Preventive maintenance for equipments installed in plant area

Dear experts,
I want to implement Preventive maintenance for equipments installed in plant area.
Requirement is that i should be able to create a maintenance plan & schedul it as per the due dates. Maintenance order should get created. This order can be linked to the service contract item for which service entry sheet is created & released.
I want a control on service entry sheet creation if the order is not settled or the related inspection lot which is generated is not confirmed.
Please give advice ,how to proceed.
Regards
Vivek Deshpande

Hi Vivek,
Not sure on clearly what u need .. but have a look at some of the plans and examples of their usage for better idea ..
1. Types : Time Based or Performance Based
2. Single Cycle Plan [Time Based] : Ex u2013 Maintenance of a Vehicle every 03 months
3.Single Cycle Plan [Performance Based] :Ex- Maintenance of a Vehicle every                                1000KM .
4.Strategy Cycle Plan [Time Based] : Ex- Maintenance of a Vehicle every 03                                            months, 06 months etc.
5.Strategy Cycle Plan [Performance Based Plans] : Ex u2013Maintenance of Vehicle                                                                          every 1000km , 2000km etc.
6.Multiple Cycle Plan with single cycle set [Time or Performance Based] : Ex u2013                                                    Maintenance of a vehicle every 3months or                                  500km
7.Multiple Cycle Plan with Multiple Cycle Sets [Time of Performance Based] : Ex- Maintenance of a Vehicle every 3months or 500km and 6months or 1000km
8. The above given are explained with callobject as Maintenance Order. For getting inspection Lot then you can use order type PM05 calibration order in your Maintenance Plan and MO gets created as per the plan cycle and inspection lot gets created once u release the MO ..
9. If you want MP related to service items then create MP with service procurement as Maintenance plan category in IP41 .. for remaining you can put MO as Maintenance plan category  .. for details refer to SAP Help ..
regards
pushpa

Similar Messages

  • Preventive maintenance for maintenance assembly

              I want to Preventive Maintenance for Maintenance Assembly.( IBAU). When I create a maintenance plan I cant specify Assembly ( Only Equipment or Functional location can be selected).
                I checked the customization settings where I have specified Screen object type as FLEquipmentAssembly but still i cant see Assembly field in the maintenance plan.

    thanks but is not working.
              The problem is that i can select the Reference Object screen for a particular main. plan category in customizing , but even if i select FLEquipmentAssembly- O100 in customizing (Backend) it is reflecting as FLEquipment in the IP41,42 screen. If I Select O110 - EquipmentAssembly in the customizing it is reflecting as Equipment only by any selection Assembly is not coming.
                I guess any table is not included but i am not sure.
                 do u know where these screen types -O100,O110 are defined.

  • Preventive maintenance for longer periodes like 25 years

    For preventive maintenance we try to schedule the very large maintenance objects (buildings) which apear only ever 25 year. this for the purpose of long term planning ?
    preventive maintenance seems only to allow 10 years of periods ?
    is there a way around this ???
    or if there are other possibilities to schedule long term activitities I would also like to hear
    reward for all valuable input
    arthur

    Hi,
    I tried to create a maintenance plan with a schedule of 25 years. This was no problem.
    Regards,
    Paul

  • Can I get a tuneup or preventive maintenance for my Pro?

    My MacBook Pro is a little over four years old and I am concerned about its performance.  We have a an IPhoto library with about 138GB of content and iTunes with 8.2.  Aside from photography we mostly use it for web browsing and a little bit of Word and Excel.  I have about 185G of available space on my hard drive. I am on OS X Yosemite with a 2.53 GHz Intel Core i5 Processor and 4G of Memory.
    Over the last few months I find changing from web site to web site and program to program is often very slow.  I may click on a bookmark and the color wheel goes on and on that seems like forever.  When I click on "About this Mac" to get the info for above, it did not instantly open up and instead I saw the color wheel doing its thing for several seconds.   Too many times it gets hung up and I have to force quit.  I NEVER have a lot of open pages or more than two or three apps running at the same time.
    I am not technically savvy enough to go in an delete various things from areas where I do not understand what they do. 
    I would like to know if Apple offers a "tune-up" type service or if they can do anything to determine if something is wrong? OR, if there is a trusted program I can use that will clean things up and improve the performance?  And is such a program worth a try?
    Thanks

