Pre requisite before running MD51--project driven planning

Dear Experts,
I am executing MD51, but no planned orders are generated.
can u pls. suggest whr i m missing the steps .
What i did:
1-created WBS BOM taking reference to the material BOM.
2-Attached that wbs bom in the activity
3-Entered the desired work center and activity in the internal activity
then i am trying to run MD51.
Whether above steps are correct or do i need to create routing and to attach with the material.
Pls. suggest how the routing part  will be taken care in this scenario.
is there any other method through which we can generate planned order from the reservation which is created in the network.
Regards
ashis

Hi Ashis
You can generate planned order from the reservation which is created in the network thru MD01 and MD02.
check you mrp parameters in Material Master
in MRP 1,2,3 Tabs
check. the Planned independent requirements is'02'
in material master
also you should check the material wch generates Planned order is Procurement type E in the Material master.
Thanks,
Dhruv Kumar Malhotra
Edited by: Dhruv Kumar Malhotra on Dec 5, 2008 7:57 AM

Similar Messages

  • Pre-requisites for running oracle forms 11G

    What are the pre-requisits for running Oracle forms 11G?

    Ok - where to begin?
    From the beginning....
    <blockquote>1. There are prerequisites for nearly every Oracle product. If you have not read the Installation Guide and Systems Requirements Guide you likely are missing something. Docs are [URL http://docs.oracle.com/cd/E24269_01/index.htm]here
    2. If you followed the installation guide and completed the installation without error, the basic product works out of the box without any configuration changes. Don't start tweaking unless you understand the change.
    3. In order to use an application server of any kind, you need to ensure it is running.
    4. If you have chosen the "Development" installation type (applies to 11.1.2 only) then you will not have an HTTP Server and it is not needed. Your listener will be the WLS managed server (usually port 9001).
    5. If you have chosed the "Deployment" installation type then you will have HTTP Server. You can access your Forms application via the HTTP Server Listen port (usually 8888) or the WLS_FORMS port.</blockquote>
    To the issue that started this post... "+*Page cannot be displayed*+"
    This error is either caused as a result of there being no listener running, specifically the HTTP Server or the wrong URL was entered in the browser, or the hostname used in the URL does not map to the correct machine where the listener is running. If you have installed and are testing on your local machine and that machine does not have a static IP address and/or a DNS registered name then fixing these issues would be a few of those "prerequisite" steps I mentioned. This is documented here:
    http://docs.oracle.com/html/E18558_01/fusion_requirements.htm#BABFHBID
    The above configuration needs to be completed before the installation is started.
    To the next issue or change in error message: "+*Failure of server APACHE bridge: No backend server available for connection...*+"
    This means that HTTP Server (specifically mod_wls) is unable to contact WLS_FORMS. This could be because WLS_FORMS is not running or because of those prereq steps noted above or a variety of other things related to not following the instructions. Refer to MyOracleSupport Note 1304095.1 for more details about this error.
    Finally, as for the need for a JRE, you can do this either before you attempt to run a form or allow the autoinstall feature of the browser perform the installation. However, as Craig mentioned, you would be better off installing the latest version which is 1.6.0_33. You can change your configuration to automatically do this, but if you are new to FusionMiddleware and/or Forms doing the JRE installation manually at this point is probably a good idea. I also recommend starting with Internet Explorer because likely some config changes will be necessary to get it working.
    As I mentioned, for the most part, the installation should work out of the box without changes. I would recommend getting the default form (test.fmx) running before attempting to make too many changes.
    (If you chose the Deployment install type) http://youMachine:8888/forms/frmservlet?form=test
    (If you chose the Development install type) http://youMachine:9001/forms/frmservlet?form=test
    .

