PRD at 102 with v price material

Hello everybody, I have a 102 movement with PRD posting although the material has a variable control price. Does anybody know why this PRD operation appears. Thanks in advance.

Hi María,
According to the Accounting documents that you mention for the movement type 101:
89 3280000000 Oa mat de oficina 4,89 EUR S BSX
96 4009000000 Fctras pntes recibir 4,89- EUR H WRX
40 6028000100 Mat oficina y divers 4,89 EUR S EIN
50 6122800000 Material de oficina 4,89- EUR H EKG
and for the movement type 102:
99 3280000000 Oa mat de oficina 5,08- EUR H BSX
86 4009000000 Fctras pntes recibir 4,89 EUR S WRX
86 6122800000 Material de oficina 0,19 EUR S PRD
50 6028000100 Mat oficina y divers 4,89- EUR H EIN
40 6122800000 Material de oficina 4,89 EUR S EKG
I think that the issue is as follows:
I do not know how much quantity you were posting here, but let's imagine that the 101 and 102 have been made for 1 PC.
When you received this 1 PC it was valuated according to the value given externally by the purchase order: 4,89 EUR.
Then, you make some other movements and finally decide to cancel the reception.
Just before cancelling the reception, your stock and value situation were as follows:
Stock before the posting: 1 PC.
Value before the posting: 5,08 EUR.
You then post the cancellation. With this cancellation we issue from our warehouse the only 1 PC that we have. This is, with this cancellation we are clearing totally the quantity in our stocks. After this posting is made our stock will be zero.
If we clear the stock, we have to clear the value also.
Otherwise, we would reach an inconsistent stock situation if we have 0 PC valuated with a value different than zero.
Because we have to clear the value we post -5,08 EUR to the stock account BSX in order to totally clear the value of the stock.
After this posting is made, the stock is zero and the value is also zero.
The stock and value situation are totally consistent.
However, the WRX line follows a different valuation rule, as it has to clear the GR/IR Clearing account, independently of the values of the stock posting. The WRX line is valuated again with the values given externally by the purchase order: 4,89 EUR.
The difference is posted to the PRD line, even if the material is managed by MAP control.
Note: You can check the stock and value situation before the posting was made in the table MSEG for the material document.
See the fields MSEG-LBKUM and MSEG-SALK3.
MSEG-LBKUM is the total stock before the posting was made (see the data for your document -> is it the same quantity as the quantity in the reversal? -> then you were clearing your stock).
MSEG-SALK3 is the total value before the posting was made (see the data for your document -> is it the same 5,08 EUR? -> then you were clearing your stock value).
I hope this information helps you!

Similar Messages

  • System posts to PRD account for moving average price material.

    Hi,
    We are procuring spare parts (ERSA) externally, which is having price control as MAP.  While doing GR, system shows message "Account 602042 required an assignment to a CO object."  Here the problem is account 602042 is a price difference (PRD) account.  Why should system ask for a G/L, which is mentioned in PRD in this case. 
    Please note that this is first movement for the material and stock is zero in plant.  There are no  material documents for this material.
    Please suggest.
    Regards
    Alex

    If ML is active, then this can happen.  Please see note  532932  FAQ: Valuation logic with active material ledger.
    material is valuated by the inventory management similarly to the posting logic of a material managed by a standard price. The accounting document generated by the inventory management shows this posting logic; the amount posted in the material document corresponds to the product from quantity and moving average price and not to the externally assigned value.
    Generated accounting lines of the material ledger (depending on the material ledger settlement control) then valuate the stock.
    Example:
    Material: Testmat 1
    Price control: V
    Moving average price: 10 EUR/PC
    Purchase Order: 10 PCS for 150 EUR
      > goods receipt for the purchase order for 10 PCS
    Acctg documents:
    1) GR document:
       BSX 100 EUR D
       WRX 150 EUR C
       PRD 50 EUR D
    2) ML document:
       BSX 50 EUR D
       PRY 50 EUR C

