PP costing Formula for  work center

Hello Experts
I am having issue to set up formula for given below case,
I have on my work center three parameters, x time (unit: Hr) and   Y Power (unit:kw).
i want to multiply both the parameters and get the answer in terms of energy Z  (unit: kwh) paramenter.
so i already define activity type unit with KWH.
for example:
From Routing: 
work center: 1111,
x: 10
Y: 20
so Z= X*Y
       = 10hr * 20kw  = 200kwh
So which would i apply formula for all 3 parameters to get result 200 kwh? Do i need to assign 3 different formula to X,Y,Z   or   1 formula direct to Z?
Sooner response highly appreciated
Thanks
Nixal

Dear Nixal,
Assume this 10 hours is for some base quantity and this value gets changed based on operation(order quantity) means,you can
check with standard SAP formula SAP006 = Machine * Operation quantity / Base qty.
In case if the duration 10 hours is for any operation quantity means,then there is no relation between base quantity and
operation,so you have to assign a formula which has only duration alone.
Likewise you can decide and select the suitable formula and use the formula key in the costing tab to calculate the cost based on
the formula selected.
Regards
Mangalraj.S

Similar Messages

  • Confirmation of a formula in work center in the confirmation

    Hi All,
              I want a result of a formula of work center of particular operation in confirmation. Can any body guide the steps

    Hi Vachanala,
                           1. You create a standard value parameter in OP7B which is to be used in the formula.
                           2. Your standard value key created through OP19 should be containing this parameter which you have created and this key should be assigned in the basic data in the work center. Check generate box before saving the SVK.
                           3. You define the formula which uses this parameter through OP21. You should check allowed for calculation box.
                           4. In the costing tab of work center you maintain the formula against this parameter. If you want to cost it In that case  and should also maintain an activity through KL01 and maintain a price for it through KP26. This activity should also then be maintained against the parameter in the costing tab of work center. Also check the reference indicator against the parameter.
                           5. Assign this work center to the operation in routing.
                           6. Create order, release and do confirmation, if you click actual data system should propose you the quantity as per calculation. Cost will be calculated if you maintained as per point 4, in the planned cost against the order.
                               Please check and revert.
    Regards
    Sm.

  • Customization Setting for Work center creation

    Dear all,
    What is the Customization Setting for Work center creation? How to do it?

    Hi,
    Here are the few things you can check
    OP40 : WC category
    OP17 : Formula for WC
    Person responsible : Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers >>Define Employees Responsible for Work Centers
    apart from above You can explore more in
    Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers
    Riyaj

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • User Exit or DB-Table for Work Center (CR01)

    Hi!
    I have an external software which must be triggered when the user changes a work center in SAP (transaction CR01,CR02). I was looking for an user exit to do what ever is necessary but I couldn't find one.
    So, does anybody know an user exit or BADI for work center?
    Also possible:
    The database table where work center are stored. So I could poll against this table and check if a work center was changed. I found the table SGOSHIST which log all modified objects in SAP. So this could maybe used to check for modified work center, I think.
    Thanks,
    Konrad

    > You can check the BADI definition from transaction SE18,
    > 'LTRM_WORK_CNTR_DTRM', this might be helpful,
    How can I check this BADI. If I use SE18, it doas not exist, buit if I try to create it, the system tells me that it already exists in the SAP Original System... and asks me if I want to create a copy of it! I don't know what to do at this point!
    > Work center details are avilable in CRHD table, you can
    > look for CR* from SE11 transaction,
    I know, but if you change the description of the work center, it is stored in CRTX. there are a lot of CR* tables. It would be helpful to have a table which is updated every time a work center is modified!
    Thanks,
    Konrad

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • Change log for work center data

    Hi,
    I was looking for the table where the change header document for the work center is stored.I was able to find a transation CR10 which shows the changes and also the database table CDHRD.
    When I am trying to view the changes that were made to the work center I find that the data does not exist in the tables.
      I was curious to know this as for some transaction the data is being logged in their respective change table but not for Work Center changes.
      Can anyone tell me as to why this is happening.
    What I think is that some changes to the configuration are required in order to log the changes in the database.
    Kindly help.
    Regards
    Varun

