PP/DS Optimizer u2013 Planning for HALB and FERT in sequence with Optimizer

We are using PP/DS optimizer to plan the two level BOM items. FERT and HALB planned orders are converted from SNP. ROH products are not planned in APO. PPDS is not used to create or delete orders. Only scheduling is done by optimizer. Only one mode exists in PDS. Setup matrix is used for both HALB and FERT.
The requirement is to schedule HALB products in time on their own resources in time for multiple FERT orders. The optimizer does not appear to do this consistently. We use the following steps in planning run:
1.     Stage numbering.
2.     Schedule orders at the earliest with infinite planning. This is done to ensure there are no blank spaces at the beginning of the planning interval on resources after optimization. The result is all orders starting at the same time with multiple loading on resources.
3.     Optimization with weightage for makespan and setup time. Key settings are: Forward planning, finite resource loading, pegging relevance, considering inter order relationships. All HALB and FERT resources are selected in this step. (Delays are not important within the Optimization interval and there are no stocks of HALB except when there are time gaps between HALB Orders and FERT orders. HALB order is finished earier than FERT order start.)
The question is: Is Optimizer capable of scheduling HALB and FERT on their own resources  but at the right iner order timings while optimizing the setup time. Are there any key setting to watch out for in Optimization profile or Strategy profile to enable this?
If this is not possible, we will have optimize only at one BOM level and then use top down or bottom up heuristics to plan the other level.

HI TemYogi,
Assumptions:
1. One PDS each for HALB & FERT level with one resource
2. HALB to be scheduled first. Based on HALB schedule, FERT has to be scheduled
To achieve this
Maintain "Maximum Lateness of a Receipt"  in Pegging tab in Demand tab in Product master
in FERT PDS maintain the consumption type of HALB components as continious/ start/end of the the operation
use the planning direction as backward and reverse in DS strategy profile
Use schedule mode as Insert operation / insert operation and close gaps until end in DS strategy profile
Fix all the previous run orders in DS board for HALB and then Schedule all the HALB orders considering u r setups through optimization
Now run the optimizer for FERT
Regards
Sravan maturu
+91 9392602314

Similar Messages

  • What is least expensive plan for smartphone and wifi hotspot?

    What is least expensive plan for smartphone and wifi hotspot?  I would probably want 1 -2GB or so of use for the hotspot, to allow access for my laptop when needed.  I don't need a lot of minutes, really my usage is 100 - 200 mins/month,  no or very little text, and some date use from phone, maybe 1 GB?
    Thanks for any ideas!
    FF

    phonelessFrank wrote:
    What is least expensive plan for smartphone and wifi hotspot?  I would probably want 1 -2GB or so of use for the hotspot, to allow access for my laptop when needed.  I don't need a lot of minutes, really my usage is 100 - 200 mins/month,  no or very little text, and some date use from phone, maybe 1 GB?
    Thanks for any ideas!
    FF
    Verizon Wireless is currently offering 3G Mobile Hotspot free on Palm devices that are still offered by Verizon Wireless. Depending on which device you have, and/or upgrade to here is an option that is lease expensive that would be suitable for your usage.
    Device: Palm® Pixi™ Plus
    Plan: Nationwide Talk 450 minutes $39.99/month
    Per-Minute Rate After Allowance $0.45
    20¢ per text or add packages starting at $5.00/month
     Data Package:
     $15.00/month (150MB with Mobile Email)
     $29.99/month (unlimited Email & Web)
    3G Mobile Hotspot: (5GB allowance)
    Free (promotion for Palm Pixi Plus)
    5GB monthly data allowance applies to all data transmitted (on handset and shared devices) while the Palm mobile hotspot application is active.

  • Bought a indevidual plan when he wanted was to buy a plan for small and medium enterprises

    I made a mistake, bought a indevidual plan when he wanted was to buy a plan for small and medium enterprises, it is possible to change, is that the credit card has been charged.
    Thank U

    This is an open forum, not Adobe support... You need Adobe support to cancel a subscription
    -start here https://forums.adobe.com/thread/1703848
    -or by telephone http://helpx.adobe.com/x-productkb/global/phone-support-orders.html
    --and two links which may provide more details, if the above links don't help you
    -http://helpx.adobe.com/x-productkb/policy-pricing/return-cancel-or-change-order.html
    -http://helpx.adobe.com/x-productkb/policy-pricing/cancel-membership-subscription.html

  • How can I get a sim card for Japan and will it work with my locked Iphone 6

    How can I get a sim card for Japan and will it work with my locked Iphone 6

    You cannot use a SIM card on a carrier locaked phone, other than a sim from the carrier the phone is locked to. You must first get the carrier it is locked to, to unlock your phone. Apple does not unlock phones.