    Thanks Allan.  Here it is....   AND...BTW what are Daemons and Agents???
    Problem description:
    My MacBook Pro is running very slow and frequently gets hung up to the point I have to Force Quit too often.
    EtreCheck version: 2.1.8 (121)
    Report generated March 10, 2015 at 6:12:53 PM EDT
    Download EtreCheck from http://etresoft.com/etrecheck
    Click the [Click for support] links for help with non-Apple products.
    Click the [Click for details] links for more information about that line.
    Hardware Information: ℹ️
        MacBook Pro (15-inch, Mid 2010) (Technical Specifications)
        MacBook Pro - model: MacBookPro6,2
        1 2.53 GHz Intel Core i5 CPU: 2-core
        4 GB RAM Upgradeable
            BANK 0/DIMM0
                2 GB DDR3 1067 MHz ok
            BANK 1/DIMM0
                2 GB DDR3 1067 MHz ok
        Bluetooth: Old - Handoff/Airdrop2 not supported
        Wireless:  en1: 802.11 a/b/g/n
        Battery Health: Normal - Cycle count 46
    Video Information: ℹ️
        Intel HD Graphics - VRAM: 288 MB
        NVIDIA GeForce GT 330M - VRAM: 256 MB
            Color LCD 1440 x 900
    System Software: ℹ️
        OS X 10.10.2 (14C1510) - Time since boot: 8:25:53
    Disk Information: ℹ️
        TOSHIBA MK5065GSXF disk0 : (500.11 GB)
            EFI (disk0s1) <not mounted> : 210 MB
            Recovery HD (disk0s3) <not mounted>  [Recovery]: 650 MB
            Macintosh HD (disk1) / : 498.74 GB (184.35 GB free)
                Encrypted AES-XTS Unlocked
                Core Storage: disk0s2 499.11 GB Online
        MATSHITADVD-R   UJ-898 
    USB Information: ℹ️
        Apple Inc. BRCM2070 Hub
            Apple Inc. Bluetooth USB Host Controller
        Apple Inc. Apple Internal Keyboard / Trackpad
        Apple Internal Memory Card Reader
        Toshiba External USB 3.0 1 TB
            EFI (disk2s1) <not mounted> : 210 MB
            Toshiba-TimeMachine (disk2s2) /Volumes/Toshiba-TimeMachine : 999.86 GB (26.48 GB free)
        Apple Inc. Built-in iSight
        Apple Computer, Inc. IR Receiver
    Gatekeeper: ℹ️
        Mac App Store and identified developers
    Kernel Extensions: ℹ️
            /System/Library/Extensions
        [not loaded]    com.Belcarra.iokit.USBLAN_netpart (3.1.1 - SDK 10.6) [Click for support]
        [not loaded]    com.Belcarra.iokit.USBLAN_usbpart (3.1.1 - SDK 10.6) [Click for support]
        [not loaded]    com.RemoteControl.USBLAN.usbpart (3.1.1 - SDK 10.7) [Click for support]
        [not loaded]    com.keyspan.iokit.usb.KeyspanUSAdriver (2.6) [Click for support]
        [not loaded]    com.leapfrog.codeless.kext (2) [Click for support]
        [not loaded]    com.leapfrog.driver.LfConnectDriver (1.8.1 - SDK 10.7) [Click for support]
    Launch Agents: ℹ️
        [loaded]    com.oracle.java.Java-Updater.plist [Click for support]
        [not loaded]    com.teamviewer.teamviewer.plist [Click for support]
        [not loaded]    com.teamviewer.teamviewer_desktop.plist [Click for support]
    Launch Daemons: ℹ️
        [loaded]    com.adobe.fpsaud.plist [Click for support]
        [running]    com.backblaze.bzserv.plist [Click for support]
        [loaded]    com.hikvision.iVMS-4200.plist [Click for support]
        [loaded]    com.leapfrog.connect.shell.plist [Click for support]
        [loaded]    com.microsoft.office.licensing.helper.plist [Click for support]
        [loaded]    com.oracle.java.Helper-Tool.plist [Click for support]
        [loaded]    com.teamviewer.Helper.plist [Click for support]
        [not loaded]    com.teamviewer.teamviewer_service.plist [Click for support]
    User Launch Agents: ℹ️
        [loaded]    com.adobe.ARM.[...].plist [Click for support]
        [running]    com.backblaze.bzbmenu.plist [Click for support]
        [loaded]    com.google.keystone.agent.plist [Click for support]
    User Login Items: ℹ️
        Garmin Express Service    Application  (/Applications/Garmin Express.app/Contents/Library/LoginItems/Garmin Express Service.app)
