PR generated for materials although there is no demand.

Hi,
I have a situation where the system's MRP run is generating PRs for few materials although we have open PO with quantity equal to the requirement for that particular material.
What can be the reason behind such system behavior.

if you PO date is 01.01.2015 and your rescheduling horizon is 50 days your PO is outside the horizon ;-) and system will create a new PR
What is rescheduling and how does it work - ERP Manufacturing (PP) - SCN Wiki
You can also have a look onto the corresponding SAP note http://service.sap.com/sap/support/notes/25388

Similar Messages

  • Is there a video generator for lines?

    I'm still drawing circles, squares, and lines to overlay on my videos. Some time ago when I needed to make circles and squares, but didn't know how, someone here (Piero I think) told me about a great plug-in generator called Frames for just that purpose, which I installed in FCE and now use a lot (I forget the author of that wonderful program, but it appears under Video Generators > pf > Frames).
    Well, now I'd like an easier way to draw lines on my videos than creating mattes and cropping them down to a sliver, or creating them in Photoshop on transparent backgrounds and then importing them into FCE as .psd files. Those methods are slow and tedious.
    What I'd really like is a line generator on the order of that great pf plug-in for creating frames, only this one would be for lines. And ideally it would be able to create control points on a generated line so that you could curve and bend the line into various shapes, for example to match the twists and turns of a road on a map, or to make arcs and S-shapes. And it should have arrowheads available to put on the ends for pointing at things: arrows.
    Does anyone know of any such line generator available anywhere for Final Cut Express?
    Tom B.
    Tom B.

    That arrow generator is really nice, Ian, thanks much. That solves one of my problems; I was making arrows in Photoshop and importing them, which was tedious. But now with this generator I can quickly make any size or length arrow easily, right inside FCE. I notice that the size of the arrow after rendering is slightly smaller and thinner than it appears pre-rendered, but once you get used to that, and compensate for it a little in your design, you can make arrows of just the right size needed. Very nice!
    Now if there were only a generator for curved, bent, or squiggly lines, able to be shaped as desired, for example to create a line to match the shape of a road as seen on a map, or an aerial photograph, I'd be all fixed. I don't suppose any such generator exists yet, though, so I'm still stuck with Photoshop for that, for now.
    Tom B.

  • I want to register my iPod with iTunes but the registration firm keeps asking for a postcode but there is no field to enter it, although there is an arrow showing where the error is but still no field for entry. Any suggestions how to get past this ?

    I want to register my iPod with iTunes but the registration form keeps asking for a postcode but there is no field to enter it, although there is an arrow showing where the error is but still no field for entry. Any suggestions how to get past this ?

    I can not get to iPhone screen, so no way to get to Settings. That is the problem. When I connect phone to iTunes I get screen asking to insert SIN card. On the phone I'm getting Cinfigure screen asking Launguage , Country or Region, Wi-Fi, ( I can connect to my home wi-fi), and last screen "Activating your iPhone". After two minutes of waiting IM getting message: Your iPhone could not be activated because the activation server in temporary unavailable. try connecting to iTunes or try later or contat apple.com/support.
    Like I mention, I went to Bell as well Rogers store and tried to insert active SIM card with no results.
    Yes, my friend unlock the phone to use with Rogers but I don't know where

  • Last back up: never . i am connected to a wifi network and phone also pluged in yet my icloud never backs up , i have also deleted previous backup for all applications(although there was never any successful backup)in"manage storage" still no headway

    last back up: never . i am connected to a wifi network and phone also plugged in yet my icloud never backs up , i have also deleted previous backup for all applications(although there was never any successful backup) in " manage storage" still no headway

    rucchyy wrote:
    my Internet is working fine . i also turned the iCloud drive off, could this be the reason I can't back up?
    No.
    Have you done:
    Restart / Reset
    http://support.apple.com/en-us/HT201559