  • Looking for a back up drive for photos and videos that works with time machine, prefer wireless. Time capsule has poor reviews and already have BT hub

    Looking for a back up drive for photos and videos that works with time machine, prefer wireless. Time capsule has poor reviews and already have BT hub that serves as a good router. 3gb or 4gb capacity preferred but 2 would suffice.

    Plug a NAS into the BT Hub that does TM. Look at Synology.
    You just use the wireless of the hub.
    But the cheapest solution is still the TC.

  • LSMW preapare common for ROH and FERT

    1)I created lsmw to extend sales view of material for ROH and FERT by Recording method. My problem is I cant use that same sourse stru for both material type. material static group is mandatory for FERT and not mandatory for ROH, If prepare lsmw for FERT, that cant use for ROH, same like if prepare for FERT that cant use for ROH, all fields are common except only one field (VERSG). How to solve this?
    2)Display converted data is not same as read data, both should be same what to do?

    Hi,
    While using LSMW recording for material masters (or usually any other master data) Material type you mention in the recording has the dependency on the view selection you have done in Mat Type attributes which differs from one mat type to other. So the recording created for ROH which has particular screen assignments for the views will not match other material type for the same LSMW recording. This will lead to complications and incorrect mapping.
    So create separate recordings for both the types
    Regards
    Shiva

  • Unit test plan for inbound and outbound interfaces

    I am trying to create a UNIT TEST PLAN for an interface. In this interface a flat file in IDOC format is picked up from the application server and processed using EDI_DATA_INCOMING for the relevant posting ( example : Sales order creation from a PO IDOC). IF the file is not in IDOC format then it is reformatted to the IDOC format manually.
    In second scenario(outbound), after sales order creation or billing document creation, IDOC is created which is read and a custom flat file is created and sent to a middleware.
    PLease suggest a unit test plan for these kind of scenarios or send a sample UTP if possible.
    REgards
    Nishant
    PS: points will be awarded to helpful answers.

    Unfortunately this isn't possible, the esa has only one routing table. You'll have to add specific routes for your internal networks.
    I usually avoid two-armed setups because of this and it gets even worse if you want to use virtual gateways (traffic gets sent via the internal interface with an IP from the external interface)

  • Cross Plant Planning for External procured Material in MRP with their stock

    Dear Gurus,
                 I have one requirement my client want Cross plant planning in MRP. this plants are only site plants no Manufacturing. All materials in these plants are Externally Procure Materials(F). Now they want cross plant planning  for Externally Procure Materials or cross plant planning  for Externally Procure Materials  with consider all plant stock details while planning.
            can you tell me procedure for this,
    Thanks in advance,
    Regards,
    Devraj

    Hi,
    In R/3 you cannot consider all plants in planning, you have to use SAP APO to achieve your goal (if your goal is to optimize the procurement in your plants). When you execute MRP run in R/3 it will only consider the details of one single plant.
    I mean if you have several plants used for external procurement, and you want to make an optimal decision considering all the stocks and open transactional data, requirements in those plants, it is not possible in R/3 as per my knowledge - multi site/plant planning won't give you such optimal solutiion.
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2d4d44af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_apo/helpdata/en/7e/63fc37004d0a1ee10000009b38f8cf/frameset.htm
    Regards,
    Csaba
    Edited by: Csaba Szommer on Nov 17, 2008 10:27 AM

  • BI content InfoCube missing for reporting and reports show'~' in with KFs

    Hello friends,
    I need help with the following two issue with the business content query that I have
    installed in DEV system.
    1. I have installed a BI content infocube and 5 standard
       queries with it, I am able to see and execute the query but some other
       users are not able to see the Infocube listed under Infoarea. The same
       users were able to see the Infocube if they tried creating a new query.
    2. When I execute the same installed standard BI content query all the key figures values in columns are shown with a '~' symbol before and after it.
       example: $ 198.63  and -$ 0.02
       How do I over come this ? and what might be the reason ? Please suggest.
    Thanks,
    SONU.

