PR Release Strategy for DOCUMENT TYPE
Hi Gurus,
I have created a Document Type in PR & I want to set a Release Startegy for ONLY that Document Type.
Can anybody explain me step by setp procedure for this ?, I have gone thru one link :
http://www.sap123.com/showthread.php?t=59
but I could not set the relase startegy. May be I am missing something ??
Thanks & Regards,
Vikas
If you want to define the release strategy only for doc type
then
create the class using CL02
create the chra for Doc type using CT04 - the table is CEBAN and the field is BSART
then assign the doc type value in char (after you create the char then go back and assign the value)
now assign your char to your class
now go to SPRO and goto PR release strategy config - procedure with classification
go to Set Up Procedure with Classification
create your release group by assigning the calss you have created (make sure this config should have only one class)
create release code
release indicator is already exist in sap so you don;t need to create
create your release strategy and assign the value in classification tab of release strategy
this will work
but make sure that - if you are creating only for doc type means all the reqs created for this doc type will be blocked by the system. so if you have reqs like if this doc type and the amount >5000 then only block then you have to have amount is also you char in your class
hope this will give you a cleat idea
Similar Messages
-
Release strategy by document type wise
in our current project we are prepare lot document type in PO. some document type i need release strategy some no need
how i have assingn that
pls explain the stepscreate a characteristic with CEKKO--BSART and assign the same in your class and further use this characteristic in your release strategy.
regards,
Indranil -
Hi Friends,
I have a issue to fix. The issue is releated to PR.
There are some PR's in the system which has wrong release strategy picked up or wrong approvers picked up due to some congif change. now that the config changes are rectified correctly, we need to find a solution to correct the PR's which got affected due this.
I have to retrigger the release strategy for all the affected PR's.
The characterstics which we have consider for release strategy is Document Type, Company Code and Price Range.
Can anyone suggest how can we retrigger the PR in bulk or individual to all the affected PR's, so that it picks up correct release strategy as per new config changes.
Regards,
Manjunath KHi,
Refer the discussion to triggers release again on release code addition/change in release strategy.
release code is changed on PR release strategy - old PR can´t be approved
Regards,
Biju K -
Release Strategy for a new material type in PR
Dear Friends,
One of our client require new Release Strategy for a particulat material type PR. Can u pl provide me the steps to configure a new release strategy for PR for a particular Material type.
Regards,
AskHi,
Create a Char for your material types in CT04(MARA-Table,Field-MTART) and assign the same to your Class in CT02.
Then follow all the cusmozation path for your PR release startegy .
For Config part refer the below wiki link it may help you.
http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE
http://wiki.sdn.sap.com/wiki/display/ERPLO/ReleaseprocedureforPurchaseRequisitioninMM?focusedCommentId=195723808#comment-195723808 -
What is the use of Release Strategy for Sales Document
Hi,
Can i know what is the use of Release Strategy for Sales Document? Difference between lowest level and Highest level.Hi,
Can i know what is the use of Release Strategy for Sales Document? Difference between lowest level and Highest level.
Lowest Status No: Sale Document can have several statuses at the same time. However, only one of the statuses may have a status number. If another status with a status number is activated; the old status with status number is deactivated. This is only valid under certain conditions. The system makes a note of the status with the highest status number that has been reached up to the present. The "lowest number" of this status number determines which status number a new status must have.
Highest Status No: Sales Document can have several statuses at the same time. However, only one of the statuses may have a status number. If another status with a status number is activated, the old status with a status number is deactivated, provided the new status number does not exceed the 'highest number' defined for the old status number
If you want more clarity try to check below link
http://www.sapfunctional.com/SD/ReleaseStrategy/Index.htm
Regards,
Prasanna -
Release strategy for PO and Contract
Hi,
I maintain characteritic for PO
Plant
Doc Type
Net Order Value
Purchasing Group
I maintain characteristic for contract
Company code
Target Value
Doc Type
Purchasing group
My class consist of
Plant
Doc Type
Net Order Value
Purchasing Group
Company code
Target value
Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
Q2: What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
Thank for your adviceFirst of all
For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
You have to maintain all the characteristic value then only it will trigered release.
Check the release indicator as well.
Hope it will help. -
Release strategy for Scheduling Agreement(SA)
Dear Forum,
This issue is with regards to the release strategy for Scheduling Agreement(SA)
Until now release has only been applicable to contracts at our client site. But we now plan to introduce it for SA as well. Such a feature is available in SAP but the problem is that with the given release strategy GR is not allowed until the release is affected. The system allows you to post the delivery schedule.
Now what I want is that after making the SA the system should not allow to make delivery schedule if release is not affected.
We also have MRP run at client site..Kindly suggest the procedure as, how to configure it.Are der any User Exit for the same,if so please discuss..
