PR Creation from Main Order based on Material Availability Check

Hi Experts.
I have activated material check for maintenance order, and system is checking material availability. But system is not generating purchase requisition if material not available.
PR creation from main order is feasible in case I will select item category as Non Stock - N; but system is not creating PR for stock item IC - L.
Can u further guid me, how system will generate PR for material assign in maintenace order, but required stock not available.
Thanks in advance....
Rgds,
Dipen

Hi,
As Venu told, for the Item Category L, system will create the reservation. While running MRP for that item, system will check the stock qty & required qty, then it will create the PR for the unavailable qty.
Only for item category N, from maintenance order, PR will be created.
Maintain the MRP type in Material Master.
Regards,
Maheswaran.

Similar Messages

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • How to make material availability check work during Work Order creation

    Hi Experts,
    Kindly advice about these matters:
    1. How to make material availability check work during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

    Hi Maheswaran,
    I have implement the prerequisite notes. (Notes 790219 and 1034962). Do you know why it is still does not work?
    Thanks
    -amoonra-

  • Custom duty should be copied into the Sales order based on material

    Hi,
    Requirement is only Custom duty  Tax condition types to copied into the sales order based on material (for e.g A) .Suppose customer X is buying material Y then different tax condition types is to be applied but if the same customer  is buying material A then only Custom duty will be copied.
    But we can set in the customer Master whether the maerial is taxable or not.So where to do the right tax classification settings so that sysyem will automatically fetch the right  tax condition types if i enter one  material which is applicable for Custom Duty only
    We are using TAXINJ.
    Regards
    Jyoti

    Dear Jyoti
    As per your post, the material code is different for the same customer and hence you can differentiate the tax classification in material master.  That is for material X, if you maintain Tax classification 1 in Sales Org1 view, maintain 2 for the material Y.
    Now maintain different tax code for these tax classifications in VK11 / UTXJ.
    thanks
    G. Lakshmipathi

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Production Order Simulation for Material Availability

    Please Help.
    Does anyone know how to run a simulation for a configured material and then do a material availability check? First I need to be able to configure a material, then I need to be able to see if I have the material available to build it. The requirement is coming from Sales or another Plant if the form of a question "Can you fulfill the SO by X date?"  I have tried CO01S but after configuring the material it is not allowing me to then do the availability check. Any ideas would be appreciated.
    Thank you

    Hi,
    Based on further checks i feel the simulation order might not meet your exact need, apologies for the incorrect info.
    Alternatively what i can think of at the moment is,
    1. Create a new order type say ZSIM, assign a new number range (create via co82) for this & maintain all other paramters as a normal order type
    2. Create a user status in BS02, which does not allow for releasing the order & assign this user status to your new order type in OPJH.
    3. Create a order for your material using this new order type & you can then use the material availability functionality.
    The blocking of release for these orders, ensure that even by mistake the user does not release these orders as you want to use it for simulation purpose & thereby ensuring that it does not become relevant for production.
    Hope the above helps.
    Regards,
    Vivek

  • Program to update Delivery dates of STO based on Material availability

    Hi,
    We have requireement in which, we need to material availability check for the materials on daily basis. This is only for Stock Trasnfer orders.
    Suppose there is STO ( Stock Transfer Order) 1 that has been created for material M1 for qty 20. The scheduled delivery date for the material is tomorrow. Now I create another STO 2 today for the same material and same quantity. The scheduled delivery date that was proposed was 7 days from today.
    Some one deletes the STO 1. Now Material M1 with qty 20 is avaiable to use. I then go in the system, open STO 2 in change mode. Select the line item and click on Material availability check. When I do this, the new delivery dates are proposed.
    This is standard sap functionality.
    We have required to do this programmatically. Is there any standard SAP program which will check all the STO's by there creation date and do the material avaibility check automatically and re-set STO dates.
    Regards,
    Shahu

    Instead of all that, you could just use stock transport scheduling agreements.  MRP can update those automatically during its processing.

  • Material availability check be switched off for during dispatching of order

    Hi All,
    Material availability u2013 can the material availability check be switched off during  dispatching of production order but kept when order is created? 
    Is there any implications on availibilty check.
    How can we do this?
    Regards,
    Vidyasagar

    Dear
    If you want to do Material Availablity Check only at the time of order creation , please choose Availability Check Business Function 1  with your order type  /plant combination .Keep No Check  in Capacity  and do not assing  the Overall Capacity Profile Here .
    Where as keep the Capacity Overall Profile for Production Order Type with Availablity Check  -2  and Mark No Check to material availablity  option in the same .
    In OPKP -make sure that you have Capacity Profile assinged and do not mark Confirm Partial Available Qty .
    How ever , in capacity requirement , material availablity is the intregrated part  and while dispathcing production order with in the available capacity of any operation in work centre , system tries to make sure the materials are available for processing just before actual operation starts .
    Check in CM21-Setting-Strategy -Dispatch Control -Check if you have option to un-check the Material Availability .
    Regards
    JH