        iTunesHelper    UNKNOWN  (missing value)
        Monitor    UNKNOWN Hidden (missing value)
        iCalAlarmScheduler    UNKNOWN Hidden (missing value)
        MacR-1000    UNKNOWN  (missing value)
        AirPort Base Station Agent    Application  (/System/Library/CoreServices/AirPort Base Station Agent.app)
        Mail    Application  (/Applications/Mail.app)
        Safari    Application  (/Applications/Safari.app)
        AdobeResourceSynchronizer    Application Hidden (/Applications/Adobe Reader.app/Contents/Support/AdobeResourceSynchronizer.app)
    Internet Plug-ins: ℹ️
        LogitechHarmony: Version: 2.0 - SDK 10.7 [Click for support]
        WebVideoPlugin: Version: 3.0.5.14 - SDK 10.8 [Click for support]
        Google Earth Web Plug-in: Version: 6.1 [Click for support]
        Default Browser: Version: 600 - SDK 10.10
        RealPlayer Plugin: Version: Unknown [Click for support]
        AdobePDFViewerNPAPI: Version: 11.0.10 - SDK 10.6 [Click for support]
        FlashPlayer-10.6: Version: 16.0.0.305 - SDK 10.6 [Click for support]
        Silverlight: Version: 5.1.20513.0 - SDK 10.6 [Click for support]
        Flash Player: Version: 16.0.0.305 - SDK 10.6 [Click for support]
        iPhotoPhotocast: Version: 7.0 - SDK 10.8
        QuickTime Plugin: Version: 7.7.3
        SharePointBrowserPlugin: Version: 14.4.8 - SDK 10.6 [Click for support]
        AdobePDFViewer: Version: 11.0.10 - SDK 10.6 [Click for support]
        CouponPrinter-FireFox_v2: Version: Version 1.1.6 [Click for support]
        GarminGpsControl: Version: 4.0.4.0 Release - SDK 10.6 [Click for support]
        NPExView: Version: Unknown [Click for support]
        Photo Center Plugin: Version: Photo Center Plugin 1.1.2.2 [Click for support]
        JavaAppletPlugin: Version: Java 8 Update 31 Check version
    User internet Plug-ins: ℹ️
        Move_Media_Player: Version: npmnqmp 071706000001 [Click for support]
        fbplugin_1_0_3: Version: Unknown [Click for support]
    Safari Extensions: ℹ️
        WOT
        1-ClickWeather
        Facebook Photo Zoom
        clea.nr Videos
        DuckDuckGo
        Turn Off the Lights
        AdBlock
    3rd Party Preference Panes: ℹ️
        Backblaze Backup  [Click for support]
        Flash Player  [Click for support]
        Java  [Click for support]
    Time Machine: ℹ️
        Skip System Files: NO
        Mobile backups: OFF
        Auto backup: YES
        Volumes being backed up:
            Macintosh HD: Disk size: 498.74 GB Disk used: 314.39 GB
        Destinations:
            Toshiba-JimBackup [Local]
            Total size: 999.86 GB
            Total number of backups: 37
            Oldest backup: 2015-02-02 21:01:28 +0000
            Last backup: 2015-03-10 21:27:04 +0000
            Size of backup disk: Adequate
                Backup size 999.86 GB > (Disk used 314.39 GB X 3)
    Top Processes by CPU: ℹ️
            18%    mds
             9%    WindowServer
             7%    Dock
             0%    SystemUIServer
             0%    bztransmit
    Top Processes by Memory: ℹ️
        215 MB    Safari
        193 MB    bztransmit
        142 MB    iPhoto
        142 MB    Mail
        82 MB    Finder
    Virtual Memory Information: ℹ️
        113 MB    Free RAM
        1.25 GB    Active RAM
        1.19 GB    Inactive RAM
        940 MB    Wired RAM
        87.54 GB    Page-ins
        156 MB    Page-outs
    Diagnostics Information: ℹ️
        Mar 10, 2015, 11:08:28 AM    /Library/Logs/DiagnosticReports/com.apple.internetaccounts_2015-03-10-110828_[r edacted].crash
        Mar 10, 2015, 09:50:17 AM    /Library/Logs/DiagnosticReports/iTunes_2015-03-10-095017_[redacted].cpu_resourc e.diag [Click for details]
        Mar 10, 2015, 09:44:31 AM    Self test - passed
        Mar 9, 2015, 08:57:48 AM    /Library/Logs/DiagnosticReports/discoveryd_2015-03-09-085748_[redacted].crash

