PP Issue - Resources VS WorK Center

Dear PP Guru,
As i know for resources , there's secondary resource could allocated for costing purpose.
Thru resource network, you can define the network as the work center and the assign an specific resource (work center) at order release.
Can anyone tell the similarity & different in term of resource vs Work center ?
TQ

Dear,
Resource & Workcenter are approximately same. Resource are assigned to work center category 008 (Processing unit). This is inturn assigned to the Task list type 2 (Master Receipe). Work center (CR01) is deifned for work center ct 001 or 002 and assign it to the routing. And in simple language work Centers  use in routing of PP (discreet manufacturing), and resources use in master recepies of PP-PI (proces manufacturing).
Hope clear to you. There is no other difference.
Regards,
R.Brahmankar

Similar Messages

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

  • Work center data

    Hi Experts,
    How do i see work center data in SRM, like the users belonging to a work center, company code etc.
    The issue is , a work center ID is maintained in one of the approval level in a owrkflow.
    I want to know the users belonging to that work center.
    Kindly assist.
    Thanks,
    Siva.

    i created it from PO01

  • Facing issue with work center

    I am working on a real estate implementation.Require one help on below issue.
    Requirement is like one work center say excavation ,
    Work is 5000 m3
    Capcity of 1 labor is 15 m3/day
    Duration is 5 day
    In this situation we need system should calculate number of capacities as equal to 5000/(15*5)
    In CJ20N for an internal activity I tried to use unit of measurement as m3 for work and normal duration in day  system shown me error as
    Enter a time unit, since you have entered either work or actual work
    Message no. CN809
    Is someone came across such issue.Please suggest me on this.

    Dear Shrikrishna,
    A workaround is as below
    maintain the capacity of the work center for one person as 15 hours per day
    in the activity screen in project builder enter the figure in work as 5000(cosider 5000m3=5000hrs)
    enter the duration
    note that maintain the work center capacity utilization as 100% if under  work center there are 10 labours or 20 labours maintain it under individual capacity.
    so while calculation system shall consider all factors and you shall get the output desired.
    just convience the client with unit of measurement

  • Resources assigned to a Work Center

    Hi Experts ,
    Is there any Function Module to get the 'Person Responsible' and the Resources assigned to a Work Center ?
    Thanks,
    Radhika.

    Hi Renjith,
    Thanks for the quick reply. The Second FM is exactly what i was looking for, but regarding the Person Responsible field, i need related to the Work center only not the Project Definition.
    Any idea of person responsible for work center ?
    Thanks.

  • BAPI for getting Equipment and Resources for a WORK CENTER

    Hi All,
    I have a requirement where i need to get all the equipment list for a given work center. So its Interface should be like
    Input -- Work center
    Output -- Table filled with Equipment list
                   Table filled with Resource(Person) list
    Please let me know if i need to provide other additional information also.
    Thanks ,
    Abhishek

    Hello,
    I think What you providing input is right.Just would like know how will you get Person Responsible out put list??
    Please Use The table ITOB to fetch the Equipment List according to Work Center as Input.
    OBJID=Put work center ID in CRHD Table you will get the OBJID then you have use the OBJID in table ITOB for  getting the equipment data.
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Oct 1, 2010 9:13 AM
    Edited by: RAKESH ASHOK MANE on Oct 1, 2010 1:20 PM

  • Re: Work flow for resource / work center in MEINT

    Hello Experts,
    We are working on SAP ME 15.0 recently installed. We are trying to send the work center from ECC to ME. In MEINT we see only the following work flow for work center / resource:
    As can  be seen, LOIWCS02 is not there. When we sent work center (category 9100) with LOIWCS02 IDoc type, it failed in MEINT. But when we sent work center from ECC (category 9100) using IDoc type 9100, it was processed successfully in MEINT but it created work center in ME.
    The other component LOIWCS02_ME_RES or LOIWCS02_ME_WC is not getting called. What is the possible reason and resolution?
    Would be thankful for any feedback on this.
    Thanks in advance
    Srinivas

    Hello Alexander,
    Thanks for the quick reply.
    As per the help document, the work center category 9100 is supposed to create a Resource in SAP ME but it ends up creating work center in ME.
    If you see the screen shot I had put in my query, I see that there are three work flows - one for LOIWCS03 and the other two for LOIWCS02_RES and LOIWCS02_RES. Would this make any difference since I would expect that the work flow for RES and WC should also be in line with LOIWCS03?
    I will be asking my tech team to raise a support incident for this. Meanwhile I would appreciate your reply on this.
    Thanks
    Srinivas

  • Idoc for Resource/Work center characteristics .

