Pp and pm integration for capacity planning

Dear ALL,
Just now i started integration testing between pp and pm.
As we know PM equipment is work centre for PP.Suppose there is 1 machine MAC-1 for which i created maint. order  also i ticked Sys. condition in MO and by using  the same  machine , Prd.dept is created Prod. Order.
But as per std. scenario , SAP should show that this  capacity is not available for pp but in our case it is not happening and capacity is available  here.
I would like to know is there any thing  missing from my side.
Awaiting for your valuable suggesation.

In Equiment Bom, enter PP workcenter. When you make MO it will not give you an alert. But while your leveling your capacity MO will appears that Work Centre will be on Maintenance from --- to date.
If it helps, kindly give points.
Regards,
RM

Similar Messages

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • Any good table for Capacity Planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    Dear
    Please find below SAP tables for CRP :
    CRHD         Workcenter Header Data
    CRCA         Workcenter Capacity Allocation
    CRCO         Workcenter Cost Center Assignment
    CRHH          Hierarchy Header
    CRHS           Hierarchy Structure
    CRTX          Workcenter Text
    KAKO         Capacity Header
    KAZY          Intervals of Capacity
    Regards
    JH

  • Tables for capacity planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    >
    harvey wu wrote:
    > HI all,
    >
    > Is there any table for capacity planning?
    > we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    > Thanks!
    >
    > Harvey
    Hi Harvey,
    Kindly check if the Below tables satisfy ur requriement
    KBED      Capacity Requirements Records
    KBEZ      Add. data for table KBED (for indiv. capacities/sp
    KBKO      Header Record for Capacity Requirements
    Reg
    Dsk

  • Issue in Application Module and Enterprise Integration for SAP applications

    Hi,
    When I enabled the Application Module and Enterprise Integration for SAP applications Version 2.60 Patch 2 I am getting error in defect entity and Application Module. Does any one face this issue? Please let me know the solution.
    QC details:  QC 11.0 with patch 7
    I followed the steps given in ALM addin page to install the adapters
    Attached Screen shots of the Error

    Hi
    If you are wanting to know how to configure ESSO to be used to logon to SAP applications then there is a guide in the helpfile of the admin console. Simply do a search for SAP.
    In short ESSO-LM comes with a SAP helper object which needs to be selected on install. To enable the ESSO SAP helper to interact with SAP, the SAP server and the SAPGUI client need to be configured. The details for this are in the helpfile. If you have multiple SAP systems launched from the SAPGUI then this is the best method because it means ESSO can distinguish between the different SAP systems through matching screens
    If you have only one SAP system and you do not want to configure the SAP server then you could use send keys and not use the SAP helper object at all.
    Hope this helps

  • Bandwidth Utilization Avg or Max for capacity Planning best practice

    Hello All - This is a conceptual or Non-Cisco product question. Hope you can help me to get this best industry practice
    I am doing a Capacity planning for the WAN Link Bandwidth. To study the last month bandwidth utilization in the MRTG graph, i am seeing  two values
    Average
    Maximum.
    To measure how much bandwidth my remote location is using which value i have to use. Average or Max?
    Average is always low eg. 20% to 30%
    Maximum is continuous 100% for 3 hour in 3 different intervals in a day and become 60% in rest of the day
    What is the best practice followed in the networking industry to derive the upgrade size of the bandwidth by using the Utilization graph
    regards,
    SAIRAM

    Hello.
    It makes no sense to use average during whole day (or a month), as you do the capacity management to avoid business impact due to link utilization; and average does not help you to catch is the end-users experience any performance issues.
    Typically your capacity management algorithm/thresholds are dependent on traffic patterns. As theses are really different cases if you run SAP+VoIP vs. youtube+Outlook. If you have any business critical traffic, you need to deploy QoS (unless you are allowed to increase link bandwidth infinitely).
    So, I would recommend to use 95-percentile of maximum values on 5-15 minutes interval (your algorithm/thresholds will be really sensitive to pooling interval, so choose it carefully). After to collect baseline (for a month or so)  - go and ask users about their experience and try to correlate poor experience with traffic bursts. This would help you to define thresholds for link upgrade triggers.
    PS: proactive capacity management includes link planning for new sites and their impact on existing links (in HQ and other spoke).
    PS2: also I would recommend to separately track utilization during business hours (business traffic) and non-business (service or backup traffic).

  • PP and PM integration for PRT equipment

    Hi,
    i got integration issue when implementing PP and PM.
    i used PRT equipment with counter, PP confimation will update the counter.
    If it reach some value it is overhaul and maintenance order created.
    1, if it is overhaul, can i automatically set the PRT so it is not available (status)
    2. can PP people know this and the they reschedule the PP order and it schedule automatically considering the maintenance order for the PRT equipment they use.
    after PRT equipment i will user work center as equipment too and then we will have botj issue as above
    is it really possible for pp and pm integration like this.
    please kindly help.
    best regards,
    Freddy Ha

    hi
    In the normal process once your production order is confirmed ,your maintenance order from plan will be triggered ,but your PRT status is in release only which will not be updated as LOCK automatically .it can be locked manually in the Master data.
    check with abaper whether it is possible to update the status using measurement document ,for say once it reaches 2000 pc
    Once the status is locked it cannot be used for maintenance or production order
    for Workcenter as equipment then you can process with System condition as Not in operation which will show the maintenance order while checking the production order planning table
    regards
    thyagarajan

  • Selection profile sets for capacity planning

    Hi,
    Could you please explain me in details about different sets in selection profiles configuration (work center set, order set, capacity category set, initial set) thorugh OPA2  and how they are related to sets in OPD1 configuration (Object, filter sets).
    Does these sets will effect capacity availability check calculations or they only for different display options for user.
    Please provide if there is any detailed document available since I have a problem where CM01 list is not matching with overall profile used for capacity availability check while creating orders.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • EXtractor for Capacity planning

