to be very slow ) and now I can't record any video's anymore in camera. I can't seem to select video or square format, so i'm stuck with only taking pictures? Please help.

  • Creation with Reference using BAPIs

    We're looking into creating an order with reference to a quotation or a return order with reference to an order or invoice. According to OSS note 370988 you can only achieve this using a workaround. We're in the process of testing it, so we were wond