    Hi All ,
    I want to send Resource/Work Center characteristics name and value from SAP R/3 to Legacy system via PI.
    The requirement is that I should use Idocs.
    Is there any Idoc in which I can send the following info.
    1.Resource/Work Centre
    2.Resource Description Text
    3.Characteristic Name
    4.Characteristic Value.
    Can we use CHRMAS04 . If yes then how do we pass Resource and its text.
    Thanks in advance

    Hello Alexander,
    Thanks for the quick reply.
    As per the help document, the work center category 9100 is supposed to create a Resource in SAP ME but it ends up creating work center in ME.
    If you see the screen shot I had put in my query, I see that there are three work flows - one for LOIWCS03 and the other two for LOIWCS02_RES and LOIWCS02_RES. Would this make any difference since I would expect that the work flow for RES and WC should also be in line with LOIWCS03?
    I will be asking my tech team to raise a support incident for this. Meanwhile I would appreciate your reply on this.
    Thanks
    Srinivas

  • Volume resources & Work Center

    Hi experts,
    I submit you this question as an old nightmare of mines which raises to me again.
    In order to build the best R/3 production model as possible, I would get a way to define a work center as a volume or an area capacity (m2/m3).
    The work center types 0014 "Stor. resource" & 0015 "Proc. unit/Stor.res." sound good to me to reach my goal. But after customizing by OP40 the production usage, I am still not able to define a volume capacity for this work center by cr01/cr02 : only capacity type 1 & 2 are allowed with the time dimension.
    Who could help me ?
    Who could tell me the initial usage in R/3 for the work center types 0014 & 0015 ?
    How it works ? For what ?
    Who has got a trick to manage a production process with a finite volume resource in R/3 ?
    With regards,
    François-Robert

    Hi,
    When you create a resource (PP-PI work center) with the types 0014 or 0015, an assignment of one storage location is mandatory on basic data view. In addition, the systems checks that the populated storage location has not been already assigned to an other resource. That suits me well as we can imagine to manage the capacity of a physical area by this link.
    I still have a doubt before any tests because I don't know what is the consistency of the link between the work center and the storage (/GI /GR /PP conf.), moreover I didn't found any docs on it at the time being.
    I would know what can we expect from this link as analysis and results.
    It remains a second point about the resource : the correct usage as a capacity for PP and not PP-PI.
    The target of this investigation is not to implement PP-PI, it's to fine tune a good PP model.
    I'll appreciate if someone who has already used this kind of resource (type 0014/0015) could transfer me the usage. -> Thank in advance to everyone who will add a post in this sense.
    But in any way, so far so good, it's just a question of time.
    With regards,
    François-Robert

  • Factory Calender assigned to Plant & resource/Work center

    Hello,
    If we have assigned the Factory Calender "XX" which has 5 working day(Monday to Friday) with no Special rules & no Holiday Calender to Plant & "YY" Factory Calender to Work center which has 365 days working with no no Special rules & no Holiday Calender.Now, when MRP creates Planned Orders for FERT material It did not create it on Weekends(i.e. on Saturday & Sunday) though the factory calender assigned is  "YY" (which has 365 days working )in work center.Why?
    Actually it should have consider the Work center assigned Calender for Capacity planning & Schedulling purpose.
    If I assign the Factory Calender "YY"  to plant then it will create the procurement proposal on weekends which is not acceptable to external procurement MRP Controller as plant office works only 5 days.
    Please guide.

    Dear
    Goto CR02/03 , select the Capacity tabe "hat" and u will fined there is tabe "Available Capacity " .U have to maintain the Active version ok.
    Basically , the active version is used for scheduling and capacity planning. If you have not entered an active version, the standard available capacity is used, even if an available capacity version has been entered.
    At the same u have to check out the below requirement :
    you must maintain the following data in the capacity header:
    1.The grouping, that defines which shift sequences and shift definitions can be used to maintain the available capacity
    2.The number of the active version of available capacity
    3.The base unit of measure of the available capacity
    3.The factory calendar, that is the basis of the available capacity-Workcentre
    If you do not enter a factory calendar , the system uses the default calendar for the plant.
    I hope in your case , u have the shift sequence of 5 work days for the calander you have assinged in work centre .
    Please check all those n come back .
    Reward points if usefull.
    Regards
    Jia

  • Issue - CIF Work Center

    Dear Sirs,
    While creating IM for work centers only (with selection criteria - work centers & plant), system checks and prompts a warning message that 'Capacity xxxxxxxx: Model does not contain plant'.
    (Plant is ciffed to SCM system ahead)
    What it's supposed to check and to fix it please?
    Your kind advice is appreciated,
    Thank you
    Mandy

    Hi Mandy,
    Please check on the following:-
    1) Check whether the work center/capacity/plant is assigned to model 000
    2) Check whether the work center/capacity is maintained in ECC in all respects including capacity tab/scheduling tab
    3)  Check whether work center/capacity/plant has time zone maintained
    4) Check whether capacity is maintained CR12 transaction in ECC and same is assinged while maintainng in CR02 transaction while maintaining work center
    Regards
    R. Senthil Mareeswaran.