    HI, I cant find any extractor for manufacturing capacity planning, data are stored in tables KBED + KBKO  on R3 side. Have You any advice
    Thanx

    Hi,
    Check with 2LIS_04_* datasources.
    Thanks
    Reddy

  • Workflow and POWL integration for Travel Request / Approval

    HI,
    We are on EHP7 and using POWL  for different kind of Approvals.
    POWL is working good for Leave Approval and we have used Workflow Task ID as : TS12300097 / TS12300116, and all leave request appearing in POWL for manager and approving them.
    Now we have to use POWL for Travel Request / Travel Expense approval and need to know what Task IDs I should use to configure this under SPRO.
    Few tabs / links created like Travel Req Approval / Expense Approval / Claim Approval in POWL and need to show entries in respective tabs.
    Thanks

    HI
    Is it required to run FPB_MAINTAIN_PERS_S / FPB_MAINTAIN_PERS_M to display Travel entries in POWL screen.
    2) Is it required to keep entries under "Assign Task IDs to POWL Types" in SPRO ???
    ex : MANAGER_MSS_INBOX    MSS_POWL_LEA_APPROVAL    TS12300097
    I don;t see any difference in terms of functionality even If i delete above entry, may i know the necessity of having those entries ?
    Thanks

  • Assigning Control profile in Overall profile for capacity planning

    Dear all Hi,
    While creating the order iam getting the error as contrrol profile attached to overall profile is not suitable.
    Please can you help me in finding in which transaction do we assign control profile to over all profile.
    Thanks in advance.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • Planned Order and Purchase Requisition for total Plan

    HI
    As per my client requirement whenever i am giving a plan in Demand Management in MD61 say for quantity 100. System should create purchase requisition for quantity 40 and Planned Order of 60.
    Please let me know if it is possible.
    Regards,
    Anand

    HI
    Thanks a lot. Its working with quota arrangement.
    Regards,
    Anand.

  • Question for Capacity Planning

    We are planning a large expansion of users and regions and therefore, data in our application. I am trying to figure the most important items that need to be covered for this move from an oracle architecture standpoint. So far I have:
    # of users currently connect
    # of new future users
    # of current transactions per day
    These should help with things like # of processes and cursors and PGA size.
    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed. If someone can point me in the right direction or maybe give me some ideas of other things I should be looking at, it would be much appreciated
    Thanks

    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed.Maybe because this doesn't really exist ...
    See following AskTom thread: http://asktom.oracle.com/pls/ask/f?p=4950:8:12270935817190372191::NO::F4950_P8_DISPLAYID,F4950_P8_CRITERIA:14258091776835
    and Oracle9i Database Performance Planning: http://download-uk.oracle.com/docs/cd/B10501_01/server.920/a96532/toc.htm

  • Precision for Capacity Planning for Response Group Lync 2010

    Hi,
    does anyone have
    information on the following points:
    Concurrent calls connected to IVR or MoH
    480
    60 --> I think that each FE can support 60 simultaneous calls on the MOH
    Concurrent anonymous sessions (without IM)
    224
    28 --> I think that each FE can support 28 simultaneous calls on different RGS/agents
    Active agents (formal and informal)
    1200
    1200 - -> It's the maximum of actives agents for RGS. But does I have to count 3 connections if a person is active for 3 RGS?
    Thanks for your help
    Marc

    Concurrent calls connected to IVR or MoH > 480 that mean per enterprise pool it support 480 simultaneous call to IVR but enterprise pool must contain at least 8 Front End.
    Concurrent anonymous sessions (without IM) > 224 same as previous, that mean enterprise pool support 224 simultaneous call on different agent.
    Active agents (formal and informal) > 1200, It's the maximum of actives agents for RGS and yes, you will have 3 connection for 3 RGS.
    Each hunt group is associated with a different Response Group application queue, but each queue is associated with the same agent group comprised of three agents. The total number of possible active agents on this Enterprise Edition pool is three (1 agent
    group x 3 unique agents in that group).
    Also you can refer below link
    http://technet.microsoft.com/en-us/library/gg412754.aspx
    http://blogs.technet.com/b/nexthop/archive/2012/09/24/lync-server-2010-response-group-application-frequently-asked-questions.aspx
    Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question, please click "Mark As Answer"

Maybe you are looking for

  • Object text not coming in report selection screen

    Hi, i have an object task type for which text has been loaded.this is included in one reports selection screen.But in F4 only kee is displayed and not text.If check button is pressed text is displayed besides key.Also text doesnt come after report is

  • JAR files + java.lang.NoClassDefFoundError

    Hey all ... I'm looking for little help with building JAR files. Here's the situation: (using ant script :)) I have few source files *.java which I include into JAR file with default MANIFEST built by ant. (these files should be implemented as LIBRAR

  • FM or RFC to retrieve QM notification data

    Hi Gurus, I looking for a function that can fetch QM notification data from R/3, so that I can display the same in a WebDynpro application. I will be lucky if there is some standard FM to do that. If not, I have to do it my self for all the notificat

  • Flash Media Encoder problems

    So I'm getting these 2 problems. I'm using Flash Media Encoder 2.5 on Windows 7 home. My upload speed in 2.1 mbs. I don't want to use FME 3.1 or 3.2 because they make my computer slower and I have the same problems. First the preview screens are chop

  • IMAP & POP E-Mail on two devices?

    I have a quick question, mostly for those who understand the inner-workings of the two systems fairly well. I am using IMAP on my laptop to connect with my personal E-mail account. I am also using it on my iPhone, but you can't sync subfolders in IMA