Warm Regards
Nainesh
SAP ECC 6.0Hi,
What's the SA Type that was created via MRP.
If it's LP (without release document), release will not do anything BUT
If it's LPA (release document), then you will not be able to Post the GR until release is affected.
Thanks.
Scheduling Agreement can be categories as
1) LP (without release document) and
2) LPA (with release document)
If use LP, you can do GR without release but with LPA, you need to release the schedule line via ME38.
Thanks.
NanoSAP
Posts: 58
Registered: 1/5/09
Forum Points: 6
Re: release strategy for Scheduling Agreement(SA)
Posted: Jun 26, 2009 8:32 AM in response to: sathish.kumar Reply
Dear Mr.Satish,
Thanks a lot for your earliest reply...But my point is i want the system should not allow to make delivery schedule if release is not affected...Though schedule lines are generating through MRP run...Is is possible,by any chance...?? -
How to setup a release strategy for store generated purchase order
Hi there,
Does anybody know how to setup a release strategy for store/plant generated purchase order? I have a request from our client, but I never cross this before. Please help and let me know the step with every single detail.
Greatly thank for your help.
Kind Regards,
2teaPlease go thru the below Release Procedure and check whether you have maintained all the settings properly.
PO RELEASE STRATEGY
The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
CT04 - Create Characteristic e.g. NETVALUE
Click Additional data Table name CEKKO Field name GNETW and press enter
(for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
In the Basic data (X refers to tick),
X Mutliple values
X Interval values
In the Value data, in the Char. value column, type >10000 and press enter
Save your data
CL02 - Class
Class - Create REL_PUR
Class type - 032
Click Create
Description - Release Procedure for Purchase Order
In the Same Classification section, click Check with error
In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
OMGS - Define Release Procedure for Purchase Order Type
Release Group - New entries
Rel.group Rel. Object Class Description
02 REL_PUR Rel. Strategy for PO
Release codes - New entries
Grp Code
02 01
Release indicators
Release indicators Release Description
0 Blocked
1 X Release
Release Strategy
Release group 02
Rel.strategy 01
Release codes 01
Release status 01
Classification Choose your check values
OMGSCK - Check Release Strategies
(make sure there are no error messages)
Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
The person with the release authorization have to use ME28 to release the Purchase Order.
Regards,
Ashok -
Want to change my existing Release strategy for - PR, PO & Service Entry
Hallow Experts ,
Here i have a requirement to change the existing Release strategy for Purchase Requisitions, Purchase Order and Service Entry sheet. Already There are unreleased Purchase Requisitions and Purchase Orders in Production system with the existing Release strategy.
1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
thanks in advance.
regards
vbDear Vikrant,
1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
Sol: Not Required but , doing it is recomandaed
2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
thanks in advance.
Sol: No Only thing you have to do is that go to your class 32 and chek what is the charaterstic define for the purchasing group copy it
2 Now go to Tr.code: CT04, give that charaterstic and go to change mode and give the additional Purchasing group there, and save it
3 Now go to Release strategy where you want to add that Purchasing group, go to classification tab and tik that new purchase group , that group will now in fact of release Strategy -
Release strategy for PO, RFQ & Contract
Hi,
We have created release strategy for PO, RFQ & Contract.
Characterisitc is created for Target Value for Header Area (CEKKO-KTWRT)
for RFQ & Contract it working fine but for PO not triggering.
what can be the cause.
Pls guide.Hi,
Melih is right, for POs you can not use the target value.
What you might do is to include the document type and CEKKO-GNETW as additional characteristics and then set for contract document types the GNETW blank, and for PO documet type the target value blank. Blank means any value should fit.
I hope this hint helps!
Best Regards,
Arminda Jack -
Release strategy for Return PO
Hi,
Can we create Release strategy for Return PO's. ?
Regards
SunilHi,
The process for return PO is:
Process:
- Create a return PO
- Create a outbound delivery
- Goods issue
Release Strategy can be created for All Document Types as Document Types being one of the determining factors for Release strategies. So under Classification data Characteristics which we maintain determine the release strategies for a Particular Purchasing documents. Actually it depends on your Business case that for what all documents you want to have a release strategy config.
regards,
Prashant Rathore. -
Release strategy for Future validity period- (Outline agreements)
Dear All,
I want to create release strategy for Scheduling agreement.But I am creating the SA for furure validity period.In this case how the release strategy will triger.
E.g Today 09.03.09 I create a Sceduling agreement and the validity period I maintain is from 01.06.09 to 31.12.09 and Amount say 100 Rs.
I am using Characteristics Doct type and Amount.. The system checks the rate as on date (i.e on 09.03.09) and since it doesnt find any value the Release strategy is not trigeering.
How to set up release strategy in the above case.
Thanks in Advance.
