PR (Header level) release strategy not working

Hi all,
  I have configured release procedure for PR - Header level release(i.e. With classification). My scenario is as below,
If  PR value is <=1000 INR and Plant 1000 Two persons will release the PR. I.e., Release codes A1 and A2.
If  PR value is >1000 INR and Plant 1000 Three persons will release the PR. I.e., Release codes A1,A2 and A3.
i have created Two charac(for Plant and Value), one class(Assigned the characs to it), one group, 3 release codes, and 2 Release stratergies (i.e.S1 and S2). All the settings are fine. But when I create PR, system takes only the first Release stratergy by default. That is irrespective of the valuation price in PR system by default takes S1 release stratergy only. Even for higher value PR system is not taking S2 stratergy. I have given correct values in the classification field. Why does this happen? Release procedure without classification is not configured.
Note:  I have even ticked overall release for document type NB
Any inputs? Thanks in advance.
Regards,
Ayyappan.

Hi all,
One thing is clear now. System is not all considering the value characteristics. Its only considering Plant character(WERKS). Thats why by default its taking first release stratergy since both have plant value as 1000 in classification view.
Just now i checked by using sinlge character. For release class with plant as character the release procedure is working fine but for  class with value as character release is not at all getting hit.
Note:
1.My company code currency is EUR. My characteristic currency is USD. While i create PR in valuation price system by default selects EUR. I am manually changing it to USD. Is that correct?
2. Still my new posting period is not yet open.
Is there the problem is somethig related to above?
Regards,
Ayyappan

Similar Messages

  • Release strategy not working - no multiple releases

    Hi All,
    Thanks for your help.
    I have resolved that issue.
    Now I am facing another problem.I am having release strategy with release codes R1,R2,R3,R4.
    For certain amount say 1-99 I need only R1 approval.
    and 100-199 the Po should go to R2 approval only and for 200-299 it should go to R3 level approver.But for amount >300 PO need both R3 and R4 approval.The PO should go for R4 Release after R3 Release.
    R1,R2,R3 levels are working fine as the PO goes only at one level.But for R4 it not working.
    The users are selected based on the roles assigned.
    I am using a Ztable to get the roles where release code,group and roles are populate.
    For each Release code are assigned Say for R1 it is ZR1 and R2 it is ZR2 etc...for each level the users selected based on roles say for R1 ---users will have roles ZR1.
    But at R4 level I need to select the users for both ZR3 and ZR4.
    When I am triggering the WF using Purchase order as Po number and Release code as R4 it is not selecting R3 roles.
    I am using the user exit for the user determination based on roles.
    Can anyone please help me on how to resolve this.
    Thanks and Regards
    Raju
    <MODERATOR NOTE: Original post in [this thread|Release strategy not working; moved to new question>
    Edited by: Mike Pokraka on Jun 20, 2008 10:47 AM

    Hi Sujoy!
    Thanks for the resolution.
    My question is: Currently, plant is set as one of the characteristic in the release strategy. Hence, this problem!!
    Now, we need to remove this "plant" and maybe consider including Company code or Purchase organization as the characteristic.
    1. Pl tell me how to implement this?
    Regards..

  • PR Item Level Release WF not working after Release Strategy change

    Hi Experts,
               I did PR item Level Release Standard Work flow and it was working fine now due to client requirement we changed the release strategy and now when the PR workflow triggers it gives the Below mentioned error.
    I really don't understand y after changing the release strategy workflow is not working and giving the following error.
    Even if i restart the workflow in SWPR the same error is occuring.
    Exception occurred    - Error when starting work item 000000390118
    PROCESS_NODE     - Error when processing node '0000000003' (ParForEach index 000000)
    CREATE                   -  Error when creating a component of type 'Step'
    CREATE_VIA_WFM  -  Agent determination for step '0000000003' failed
    EVALUATE_AGENT_VIA_RULE - Error in resolution of rule 'AC00000148' for step '0000000003'
    AC00000148             -  Object type 'TS' not valid
    Executing flow work item   - Work item 000000390118: Object FLOWITEM method EXECUTE cannot        be executed
    Executing flow work item   - Error when processing node '0000000003' (ParForEach index 000000)
    Regards,
    Hari