  • Multiple PR's generating for same material after MRP

    Hi Guru's,
    As per my business scenario, i am creating project with WBSE, Activities and BOM.
    By using the reference points, i am transferring the BOM to Project, then executing MRP run.
    But after MRP run i found that multiple PR's generated for the same Material.
    Please find my BOM structure
    BOM-->Assembly + raw material
    Assembly is consists of
    Sub-Assembly+ 2 raw materials
    Sub-Assembly consists of
    1 Raw Material.
    as per this i should have 4 PR's after MRP but system is generating 8 PR's.
    Please tell me where i am doing wrong
    Regards,
    Bhadra

    Hi,
    I find the reason why it is creating the multiple PR's for the same component.
    It is because of the BOM status. Please find the attached scree shots for the BOM structure and BOM status.
    As per my requirement the Planned Orders should be created for "BOM" and "Assembly" and 3 PR's should be generated for Components.
    Initially i maintained BOM status as "4" for "BOM" due to that system is exploded the BOM twice i.e., for "BOM" and "Assembly" and generated PR's twice and two planned orders for "BOM" and "Assembly" along with their components.
    Now to avoid the duplicates PR generation, i have maintained BOM Status as "5" for "BOM"and run MRP.
    This time system is generated 3 PR's and 2 Planned Orders.
    As per as PR's is concerned there is no issue. Coming to the Planned Orders there is a issue that, the components are not copied into order which is generated against "BOM" (BOM Status-5) and components are copied into order which is created against "Assembly"(BOM tatus-4)
    But as per my requirement, the components should copied in both the orders.
    So please tell where is the wrong in this..
    Regards,
    Rao

  • SMS_AD_SECURITY_GROUP_DISCOVERY_AGENT - Active Directory Security Group Discovery Agent reported warnings for 524 object(s). DDRs were generated for 0 object(s) that had warning(s) while reading non-critical properties.

    Hi, can anyone help me troubleshoot the following please:
    Active Directory Security Group Discovery Agent reported warnings for 524 object(s). DDRs were generated for 0 object(s) that had warning(s) while reading non-critical properties. DDRs were not generated for 524 object(s) that had warnings while reading
    critical properties.
    Possible cause: OU name or Security Group name may contain at least a Unicode character which has conversion problem between Unicode and your system ANSI locale(e.g. Korean characters in English System Locale). The site server might not have access to
    some properties of this object. The container specified might not have the properties available.
    Solution: Please verify the Active Directory schema for properties that are not replicated or locked. Refer to the discovery logs for more information.
    Does the error relate to 524 security groups? There are several invalid search paths listed in adsgdis.log, are these related?
    Thanks,
    Dale

    You'll have to examine the log to determine exactly which objects its referring to. Although this is in the context of group discovery, group discovery still creates DDRs for computer objects within those groups so it could be either groups or computers.
    This is not a search path issue though as it's clear that the discovery process found 524 different objects, but as stated, it could not properly read criticial properties of those objects and thus did not create DDRs for them.
    As mentioned, reading the log in detail will list the objects individually and the reason it could not create a DDR for it.
    Jason | http://blog.configmgrftw.com

  • Delete Trans requirmts generated for delivery (Shipment done, without PGI )

    HI Friends ,
    I have came across below issue-
    A Z delivery type is being used to ship Material to vendor for external processing (Goods issue is NOT done against the delivery but is done against a Process order , it is a type of dummy delivery. Requirements should not get generated for such delivery.
    Because of error in configuartion, requirements were getting genearetd which is now corrected , now no new requirements are getting generated for this delivery type.
    Now the problem is -  How to delete requirements generated for old deliveries (Shipmentment has already been posted , PGI can not be done). These deliveries are now affecting MRP calculations significantly.
    To my knowledge , such deliveries can be cancelled only after cancellation of shipment , the solution is not acceptable as there are thounsands of such deliveries lying in system & it would be practically impossible to follow this route for resolution of this issue.
    Is there any program / quick way to delete these old requirements without cancelling shipment / without doing PGI ?
    Please help, Thanks.
    Edited by: sandeep K on Feb 12, 2012 6:59 PM