Regards
AmarHi Amar,
1) if you maintain a target value (EKKO-KTWRT) in the header of the
contract this value is the basis for the determination of the release
strategy. If the target value is 0, the system will cumulate the
values of the items and will use this value for the determination.
2) So if the target value is 0 and you change the price of a condition
with a validity period in the future the system will react in the
following way:
Example:
the contract contains one item with quantity = 100 and a net price
of EUR 5,-.
all contracts with a target value from EUR 0 - 1.000,- should be
subject of a release strategy
the contract is created and released on October the 1st
ME32K -> October the 2nd you define a new price of EUR 7,- with a
validity period from 03.10.09 - 30-10.09 -> you save the contract
-> the release strategy is not reset, as the start date is not
reached yet (system date < startdate of validity period)
ME32K October the 3rd you change a field in the contract -> the
release strategy is reset
This is system design that a release strategy can only be reset through
an action by the user. The determination of the release strategy can't
be triggered automatically in the background.
If you create a document which is subject of an overall release strategy
(e.g. p.o., contract) the determination of the release strategy takes
place when the user hits the 'save' button or chooses the 'check'
function.
So there must be a kind of event that tells the system that something
has changed.
Regards,
Edit -
Release strategy for auto created PO's
Hi Guys,
I have a requirement to implement release strategy for automatically created PO's.
PR's are created automatically and we have a program which create PO's automatically.
we would want to release them before generating output to vendor.
could anyone please have any inputs here.
regards
mittuHi!
You may use your existing release strategy or create a new one (depending on your requirement). You just have to add/ use the document type you used for your auto-generated POs.
Hope this helps! =) -
No release strategy for service PO
Purchasing document xxxxxxx cannot be released
Message no. MEPO823
I created release strategy for service entry sheet through following process.
1. Created three characterstics(service_val, serv_plant & ZSER_DOC TYPE) and assigned it to class 032 (gave it name service entry sheet) Communication structure CESSR and fields WERKS etc...
2. Than maintained all the config setting for service entry sheet through External service management..Maintained release groups, release codes, release strategy and r and maintained all the values .
3.I made a service PO with doc type FO
Now i dont get a tab of release on the service PO tab and get the above error.
Just let me know step by step how to config release strategy for service entry sheet.Do we need to maintain all above entries...?
For PO we have release strategy maintained for all document types and i am able to release the PO.
Regards,
ShailendraKeep the release strategy at Plant level only....All the purchasing docs will get blocked
-
Purchase Requisition Release strategy for MRP based Requisition
Hello Gurus
We want to set up the urchase Requisition Release strategy for MRP based Requisition ..Any can one Please share your experience about the impact down the road?
Thanks
NickHi,
If you want include the MRP related PR in Release strategy.
You need to include the field CEBANESTKZ-Creation Indicator (Purchase Requisition/Schedule Lines) in one of the characteristics which you create and include the characteristics value as per the field values like AReal time, BMRP, CConverted Planned order etc.. and include the charactristic in the Release Strategy will release group & release codes.
So when ever the PR is created through MRP run then this creation indicator will update in the PR as per that release Strategy will trigger in the PR.
there is one more option you need to create the separate document type as MRP PR then create document type as characteristics and include the values of all these document types and include in Release strategy.
But it will not pop up for direct PR from MRP run only trigger when planned order is converted to PR manually there you need to select this MRP document type then release strategy will trigger.
I think first one is best suited.
rgds
Chidanand
Maybe you are looking for
-
I try to play a song but an exclamation point shows up saying the file could not be located. They play on my 1st gen video ipod just fine. It does that with more than half of my songs. Originally I had my songs in an external hard drive but the HDD f
-
Non-English language install of the SUN OS on Sparc
Hello... I'm sure that you used to be able to do a totally non-English install e.g. in French, German, Japanese etc. but I'm told the only way that you can now install Solaris Sparc is in English and then add the language packs. Can you advise if thi
-
HT3228 Can't get email accounts to push new emails through
I Have iPhone 5 and I'm having trouble receiving emails. It won't allow me to select push I need to select fetch which means I'm only receiving emails if I open up my mail application. i Have a hotmail account which can be selected to push and I rece
-
Enabling VT-x in the BIOS of a G780
Hi I've tried to set up a 64bit guest operating system in VMWare and in VirtualBox, but have been unable to. I understand that the problem might be that VT-x is not enabled in the BIOS. However, on booting up my G780 and using F2 to edit the setting
-
My PC isn't accessing the internet via my Time Capsule.
I just got the new AirPort Time Capsule 3TB with 802.11ac WiFi and set it up. My iMac and my iPhones and my PC laptop are all connecting to the network just fine; however, the PC (a Toshiba Sattelite running Windows Vista) is the only device unable t