PR not reflected in MD04

Hi,
I am doing stock transfer thro'rule based.When save the sale order in R/3.I am getting my R/3 PR number in APO.But in MD04 i am not able to see the PR number.But in ME52N(change PR),I am able to see it.How i can fix this issue
regards
venkadesh

Hi Ken,
I have changed my default document type as ZZ instead NB.But i don't know what was the problem in NB.Now we are getting results.
thanks
venkadesh

Similar Messages

  • Storage location entry in ASN is not reflected in MD04 screen

    Hi Gurus,
    We are using scheduling agreements with confirmations (ASN) . For some business reason we change the storage in inbound delivery created against the SA . However change effect of storage location  is not reflected in MD04 .
    In MD04 screen storage location is getting defaulted from the scheduling agreement .
    Why the system is not considering the storage location from the inbound delivery ?
    Thanks in advance

    Thanks for the reply.
    Indeed it will appear in MD04 if you change in SA. However I don`t want do that , in certain cases only I want change at IBD level which should reflect in MD04. Is there a way to achieve this ?
    Thanks in advance

  • Sales orders not reflecting in MD04

    Hi all
    Can anybody explain reason why sales orders are not reflecting to MD04. If possible kindly give config settings for this issue...!
    Thanks in advance
    Nadh

    Hi,
    Please check the check box for the CP and MRP combination in the SPRO setting and tick the check box for Availability check and requirment.
    sales distribution --> basic Functions -->Availabiltiy chekc n transfer of req -->Define procedure for each schdule line category
    I hope this is helful for you.
    if still it is not solved ,please clarify whether r u using std requirement type or your own requirement type.
    best Regards
    Srinivas

  • Problem:FM - ME_CONFIRMATION_INSERT_GR,changes are not reflecting in MD04

    The problem with the Function modules ME_CONFIRMATION_INSERT_GR is that it updates the table EKES directly because of which the data in MD04 has two lines even if we confirm the full quantity. One line with MRP Element as ShpgNt (shipping notification) and another line with MRP Element as POitem. Instead it should display the full confirmed quantity in one line with MRP element as ShpgNt.
    Also, BAPI_PO_CHANGE doesnu2019t work for updating the confirmation data.
    Is there any way to reflect the change into MD04 through my Zreport .

    The problem with the Function modules ME_CONFIRMATION_INSERT_GR is that it updates the table EKES directly because of which the data in MD04 has two lines even if we confirm the full quantity. One line with MRP Element as ShpgNt (shipping notification) and another line with MRP Element as POitem. Instead it should display the full confirmed quantity in one line with MRP element as ShpgNt.
    Also, BAPI_PO_CHANGE doesnu2019t work for updating the confirmation data.
    Is there any way to reflect the change into MD04 through my Zreport .

  • REM MFBF Scrap posting not reflecting in MD04

    Hi All,
    If I am doing yield posting from MFBF i can see reduced quantity in MD04.
    If I am doing scrap posting from MFBF quantity is not getting reduced from MD04.
    how can i achieve it via ABAP coding. pleae help with any exit or sample code.
    Thanks,
    Chinna

    Hello Chinna,
    Please refer below thread for your issue
    Scrap rate is set in bom but can't be consumed in REM
    I hope this information helpful to you
    Regards
    Umesh Mali
    Message was edited by: Caetano Almeida

  • Demand for Partial Schedule line not showing in MD04?

    Hi All,
    An SO with around 1200 line items, having problem with one line item, ordered qty is 20. Shipped a partial line of 6qty.Schedule line was showing order qty of 20, confirmed qty 6 but no second schedule line for the balance of 14 and the demand for the open qty 14 is not reflected in MD04. Tried manually and also manually running MRP for the item but neitger created a second line or triggered the demand to show in MD04.
    Thanks in Advance.
    Thankyou and Regards
    Hatti.

    Try creating the schedule line in the order and then running MRP for the demand to show in your stock requirements.