    Hello Hari,
    please set a breakpoint at function module
    ME_REL_GET_RESPONSIBLE
    and see what happends in section
        CASE t16fc-frgwf.
    * keine Ermittlung
          WHEN space.
            RAISE nobody_found.
    * Ermittlung über T16fW
          WHEN '1'.
    If using the T16FW-table, it should go to '1', otherwise it may that a user exit under '9' is used. So please check this.
    Best wishes,
    Florin

  • Release strategy not working

    Hi All,
    I am working on a release procedure.All the release procedure configurations  have been done for PO release .I have modified the user exit that determines the approvers which is a part of role 2000027 and I am using the standard WF 20000075 itself.
    But after that when I creating a PO it is not triggering the WF.
    When I am test the WF in SWUS by giving PO number and release code,its working fine.
    But when I am Creating PO from ME21N workitem is not going to the user.
    Can anyone please help me to resolve this.
    Thanks
    Raju

    Does the PO have any Release Strategy tab in the Header of the PO. If not then your Release strategy is not configured in SPRO. Search this forum for configuration
    2)If the PO has Release Strategy tab then please check in SWE2 whether the Linkage between the event and Workflow is activated. If not activate it. Also please check entries in SWEL Transaction code.
    Thanks
    Arghadip

  • Release Strategy not working for MRP generated PR

    I have one qurey. Currently we are release strategy for normal PR.Now client want to activate release strategy for MRP generated PR.
    current Release Strategy for normal PR configured as following.
    Purchase requisition document     RV
    Purchase requisition document     ZADV
    Purchase requisition document     ZIMP
    Purchase requisition document     ZSER
    Purchase requisition document     ZSTD
    Purchase requisition document     ZSTR
    Purchasing group     A01
    Total value of requisition for     > 1.00 INR
    Creation indicator (purchase r     Realtime (manual)
    Overall release of purchase re     Yes
    For MRP generated PR I add creation indicator B - Material requirements Planning.Even after add creation indicator release strategy is not triggering for PR.
    To trigger PR any setting need to do other than add creation indicator.
    Regards
    Sathish

    Hi
    You don't have to include creation indicator as parameter. Check in what documnet type MRP PR is generated. You can see it in t.code OMDT. At document type level also you can manage it. You need to include creation indicator only if a seperate person approves MRP generated PR.
    To know how to configure release procedure see the below link
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE
    Regards
    Antony

  • Header Level Release Requisition

    Hi,
    The purchase requisition WS00000038 is for item wise release. But they need header level release. Is there any standard workflow ?? I dont find any, so i created custom workflow and everything is ok. But when i create the PR, the workitem goes to everyone. I've marked General Task. For standard wf, it works properly, but not for my workflow. It is not picking the agent from Release Strategy settings. Do we need to give the custom wf no anywhere to pick the correct agent ??

    What you have done in Release Strategies, can you explain.?
    What is the Path? Where you have mentioned Agents in RS for Requisition?
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/1d/ea9d9c7aca11d194b70000e82dec10/frameset.htm
    Make in SPRO for Purchase Requisition:
    SPRO-> MM>Purchasing->Purchase Requisition-->Release procedure->Procedure with classification-> set up procedure with classification-> double click on Release strategies
    and aslo
    double click on Workflow
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/1d/ea9d9c7aca11d194b70000e82dec10/frameset.htm
    Edited by: Prabhakar Dharmala on Feb 5, 2008 1:22 PM

  • Release Strategy or work flow in BI Content

    Hi !
    Do we have Release Strategy or work flow in BI Content of BW Release 3.5 ?
    I have to display a history of purchasing requisitions and orders that was uploaded from SRM.
    Thanks !!!
    Zelda

    You have to carry on the following activites:
    1) Define Organisation Struture
    2) Application specific customizing
    A) Define Characteristic values
    B) Define release codes and make them Workflow relevant
    C) Define release strategy
    Based on the characteristic values the Purchase Order will be applied to a particular release
    strategy and will fall under specific catagory to pass through different level of approvals
    D) Assign release codes to corresponding Orgnisational Objects with ID
    3) Task specific customizing
    A) Activate the event linkage for the standard workflow WS20000075
    B) Do the agent assignment for the TS20000166
    C) Make other two tasks as General Tasks (TS20000168,TS20000167).
    4) Delete the row for event "Releasestepcreated" from SWEC (OSS Notes: 797775)
    Hope this will help you