    Sandeep,
    Because of error in configuration, requirements were getting generated which is now corrected , now no new requirements are getting generated for this delivery type.
    One wonders how the business was able to manage with these 'thousands' of deliveries (which had requirements) for so long, prior to the correction of configuration.,,,
    Anyway, if you are lucky, simply rebuilding the requirements file may solve your problem. Run report SDRQCR21 against these materials.  Otherwise, for a mass change, you will probably need to develop some custom functionality.
    Best Regards,
    DB49

  • PRs generating for Prod Order

    why are there PRs generating for my Order? All materials are available and I dont see why the system does this.

    Hi Rad,
    Go to  SPRO-ProductionMRP-Master data-Define special procrument key---Select your special procrument key (Direct production) click on it, it will take you inside,and check there procrument type chage it to E INHOUSE.
    Run MRP once again with delete & recreate mode.
    Please check the results.
    Regards,
    R.Brahmankar

  • Automatic STO for materials with split valuation

    Hey Gurus,
    Our client uses plant-to-plant STO to do transfers among internal plants. The current process: Run MRP in receiving plants --> MRP generates PReq --> Release PReq --> Assign Preq and create STO(from here, buyers manually check stock at issuing plant to see if there are "New" or "Rebuild" stock available, Rebuild stock always take the priority. Buyers manually assign Rebuild or New to ME21N).
    The client tries to automate the STO process, ie, using ME59 or ME59N instead of ME21N. The problem is how the system does stock check and automatically enters"Rebuild" or "New" for materials with Split Valuation, which are done by buyers manually?
    Thanks
    JM

    Hello,
    Your client's request can be met with an user exit i guess. I have not used this but this is a suggestion that you can try if you wish.
    The following things need to be done.
    1. New PR type needs to be created and assinged to the STO document type.
    2. When running a MRP at receiving plant, the system uses the special procurement key to create the STO requisition, hence we can write the relevant code in user exit in the MRP program. (please find the user exit for MD01)
    3. If the special procurement key is 40 in the material master (MRP view), then system has to create the PR using the new PR type for STO. Also for those PRs the default batch should be "Rebuilt" entered while creating the PR.
    4. As the batch is already entered in the PR, converting them to PO automatically will not be an issue.
    if you feel that the above solution is little tough to implement, then please write a program to fetch the STO PRs and update the PRs one by one using the BAPI PR update or BDC with the batch "Rebuilt". This program you can ask the users to run before using ME59.
    Regards,
    Sakthi

  • Wrong Absence Quota generated for change of entitlement

    Hi experts,
    I have one employee joined somewhere in mid January 2008 (his IT000 start date, IT0001 start date, and IT0041 date is the same, i.e. mid Jan 2008).
    The Annual Leave Base Entitlement setting (V_T559E) for his particular grouping is based on seniority:
    Seniority  0 - 4 = 15 days
    Seniority 4 - 9 = 18 days
    Base period is : Calendar Years.
    At the Selection Rule (V_T559L) :
    - Accrual Period tab => Monthly (Take account of Change of WPBP is checked)
    - Base Entitlement => Key date for determining seniority = Date Type (from IT0041)
    - Accrual Entitl. => Pro rate calculation = selected
    Up to last year (2011), the AL entitlement generated for the emp is 15 days (12 * 1.25). Which is correct.
    When I create for next year (2013), 18 days is generated (12 * 1.5). Which is also correct.
    For this year, 2012, I expect to see 18 days (or 17.75?). However I'm seeing 19 days.
    After debugging, I found that for month of January, 2 entitlements are calculated.
    Take for example the employee joined on 21 January 2008.
    There were 2 records generated by HR_QTACC_QUOTAS_GENERATE:
    1. 20.01.2012 with 1.25 day
    2. 31.01.2012 with 1.25 day
    For Feb until Dec 2012, I'm seeing 1.5 day for each month (which is correct). I.e. :
    Feb: 28.02.2012 with 1.5 day
    Mar: 31.03.2012 with 1.5 day
    ... and so on until dec
    Dec: 31.12.2012 with 1.5 day
    They all add up to 19 days.
    Any advice on what should be corrected here?
    Thanks in advance!

