PR( purchase requ) for Alternative material in BOM

Hi PP expert,
I am using alternative material in BOM. As for example my Header BOM material is u2018Yu2019 and his alternative components  are  X1 and X2
I have done setting in BOM
For -
X1,------
Priority  ---1
Strategy  -  2 ,100%
Usage prob     100
For -
X2----
Priority  -
2
Strategy  - -
2 ,100%
Usage prob    -
0
My client want when  run the MRP , PR should be  generate  of material u201CX2u201D ,because there is no X2 stock and Material  u201CX1u201D  have more stock and want to consume X1 material 1st  then X2.
X1 has been blocked for procurement.
Kindly suggest me how will generate PR of X2 when the run MRP. X2 is alternative material..
Regards,
Aqueel

Hi Aqueel!
      As I know, standard SAP cannot solve your problem. Howerver, you can try with these way:
          1/ Try to estimate how long your company will consump all X1(Ex 3 days). Use Alternative BOM 1 for X1, Alternative BOM 2 for X2. And allocate Alt 1 to Production version 1 with valid to 8/10/2010, Alt 2 to production 2 valid from 9/10/2010.
          2/ Change:
          For -
X1,------
          Priority ---2
          Strategy - 2 ,100%
          Usage prob 0
          For -
X2----
          Priority -
1
          Strategy - -
2 ,100%
          Usage prob -
100
And Run MRP, system will take X2 into accout. If you want to savage X1. Need to calculate it and manually change in comonent list of Production order (Now, X2 will consider) with X1 until X1 stock finish.
Hope it can solve you problem(not perfect).
Regards
Tony

Similar Messages

  • How to attach a drawing for a material to BOM? Is it possible?

    hi, all SAP experts,
          for creating document i went in cv01n but i don't found any tab or space where i will attach a drawing.So please tell me how to attach a drawing for a material to BOM?
    thanks in advance
    regards
    Nitin Nerkar

    Yes, it is.
    Please check this link:
    how i will attach drawing in bom and how i will see the drawing in screen.
    (please use the search function of the forum)

  • Alternative material in BOM

    Dear SAP Friends,
    I have a BOM with 1 material & want to add 1 alternative material if previous one is not available in stock.
    pl tell how to create alternative material in BOM without creating alternative BOM.
    Regards,
    Chandra.

    Hi chandra
    Alternative items can be added to the BOM without alternate BOM.
    In change mode of BOM CS 02 go to BOM item details There you can see alternative items with item group
    There you can define you items with Priority,usage probability , Strategy,
    Alternate item will be selected during MRP run as per your usage probability
    Regards
    J . Saravan

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • Create another purchase order for a material ordered in full

    Hello friends,
    I have a little MM question for you.
    I've created a purchase requisition with a material A and quantity 100 UN
    I've then created a purchase order in reference to this PR.
    This PO has been released.
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?
    How does SAP control that ? (customizing path ??)
    Regards,
    Bahia.

    Dear,
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?  Yes it is possible in SAP
    How does SAP control that ? (customizing path ??): SAP controls in that way, when ever you create purchase requisition with a material A and quantity 100 UN...Now PO created and released...
    Now again if you try to create PO wrt PR, you can observe this time you will get all deatils in PO without quantity...reason behind that is, you have already released an order for full qty w.r.t. that PR...So this time qty field will be empty..You have to manually enter this field.
    Now the same you can see in the the PR status in ME53N Tcode.
    Regards
    Utsav

  • Purchase order for stock material in production order

    Hi
    does anybody know how to link a purchase request to production order in case of stock material ? When MRP runs aggregate all requirements for stock materials in one purchase request, and I wold like to find list of order that generated the request,
    thanks
    Gabriele

    Gabriele Montori wrote:
    >
    > 2) I would like to know if there is a way to bind purchase request to Production Order (not planned order) BEFORE the MRP runs and create a Purchase Order, because when creates a PO for stock it aggregates all requests in one order.
    I think I understand what you are trying to achieve -> this sounds like you would want to do what SAP standard would do with KD/E-requirements (customer specific) = every material=item=position in a SD-order will create it's PR or production order. In the same way you want to generate one PR-item per production-order component - wait! - Maybe you want to create a single PR for every component in the production order???
    Gabriele Montori wrote:
    >
    > I hit that road but for stock material, RESB-AUFNR is left empty in table..
    You will have to talk to your MM/PP-functional ... if you do not have RESB-entries I have no idea how this process is setup. You probably do not have components in those production orders, only one header-material (CAUFVD-MATNR).  Depending on what is configured in the material-master MRP views + what modifications/enhancements are installed around the complete process, you could have almost any setup. It's impossible to say without seeing it. Make sure s/he explains to you exactly, since even with different stock-materials there could be different setups for procurement.
    Edited by: Mylène Dorias on Jul 22, 2010 11:37 AM