  • PO Release Strategy not triggerred for particular Total Net Order Value

    Dear,
    I am currently facing the issue where release strategy for purchase orders is not getting triggered for a particular value or lower.
    For order value 1 INR or less, no release strategy is triggered for new created PO. And for value > 1 INR release strategy is getting triggered.
    All otehr PO characterstics are the same, I mean to say the values for other characterstics such as plant material group are identical.
    But the characterstics for release for Total net order value are <= 30000 INR. There are two system copies, where in one system the same release strategy is working as expected. But in other system the above mentioned issue occurs. There is no differnce which I can see in the release strategy setup.
    Please suggest for solution.
    Thank you.
    Warm Regards.

    Dear All,
    While looking further into the issue by going into debugging mode, we have found that in include LCLSCF2I, Internal table p_selection_criteria_tab , the value for ATFLV (Internal Floating point from) gets different values in the two systems. For example, in the affected system, for PO with 1INR tottal value, for one of the Total value chaaracterstics before INR characterstic, ATFLV value is 0,0000000000000000E+00, hence it gets out of loop and doesn't trigger release strategy.
    But in another system for same PO values and release setup, ATFLV value is 1,0000000000000000E+00 for that characterstic.
    May I know how the value for this field gets calculated.
    Thank you.
    Warm Regards.

  • PO Release Strategy not changed after deletion of few line items with less

    Subject : PO Release Strategy not changed after deletion of few line items with less Total PO
    Dear Friends
    We have issue with PO Release strategy. We have created the PO. with release strategy  with multiple approvers.  After approval of first approval manager , one of the PO line item got deleted and Total PO value is reduced . The new PO value should have changed the PO release strategy. But it is not changed. Old release strategy only showing in the PO which is wrong. 
    Details of the PO
    PO no 4500000123 with 5 line items Total PO value : 100,000 USD Release strategy : AB
    PO line item 5 deleted. Now total PO value changed to 50,000 USD and the PO release strategy should have been changed to AA but not changed. Still showing PO release strategy AB only.
    Are there any OSS notes available to correct his bug.
    Please let me know if you need more details
    Thanks in Advance
    Thanks
    MVS

    Hi,
    release indicators  change it to 4.It may works. Please explore to all 6 indicators..........
    i.e,
    1-cannot be changed
    2-changable,no new determination of strategy
    3-changable,new release in case of strategy
    4-changable,new release in case of strategy or value change
    5-changable,new release if new strategy/outputted
    6-changable,new release if new strategy or value changed/ outputted......
    And check   Characteristic description and value in Classification  of Release strategies ........
    I hope this will help you. Thanking you.
    Regards,
    Venkat.

  • For  MTO scenario,multi level bom is not working sap afs pp

    Hi Experts,
                  We are implementing MTO scenario for our client. I have maintained  strategy group for FERT is 40 and strategy group for HALB and ROH are 20.
                   For single level BOM , requirements is not getting generates properly.
                  I would like to know What are all the settings is required to create AFS BOM.(single and multi level)
                   Please suggest me.
    Thanks & Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • Release Strategy to work on PO Gross value (inclusive of taxes)

    Dear MM Gurus,
    We have configured the PO Release strategy as under:
    1) < 500000
    2) > 500000
    After checking the PO, we now find that the release strategy gets
    triggered on the basic price only. Any additions to the amounts in the
    condition tab also adds it to the Basic price and the release strategy
    is properly working.
    But when the user defines Tax code under Invoice tab, the Tax amount
    gets added to the PO value. But in this case, the Release strategy
    functionality does not work.
    Requirement is that the Release strategy should work on the total PO
    value (including Tax amounts). Any addition to the PO value by either
    Condition amounts and/or Tax amounts should activate the Release
    Strategy functionality.
    Currently, it works only for the Net order value. Please let us know
    how to configure for the PO Gross order value.
    Thanks in advance
    M

    How can you include tax amount in the release strategy process. Approvers are doingthe approval/rejection through release strategy only for goods that are being purchased and it is value and tax amount is not relevant here at all.
    Explain to your customer that this requirement cannot be implemented. If he still insists thatn tell him that only if they convert the tax amount into a price component, then it is possible. But then doing this means it is not tax, so basically the requirement is crazy.