  • Standard Values in Production Order for Alternate Work Center

    Hi SAP Expert,
    I would like to find out whether there is possible solution for the requirements as below:
    e.g.
    >>> Routing for Product A only has one Operation 0010.
    >>> 4 Work Centers/Resources (A,B, C, D) can be assigned to run this operation where all these 4 Work centers/resources are having different capacities (Setup, Labour, Machine hour & Electricity are different).
    >>> Out of these 4 work centers, only one work center will be selected (Selection criteria will be based on the capacities & availability).
    >>> In my current setting, only one preferred work center (A) is maintained in the routing for operation 0010.
    Issue:
    >>> If I select the work center B manually in APO during the planned order creation, the Production Order created will be tied to work center B but the standard values captured in the Production Order are still referred to the standard value of A.
    Question:
    1. Is there any way I can maintained in the routing so that it will captured all the different standard values for each work centers?
    2. If the answer is yes for Q1, then can the SAP auto populate the correct standard value into the Production Order according to the work center I selected before the planned order is converted into Production Order?
    Thanks.
    Regards,
    Hooi Chia

    Hi,
    You can use alternative sequence in routing and mainain three different sequence for all 4 workcenter.
    At APO side you can maintain priority for alternative sequence in PPM/PDS.
    Now when you execute the scheduling Heuristic depending on priority and capacity workcenter will be assigned.
    Regards,
    Vishal

  • PM-HR assigning work center to employee changes position

    Dear all,
       I have an urgent issue, and I have absolutelly no idea how to resolve it, because it takes place in the module PM, and I dont know anything about it.
       The problem is that when users go to tcode IR02 and make an asignament of a employee to a work center the system also changes the position of the employee for the work center (I mean, SAP in the back ground goes to Infotype 0001 of the employee and changes the position of the employee).
       Is there a way of avoiding it? I think it is due to a bad customizing in the integration PM-HR, but Im not sure at all.
    PS: sorry if this is the wrong forum to post it, I didnt find a PM forum, If you know a forum that fixes better please let me know!!!
    Any advice will be GREATLY appreciated and rewarded
    Thanks a lot in advance

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • System monitoring work center and CEN system

    Hi everybody.
    I'm setting up the central monitoring, using SSM as monitoring system. I'm also having a look at the work center for system monitoring; but I don't find how to link the central monitoring capabilities with this dashboard.
    I mean, it looks the central monitoring does not provide any advantage to work with this work center, am I right? Anyone has experienced this?
    Thanks for your answers!!
    Fermí

    Hi!
    I've done finished this issue!
    Please follow steps below:
    1. Create activity type in T-Code: KL01
    2. Go to KP26 to create the realtionship between Cost Center and Activity.
    Now you can see new activity in Costing tab.
    Regards!
    Woody.

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

Maybe you are looking for

  • Did you know: Photoshop and Keynote

    I never knew this, maybe you have....maybe you have not. So here I go: I always converted my Photoshop designs to JPG or PNG by using the export options in Photoshop. Not only did that require more work and time, it also poluted my system with lots o

  • AlertfileErr: ORA-02097 and ORA-00439 on Oracle 10g Rel 2 Stdrd Instances

    Hello, I need some help for the following alert file erros, that I get periodically on every database instance. ORA-02097: parameter cannot be modified because specified value is invalid ORA-00439: feature not enabled: Database resource manager I red

  • Synchronize only checked in records from Master to Slave

    Hello All, Would someone be able to tell me if there are any CLIX commands that allows the slave to synchronize with the master such that only checked in records are transported from master to slave. Regards Venkat

  • Approval Overtime iView Error - "Exception condition "PROFILE_NOT_FOUND"

    Hi There I have looked at every forum thread loaded on this site and if I missed something I do apologise. I keep on getting error - "Exception condition "PROFILE_NOT_FOUND" raised., error key: RFC_ERROR_SYSTEM_FAILURE" I have maintained what I deem

  • Firewalls and WLE

    IHAC who is using WLE5.1, wants to get some recommendations on the number of ports they need to reserve for a firewall which essentially sits in between their WLE clients and servers. Keeping in mind that once the client requests comes into a WLE dom