    Hi Sonu,
    In Tcode SU01 check roles and profiles for your users.
    Then in PFCG check the authorizations for that specific roles you have found in SU01.
    Maybe your users have restrictions on query names: maybe they are authorized to execute only query starting with "Z" and BC query start with "0".
    Ciao.
    Riccardo.
    PS: If Bhanu has solved your problem for item 2 I think you have to assign points...

  • Does Adobe Reader for iOS and Android Support Encryption with PKI Solution?

    Hello there,
    I have been searching for an answer whether or not Adobe Reader for iOS and Android can read encrypted PDF files by public key infrastructure solution (encrypted by a public key, to be decrypted by its private key pair), but to date I have not found the answer.  From the Adobe web site, I understand that Adobe Reader for Android supports to read encrypted document by AES256 but it does not mention about PKI.  I had to guess that it does not support encryption with PKI but I would just like to get a formal answer, and would like to know whether Adobe Reader Mobile will support it. 
    Thanks!
    Masaya

    Hi there,
    Now we have Acrobat DC Mobile but I am still wondering if encryption/description using PKI solution (digital certificates) is supported.  Could anyone let me know?  Thank you.
    Masaya

  • How to save for web AND overwrite original files with Action?

    Hello,
    I want to compress a batch of images with "save for web" using a Photoshop Action, and I also want to preserve my folder structure and overwrite source files. The structure is important because it's complex and needs to be structured this way.
    The Problem:
    When I choose "save for web", I must define a destination. What happens is all optimized files from within the structure are saved in a single location.
    Here's an example of the folder structure
    Folder A
         - Subfolder A1
         - Subfolder A2
    Folder B
         - Subfolder B1
         - Subfolder B2
              -Subfolder B2.2
    Folder C
         -Subfolder C1
    Summary
    Is it possible for me to use a Photoshop Action with "save for web", and overwrite my files without moving them from the structure?

    No need to re-invent the wheel.
    Just learn how to use the Image Processor, Image Processor Pro, or Dr. Brown's Services 1-2-3 in Photoshop and/or Bridge.

  • Why is Apple the only people on earth that can't send an email to my gmail account? I use my gmail account for everything and people call me with it. Now I can't use it because Apple can't verify it.

    Why is Apple the only people on earth that cannot send an email to my gmail account? I used my gmail account to receive calls on Face Time until the last update and now Apple "cannot verify" the account and they have sent over 100 "verification emails" but I have yet to receive one. Amazing!

    My original Apple ID was my bellsouth address. When I got iCloud, it was merged with the .me address. I can use either to log into the same iCloud, Facetime, iTunes & Apple Store, and Messages. Seems you have 2 separate Apple IDs (one for iCloud and one for iTunes).
    If you log into any app using the Apple ID such as Facetime, only the email addresses associated with it will work. You can log into the Manage Apple ID website and see what addresses are associated with that login.
    https://appleid.apple.com/cgi-bin/WebObjects/MyAppleId.woa/
    I don't know of any way to merge seperate Apple IDs. You can try changing the one you use for iTunes to the one you use for iCloud and see if it works. If not, you can change the iTunes one to a different email address. Then you can disassociated the gmail address for the iTunes Apple ID and then associated it with the iCloud Apple ID. Once it's disassociated from one account, you will then be able to add it to the other and get the verification email.

  • Updates for PhotoshopCC and Lightroom having trouble with downloads. error , corupt files under learn more. First time in the year that I have Photoshop CC

    Download trouble today Got the message for new updates for Lightroom and Photoshop CC.   Download fails, under learn more ,, corupt files  Fist time this hapened in a year Whats the remedy?

    There's a number of potential problems here, and they may not necessarily be at your end.
    First of all, it should be clear that CMYK is not so much a generic "image mode" as it is a description of specific press conditions. If you produce final CMYK, you must have the right profile. Don't use Image > Mode, use Convert to Profile.
    Given that, I would question anyone who doesn't accept Adobe RGB photographs for a magazine article, because it implies a process that isn't properly color managed and generally not up to date. A standard workflow today would use InDesign, where images are normally placed in their original RGB space whatever that is. Then the conversion to final output CMYK is done as the last step, when producing a press-ready PDF from InDesign.
    It helps tremendously if you know that final CMYK, because then you can proof to that so your file survives the CMYK conversion with the least possible damage (we're talking gamut clipping here; not general color shifts). But it's not absolutely required, which is why this workflow is relaitively safe.
    Third, CMYK jpeg is in itself risky, because many jpeg decoders (in some software) don't have proper CMYK support. The result can be weird colors. This could well be the problem here, because it sounds as if your client uses a non-standard workflow.
    So what to do? I would send two files. One sRGB as reference, which is guaranteed to come through correctly. Then find a way to send TIFF for the CMYK version if they insist, or ask them to try opening it in different software. Of course you should have a calibrated and profiled display, but I agree that's probably not the immediate problem here. There's no particular reason a CMYK file should come back with twisted colors if it's opened and processed in properly color managed software.

