PP BOM explosion during MRP

Hello all,
During MRP, BOMs for dependent assemblies are supposed to be exploded.  I am running MRP in the background.  Until recently, MRP is exploding only the first level BOMs such that subsequent assemblies are not exploded.  Is there a setting I can check to ensure that BOM is doing a multi-level explosion.  MRP set to NETCH.  Thank you for your input.
Joy T.

Dear Joy,
1.check whether the BOM status is 1 for the dependent assemblies in the BOM header.
2.In case if you have used change numbers with release key for creating the BOM for those dependent assemblies,then check
in CC02 whether the release key is set.
3.Ensure that the MRP type is not ND.
Also check this thread whether this can help you,
MRP RUN NOT EXPLODING BOM
Regards
Mangalraj.S

Similar Messages

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • BOM explosion in MRP for non-stock material

    Dear friends,
    I have a non-stock(bom item category 'N')  service material setup as a component in my production BOM, which during MRP run, should create a Planned order or Purchase requisition for that non-stock component. But, when I run MRP for the top-level material, it doesn't create any requirement for that service material, while all other stock material(Bom item category L), it generated dependant requirements.
    Appreciate your help.
    Thanks
    Suri

    Dear Suri,,
    Please go through this.
    <b><u>Non-Stock Items</u></b>  Use this item category if you want to enter a
    material that is not kept in stock before use, and that is only procured for a
    specific planned order or production order.
    The material is only rarely required for a custom-made product and is used
    directly in the product as a purchased part.
    <u><b>Before you start</b></u>
    You can enter a non-stock item either with or without a material master. If you
    enter a non-stock item without a material master, you must enter a description.
    For non-stock items, you have to maintain purchasing data in the bill of material.
    You enter the following materials as non-stock items because the quantities are
    not updated in the material master record:
    o     Materials with a material type that supports configuration
    o     Pipeline materials, which can be taken from a pipeline at any time
    <u><b>
    Special functions</b></u>
    The following functions are supported for non-stock items
    •     You maintain purchasing data for non-stock items in the bill of material.
    •     In the planning run, the system generates purchase requisitions
    instead of dependent requirements for components that are procured directly.
    When you configure your R/3 System for MRP, you can define whether direct
    procurement is triggered by the planning run or by production order management.
    •     Product costing processes take valuation data from the BOM item.
    The system determines the release strategy on the basis of the price data you
    enter. The material group is required to produce a purchase requisition.
    Regards
    Mangal

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • BOM explosion while MRP run

    hi all
    I have a FERT for which raw materials are assigned in the BOM. but while running MRP, the BOM is not being exploded and the list doesnt show the raw materials.
    I have checked in the Overall maintenance of the plant parameters in MRP in SPRO and the required paramenters are maintained.The scenario is MTS - strategy 10.but still the BOM is not exploded.
    Could anyone solve my query
    Thank you in advance
    chandra

    Hi Chandra,
    Could you please check if there was an exception message "50 or 52"? If so then it can be beacuse for the BOM explosion date system is not able to get a BOM.
    If there were no exception messages then check in MRP4 view of the FERT material for dependent requirement defination. This should be blank.
    Hope this helps..
    Regards,
    Prasobh
    Reward your points if this was helpful.

  • Bom explosion in MRP

    Hi
    I have following scenario -
    I have Regular Sales order bom For one material X in Plant A and as long as engineering is not completed, this Sales order bom is having status inactive. Once engineering is completed then it will become active.
    For Same material X in Plant A material BOM also exist  ( It is used for stock transport order) and I dont want MRP should select material BOM if it doesnot find Active Sales order BOM.
    How to achieve this.

    Hi
    Try these steps
    1) Create BOM Selection ID  in SPRO
              Sel ID(say for ex 09)    Sel pr (1)      Usage (5)
    2) Assign the ID in OPPQ under BOM/Routing selection Tab
    During MRP system will chk for the Usage Priority and if it found any active sales BOM then only it explodes or other wise it don't consider any other BOM
    Regards
    Brahmaji

  • BOM Explosion IN MRP RUN

    When I run MRP BOM Explosion doesnot take place for certain F parts.This is REM scenario.Planning strategy is 40.I have already checked Planning file entries.
    It is OK.Please guide.