  • Vendor master data - Single material with multiple price

    Hi Gurus,
    Per our set-up, we have 1 purchasing organization to handle the central procurement function for purchases to various countries/destination.  As such, whenever we seek for quotation from a single vendor, the vendor will provide their price for a single/same material, e.g. ABC, with various price by locations. for example:
    1. Material: ABC
    - Price: $83 (EXW)
    - Price: $85 (FOB, Tianjin)
    - Price: $100 (CFR Port Klang)
    - Price: $120 (CFR Mumbai)
    - Price: $160 (CFR Jabel Ali)
    Is there a way I can use any of the vendor master records (e.g. outline agreement / info records) to capture a single material having multiple price?  At the same time, this infomation is available during our PO creation (e.g. via ME57).
    Thanks in advance.

    Dear
    For Condition Type PB00, SAP has some standard requirements in Pricing Schema.For one material different location one requirement is there.But as per your requirements you need to put logic through ABAP and it will definetely work.The exact requiremnt i'm not remembering.
    Just go through all the requiremnt and respect to PB00, put the requiremnt and put the logic.
    Revert me for the result.
    Thanks & Regards
    PKB

  • Material purchase with different price

    dear all,
    please let me know standard reports in sap which can understand me the material purchase with different prices along with period.
    thanks in advace

    Hi,
    Please refer MBEW  & MBEWH tables. If the you want a report then go for a simple SAP Querry to meet your requirement.
    regds,
    CB

  • MIRO, enter one material with different price

    Hi Experts,
    i have one PO and the material number is 20MTF70301, the quantitiy is 3. Because of the material price is different(same material number) i need the enter them line by line. For example;
    Material                     Plant         D/C        Amount      Quantity
    20MTF70301     1015     S Debit     1917,30     1
    20MTF70301     1015     S Debit     794,55     1
    20MTF70301     1015     S Debit     249,39-     1
    But the system warning is like that "Double entries for material 20MTF70301 1015 are deleted". After this warning , system automatically delete last 2 line.
    How can i enter same material line by line.
    Thanks,

    Hi
    It will naturally delete the two last items, just understand, You have the same material same vendor but want to have 3 different prices in three lines in One PO, are you not contradicting the basic idea which SAP follows, how do the in-fo recoprd will get updated? with which price?
    It is not that you can not do , but for that you have to go for another PO for a different price and the vendor but not in the same PO.
    Regards

  • Can i create credit note request with selling price,but without material no

    hi
    can i create credit note request with selling price, but without material no.? which item cat. i should choose?
    thanks

    Hi,
    The price is controlled for any item category with the help of the Item Category setting (VOV7 tcode) that is, the field Pricing under Business Data section.
    Select the option X in the Pricing field.
    Now for your case, the setting will be greyed out. as it is a text item....
    To make it for entering any option ....then change the option to A in the Item Type field.
    Reagrsd

  • Creation of PO with Zero Price

    Dear Experts,
    I need to craete a PO with 0 Price (Free of Cost). But I will be charged only for the transportation.
    Example I am creating a PO for 1000 TON of Material. Free of Cost. For delivering 1000 TON 100 delivery will be required. Transportation charge for each delivery =  150
    So I should be charged for only 100 * 150 = 15000.
    How to do this in SAP.
    Thanks.

    Hi,
    You can post Transportation charge related to separate G/L account in MIRO.
    Active "G/L account'  TAB in the MIRO screen to post COST by selecting check box of "Direct posting to G/L account=active" &  then save, in the following path
    SPRO> Material Management>Logistics Invoice Verification->Incoming Invoice->Activate Direct Posting to G/L Accounts and Material Account
    OR.
    Post Transportation charge related in t.code:FB60.
    For check link:
    http://www.sap-img.com/financial/unplanned-and-plan-delivery-costs-in-stock-and-gl-account.htm
    Regards,
    Biju K