  • Schedule agreement not showing in MD04

    Hi All
    We have a schedule agreement created and its not reflecting in MD04. According to the thread i changed the avl check to 02.
    But its still not showing in MD04. So my question is do I have to do any other thing so that the avl chk change will get affected for same schedule agrmnt or I have to create a new one so that it will show in MD04.
    Thank You.

    First you need to identify what schedule line category is flowing in your sale order.  Normally, this would be CP.  So next go to VOV6, select the schedule line category and execute.  There tick the box for "Req./Assembly"
    thanks
    G. Lakshmipathi

  • Confirmed quantity of STO not properly reflected in MD04

    I am facing following problem:
    I Have created one STO for 20 pieces. In supplying plant only 10 pieces are available and rest 10 pieces will be available later. So, 10 pieces are confirmed for today (14.09.07) and rest 10 pieces are confirmed for 20.09.07 in STO.
    Now when I look at transaction MD04 for receiving plant, all 20 pieces are shown against 14.09.07. This is the problem.
    Can anyone please clarify above.
    Thanks & regards,
    Nilesh kumar

    Thanks for the reply.
    Indeed it will appear in MD04 if you change in SA. However I don`t want do that , in certain cases only I want change at IBD level which should reflect in MD04. Is there a way to achieve this ?
    Thanks in advance

  • GR time not taken in MD04

    Hello Everyone,
    In my project an enhancement been done for running Route Determination at the time of PO save. In order to update GR time in MD04, I am updating field TERMN in EKET table at the time of PO save that finally reflect in MD04 when MRP is run on that material. But the problem is when this is not happening in one PO, It updated TERMN at PO schedule line level but when MRP is run it shows  delivery date without considering GR processing time.
    is there any condition when GR time not considered when Route is run.
    Is there something i need to check to find the cause.
    Thanks
    Sunil

    Answered

  • PIRs not shown in MD04

    Hi Experts,
    I have created Planned Independent Requirements (PIR) to the material but which are not reflected in Stock Requirement List (MD04).  What could be the reasons?
    Best answers will be rewarded.
    Thanks & Regards,
    Surya
    9000440032

    Hi,
    1) You need planning file to be created before MRP run
    2) You need to have correct requirement type, just set this in MD61, MD62. Meanwhile strategy type be ignored
    3) You need to set the active indicator in the demand management for your item to run MRP. MRP will point at the active to generate all the plannings.
    4) PIR will be generated and there come along with planned order / Purchase requisitions after the run depending on the availability check (daily or individual).
    Thanks.
    Regards,
    Andrew

  • What is the Reason for Rejected Materials from SO still reflecting in MD04.?

    Hello Expert,
    Just a question
    I know the solution about this but want to know the reason why the rejected Materials from SO still reflecting in MD04? Is it standard program issue or need to implement any exit to avoid this issue?
    I think the table VBBE was not updated properly while rejecting those material so still reflecting in MD04 but not sure.
    If anybody can explain in details it would be great for me .. Thanks

    Hi Depika,
    Refer the SAP Note 1149556 - Characteristic ... has no master data for "..."
    Hope this helps.
    Regards,
    Hari.

  • Sales order rejected in ECC does not reflect in APO

    Hi Friends,
    We are working on ECC6 and APO7.0 for a paper mill- IS Mill functionality. We have MTO ATP with block planning and a exernal trim application. The sales order is rejected in ECC but did not reflect in APO. This has not appeared in daily CCR monitoring also. The order is trimmed, i.e planned for production.  I dont see the rejection in APO table: /SAPAPO/SD_DOC Beow are the sequence of events:
    -Order rejected 3/25
    -Sales order 42678-20 had planned order 587645.
    -Planned order 587645 is part of the enquee 4487 that was downloaded to trim on 4/4.  Well after the rejection.
    Please guide me if there is any way to prevent such occurences, leading to unnecessary planning, blocking of capacities.
    Thanks in advance.
    Arvind