    Hi,
    Pl. check in T.code oppq (plant parameters), if you have mentioned the BOM explosion ID. or in T.code oppq (mrp group).
    Also check in the material master, mrp 4 view,
    the bom selection id.
    whether it is based on lot size or based on production version.
    You can cross check using t.code<b> cs11 or cs12</b> (bom explosion).
    Rgds,
    SD

  • Sample steps to setup BOM explosion in MRP

    Hi everyone,
    I am one of those unlucky folks that can't seem to get a simple BOM with FERT to explode HALB component within in MD02. I have spent two days reading every post about this common issue found over the Internet as far as 2007 and also read the SAP note 13023. I tried every suggestion to troubleshoot without success.
    In my environment, I am using a clean IDES with standard SAP configuration, meaning no changes were done on it. As faced by others before, the BOM component just won't explode. I have even blank the days in MRP2 not entirely sure if my way of troubleshooting make sense. For simplicity, I have input a safety stock value to trigger the FERT within MD02.
    Rather than I ask the same question again about where it might have gone wrong, may I know if anyone here can send or point me to a sample few steps guide or screenshots for the FERT and HALB MRP1 - 4 views and the BOM itself (1 material with 1 component)? I can then simulate the results using my IDES and move on from there.
    Asking in this forum is actually my last attempt. My apologies to forum administrator for posting a request instead of something helpful to the community.
    Thanks.
    D.B.

    Hello DB
    The most common cause for a missing BOM explosion is the validity.
    On transaction OPPQ, on tab BOM explosion, you can determine which date will be used for the BOM explosion. You should make sure that your BOM is valid on this date. You can try to create your BOM with a validity in the past, in order to guarantee that it will be exploded.
    Another common reason is the setting selection method on MRP4. If it is set to 3, the BOM will be only exploded if there is a production version.
    BR
    Caetano

  • Bom explosion after MRP (variant configuration)

    Hi Experts,
    I'm facing a problem here, for unknow undentified reason until now, after I run the MD50 with a configuration material, I cannot get a explosion of the itens. This is happening in 4 cases here and I cannot get any good result, I check dependencies rules and everything and no success
    Does anyone know waht can I do?
    regards
    Oliver

    HI,
      If a BOM is not exploded possible reasons could be
    1.  Validity period of BOM
    2.  BOM Status should be active for MRP.
    3.  BOM Components should be relevant to production.
    4.  Check whether you have defined the selection ID for the 
         priority of BOM Usage in SPRO define order of priority of
         BOM Usage.
    Regards,
    nandha

  • BOM Explosion in MRP runs for sub-contracting PO

    Hello Experts,
    We have sub- contracting Purchase order in business scenario.
    Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
    MD02 subcontracting BOM not exploding.
    Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type 
    Please suggest what all special setting is required as master data & configuration data.
    Thanks in advance!!!

    Hi,
    In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
    Procurement type = F
    Special Proc Type = 30
    MRP Type = PD
    Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
    Be sure you have a BOM (CS01)
    Create a Production version indicating the BOM (C223)
    Enter Selection Method 3 in the MRP4 view of the material master
    Create an Info Record (type Subcontracting).. (ME11)
    Create a Source List (ME01)
    Run the MRP and check MD04
    Kind Regards,
    Mariano

  • Bom selection during mrp

    Hi, in oppq we are specifying the bom sel id as 01, pls explain how to see this sel id in bom for any fert material? how to link those.