    Hi, Yuki!
    In your example, can you tell us how should it accumulate if the seniority date is in june/2012?
    And another doubt, what is your accrual period?
    What Iu2019ve understood every seniority change youu2019ll have this problem, if the employee starts in the company during the middle of the month.
    Please answer that two questions, so I try to do some test here.
    Regards,

  • Schedule Lines generated for expired Scheduling agreements

    Hi All,
    We are facing problems in Scheduling agreements.
    Schedule lines are getting generated for those agreements whose validity has expired(i.e Validity in Past).
    Is there any check to restrict those Scheduling Agreements??
    Please Help.
    Regards,
    Ritesh.

    from OSS note 914607 - FAQ: Validity and status of scheduling agreements
    1. Question: When I process scheduling agreements without delivery schedules, I have the option to specify the validity of the scheduling agreement: "Valid" and "Valid to". What role does the validity play when the scheduling agreement is processed?
    Response: In the case of scheduling agreements without delivery schedules, the system checks the validity of the scheduling agreement if you create a new schedule line or change an existing schedule line. If the schedule line date is outside the validity interval, a warning message is issued. You can then decide whether or not to create the schedule line or whether to adjust the validity of the scheduling agreement. No error message is issued.
    2. Question: What role does the validity play in the case of scheduling agreements with delivery schedules?
    Response: The function is similar to scheduling agreements without delivery schedules. The only difference is that the entry of the validity is optional (unlike scheduling agreements without releases) and this is not checked by the system. If the validity is missing, the system does note issue a warning message. If you specify the validity, the system behaves in the same way as for scheduling agreements without releases.

  • Proposals are not getting generated for BOM items in MD50

    Hi Gurus,
    I have maintained strategy 50 in MRP for header material , Item category gp as LUMF & maintained consumption parameters in material master .
    For dependent requirements i have maintained BOM for production & sales usage, Strategy is blank as it is customer specific component , Item category gp is NORM , individual requirements i.e 1 in MRP 4 view.
    MRP type is PD in both materials.
    When i run a MRP thru' MD50 after getting customer order.
    it is not planning my dependent requirements i.e. proposals are not getting generated for dependent requirements (BOM materials).
    Please let me know the solution.
    Thanx in advance
    Regards,
    Nagraj Vasmate

    try to use strategy 20

  • SQLloder scripts not getting generated for CLOBs

    I am trying to migrate MYSQL 3.23 database into Oracle 8.1.7 and after creating the Oracle model and after converting the MYSQL text datatype into CLOB of the Oracle model the SQLloader scripts is not getting generated for CLOB datatypes. I mean the scripts are getting created but there is no change in the script for CLOB datatype.
    The script generates the following for the table containing CLOB datatypes:
    mysqldump -h <HOST> -u <USERNAME> -p<PASSWORD> -T <DESTINATION_PATH> fields-terminated-by="<ec>" lines-terminated-by="<er>" test av_wbt_course
    Please let me know how to load data when the datatype is of CLOB ?

    I was able to resolve this issue by using OWM Oracle Migration instead of using offline method by sqlloader scripts.