    Arvind,
    I haven't worked with SCM when linked to IS_MILL, so I am not speaking from experience.  However, I have worked with SCM and ERP Baseline, so I will be speaking from this perspective.
    You didn't mention how your GATP is configured, and what planning modules you have implemented in SCM.  These facts definitely can have an impact on the supply elements (planned or production orders), and what should/should not happen to these supply orders.
    You also didn't mention what indicated to you that the Sales order is inconsistent between the two system.  FYI just looking at tables is not a definitive method.  The most important bits of information lie in LiveCache.
    I don't know what is meant by "Planned order 587645 is part of the enquee 4487 ", so I will assume it is some customized interface, and I will ignore this statement for the moment.
    So, I will just make a couple of suggestions as a starting point.  If the sales order is actually rejected, it should not appear in R/3 MD04.  Does it?  If so, run program SDRQCR21 in R/3.  The inconsistent order should then disappear from MD04.
    If MD04 does not show the sales order (as it shouldn't), but /SAPAPO/RRP3 does show the sales order, then run program  /SAPAPO/SDRQCR21 in SCM.
    If neither MD04 not //RRP3 currently shows the sales order, then please tell me why you think there is a problem.
    Best Regards,
    DB49

  • List view web part not reflecting changes made to list view in SharePoint Designer

    Dear All,
    When adding a list view web part containing a view modified in SharePoint designer (e.g. conditional formatting applied, or group headers modified) I'm finding that the changes made in SPD are not reflected in the web part. 
    For example, I go into SPD edit a view, and the view appears correctly when I go back into SharePoint, however when I link to the view within a list view web part it results in losing the changes made in SPD. 
    Becasue it's a publishing page I'm unable to edit the contents of the web part in SPD.
    I'm sure this is expected behavior but how do I get around this?
    Thnaks,
    MDB

    Try below
    http://stackoverflow.com/questions/19533998/sharepoint-designer-doesnt-show-anything-in-list-and-libraries-link
    http://social.msdn.microsoft.com/Forums/sharepoint/en-US/a63a1894-6b1d-420a-95dd-b6c546eab34d/updates-made-to-sharepoint-designer-2010-workflow-do-not-show-up-on-the-server?forum=sharepointcustomizationprevious
    http://stackoverflow.com/questions/5959521/sharepoint-designer-saves-the-changes-but-it-does-not-affect
    http://social.technet.microsoft.com/Forums/en-US/1e9a8c27-bbc5-4a6f-8daf-4b243182f543/changes-in-sharepoint-designer-2010-not-showing-in-sharepoint-server-2010-page?forum=sharepointadminprevious

  • Free goods not reflecting in PO from Info Record

    Hi,
    My requirement is , when ever i order 100 qty from a vendor 10 qty should be delivered free of cost.
    I am trying to maintain Info record for the same..
    Now when i created PO for the same...I entered 100 qty..it is not reflecting 10 qty in another line in PO..
    Where i am wrong?
    Uts

    HI,
    Have maintained the values in
    *Spro-Purchasing-Discount in kind-Define & assign discount in kind schema-Maintain free goods schema*
    It will be available in standard SAP if not do the following configuration
    Here
    Usage -N
    Application -M
    create procedure NR0001
    In control data
    step-10
    Cond Type-NR00
    Then save.
    Next
    Define free good schema
    Here assign ur schema grp of vendor
    Then assign the procedure created previously (i-e) NR001 & THEN SAVE.
    The above configuration is very important for the free goods scenario to work.
    Then go to MM and in purchasing view and give the value 2.
    Then in MBN1 create the condition record for the IR -0.
    Then create the PO it will work definetly.
    9884057038
    murugan
    Edited by: Murugan mgl on Jun 17, 2009 6:58 AM
    Edited by: Murugan mgl on Jun 17, 2009 6:59 AM

  • DataGrid not reflecting changes after INSERT into Table. Delete from Table does.