  • Pre-requisites before doing TDMS installation

    Hi,
    Can any one give me pre-requisites before doing TDMS installation
    Regards
    Kiran,

    Hi,
    Please check the documents in the First Post of the Forum i.e.
    Links, Documents, Support Pack Schedule
    This would give you all the details that are required.
    Regards,
    Suman

  • Pre-requisite before going for training to customise sap business one.

    what are the pre requisite before going for training to customise sap business one according to our requirements...I am going for training on SAP business one to Germany

    Hi
    In SAP B1 there is only 3 Modules.
    1 Technical Basic Knowldege in Programming in Visual Studio
    2 Accounting
    3 Logistics
    2 & 3 are Functional Consultant. Basic Knowledge in Business Management is Enough.
    SAP B1 is easy to learn and Understand.
    You can Manage. Well
    Regards
    Srini

  • Pre-requisites for running report for P45 RPCP45GN

    Hi,
    We would like to know that are there pre-requisites steps that are now required to run RPCP45GN program and if so what are they?
    Regards
    Nimmi

    Hi,
    The following are Pre-requisites for RPCP45GN in new year legal changes:
    1> The starter report RPUEFO_STARTER should be run before running the    leaver report RPCP45GN.
    2> Last payroll should be run for that perner.
    3> The actions must performed e.g. leaver, payroll area changed, etc.
    4> Infotype 65 should be correct maintained.
    5> Address infotype 6 should be maintained for the perner.
    Hope this could solve your problem.
    Regards
    Roop

  • Pre Checks before running Data Pump Export/Import

    Hi,
    Oracle :-11.2
    OS:- Windows
    Kindly share the pre-checks required for data pump export and import which should be followed by a DBA.
    Thanks

    When you do a tablespace mode export, Data Pump is essentially doing a table mode export of all of the tables in the tablespaces mentioned.  So if you have this:
    tablespace a    contains table 1
                                              table 2
                                             index 3a(on table 3)
    tablespace b   contains index 1a on table 1
                                             index 2a on table 2
                                            table 3
    and if you expdp tablespaces=a ...
    you will get table 1, table 2, index 1a, and index 2a.
    My belief is that you will not get table 3 or index 3a.  The way I understand the code to work is that you get the tables in the tablespaces you mention and their dependent objects, but not the other way around.  You could easily verify this to make sure.
    Dean

  • Pre-requisites for Drill-Down from Hyperion Planning to Oracle GL

    I am using Hyperion Planning 11.1.2 for maintaining budgets. I do comparison of actual vs budget in Hyperion. I export actual results from Oracle General Ledger (11.5.10) in flat file and upload to Hyperion planning using FDM. I maintain mapping in FDM for flat file and the Hyperion members.
    Q1) Is it possible to drill down actual numbers from Hyperion planning to Oracle General Ledger via FDM?
    Q2) If yes, what are prerequisites for using drill-down functionality?
    Can anyone please answer and refer some link/material that may help me in setting this up?
    Thanks in advance.

    Thanks
    But when i try to log in i m getting error bellow"
    Failure of server APACHE bridge: No backend server available for connection: timed out after 10 seconds or idempotent set to OFF."
    So do u have any other reference plz
    thanks

  • Checking Pre requisite before installing software

    Hi,
    I am new to Windows policy settings.
    The scenario is as follows:
    I need a valid user to be able to install a software# 2, only if he has software# 1 installed on the same machine.
    How can i achieve this restriction.
    Any suggestions are appreciated.
    Thanks.
    Ankur
    AV

    this isn't an app compatibility problem.
    Ask in a forum devoted to your current installation technology. If you use Visual Studio setup projects, visit
    the setup project forum.
    Visual C++ MVP

  • Ckeck For File: Checking RSEINBQUEUE Pre-Requisites

    More of a BASIS question really, but I'd like to know what options I have for checking certain pre-requisites before processing XI sourced files using program RSEINBQUEUE?
    This background job is currently scheduled for 18:50 each night, but I really want to check either files at the Windows directory level or preferably the existence of the XI processing having taken place.
    Is this possible?
    Thanks, Robert.

    Taher,
    See the following from "Oracle® Applications Maintenance Utilities Release 11i (11.5.10.2)", Page 4-11 Compile flexfield data.
    Compiles flexfield data structures in Oracle Application Object Library (FND) tables. Choose this task after you apply a patch that changes the setup of flexfields. Patches usually indicate when you should perform this step.
    Flexfields automatically compile data when you use them for the first time, so running this task is not required. However, compiling flexfield data at a specific time (for example, when system use is low), rather than automatically at first use, can alleviate potential runtime performance issues.
    Regards,
    Hussein

  • What are the System pre-requisite for the BODS installation(SAP Data services)

    I am trying to install SAP Data services, please help me to get system pre-requisite. checked in PAM but i couldnot get it.