    Hi Wolfgang,
    Thanks for the information.
    However i have another question.
    The change table will have data only when it is activated in the configuration menu.
    However is there any other way by which we can capture the previous data for the work center e.g. the changed by field. I want that the names of the users who has changed the wrok center currently and the name of the person who previously made changes to it.
    See if you can help me on that.
    Regards
    Varun

  • Standard IDOC for WORK CENTER Master

    Hi,
    Please suggest the standard IDOC for work center master.
    I have tried PWKC.Got  DUMP when executed.
    Tried on SAP-Market place for help.Suggested not to use PWLC.
    Please suggest alternative.

    Will you please explain in a bit detail if LOIWCS01 or LOIWCS02 are transaction (as i tried to execute) or programs or please explain how to use these.(I executed from command prompt and SE38 but didnt helped)

  • Table for work center..........

    Hi
    Is there any table for work center which shows available capacity v/s utilized capacity......Please revert with your valuable comments
    Rgds

    Hi,
    Check Table RC65L.
    Regards
    Kannan

  • Number Range for Work Center

    Hello All
          Am having a little concern regarding the number range for Work Center, kindly let me know where the number range for Work Center is maintained or from where it is picked up when we are using external no range assignment for Work Centers.
    Regards,
    J K Tharwani

    Thanks Sir for your reply,
            Actually the requirement is the client want that Equipment number must be the same as the Work Center Code, and Work Center code which i have decided is something like 0101001 & if i give the external no to the Equipment then the system doesnt take the same number instead it takes 101001 i.e. it ignores the initial "0" in the work center code. Actually I wanted to see the no range from where the work center numbering is being picked up, but later on i came to know that there is no such no range setting for work center instead it has contol from no range for object type. Shall look forward to your valuable inputs & guidance.
    Regards,
    J K Tharwani

  • FORMULAS IN WORK CENTER (ELSE, IF, OR)

    HI PP GURUS
    Hope you can help me with next scenario:
    When defining formulas in work center I want to calculate values using conditionals (IF), let me explain it:
    FORMULA NAME: XXXX
    OPERATIONS:
    LINE 1 : IF SAP_02 > 0 THEN ( SAP_02 + SAP_09) ELSE (SAP_02 * SAP_09 / SAP_08 / SAP_11 )
    LINE 2: EMPTY
    LINE 3 : EMPTY
    Unfortunately  the system does no perform any action because the operands IF and ELSE are not allowed.
    Any idea?????
    Thanks a lot
    Elias

    Hi
    No you cannot create this type of Formula in SAP std, other way of mapping is you have to create different std keys and you have to have to assing in different workcenters at the time of routing or production order you need to assing that type of workcenter, just iam thinking in that manner, till what extent it works.
    Regards
    Mohan

  • PP IDOC Message for Work Center upload with Costing

    Hi all,
    I'm looking for apropriate IDOC message type to import  Costing data with Work Centers.
    I found some of them to pass WorkCenters data, the best is LOIWCS I think, but I don;t see a possibility to passing costing data. ( e.q. KOSTL domain field)
    Any suggestions? Is there any other IDOC to pass Costing data for WC's?
    Thnx in advance
    Tom
    Edited by: Tomasz Szofer on Jan 24, 2011 12:48 PM

    Dear Nixal,
    Assume this 10 hours is for some base quantity and this value gets changed based on operation(order quantity) means,you can
    check with standard SAP formula SAP006 = Machine * Operation quantity / Base qty.
    In case if the duration 10 hours is for any operation quantity means,then there is no relation between base quantity and
    operation,so you have to assign a formula which has only duration alone.
    Likewise you can decide and select the suitable formula and use the formula key in the costing tab to calculate the cost based on
    the formula selected.
    Regards
    Mangalraj.S