  • Items in the shopping cart appear with different price than in the catalog

    Hi All,
    We are running SRM 5.0 (Classic Scenario) with external catalogues.
    After selecting items from the external catalogue and transferring them to the shopping cart, the items appear with different price(the problem exists in the productive system)
    The strange thing is that there is no dependence or sequence between the differences. For example, in one shopping cart, one item is with correct price, the price of the other item is not correct (when I click on the icon which is  showing item details in the catalogue, the price is different than the one in the shopping cart). Sometimes the difference is significant, sometimes not - if the item price in the catalogue is 22.34 EUR, in the shopping cart is 21.22EUR or if the item is 45.62EUR in the shopping cart is 45.60 EUR. There is no logic.
    I tried to create a shopping cart in the support system, with the same items from this catalogue, and they are sent back in SRM with the correct prices.
    I traced all OCI parameters, sent from the supplier catalogue, and everything is correct.
    At the example given below the price in the shopping cart ordered in the productive system is 69.00CZK, and after that during the test the correct price of 73.870CZK has appeared.
    NEW_ITEM-DESCRIPTION==Durable-KeyClip-keytag%2C+black
    NEW_ITEM-MATNR==
    NEW_ITEM-MATGROUP==
    NEW_ITEM-QUANTITY==10
    NEW_ITEM-UNIT==EA
    NEW_ITEM-PRICE==73.870
    NEW_ITEM-PRICEUNIT==1
    NEW_ITEM-CURRENCY==CZK
    NEW_ITEM-NEW_ITEM-LEADTIME==1
    NEW_ITEM-VENDOR==
    NEW_ITEM-VENDORMAT==0176%2F1957001
    NEW_ITEM-MANUFACTCODE==
    NEW_ITEM-MANUFACTMAT==
    NEW_ITEM-CONTRACT==
    NEW_ITEM-CONTRACT_ITEM==
    NEW_ITEM-SERVICE==
    NEW_ITEM-EXT_QUOTE_ID==
    NEW_ITEM-EXT_QUOTE_ITEM==
    NEW_ITEM-EXT_PRODUCT_ID==23109
    NEW_ITEM-EXT_SCHEMA_TYPE==UNSPSC
    NEW_ITEM-EXT_CATEGORY_ID==55121504
    NEW_ITEM-LONGTEXT_1%3A132==Durable-KeyClip%0D%0Akeytag%2Cblack%0D%0A%0D%0A6pc
    I checked the error log in SLG1 for BBP_OCI, and no error message exists. In my opinion the problem can be in supplier system, because otherwise all items will be with wrong price. And at the moment, there are shopping carts in which all items are with the correct price!
    It is not something in the user profile, because in one shopping cart created by one user some items are correct, some of them not.
    I also checked with the supplier,  they said that they haven't change the price, recently.
    Has somebody of you met this problem?
    In the IMG-> Define External Web Services (Catalogs, Vendor Lists etc.) I have set all parameters for the standard call structure: the URL of the supplier, our company ID and password for their catalogue.
    In the Detail view for the catalogue, the following parameters are set
    u201CAdditional functions in the product catalogueu201D field:
    -     Display product data again in the catalogue
    -     Validate product data from SAP Enterprise Buyer
    -     Find supply sources
    u201CTechnical Settingsu201D field
    - Use Error Log
    Thanks,
    Desi

    That means that we are not maintaining material numbers in SRM, so there are no predefined price or info records for that materials in R/3 system, or in SRM.
    In the set up of external catalogues, validation of the price is set. Which means that, if a new shopping cart is created from already existing one, and meanwhile, a change of the price is done by the supplier in the catalogue, the new item price will be adopted in the shopping cart.
    No prices are maintained in the SRM system, everything is from the supplier catalogue.
    Desi