  • Dynamic Link for Premiere and After Effects CS4 with Titles

    I've created a Rolling Title in Premiere Pro CS4.  I'd like to create a Dynamic Link to bring the title into After Effects CS4 to add effects that will show up in Premiere.  I've watched a few video tutorials on Dynamic Link and read the documentation and tried a variety of permutations but can't seem to get this done.
    Also saw something in these forums about problems using Dynamic Link with Titles (as opposed to regular clip??)
    And something about Premiere and After Effects projects being saved together ??in same folder - is that correct?
    So, could someone explain if this can be done and the right way to do it?
    Thanks

    Thanks Mylenium - appreciate the quick and focused reply.
    I would like to keep the benefits of the Premiere Pro Titler (to play with the length of time by stretching or squashing the Title block on the timeline; to type in time to stay on screen at end; ease in and out etc . . .).  If I do render out a png / tiff / or psd sequence with alpha, and bring that into AFX to play with.  Will I still retain the ability to use the Titler features in Premire Pro, or do I essentially have to convert it to 'regular footage' on reimport as opposed to a 'Title?"
    Thanks

  • How do I start, stop and restart a sequence with a periodic input?

    Hi,
    I have written some code that will monitor my com port (rs-232) continuously for an ASCII character (in this case a 'P'). When the P is received, I want a sequence structure to start working. The P will only appear once for a short while, but the sequence should carry on running until it finishes all the frames. On the next time a P appears on my monitor, I want to either stop the sequence structure regardless of which frame its in and restart the sequence from the beginning again or to run the sequence from the start again if it has already completed all the frames.
    What sort of structure do I need to do this, are there any examples?
    James

    James,
    Indiana is correct, my take on this is similiar.
    If you have a 3 element sequence structure for example which runs if 'P' is returned from your COMs thread, you will need to query a variable in each element of the sequence in order to suspend execution of the next/remaining elements in the sequence if this event occurs. You can do this by reading the variable that your COMs thread sets using a case structure in each element of your sequence. In order to re-run your sequence if 'P' is returned during the execution you can simply set the suspend variable and ensure the code is in a while loop to recall the code.
    See the attached example code/screen shot:
    This is however not an elegant solution and the best way would probably be using the events structure and a user event to queue the P events. This is available in 6.1 but I believe its the professional package. See also my implementation using this method, again attached below:
    Hope this helps,
    Kind Regards
    Steven Bird
    Applications Engineer
    National Instruments
    Attachments:
    Example.JPG ‏194 KB

Maybe you are looking for

  • SB live 24bit quest

    i was wondering if there is a way for me to have my two speakers conected and my headset some how when i plug my headert into the other line outs it doesnt work any ideas?

  • Program in unicode

    Hi All, I am having this problem when I am working in 4.7 unicode . My question is that why doesn't this program give me any error Data: begin of struc4,         line(50),       end of struc4,       begin of struc5,         line1(30),         num(30)

  • I suspect I have issues with Rosetta, after 10.9.10 update

    Hi, Lately i havent been to use some software with rosetta, including scanner software, sketchbook pro. and today, i was trying to install my copy of photoshop 7.01 but it doesnt even start. the issues are all the same: the icon bounces onc or twice

  • IPod won't appear in iTunes or in My Computer. Help please

    Hello my iPod is fully charged (2nd gen nano), and charged up last night. When i plug it in to put more songs on, it won't appear in iTunes or my computer. I know that the USB port is working fine, becuase i tried my pen drive and that was fine, and

  • Can't download Oracle Business Intelligence for Linux

    Hi, from the "Download Page": http://www.oracle.com/technology/software/products/ias/devuse.html That link redirects to: http://www.oracle.com/technology/software/products/ias/index.html Can anyone help me with this download? Thanks.