Presentation Design 2008 install

Having issues installing SAP CRYSTAL PRESENTATION DESIGN 2008
1st: Where a instructions for installing? there is no "setup" in the root of the CD
Tried installing via the Xcelsius folder, appears to install but asked for product KEY when I enter valid key software will not accept.
Is this an addon product and not a full product? Do I need xcelsius installed before I try installing this?
I'm new to this product and very confused.
Thanks for any Ideas / guidance.

First try to Remove Previous Version of Xcelsisu
then install it
Crystal Xcelsius 2011(Dashboard 4.0)----\DATA_UNITS\Xcelsius----Set UP

Similar Messages

  • Error installing SAP Presentation Design 2011

    I successfully installed Xcelsius Present 2008 trial version and then purchased a registered version of Presentation Design 2011. At the end of installation I received a message that said: "Missing installdir reg key for installiverse, required for uninstall. Key: SOFTWARE\SAP BusinessObjects\Suite XI 4.0\Installer\aurora Value: Path".
    I ran the installation setup program as administrator. When that didn't work I logged on as administrator but got the same error message. Each time it installs a folderSAP BusinessObjects in my Program Files (x86) fikder, and I have to delete this folder in order to rerun the installation.
    It makes no difference whether I do a Side-by-Side Installation or Perform Simple Upgrade.
    I am running Windows Ultimate 64 bit and using Office 2007. I'd appreciate any help in resolving this issue.

    Hi,
    Dashboard Design and Presentation Design support the following software:
    Microsoft Windows
    u2022 Windows XP Professional SP2 and SP3
    u2022 Windows Server 2003 Standard Edition SP1 and SP2
    u2022 Windows Server 2003 Enterprise Edition SP1 and SP2
    u2022 Windows Vista SP1 and SP2
    u2022 Windows 7
    For a current list of supported operating systems and hardware requirements, see the Dashboard
    Design and Presentation Design Supported Platforms documentation available at
    https://www.sdn.sap.com/irj/boc/articles.
    Microsoft Excel
    u2022 Excel XP SP3 (or later)
    u2022 Excel 2003 SP1, SP2, and SP3
    u2022 Excel 2007 SP1 and SP2
    Adobe Flash
    u2022 Flash Player with ActiveX 9.0 (or later)
    11
    @Sri

  • Crystal Presentation Design install failure

    When installing SAP Crystal Presentation Design, an error pops up that says Windows XP or higher applications: Outlook, Excel, Word, etc. must be pre-installed". Then it says an error has occurred and the installation stops. Anyone have a clue?

    I have the same problem with Windows Vista Ultimate 32-bit and Office 2010. I have Microsoft Office Project 2007 on same computer. Installer says you must have Office XP or Higher and then terminates.
    I am not able to use the free software or evaluate the free trial when the software will not install on a pretty typical machine.
    Is theer any update or news on this? A workaround or other correction?

  • Problems with Excel xlsx files and Presentation Design 2011

    Hello,
    I just began using Presentation Design 2011 and have run into an issue and would really appreciate your help.
    I have very large files in Excel 2007 format (.xlsx) that I need to import into Presentation Design.  When I try to do so, it automatically opens the .xlsx file as a 97-2003 Excel file, and in hte process, I then lose a large portion of the data (the file is very large, and the space limitations in 97-2003 are not sufficient for all the data I have, so I receive a message about compatability indicating that the data goes beyond the space limit).
    I have tried looking online for a fix to this issue, and I cannot find it.  I just installed the service pack 2 patch 8 file, and this still does not work.
    Will someone please let me know what I need to download or do to be able to import the xlsx files and maintain them in that format? 
    Thank you!
    Curtis

    Hi Curtis,
    In the older version of dashboard design 2011, xcelsius 2008, .xlsx(excel 2007) files are imported and converted automatically to excel 2003 format. So there are some compatiability issues with both versions and also size limitations. excel 2003 cannot have more than 256 columns. I doubt same is the case with new version.
    Inside the designer data is in excel 2003 format. So you cannot have data more than the limit and some formats. You should only be pulling in enough data to fill your components in dashboard and remove any unnessary information from the spreadsheet . Since dashboards are meant for summary data, importing very large excels files are not recommended.
    Hope it helps you.
    Regards,
    Nikhil Joy

  • SAP Crystal Presentation Design Upgrade failure

    When installing upgrade of SAP Crystal Presentation Design I get an Internet Explorer error "unable to load frame's content".   I am using IE 8.  It hangs and will not move forward.  Any suggesstions?