  • Production Order GR with Planned Price

    Dear All,
    We are using following steps for production order=
    1) Create BOM, for Semifinished material with Price control = "S"
    2) Create Roting, with all Keys PP01, PP02 and PP03 with Material allocation to respective steps
    3) Standard Cost Estimation using CK11N and CK24
    4) Create Production order using CO10 with Material and WBS Element.
    5) Material issue against Reservation. But the material may be changed after releasing prodction order first time. And Actual issue for the BOM material may be more or less in qty.
    6) Final confirmation with completion of last phase confirmation of production order.
    7) Production Order TECO
    8) Prodction Order Settlement using KO88
    Now my problem is while I am doing final confirmation the GR done is with Planned price (Based on BOM) + Subcontracting charges which it is set with production order while releasing it for the first time.
    Kindly tell me is the system behaviour is correct or wrong?
    We are expecting that GR should happen with the actual material issue price + Subcontracting charges only.
    Please reply.
    Thanks & Regards,
    Vishal Kadia

    Vishal,
    This is for your information.
    If you have production order of 1 EA- Starnadar Price =10 rs
    Raw material cost=5
    Activity Cost=2
    Overhead Cost=2
    So COM=9 rs
    Suppose after production order creation plan cost is 9 rs, hence after confirmation there is no varience (plan vs actual) so actual cost is also the same 9 rs.
    Now as you said if system will go for GR against actual cost, that will post in cost of good mfg account at the time of GR.
    As per std SAP after GR also you can issue the material to that order, hence if you will go for more goods issue of new material against that order (unplanned issue) of rs 5 for the same order then the actual cost will again change (recalculated), but for that oredr material is allready GR with actual cost, then you will not able settle the cost of newwly issued material on that order.
    So whatever the plan and acual cost GR will be done against std price maintioned in material master ( 10 rs)
    This is my understanding.
    Hopes that will clear your dought.
    Tara

  • Urgent:Inventory Modelling with Moving price

    I have to create an Inventory report storage locationwise material stock along with standard price and moving average price.
    We have a z cube zic_c03.
    Moving price and standard price is stored an Z ODS on fiscal/period wise.
    I need to have the following fields in the report
    charactersitics
    Plant
    Material
    Storage location
    Price control(from Z ods)
    keyfigures:
    Valuated stock qty(from zic_c03)
    Valuated stock value(from zic_c03)
    Standard price(from ods)-Using routine
    Moving Price(from ods)-Using Routine
    I have created another cube(included all the fields from zic_c03 and added the three fields from ODS).
    For the fields included from ODS, I have written an lookup routine in the new cube (zic_c04) update rule.
    For ex.Stand price routine as follows:
    PROGRAM UPDATE_ROUTINE.
    TABLES: ...
    DATA : tstd like /BIC/AZMM_O0200-pRICE_std.
    DATA : tavg like /BIC/AZMM_O0200-pRICE_avg.
    DATA : tpc  like /BIC/AZMM_O0200-PRICE_CTRL.
    fill the internal table "MONITOR", to make monitor entries
    select single PRICE_STD
      into tstd
      from /BIC/AZMOV_O0100
    where material = COMM_STRUCTURE-material
       and plant = COMM_STRUCTURE-plant
       and FISCPER = COMM_STRUCTURE-FISCPER.
      RESULT = tstd.
      RETURNCODE = 0.
      ABORT = 0.
    I have the following issues:.
    1)After adding the price control Indicator(assigned to all keyfigures in update rule) Valuated stock qty and value showing in negative.
    2)Intially I didn't compress the new cube(zic_c04).After seeing negative values I compressed(no marker update enabled) it and checked.But still showing negative.
    2)If I assign price control Indicator to only standard price and moving price Iam not getting any results for valuated qty and stock(price control Indicator = 'not assigned')
    Pls help me to do the right modelling for the above requirement.
    Thanks in advance.
    Regards
    Soujanya

    Hi,
    I have different Modeling scenario to get MAP in BIW.
    Take a Look on this thread:
    Re: 2lis_03_um and MBEW- STPRS
    Re: How to get Moving Average Prince and Standard Price in BW (inventory cube).
    With rgds,
    Anil Kumar Sharma .P