    Hi,
    When you say you have 2 BOM's, are you referring to alternative bom's or bom usages ?
    If it is BOM usage, then OS31 for ID 01 decides which BOM usage has priorty depending on the application where it is being used.
    If you referring to BOM alternatives, then check the validity dates, the lot sizes of the 2 bom's. If they are identical & there is no difference between them, system by default picks the first valid alternative. But if you want to have alternative 2 picked, then you can work with production versions where you define version 1 with BOM altt. 2 & prodn version 2 with bom alt. 1. Set selection method in MRP-4 view to 2.
    System will then pick bom alt 2. Alternatively you can set the BOM status to 2 at header level for bom alt - 2 as suggested above.
    Regards,
    Vivek

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • Materials planning for Recursive BOM during  MRP run

    SAP Guru's,
    We developed an recursive BOM as per production  requirments , but we didn't know the impact of this recursive BOM during MRP run.
    Pls help us how to recursive bom behaves during MRP.
    Thanks & Regards
    Suresh Babu.S
    Bangalore

    Hi,
    This message was sent to us by SAP when we were having the same kind of requirement. Hope it will help you too.
    Usage Probability
    Material requirements planning (MRP) plans the alternative items according to usage probability.
    If you use the usage probability to determine the withdrawal posting (strategy 1), the quantities are proposed according to the usage probability. You can change the proposed quantities.
    An alternative item is only planned if the usage probability is at least 1%.
    If the usage probability is 0%, a dependent requirement with quantity
    0 is generated for the material.
    The component with the quantity 0 is displayed in the planned order.
    If required you can increase the quantity there.
    It is possible to plan too much for alternative items, because you can enter usage probabilities that add up to more than 100%.
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Alternae BOM during MRP RUN

    Dear PP Gurus,
    I have a finished product for which there are 2 bom,  When I  run MRP for this finished product , which BOM system will consider? Is  there anyway by which  i can deicde which BOM it  should consider?
    Please help.
    Thanks

    Dear,
    If a product contains more than one alternative BOM,try to mention this by creating different prod.versions.
    You can assigne the production version in MD61 against the PIR's under schedule line tab key (in the top menu click on settings and prod version ,then you can assign the prod version which you need to pick during the MRP run),
    Also selection method is maintained in Material master MRP4 view.whether the BOM needs to be selected through BOM Qty. Explosion date or Production version....
    Or use  BAdI MD_MODIFY_PRODVERS.
    Also refer this thread,
    alternative BOM selection in MRP run
    Regards,
    R.Brahmankar

  • Bom explosion in sales order mrp(MD50)

    Hi Experts,
    In sales order MRP i.e. MD50 Getting the planned orders for header material(Finished goods) generated but for raw materials (BOM items) Purchase requisitions are not getting generated.
    Details:
    Header material A and raw materials B and C.
    In material B in MRP 4 coll/ind indicator is 2 And same indicator for C is blank.
    Now when we are running the MRP sales order based it will generate the purchase requisition for C only but not for B.
    In OPPQ we have done the setting for sales order BOM explosion.
    Can anyone please throw some light what is the setting missing in customization or in front end?
    Thanks in advance.
    Regards
    Vilas

    Dear,
    If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments. Check in MRP4 view Individual / Collective .
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50).
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03)
    Please try and come back.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • How do you edit text that is in a text box?

    How do you edit text that is in a text box?  I just want to change the font color of the text.  Solution in the Help files recommends selecting the text and then selecting Optional) To make further changes to the text box:    Using the Select tool or

  • Genric datasource using FM to extract quantity with out unit fields

    Hi All, I have a situation where i need to extract data from one custom table with 5 fields. one filed is quantity but i created structure and also the refernce fields for quantity in it. i wrote a program also which is fine. but while creating a dat

  • Select option in the report

    Hi All, i have a FICO AP  report  , in which i have vendor number as the variable , v can view the report based on the vendor number but now the user says since its difficult to remember the vendor number he should be able to key iin the vendor name

  • White dots on Samsung TV

    I to am having whie dot problems. Just a month ago our 65" tv would keep cutting itself on and off. I called Samsung. Our TV was bought in 2007 so I was told it was out of warranty. I was told that a serviceman would contact me. He called the cost up

  • MAX cannot auto-detect my SCXI cards in my PXI-1011 chassis.

    I manually set up the SCXI-1140 cards and ran my labview program. The measured data was bad. I tracked down the problem and figured it was the chassis that had the problem. I wondered if the incorrect data was related to the auto-dectection problem o