  • Work Order Material Availability Check Customizing

    Hi,
    I am currently trying to set up material availability check in the work order before saving. I am testing it by entering a material in the work order for which there is zero stock. Then clicking on ORDER > FUNCTIONS > AVAILABILITY > CHECK STOCK MATERIAL. However SAP would return 'All checked materials in order 100000317 are available' in status bar.
    My customizing is as follows:
    Define Checking Rules (SPRO):
    PM     Checking rule for plant maintenance
    Define Scope of Check (OPJJ):
       Availability Check: 01 (Daily Requirements)
       Checking Rule: PM (Checking rule for plant maintenance)
       Availability check: 2 (Check availability during order release)
        Stocks
        Include safety stock: X
        StockIn Transfer: X
        Incl. quality insp. stock: X
        Replenishment lead time
        Check without RLT: X
        In/outward movement
        Incl. purchase orders: X
        Incl. purchase requisitions: X
        Incl. dependant reqs: X
        Include reservations: X
        Include sales reqmts: X
        Include deliveries: X
        Incl. planned orders: X (check all planned o)
        Incl. production orders: X (take all production)
    Define Scope of Check (OIOI):
       Plant: (Corresponds to Work Order)
       Order Type: (Corresponds to Work Order)
       Check material availability when saving order: X
       Check rule: 02 (Corresponds to material being used)
       Release Material: 3 (No release if parts are missing)
       PRT Availability: No check
       Capacity Availability: No check
    I would appreciate if you could indicate if I am missing something in the customizing or if there is some sort of error. I would like SAP to display a system message on the status bar stating that this material is not available once the user enters this material.
    Regards,
    Nikolai

    I'am facing the almost the same problem. Could anyone tell me:
    1. How to make material availability check work  during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make  information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

  • Production order release Material Availability check

    Gurus,
    I have a production problem where the order can be released when the component for the order is in a restricted status.  This is not allowed by the batch search strategy.
    <u>Here's Problem Description:</u>
    When running on version 4.6C, I have a work order created. I release the work order successfully.  However there is a component that has an invalid material/batch according to the batch search strategy  The material availability check shows all components available. 
    However, I remove the batch and the batch can not be entered because it is not correct according to the batch search strategy.  I try and release and the material is added to the missing parts list.
    I change the component so that it can be used.  
    Put the batch number back in the order. 
    Save the order.  
    Change the component material/batch so that it is no longer valid.  
    The order will release and it shouldn't because the material/batch is not valid.
    <u>I've looked at the following transactions and master data:</u>
    OPL8 - Order Type - Dependent Parameters Overview for my plant and order type and the check batch box is checked.
    MM03 - Material Master MRP 2 view for the component to get the availability check
    OVZ2 - Availability check control
    OPJK - Order Control to get the checking rule for order release
    OPJJ - Availability check control details with availability check and the checking rule for order release - I did not see anything here that would influence the checking based on if the batch was entered or not.
    I did double check the batch search strategy for production order - COB3. Everything looks OK there.
    Does anyone have any other places to check? I must be missing something. I tried OSS - there weren't any notes that I could find.
    Thank you!
    Michelle

    Hi,
    Check in order control opjk for order type pp01
    Batch assignment /release material
    Release despite missing batches
    no release if batches are missing
    Regards,
    nandha

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • How to address missing parts during material availability check

    The system prompts that a particular component is missing during material availability check of a production order. Said component is available in the system upon verification in MMBE.
    We noted that the goods receipt date of the material is way beyond the requirement date, hence the system still prompts that it is missing.
    What we did to correct this is to change the basic start date of the production order thus changing the requirement date of the material.
    The resolution unfortunately, brought another problem, another planned order was generated, which consequently generated another purchase requisition.
    What is the proper way of addressing the missing parts prompt during material availability check?

    Hi
    Not able to understand why you are using BAPI & function module.
    It is a simple function of avaialbility check.
    For this you have to fill the availability chk field in material amster of all components &  givecheckinh rule  inOPPQ .
    After creation of process order, you can check COR2 it self.
    It is a std functionality.
    It should definitely work.
    Regards
    YMREDDY

Maybe you are looking for

  • Can I use one hard drive for two computers?  Newbie here.

    Newbie here. I currently use Time Machine for my iMac (Intel) I've been using my Macbook Pro (Intel) a lot lately and would like to back it up from time to time as well. Can I simply attach the external hard drive to my Macbook Pro and set up Time Ma

  • Images (jpg) are blurry at proper resolution

    This seems like a really silly question – as it is the first time I have had this issue – but I am having problems getting a properly "clear" image with what "should be" appropriately sized images. In photoshop – my images are crystal clear at the sa

  • Setting thermocouple type in scan engine

    I am using cRIO 9211 to acquire thermocouple data using NI Scan Engine. I don't see any option to specify the type of thermocouple other than by right clicking on the module (in project) and selecting Properties. Is there a way to programmatically se

  • Excel export - windows7

    Hi, From the time one of the users has installed Windows7, he has a problem exporting to excel. When he exports to excel, Discoverer immediately attempts to open the excel file. However, there is an error message because the excel file is saved in on

  • Why I always get error 404 after I deployed war?

              Hi,sir           I have a problem when I am using weblogic 6.1(sp2). I developed a webapp and packaged           it into a war file. The process of deployment is no error. But when I want to visit           the app via IE browser, I always