  • MR21 price change for S price material

    Hi all,
    We are facing an unique problem.
    Earlier on 05May, price was updated for a S price material from A to B thru MR21 having posting date 01May. Price change document and its accounting document has got generated successful. On checking the price on 25May, price is A i.e. Old price. I listed the price change documents for the material, I was not able to find the any document after the above said date. So far the movements has happened in old price.
    Further I checked in MBEW, price is A i.e.Old price. In table MBEWH for the april period, price is B.
    New price has got updated nowhere apart from MBEWH and price change document.
    Anyone can advice, how this has happened. What is the reason
    Regards
    Suddy

    you are working with a fiscal year variant, as your fiiscal year does not match with the calendar year.
    In general the month of the posting date is equal with the period, however, using a fiscal year variant the posting date is checked against a customizing table to determine to which period the posting has to be made.
    Those variants are defined in OB29
    and they are assigned to company code in OB37.
    so check OB37 first to find which variant is assigned to your company, then use OB29 to see the definition of the variant.
    Maybe the first day of the new month is defined to fall into the old period.

  • Batch at Packing Stage with mutiple prices

    SAP : ECC 6.0
    Module : Production and MM
    Issue : 1 Batch with multiple MRP.
    Domain : Chemicals
    Let me say I am very new to SAP and this forum. I could not find the exact place where to post my query so posting here. Help me where to post the query if this is wrong place.
    We are in the process of Moving from a Legacy system to SAP R/-3
    Our Process is as follows.
    1. Batch Transaction : Batch production how we are going to produce for a batch will be declared. Batch No as follows.
    YYMMPR0023  > YY -> Year MM- > MONTH PR> PRODUCT 0023 --> running batch.
    so batch transaction we will declare how much quantity we will produce. ex : 2000KL (kilo lt)
    2 Stage 2 : Packing while packing as per the market requirements we will pack this material in different packs not continue.
    ie. we do not pack whole material one time as per the market requirements the material will consume as per the size of the pack in demand.
    Due to this our Pricing strategy is also keep changing. ie packed material will be in 2 or 3 prices at different prices.
    when we dispatch the material will be identified with the price as sub field to categorize them.
    Current legacy system we are following this.
    Sales
    Packing --> Dispatch from plant ---> Dept. --> Dealer ---> Customer
    Return
    Customer --> Dealer --> Dept --> Plant
    this process is running. At all the places we are able to identify the stck batch level and even at MRP(price) level also.
    Implementor says in the R-3/ SAP standard this feature is not available. It is not possible with standard mechanism
    I would like to know what is the mechanism to be followed to address this.?
    Kindly inform us.

    Hi
    I'm not sure I understand you...please define your question...
    1)
    As I understand here question is:
    - batch number assignment
    - amount of the material that belongs to that batch
    In SAP you can use automatic batch number assignment, and you can also define the logic /rule based on which system has to generate it.
    When you make confirmation against a production order or goods receipt w/o PrdOrd refernce in REM (repetitive manufacturing), you define the produced quantity --> SAP will allocate the batch number
    2)
    As I understand here you have two questions:
    - how to solve pricing based on packaging
    - how to track the material (traceability)
    If you use different material numbers for different packaging (different packaging may mean diffenerent SKU), there's no problem. If you want to use the same material number for different packaging, it's very likely you have to go to developemnt - generally, batch is given / determined at the time of delivery creation. But in your case the batch should have information on the packaging and you should define it (batch) in the SO to solve pricing.
    When you sell the material (as I understand you sell it to the distributor), the material won't be in your system any more that's why you cannot track the goods from distributor to customer).
    Is Depot yours? Does the ownership of the goods change when you give them to the distributor? If not, you can map the process:
    Plant --> STO (stock transport order) --> Depot --> Consignment fill-up --> Distributor --> Consignment GI --> Customer
    Please give more explanation if my answer is not ok.
    Regards,
    Csaba

  • Purchase order with zero price

    hello
    is i possible to create pos with zero price. i have a scenario that i need to create po with out paying to vendor.
    please help
    regards

    Hi,
    If yours is a Free Goods Scenario. Then Mark the Free Item Tab ( Next to Returns) in the Purchase Order detail tab.
    Now you can create a Purchase order with Zero Price. By the time GR thru. 511 Mov. Type (Material receipt with out charge) you can receive the material.
    Reg,
    Ashok
    Rewards Welcome.