  • Accounting document not generating for excise invoice-please help

    Dear all ,
    my issue is
    accounting document not generating for excise invoice
    we are creating accounting document in J1iin
    with refferance to billing document but the accounting docuemnt is not generating
    the accounting document for billing document is generated
    so why the accounting document for excise invoice is not genrating its showing the correct amount in BED ,cee and HE Secc.
    please help

    Dear G. Lakshmipathi,
    As uknow i am getting problem when i am creating the debit memo
    so is there any specific ETT for debit memo is there .because we are not maintaining delivery type to billing type here in CIN setting
    so its not goods removal through sales . so what will be transaction type for this.
    how to check the error that why the accounting document is not generated as no error log is also comming.
    so please help me in this regards.
    Thanks with Regards
    Subrat

  • Design the New process set up for Materials in one physical stock plant

    Hi Experts,
    The requirement is one physical plant as two different logical plants in the system. The main issue is how to administrate or how to find the set up which allows one Physical warehouse in Hamburg which we have supplying two Logical warehouses in the system without having thru really physically separate the warehouses into two different ones. Materials physically will be only for one warehouse.
    Requirement is for Design the New process set up for Materials in one physical stock serving plant into two different system plants.
    Most of the things are pointing in the direction that order Backlogs will not be converted into new organization. We have backlogs for the material requirements for purchase orders, sales orders whatever we have in the current setup; then there will have all are new orders from the certain dates taking in the  new organization set up. These backlogs are very long at least three to four years.
    We would like to find some way to have the all the material requirements ending up in one basket instead of two baskets. That still be able to deliver at least in system point of view from two different baskets.
    We need to do analysis on one physical stock serving plant into two different system plants that could be done either by material master data or as i understood that could be from PS side.
    can any one please tell me how we can maintian this setup in the system.
    Please provide your valuable inputs.
    Brgds,
    RK

    RK,
    Sorry, the creation of such an end-to-end solution is outside the scope of an online forum.  Most consulting companies would send a multi-disciplinary team to perform this task, and would take several weeks to research your requirements, and come up with a prototype.
    Sales order availability checking is described in SAP online help
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/93/744b51546011d1a7020000e829fd11/frameset.htm
    I will say this.  If your goal is to have two plants, with two company codes, and you wish to only procure or produce in one of the plants, then generally I would recommend using Special Procurement via Stock Transport Order (in standard SAP, Special Procurement 40).  This based on a very small knowledge of your requirements.  I have already cited the Sap online help for special procurement.
    SAP online help for Warehouse management is at
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f8386f4afa11d182b90000e829fbfe/frameset.htm
    As you begin to read the required topics, I am certain you will realize that this task is beyond the capability of an untrained person.  I again suggest that you search for professional consulting services to assist you in this project.  It will be money well spent.
    I am now closing my responses to this thread.  Good luck in your project!
    Best Regards,
    DB49

Maybe you are looking for

  • IPhoto froze and now no images at all

    I was working between iPhoto and PSE6. I had taken an image from iPhoto into PSE6 to edit. Suddenly it froze the whole computer. The only thing I could do was hold the power button for a few seconds to shut the whole machine down. Now when I open iPh

  • -contact sync not working correctly

    Frustrated w/my i4. spent 4 hrs w/verizon and 1 1/2 @ apple store. still issues. my contacts denote contact duplication (some, not all, have duplicated 3 times). Also, experienced lost contacts (my kids, some biz associates). Apple conducted hard res

  • Horribe image quality in PDF

    Hello, my problem is very simple. The quality of the image of my PDF is really horrible. I need to have a PDF file because in order to print a magazine, that's the file that I need. So I converted my picture: http://image.noelshack.com/fichiers/2013/

  • NULL output Device creation in SPAD

    Dear Guru's, To Preventing the creation of spool request  for all users.We can assign an output device with the name NULL. It means that no spool requests are created for those users in SAP. Could you please some one let me know, how to create NULL o

  • How to make pivot table in query ?

    Hi all, SELECT COUNT(C.entity_id) as Entity_Id,   e.description       AS region,   d.business_initials AS business_group FROM   (SELECT a.entity_id ,     a.region,     B.business_group   FROM ms_fcr_entity_reg a,     ms_fcr_entity_bus b   WHERE a.ent