    Hi Siddhu,
    Please refer to the below SCN Link which will give you all the details and pre-requisites before instalalling DS 4.x
    Tutorial: How to install SAP Data Services 4.2 - Part 1
    Regards
    Arun Sasi

  • Pre requisite errors

    Dear All,
    The pre requisite checker run for SAP ECC6 installation on Solaris 10/Oracle using zones gives following errors:
    1) Environment variable CPIC_MAX_CONV should be set and the value should be at least 200
    I've done this on windows. Used "set env CPIC_MAX_CONV=200" on Solaris. SAPInst does not recognize this.
    2) It is recommended to add the entry 'set rlim_fd_cur=8192' to /etc/system. Current value: not available. See also SAP Note 395438. Note that this is checked only for an entry in /etc/system. The value found might not be the effective one. (Updated 2005-06-24)
    I've already made entry in /etc/system but again it is not recognized.
    Any suggestions please.
    regards, Sean

    The correct command should be : setenv CPIC_MAX_CONV=200
    In csh this should be: setenv CPIC_MAX_CONV 200
    ..without '='
    In bash a simple: export VAR=<value>
    ..will do.
    Permanent variables for SAP environments are usually stored in .sapenv* files in home of <SID>adm
    Nelis
    Edit: By the way that note 395438 refers to parameter settings for Solaris 9 and below. You will want to look at [Note 724713 - parameter settings for Solaris 10|https://service.sap.com/sap/support/notes/724713] rather. Note the "Please do not use any old /etc/system settings from SAP note 395438 with Solaris 10".
    Edited by: Nelis Lamprecht on Jun 26, 2008 3:46 PM

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • Pre-requisites to implement PLANNING through SAP BPC

    Hi,
    Would like to know the pre-requisites to implement PLANNING through SAP BPC 7.5.
    Please help.
    Regards,
    Deepankar Jain

    Hi Raghu,
    I have the below scenario:-
    The thing is that R/3 team is implementing FICO right now and BPC for Planning only needs to be implemented parallely.
    Client would have the Actual figures but not in SAP. so is it possible to go for it in this scenario.
    Regards,
    Deepankar Jain

  • How to make pre-requisite plans as mandatory in SAP Hr Benefits sub-module?

    I have a request to make all the pre-requisite plans (health plans, insurance plans, savings plans, etc) as mandatory in system in benefits module.
    Can anybody guide me how to do that?

    I have to configure the following scenario.
    There are 2 health plans into the system like
    a) BCBS with plan options: Basic & Special
    b) Mediservice with plan options: Basic & Supplementary.
    currently both the plans with all the corresponding plan options are available for hourly employees.
    Changes in configuration required isthat: Hourly employees are eligible only for BCBS-Basic plan and Mediservice-Basic plan.
    How do I make these changes in the system?
    Kindly help
    Thanks

  • Project Pre-requisite Doc / Questionnaire

    Hi, Iam new the SAP FICO filed.
    This will be my first project.
    Can anyone help me in Providing the Project Pre-requisite Doc's / Questionnaire, for which we will be asking for the Cleints for understanding the Business and Implementation requirements?
    Pls mail the Doc's to prady.sapfico at gmail.com
    Thanks in Advance.

    Hello
    You will have to post this in SAP FICO forum. There you will get the immediate response.
    Regards

Maybe you are looking for

  • Errorpage

    If we don't put try-catch statement in a JSP file, we will be automatically forwarded to the errorpage when an exception occurs. How do I pass a parameter along with it? Specifically, I want to pass URL name of the original page so that the errorpage

  • WPAD location in Windows 8.1

    We are retiring our TMG server for internet proxy.  Currently we use WPAD with DHCP option 252 and it has been working well.  However we want to slowly transition over to the new system which does not use proxy.  I have removed the DHCP option for gr

  • Sun JSC2 - How to download files to client

    Hi, imagine a document management site. I want to have a list of files with links that users can click to download them. Users can upload files (with handy File Upload component), and they get saved as byte streams to a file or database or whatever.

  • Webi -- Slow prompt performance

    Hi, I have a problem with Prompts in web intelligence, particularly those  of type date, the lists of values are recreated on each call, which makes the Refresh of  a document very slow The filter definition is: WP.S_DATE BETWEEN @ Prompt ('Start  1.