    Hi,
       Try running Crystal Presentation Design (aka: Xcelsius) with the supported Internet Browser Version.
    Supported Browsers (for Xcelsius 2008 up to SP3)
     Microsoft Internet Explorer 6.0 SP2
     Microsoft Internet Explorer 7.0
     Mozilla Firefox 2.0
     Mozilla Firefox 3.0
       Else you may want to try your luck and switch on Compatibility Mode for IE8.
          http://support.microsoft.com/kb/956197
    Regards,
    Ken

  • Adobe CS3 - Server 2008 Install Error

    I am in the process of transitioning our organization to a cloud server running Windows Server 2008 x64. I would like to be able to install Creative Suite 3 Design Premium on the new server. I have attempted the install but get the following error at the beginning before the installation will ever really get started "Critical errors were found in setup. Please see the setup log for details". Therefore, I am not able to even start the install.
    I have tried for several hours to research on the web but have not found any definite answer. It does appear that CS3 is not supported by Adobe on Server 2008. Has any one had any luck getting it to install properly on Server 2008? If not CS3, will any of the newer version work on Server 2008 should I choose to upgrade to a newer Adobe product?
    Thank you in advance for any assistance that might be provided. I greatly appreciate it.
    Todd

    Thank you very much for your assistance. I really appreciate it.
    Todd
    Mylenium <[email protected]> wrote:
    Mylenium http://forums.adobe.com/people/Mylenium created the discussion
    "Re: Adobe CS3 - Server 2008 Install Error"
    To view the discussion, visit: http://forums.adobe.com/message/4115952#4115952

  • SAP Crystal Dashboard Design 2008, personal edition, full product download

    Hi, can anyone tell me what I need to do after downlaoding 2008 personal edition?
    I've tried to run the install file but I keep getting a window that tells me "Microsoft XP and later applications: Excel, Word, Outlook or PowerPoint must be pre-installed".
    But my laptop is already installed with MS XP and MS Office 2010.
    Many thanks
    Brian.

    Hi Brian,
    Office 2010 is not supported in Xcelsius 2008. Check this blogpost for a workaround.
    http://www.pieterverstraeten.com/blog/sap-bo-crystal-dashboard-design-2008-installation-cobmination-with-ms-office-2010-xcelsius-liveoffice/
    Cheers,
    Xavier

  • Presentation Designer 2011 SP4 Setup Not Recognizing 32-Bit Microsoft Excel 2013

    I have 32-bit Microsoft Office Excel (with 2013 office suite) installed.  When I try to install the SAP Crystal Presentation Design 2011 software, the setup prerequisite check is stating that I am missing Microsoft Office Excel (XP or higher) 32-bit.
    How do I install Crystal Reports Presentation Designer without having to use Microsoft Excel 2003?
    Does anyone know when (estimated guess) Crystal Reports Presentation Designer is scheduled to fully support 2013?

    Hi,
    You have to use SAP Crystal Dashboard Design 2013 which does support MS Office 2013, but I've read that it is not great, so I would not recommend it and to use MS Office 2010 if you can.
    Regards,
    Josh

  • SAP Crystal Presentation Design

    I have recently purchased and downloaded SAP Crystal Presentation Design as this appears to be the first product that works with Windows 7 and Office 2010. However, every time I try hit the small icon to 'Send to Adobe Acrobat PDF' I get the following error message - 'Adobe Acrobat 9.4 has stopped working. A problem caused the program to stop working correctly. Windows will close the program and notify you if a solution is available'. Needless to say, Windows gives no solution to this problem!!
    Has anyone else encountered this problem and, if so, did you find a solution? The only remote possibility I can think of is that I also have Adobe Acrobat 9 Pro loaded on my laptop and use it frequently but I cannot believe this would create an Application clash.

    Hi David - SAP Crystal Presentattion Design 2011 was released on the basis it worked with Windows 7 and Office 2010 - the Version is 6.0.0.0 and the Build is 14.0.0.760. I mentioned in my question that the only potential issue I could see was that I also had Adobe Acrobat Pro 9 installed but assumed that Presentation Design came with an integrated version of Adobe which ran independently to anything I had on my laptop. As a last resort I ran the 9 Pro repair tool and it appears to have fixed the problem and I can now view the Presentation Design output through Adobe! Bizarre, I know but I also recall reading somewhere that users had experienced some Office Application issues after installing versions of Adobe Acrobat. Anyway, thanks for your input but the problem appears to be resolved (at least for now!)

  • Full licensed version of SAP Crystal Presentation Design for FREE

    Hi,
    I've received the product  keycode [u2014 C551B-81JE03S-000ZJMA-9V6C] via email after downloading the SAP Crystal Presentation Design.
    http://events.businessobjects.com/forms/Q210/present/sap/
    Anyone managed to get the free Product Keycode working?
    When I enter the keycode I'm getting the error message:
    'The keycode you entered is not valid. Please try again.'
    I've installed it on Vista Enterprise SP1
    Thanks
    Nazmul

    Yes. It supports Vista
    System Requirements
    u2022     Microsoft Office XP or Office 2003~2007 PC with 1.0 GHz processor, 1GB RAM (recommended), and 350 MB hard disk space
    u2022     Microsoft Windows XP, Server 2003, or Vista
    u2022     Microsoft Office 2003, Office XP, or Office 2007

  • Activating SAP Crystal Presentation Design

    I have downloaded SAP Crystal Presentation Design and have it installed.  It is now asking for a keycode which I have entered from my Order Details but it is not accepting it as a valid keycode.  What is the next step?  Who should be contacted for help?
    Randy

    Open a ticket by SAP support:
    http://service.sap.com/support
    Regards,
    Stratos

  • Presenter did not install

    Hi All,
    I've just installed Technical Communication Suite 2.5 (as an upgrade from Captivate 3). After installing DVD 1 a message came up to say that Presenter did not install and to refer to a technical document (which I didn't note).
    How can I get Presenter to install without doing a complete re-installation?
    System is Win 7 Pro 64 bit on i7 with 8 Gb RAM, 500 Gb free space.
    Microsoft Office 2010
    Thanks,
    Duncan.
    FYI - I had to uninstall RoboSource to get Photoshop to install from DVD 2? Captivate seemed to install fine from DVD 3.