    Wow, it's been a while.
    Hope you guys can help.
    This is my DataGrid:
    <DataGrid DataContext="{StaticResource TableAssetsViewSource}" ItemsSource="{Binding}" x:Name="TableAssetsDataGrid" AutoGenerateColumns="False" EnableRowVirtualization="True" Margin="15,10,10,10" RowDetailsVisibilityMode="VisibleWhenSelected" Grid.Column="1" HeadersVisibility="Column" CanUserResizeRows="False" IsReadOnly="True">
    <DataGrid.CellStyle>
    <Style TargetType="DataGridCell">
    <Setter Property="BorderThickness" Value="0"/>
    </Style>
    </DataGrid.CellStyle>
    <DataGrid.Columns>
    <DataGridTextColumn x:Name="NodeColumn" Binding="{Binding node}" Header="VS Number" Width="*"/>
    <DataGridTextColumn x:Name="SerialColumn" Binding="{Binding serial}" Header="Serial Number" Width="*"/>
    <DataGridTextColumn x:Name="NameColumn" Binding="{Binding name}" Header="Asset Name" Width="*"/>
    <DataGridTextColumn x:Name="TypeColumn" Binding="{Binding type}" Header="Asset Type" Width="*"/>
    <DataGridTextColumn x:Name="_dateColumn" Binding="{Binding date}" Header="Date Allocated" Width="*"/>
    <DataGridTextColumn x:Name="PoColumn" Binding="{Binding po}" Header="Purchase Order" Width="*"/>
    </DataGrid.Columns>
    </DataGrid>
    This is where I add a new Row to the Table:
    Private Sub Button_Click_1(sender As Object, e As RoutedEventArgs)
    Dim cbblocation As ComboBox = Me.FindName("LocationComboBox")
    Dim row As DataRowView = DirectCast(cbblocation.SelectedItem, DataRowView)
    Dim cbbtext As String = row.Item("node")
    Dim cbbtype As ComboBox = Me.FindName("comboBoxType")
    Dim cbbtext2 As String = cbbtype.Text
    Dim RETAILISOAMDDataSet As Retail_ISO_AMD.RETAILISOAMDDataSet = CType(Me.FindResource("RETAILISOAMDDataSet"), Retail_ISO_AMD.RETAILISOAMDDataSet)
    Dim RETAILISOAMDDataSetTableAssetsTableAdapter As Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter = New Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter()
    RETAILISOAMDDataSetTableAssetsTableAdapter.AddNewAsset(cbbtext, txbSerial.Text, txbName.Text, cbbtext2, Date.Today, txbPO.Text)
    node = cbbtext
    Dim mp As New MainPage
    mp.RefreshGrid(node)
    Me.Close()
    End Sub
    The RefreshGrid method:
    Public Sub RefreshGrid(node As String)
    Dim RETAILISOAMDDataSet As Retail_ISO_AMD.RETAILISOAMDDataSet = CType(Me.FindResource("RETAILISOAMDDataSet"), Retail_ISO_AMD.RETAILISOAMDDataSet)
    Dim RETAILISOAMDDataSetTableAssetsTableAdapter As Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter = New Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter()
    RETAILISOAMDDataSetTableAssetsTableAdapter.FillByNode(RETAILISOAMDDataSet.tableAssets, node)
    Dim TableAssetsViewSource As System.Windows.Data.CollectionViewSource = CType(Me.FindResource("TableAssetsViewSource"), System.Windows.Data.CollectionViewSource)
    Dim be As BindingExpression = BindingOperations.GetBindingExpression(TableAssetsViewSource, CollectionViewSource.SourceProperty)
    be.UpdateTarget()
    End Sub
    And this is what I use to delete a row from the table (and without doing anything special, the DataGrid auto-updates with the changes):
    Private Sub Button_Click_4(sender As Object, e As RoutedEventArgs)
    If TableAssetsDataGrid.SelectedIndex = -1 Then
    MsgBox("You have selected nothing to Delete!", MsgBoxStyle.OkOnly, "Nothing Selected")
    Else
    Dim dgv As DataGridTextColumn = Me.FindName("NodeColumn")
    Dim row As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText As String = row.Item("node")
    Dim dgv2 As DataGridTextColumn = Me.FindName("SerialColumn")
    Dim row2 As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText2 As String = row.Item("serial")
    Dim dgv3 As DataGridTextColumn = Me.FindName("NameColumn")
    Dim row3 As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText3 As String = row.Item("name")
    Dim dgv4 As DataGridTextColumn = Me.FindName("TypeColumn")
    Dim row4 As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText4 As String = row.Item("type")
    Dim dgv5 As DataGridTextColumn = Me.FindName("_dateColumn")
    Dim row5 As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText5 As String = row.Item("date")
    Dim dgv6 As DataGridTextColumn = Me.FindName("POColumn")
    Dim row6 As DataRowView = DirectCast(Me.TableAssetsDataGrid.SelectedItem, DataRowView)
    Dim dgvText6 As String = row.Item("po")
    Dim RETAILISOAMDDataSet As Retail_ISO_AMD.RETAILISOAMDDataSet = CType(Me.FindResource("RETAILISOAMDDataSet"), Retail_ISO_AMD.RETAILISOAMDDataSet)
    Dim RETAILISOAMDDataSetTableAssetsTableAdapter As Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter = New Retail_ISO_AMD.RETAILISOAMDDataSetTableAdapters.tableAssetsTableAdapter()
    RETAILISOAMDDataSetTableAssetsTableAdapter.RemoveAsset(dgvText, dgvText2, dgvText3, dgvText4, dgvText5, dgvText6)
    Dim cbb As ComboBox = Me.FindName("cbbLocation")
    Dim row7 As DataRowView = DirectCast(cbb.SelectedItem, DataRowView)
    Dim cbbtext As String = row.Item("node")
    RefreshGrid(cbbtext)
    End If
    End Sub
    --------- End of Edit
    It is bound to a Dataset which gets it's data from a SQL Database.
    Loading the Data and Filtering the data based on certain conditions work 100%. The problem I am having is as follows:
    I have a form on the Page that takes input and inserts a row into the Database. When this happens, the DataGrid won't automatically reflect the changes (even if I recall the Fill Method of the Dataset). No matter what I do, I have to refresh the entire page
    and THEN Fill the Dataset to see any changes.
    This is what strikes me as odd...
    When I do a delete row operation on the Database (Custom Method on the Dataset with conditions), and just Fill the Dataset again (without doing anything special), the row deletes and the changes is reflected IMMEDIATELY.
    What am I doing wrong here? Why would Delete Row reflect the changes on the DataGrid but no Insert Row?
    Thanks in Advance.
    (P.S. I am very rusty with my developing skills, I haven't done this in YEARS)