  • Cost Centers for Work Centers

    Dear All,
    In our senario we have defined 30 Work Centers required.   here the Activity are only for 2 (labour, Mechaine Hr).  In KP26 we have to maintain the Standard Price.   How can we build a logic in this.  Can we create 30 Cost Centers.  Y becoz each end eavery work center have the different price for Labour.  for EX;
    WC1 - 150 Labour Cost
    WC2 - 180 Labour Cost
    WC3 - 190 Labour Cost
    Like this we have to calculate.  I hope it is required to create 30 Cost Center to assaign wot Wrok Centers.  Here we are going to KP06.  We have a standrd pirce to calculate.
    Regards

    Dear Raj,
    IF the business is interested in capturing using different cost centers means then you can create individual cost center and
    assign it to the work center and define the rates in KP26.So only one activity type will be there but different cost center.
    The otherway is creating multiple activity types say LABH1,LABH2....and creating different rates for the activity type ans same
    cost center combination in KP26.But here the challenge is you have to assign the activity types properly under costing tab
    against the formulas.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

  • Formulas in work center-reg

    Hi,
    I have  few quires on the subject cited .
    in the define formula parameters for work centers i have found the and i could not understand the meaning and usage
    especially of SAP_11 operation splits , what they mean ?
    SAP_09     Operation quantity
    SAP_10     Other formula
    SAP_11     Operation splits
    once we define work centers formulas with these formula parameters how these work ? when standard cost is run for the part number  how it takes these defined formulas in to consideration  to give the manufacturing cost
    please provide some thoughts on these work center formula parameters and formulas and usage
    regards,
    madhu Kiran

    Hi jagadeesh ,
    thanks for your details
    my doubts are why we define these ?  for the purpose  of standard cost ?
    any way when we run standard cost for the part number , based on the times mentioned in routing it will calculate the cost ?
    or is it like this
    standard values like handling time , machine time etc.. if we can not  enter for an operation ,then for  the calculation of these  we
    define work center formulas  and through this system picks the handling and machine times while calculating the standard cost
    is this thinking correct ?  might be wrong alos , pl let me know
    i am really not clear with these work center formulas and their usage
    1. for example in our system for a work center the formula defined as
    ZPT100 --Cost  - Painting & Laquering
    formula = ( PITCH CONSTANT * Operation quantity ) / ( JIG DENSITY * Conveyor Speed )
    this is defined for the standard value Jig density used in painting
    2. for handling time the below formula is defined
    ZMG001------COST - Handlng Time
    formula = HANDLING TIME * Operation quantity / Base quantity / Operation splits
    3. What is the difference between base quantity and operation quanity ?
       is it that base quantity is for the quantity  with reference to which we are creating routing ?
      operation quantity is the out put of that operation ?
      if so operation quantity and all where we mention in routing ? i understand if we wrok on discrete we create routing with base quantity 1 and based on the order quantity , it will become the operation qty
    but we work on REm
    how to go about ?
    can you please thorw ur thoughts on this ?
    regards,
    madhu Kiran
    Edited by: madhu kiran on Sep 18, 2009 1:29 PM

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

Maybe you are looking for

  • Printing problem with Pages and iWork

    This problem has been troubling me for months. I have an HP OfficeJet Pro K5400 colour inkjet printer. I have installed the latest s/w drivers so it's all up to date as far as I'm aware. The problem is that when printing from Pages - or indeed any iW

  • Hide "ORACLE FUSION MIDDLEWARE"  message in the front-end

    Hi , I want to hide the "ORACLE FUSION MIDDLEWARE" message in the front-end forms layout. Please let me know which file I need to make change in the back-end and do I need to do any-thing from oracle admin also (any deployment or any check). Thanks &

  • Read files in directories with PL/SQL

    Hi Is there any way to read files (just the names) in a directory just using PL/SQL? I mean, finding out the files with .dat extension in a given directory, for example. Thanks

  • Is it possible to do gradient-based changes between pictures in Camera RAW?

    Say I have 10 pictures. The C-RAW setting for 1 and 10 are different. Is it possible to change the remaining pictures, 2-9, as a gradient between the settings of 1 and 10? Thanks in advance

  • 10.4.7 Crashes, NFS

    I have an ibook G4, my main storage is on my linux server which I access via NFS. Recently OS X has been crashing for reasons unknown. When it first happened I was writing to the server and I unplugged the ethernet cable. I thought this was the cause