  • Purchase request for stock material

    Hi
    when MRP runs, take all purchase request of all production order for STOCK material and aggregates all request together in one purchase order. In this way, I lost binding between purchase request and production order. Is there a way to make MRP not aggregating request but use different position for different purchase request in case of stock material?
    regards
    Gabriele

    Gabriele,
    MRP does not create purchase orders.  I assume you are talking about the Purchase requisitions created by MRP.
    In MTS by definition there is no 'binding' between supply elements (such as Purchase reqs) and demand elements (such as production order reservations).  In MTS, all production is 'anonymous'.
    You can cause MRP minimize the amount of aggregation of supply elements by changing lot size of the components to EX, and ensure that the 'individual/collective' indicator (MRP4) is not set to '2', but there is no way to guarantee a 1-to-1 relationship under all circumstances between mrp rqments and mrp supply (purchase requisitions)
    Companies that have a business requirement to 'hard-link' supply to demand use MTO.  If this is your requirement, it will never be completely satisfied with MTS.
    Rgds,
    DB49

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • How to create a Purchase Requisition for a material component in WBS or NW?

    Hello All,
    I have created a project with the following structure:
    Project Defination (Construction of Sub station)
          Main WBS
                   Level 1 WBS
                             Level 2 WBS
                                       Network for level 2 WBS
                                                      Activity  (Procuring Material)
                                                                 Material Component - MATXXX (Stock Item)
    Now in the above structure i have a activity where in i am procuring all the materails required to construct a Substation.
    So under this activity i have assigned all the materials which are needed to build Substaion.
    After i change the status of the project to release, there  a reservation created for the quantity of the material which i have mentioned in the material component under the activity.
    Now my querey is, how should i create a Purchase requisition for the reserved materail quantity in order to bring in the stock against the WBS / network / Project ?
    Awaiting your reply.
    Thanks and Regards,
    Sudarshan.

    Hi Sudarshan,
    In your case you can run Me5J to check the list of PR created against your project.
    Then Create PO and similarly you can check list of PO in Me2J.
    Then followed by GR and check if any GR release exist in MIGO. Then once after doing GR you can check the Material in Stock which will move material from Unrestricted stock to Project Stock which you can check it in MMBE.
    Then you can do the Good Issue in MIGO itself and run MIRO to complete the cycle.
    Regards'
    syed

  • Purchase order for sample material

    Dear All,
    Do you have any suggestion about purchase for sample material?
    During we develop new vendor, we will get sample material from them and do not pay, but after we use the material to produce, and the quality is OK, we will pay for the sample materials, the process should cover purchase, production, QM, warehouse.
    I will reward you.
    Best regards
    Gang

    Hi,
    I would suggest that you try a consignment PO.
    this will bring the item into stock but the item will not cause any finacial postings (the item is classed as still belonging to the vendor). Then if and when you decide to uise the item in production, consume it from consignement stock and this will  then trigger a debt to the vendor of the value of that item (from the consignment info record) and so you can then accept an invoice from the vendor or simply send them a payment by using consignmenmt settlement functionality.
    Worth considering
    Steve B

  • Display purchase requisition for a material

    Hai...,
    can any one help me in developing a report to display purchase requisition based for perticular material number.
    tell me the tables and fields to  use..
    if possible sample code tooo....
    thanks in advance.

    Tables for Purchase Requsition.
    For Purchase Requisition
    EBAN Purchase Requisition
    EBKN Purchase Requisition Account Assignment
    EBUB - Index for Stock Transport Requisitions for Materi
    EINA - Purchasing Info Record: General Data
    EINE - Purchasing Info Record: Purchasing Organization D
    EIPA - Order Price History: Info Record
    EKAB - Release Documentation
    EKAN - Vendor Address: Purchasing Document
    EKBE - History per Purchasing Document
    EKBEH - Removed PO History Records
    EKBZ - History per Purchasing Document: Delivery Costs
    EKBZH - History per Purchasing Document: Delivery Costs
    EKEH - Scheduling Agreement Release Documentation
    EKEK - Header Data for Scheduling Agreement Releases
    EKES - Vendor Confirmations
    EKET - Scheduling Agreement Schedule Lines
    EKETH - Scheduling Agreement Schedules: History Tables
    EKKI - Purchasing Condition Index
    EKKN - Account Assignment in Purchasing Document
    EKKO - Purchasing Document Header
    EKPA - Partner Roles in Purchasing
    EKPB - "Material Provided" Item in Purchasing Document
    EKPO - Purchasing Document Item
    EKPV - Shipping-Specific Data on Stock Tfr. for Purch. D
    EKRS - ERS Procedure: Goods (Merchandise) Movements to b
    EKUB - Index for Stock Transport Orders for Material
    EORD - Purchasing Source List

  • Block purchase receipts for a material for a given period during MRP.