    >>And what about the the most important question, how exactly is TableAssetsViewSource defined in the XAML markup and what is
    its Source property set or bound to? And what about the reproducable sample...?
    Here is the Markup of the TableAssetsViewSource:
    <Page.Resources>
    <local:RETAILISOAMDDataSet x:Key="RETAILISOAMDDataSet"/>
    <CollectionViewSource x:Key="TableRegionsViewSource" Source="{Binding tableRegions, Source={StaticResource RETAILISOAMDDataSet}}"/>
    <CollectionViewSource x:Key="TableLocationsViewSource" Source="{Binding tableLocations, Source={StaticResource RETAILISOAMDDataSet}}"/>
    <CollectionViewSource x:Key="TableAssetsViewSource" Source="{Binding tableAssets, Source={StaticResource RETAILISOAMDDataSet}}"/>
    </Page.Resources>
    The ItemsSource of the DataGrid is bound to the TableAssetsViewSource:
    <DataGrid DataContext="{StaticResource TableAssetsViewSource}" ItemsSource="{Binding}" x:Name="TableAssetsDataGrid" AutoGenerateColumns="False" EnableRowVirtualization="True" Margin="15,10,10,10" RowDetailsVisibilityMode="VisibleWhenSelected" Grid.Column="1" HeadersVisibility="Column" CanUserResizeRows="False" IsReadOnly="True">
    Just remember, this code was auto-generated with the drag & drop onto the Page, so I did little in terms of setting the actual bindings.
    All in all, what I have done so far works as intended, except that when I want to add a row to the table it does not reflect, and that it only shows after refreshing/restarting the application.
    I will try and put together a reproducable sample.

Maybe you are looking for