  • Release Strategy not triggered in PO

    Release Strategy not triggered in PO and also in PR. Release Strategy stimulation is working fine but release tab is not coming in Po and also Pr.
    What step  I have to do after release strategy stimulation.
    Regards
    cns

    Hi,
    Unless you provides details, difficult to suggest an answer.
    What are release criteria's you selected for PO and PR release strategy?
    What are the release characteristics you have for PO and PR release procedure?
    If you configure perfectly  the  PO and PR release strategy, did you transfers the "Vital Release Values" with your release strategy with release group and release class.
    Refer few threads , may help full to you!
    http://scn.sap.com/thread/1973324
    http://scn.sap.com/thread/3212400
    Also refer SCN wikiblog
    https://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE
    Regards,
    Biju K

  • Header level pricing is not triggered

    Hi
    I am facing problem when I change some line item data on my sales transaction then header level pricing is not triggered though system triggers line item pricing and all the line item condition types are calculated but header condition types are not calculated.
    Would you please let me know how can I trigger my header level pricing.
    Regards
    Javed

    Hi Javed,
    As I understood your problem, the item level condition types are calculated and condition records are fetched while the header level conditions are not calculated. This is a strange thing because the pricing procedure associated with the document will have condition types marked relevant for header and item level. Depending on these and the formulae associated with the condition types in the pricing procedure, IPC calculates the condition values and are summed up as different items at the header level.
    I would suggest you to to switch on the debugging parameter for your user id and try to debug to check condition types failing at the header level.
    Regards,
    Pavithra
    **PS : Please reward points if you find this useful.

  • Multi Level BOm is not working in SAP afs

    Hi Experts,
             I am facing issue in MRP.For multi level bom's ,Requirements is not getting generates.Is there any settings is there to active multi level bom for afs materials.
    please suggest solution
    Thanks and Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • BW Field level Autorizations are not working in the WEBI Reports

    Dear All,
    1. I have created Authorization roles with Infoobjects Authorization Objects.
    2. In Bex Query Authoizations are working on the Infoobjects like for
    Ex: For USER1 I have given Company code = 1000 &
    User 2 I have given authorization for 1100.....
    3. Import those roles into Business Objects-CMC.
    4.Users were Imported.
    But in the WEBI Reports BW Field level Authorizations are not working i.e for USER1 authorization for Company code is 1000 , in WEBI report it is showing all the Company codes data for USER1.
    For USER2 also showing all the data in the WEBI report.
    Plz help me on this issue.
    Thanks,
    Kiran Manyam

    Hi,
    For Authorization to work in BO you can check the following:
    1. You need to create authorization variables in your BEx query.
         Also these variables should not be input ready.
    2. While creating universe in BO you need to select "Single Sign On" option available in the parameters iwhile creating a new
        connection.
    Regards,
    Rohit

Maybe you are looking for

  • Custom Calculation Script Help

    I am in need of the correct calculation script in order to complete: I am making an evaluation form. This form contains several columns that indicate a point system. Column 1 = 1 point, Column 2 = 2 points, etc. I need to be able to have a user mark

  • How to download to my iPad from dropbox or icloud so I can work of line?

    I want to be able to work when there is not hot spot for wifi iPad to connect to.How can you pull a document of of iCloud or dropbox and store it on my iPad. that way when i want to use it  Example I have small green house business and i have a pages

  • Printing  page number and continu text in sap script

    Hi   I have created sapscript to print PO and using standard print program with three pages. My thrid page called with NEWPAGE <> from Main window of first or sencond page wokign fine but the page number is coming like page 1 of 2, 2 of 2 and 3 of 2

  • To set up variant

    I need to set up the variant of program to run in background everyday. For that one field is date and that needs to be a system date. so how can I setup that variant. variable name is p_date and that should be sy-datum. thanks, Manan.

  • Widgets not functioning

    I recently installed MacKeeper and following my Dashboard widgets stopped working. After trying to delete them, restart and generally go through a cleaning process which lost a lot of my set up I found an archived post which recommended going in and