    Hey all,
    What is the most simple way to block delivery of a material for a specific period of time within a plant? I want to block a 3 month period, where no deliveries can be received, however I still want to run MRP during this time. I want MRP to build up stock prior to the 3 month period to cover any requirements/forecast during this period.
    The solution has to be material specific, so I was thinking about using a planning calendar to only allow deliveries for that period at the beginning of the period, but my issue here is that planning calendars are set as transportable and I don't want to have to transport new calendars each time a material has this requirements, which is quite often.
    Any ideas?
    Mark

    Thanks for the feedback.
    Unfortunately this field only becomes relevant to MRP once the status becomes active. MRP does not consider the Valid From date when performing calculations. If the current date falls within the valid from date on the Material, then MRP will not run for that material. At this point it is too late. I need to be able to ramp stock levels up to still cater for demand during the period of unavailability.
    Also, I need to be able to specify a period (to AND from) where I cannot receive the goods.....

  • Purchase Price for the Material

    Hello World of SAP,
    Hallo Welt von SAP,
    Is there any report in standard SAP for Material Purchasing Price?
    Basically I'm using table EINA and EINE to check that purchase price,
    if the MAP price i check in MBEW.

    Dear Nikamz,
    Material net price in PO is store in info record , you can use ME1M or ME1P, you can take a look in it.
    Regards,
    w1n

  • Purchase reports for components of production BOM Based on Its Sales BOM

    Hi all
    I have sales BOM and the components of Sales BOM are production items having Production BOM and the components of production BOM are purchase items
    My problem is when i create a sales order for my Sales BOM, i should be able to get a report for purchase items that is how much i have to purchase with out using MRP
    pls anyone help me with approbriate queries
    Thanks and Regards
    Boopathi.T

    Hi Boopathi,
    You may try this one:
    SELECT Distinct T1.Code, SUM(T0.Quantity * T1.Quantity) 'PO Qty', T2.DocNum
    FROM dbo.RDR1 T0
    INNER JOIN dbo.OITT T3 ON T3.TreeType = 'S' AND T3.Code = T0.ItemCode
    INNER JOIN dbo.ITT1 T1 ON T1.Father = T3.Code
    INNER JOIN dbo.ORDR T2 ON T2.DocEntry = T0.DocEntry
    WHERE T2.DocNum LIKE '[%0\]%'
    GROUP BY T1.Code, T2.DocNum
    Thanks,
    Gordon

  • To find purchasing organisation for material

    Hi Experts,
    Sounds quite a trivial query but i really could not find the way out to link material with purchasing organisation.
    Please note that we do not want to use Puchasing Info record tables. This is so because requirement itself says automating the PIR creation process through ME11. and for that we need to filter out materials which have a specified Purchasing Organisation.
    Now you may ask a question as to how Purchasing org is maintained on the very first place. This has been created via provision in ISR webform for creating material.
    I hope i have made my query clear enough. Seeking your expert advise on the same.
    Thanks,
    Shreya

    Hi,
    I think  you can not find Purchase organization for a material as one maerial may come from multiple purchase organizations
    (However it depends on the Buisness process) but you can find purchase ogranization with material and plant combination.
    Regards
    Bikas

Maybe you are looking for

  • Xsl problem in weblogic7

    The problem occurs when i try to parse a double value expressed in scientific notaion. e.g. -3.902317E4. <xsl:variable name="temp"> <xsl:value-of select = "tempExpense" disable-output-escaping = "no" /></xsl:variable> <xsl:value-of select = "number($

  • Key Lenght too short error with dbms_crypto.encrypt

    Hi Friends, I am getting above mentioned error with dbms_crypto.encrypt. I had created a thread in technology --> security forum but i am not getting any help from there. ORA-28234 Key Length too short with dbms_crypto.encrypt Appreciate if anyone he

  • Can I migrate photoshop elements 9 stuff to cs5 photoshop?

    sorry for the n00b question. I was looking at buying a macbook pro with cs5, but didn't want to lose my previous work editing and effects. to be more specific I'm doing website design in Columbia SC and wanted to know if they had image optimization f

  • Flex kbd event help

    Using the example I found at http://help.adobe.com/en_US/flex/using/WS2db454920e96a9e51e63e3d11c0bf64a29-7fdb.html, I modified my Flex app to listen for keyboard shortcuts being pressed.  It works but only after the user clicks on a blank spot on the

  • OAUG Enhancement Request System (ERS) Pilot Program

    OAUG Enhancement Request System (ERS) Pilot Program The OAUG Board of Directors and Oracle® Corporation have previously announced the Pilot Program for the OAUG Enhancement Request System (ERS). This system has been collaboratively designed to achiev