  • KMAT with standard price that can be purchased or assembled

    Hello Experts!
    I have a question and doubt regarding configurable (KMAT) with standard price.
    We have the material XXX that is a KMAT/configurable that is assembled. The MBSS has the corresponding amount of assembly - it is OK.
    The same material XXX can be also configurable and purchased from other external supplier. So, it is generated the purchase order. After MIGO and MIRO, the amount posted at MBBS is 0,01 (the amount recorded at material master data) instead the amount of purchasing.
    Is it possible having the purchasing amount at MBBS when we buy the KMAT like we have when the KMAT is assembled?
    My best regards!
    Cheers@!

    Currently the only tool that provides the ability to edit a PDF (i.e, make small text changes, watermark, etc) is Acrobat Std. or Pro. You can check out a 30-day trial copy of this at:
    https://www.adobe.com/cfusion/tdrc/index.cfm?product=acrobat_pro&loc=en

  • Stock transfer between plants in a company with different price

    Hi, expert,
    i want to transfer materials between plants inside a company with different price which set by supply plant randomly, not the valuation price, how can i achieve this?
    Thxs & best wishes,
    David

    Hi,
    In short, you cannot.
    Within SAP you cannot make a profit or loss by transferring an item between two Plants within the same company code.
    This is not necessarily an SAP restriction as such, it is due to basic accounting rules.
    The company code is seen as the legal entity for accounting and so if a movement within that company resulted in a loss or profit then this would break the rules.
    I am not saying that it is impossible to set it up this way (nothing is impossible) but I personally recommend that you find another way of achieving this. Trying to modify the system to break such an important rule will definitely cause problems.
    In previous implementations I have used the following option.
    Simple use basic STOs that transfer the items at the material valuation price. But then at the end of each month produce a report that shows what materials have been transferred between the relevant plants and at THAT stage make a financial posting to reflect the "benefit" that has been realised (based on prices held in a new table, that represent the price that would have been charged).
    It does appear to be a failing of the SAP system but it really isn't. What it normally indicates is that somehow the wrong org structure may have been built and perhaps the two plant should really be attached to separate company codes (especially if you need to show "profits and loss" in this way)?
    Steve B

Maybe you are looking for

  • Report with GR but Not MIRO

    Dear All, Is there any std report where i can find GR(MIGO) done but not MIRO against a Purchase order. if not  plzzz tell the tables where i can get all information. Regards, pardeep malik

  • Problem in Import DMP-User Level to another tablespace

    Hi, I have some problem in recovering a user objects, using from exp logical dump file.I am using 8172 version of oracle.I took a exp backup from user 'john'(NOTE all objects of john are from "KATTY" tablespace).I tried to import to another database

  • Value limit in graphs 2147483?

    When making graphs in illustrator CS3, I often get the error message when changing the figures in the Value Axis that the maximum value is 2147483 -- which does me no good since I am working in larger numbers. Anybody know how to get around this prob

  • Problem in downloading excel file

    Hi, I am downloading output of SQ01 into excel file using BDC, but windows system stores the whole data in one cell of sheet instead of all other cells.   Please anybody tell me solution. Thanks & Regards, Umesh

  • HP wireless mouse not working (sometimes)

    I have an HP wireless mouse, product number LB454AA,  model no. MORFFIUO, s/n CNP25106C3. well, i bought it about almost 2 years ago, but, even since I bought it, he had problems, and continues to have them... the problem is, that sometimes, the mous