    I just finished installing TCS2.5 from the upgrade DVDs & Presenter 7 did install for me. Did you try re-running the DVD installer again?

  • Exporting from SAP Crystal Presentation Design to PowerPoint

    I have been using CrystalXcelsius Standard 4.5 with Windows XP for a couple years.  My company recently migrated to Windows 7.  I've been told the new version of Xcelsius I need to purchse is SAP Crystal Presentation Design which is supposed to be compatible with the new operating system.  I like the software as it seems to be what I need to continue creating Dashboards for my group.  However, after having difficuty exporting to PowerPoint as I have done in the past for general viewing, I've stumbled upon release notes that say though this software is compatible with Windows 7 operating system, it is not compatible with the PowerPoint software within Windows 7, and I must save the exported file in PowerPoint 2003.  However, when I open the PowerPoint document after exporting, the documement initially looks blank until I click Slideshow, then I get a "Securty Alert - Marcros and ActiveX" message that says "Macros and one or more ActiveX controls have been disabled" and I have to choose either "protect me from unknown content (recommended)" or "enable content".  I've been choosing the recommended option.  Once I do so the imported dashboard appears.  My initial question is am I performing the import correctly, and if so is there a way to get around that error message?  My management presents these dashboards to others both inside and outside the company and would prefer that the error does not keep popping up.
    Thanks much!
    Leanne

    Hi,
    First of all the message you are getting is not an error its an alerts.and its quite common. this is a standard check,if you want you can bi-passions(not recommended for all applications) this alert.
    Open a power point open Power Point Options ->  Trusted center -> Trust center settings ->  Select active X settings -> Select Enable all controls => Now select macro Settings and do the same.
    And you can avoid alert message.
    Good Luck & keep posting.

  • Crystal Presentation Design - Stacked Column Charts in 2 axis

    Is it possible to create dual axis stacked column charts in Crystal Presentation design or Dashboard Design?
    Thanks.
    Stine

    Hi Stine,
    As of today we dnt have that feature in Xcelsius . In latest service pack 4( SP4 ) also this feature is not there.
    @Sri

  • SAP Presentation Design (Xcelsius) Cursor Issue

    I am using the latest version of SAP Presentation Design (Version 14.1.1.1036).  This is the product formally known as Xcelsius.
    I am publishing a component heavy dashboard to PowerPoint.  When viewing the PPT slide and interacting with the dashboard, the cursor will often times disappear (it highlights items when I hover but you can't see the mouse at all no matter how much you move it around).  This issue is magnified whenever I connect my laptop to an external monitor while presenting to a large group.
    I have updated to the latest version of Flash and am running PowerPoint 2010.
    Without a cusor, my dashboard is dead in the water.
    Any ideas on how to fix this issue?

    Hi,
    Please check the below link.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/4022239b-80f0-2c10-40aa-98173299a320?QuickLink=index&…
    Creating Support Messages - SAP Solution Manager - SAP Library
    how do we create OSS ticket
    http://www.sapkshare.com/user/image/step-by-step-guide-on-how-to-create-an-sap-oss-notes.pdf
    --SumanT

Maybe you are looking for

  • CD burn error 4000

    I've have burned over 100 CDs with my Dell desktop over the last 3 years, but the other day i got a message 'CD disc unable to burn (error 400)'. I don't know what caused it to suddenly stop working. Basically, I selected the play list and told it to

  • Outlook Tasks to iPhone 4S

    I'm running Windows Vista on Parallels on my MacBook Pro and I desperately want to be able to get my tasks from Outlook onto my iPhone 4S in some form.  I've been struggling unsuccessfully so far with TaskTask and with 2Do.  Any ideas?

  • Standard report-Position(urgent)

    Hi Is there any standard report where we can kown an employee assigned to two different Positions. or Position is assigned to two or more employees. Thanks Archana

  • Exporting from flash movies without quicktime

    I used to convert flash movies in dv (for further editing in imovie or Final cut express). With the latest QT update this is not possible anymore (and a lot of my projects are unreadable...). Anyone knows an (possibly inexpensive) way to convert a .s

  • Highlighted box on my screen, why does this happen

    Why do I have a highlighted box around everything I tab to or move my mouse over? Also on my start page (when you click on the apple in the top left corner) it list all items on that page twice ie two shutdowns, two restart, and two of the log out. W