  • Doubt in Scheduling of performance based preventive maintenance

    Dear Experts ,
                                            This is with respect to scheduling of performance based preventive maintenance.
    I will put my doubt in example so that it will be easy for you to understand.
    I want to perform a preventive maintenance for every 100 litres of fuel consumption.
    annual estimate is 7200 litres , that means 5 litres a day.
    so as per plan , for every day 5 days , maintenance needs to be performed.
    same will be appear after scheduling in ip10 also.
    While updating in the measuring document , I know that , if 100 litres is updated before due date , then order will be generated in the current date itself.
    I just want to know how system responds , if 100 litres consumption takes more than 5 days , will the system generates order as per schedule date or will it wait to complete for 100 litres consumption ??
    Regards
    Keerthan Kumar

    Greetings Keerthan,
    That depends on:
    1) The frequency that you input Measurement Documents in
    2) Your Call Horizon on the Maintenance Plans
    3) Your Scheduling Period in your IP30 Deadline Monitoring variant
    Generally, SAP will adjust the schedule based on the Measurement Documents entered for the counter (1) to account for readings (usage) which are higher or lower than estimated.However, it will NOT reschedule any Orders already called. So to make sure the dates are usually adjusted to your usage, you want frequently input MDs, a high Call Horizon and a short Scheduling Period.
    SAP will determine a scheduled due date for the Order based on the Annual Estimate and the readings. So, if the due date is in 5 days and you are on a call horizon of 100% and a Scheduling period of 3 days, for example:
    a) if you do not input Measurement Documents from Day 0 onwards, the Order will be generated due for Day 5 when you run the IP30 on Day 2
    b) if you input a Measuring Document on Day 1 indicating that less than estimated or no fuel was used, the due date and call date may be pushed into the future and the Order will be generated after Day 2.
    c) if you input the MD after Day 2, this Order will already have been called and will not be rescheduled, but subsequent calls might.

  • Deadline monitoring in preventive maintenance plan scheduling

    Dear Experts,
    we are having only single cycle time based & performance based preventive maintenance plans. The individual plans are weekly, monthly or based on specific counter readings. Now i want to schedule it automatically through IP30. since there are plans with different units like days or hours how can i schedule it through IP30? is it possible to run separate IP30 for counter based single cycle plans? Is it ok if I run the program on every midnight? I am confused on the scheduling through IP30. please give me the clarity...Please do the needful.
    Thanks & best regards,
    Praveen

    Praveen,
    Yes you can run IP30 with single cycle plans.
    As IP30 can run for many hours (dependent upon number of plans) it is best to schedule the IP30 job at a time when there are fewest users on-line e.g. midnight on Saturday or Sunday. The timing is very much dependent upon your organisation.
    [Here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=316910] is some good background info.
    It should be someones responsibility in your organisation to review the scheduling log after every IP30 run
    PeteA

  • Preventive maintenance WLC 4400 and 5500?

    Hi good morning,
    i asking for help in order to make a preventive maintenance for WLC 4000 and 5500.
    the main problem is: can i open the WLC´s and clean all the circuits they have inside? or must i only cleaning out the WLC?
    And i would like to know if there are documentation about this topic.
    thanks.

    thanks
    I thought of opening the WLC, and use compressed air to remove dust only.
    but like you mention would be better not open it.
    Greetings

  • Deactivating/Dismantling Equipments - effects on Preventive Maintenance

    Dismantling a piece of equipment means uninstalling it from its current installation location. It may be done in order to:
    1. Install it at a different location.
    2. Indicate that the equipment is not in operational use and is going to be stored at some storage location for a while. Some other equipment will be installed in its place.
    In case 2, the equipment is not subject to breakdown maintenance. However, preventive maintenance may still be carried out. The scheduled preventive maintenance plans will keep generating call objects for this equipment.
    But, preventive maintenance may not be needed to be carried out for certian kinds of equipments while they are not in operational use. To stop generation of call objects agaisnt such equipments, we Deactivate the equipment master record alongwith Dismantling it. Call objects are not generated for equipments that are deactivated and hence no preventive maintenance will be carried out until they are Re-installed and Activated.
    I need to know if we are handling things in accordance with standard practices by following the measures described above. Secondly, I am concerned about the validity of the assumption that whether preventive maintenance is needed for a certian uninstalled equipment depends on the kind of equipment it is (electrical, mechanical or whatever).
    Any help in this regard will be highly appreciated.
    Regards,
    Farhan Shaikh

    Another way doing that would be scheduling your PMs on basis of the functional location. So then, no matter what equipment is installed, you get a call for the maintenance of the current equipment.
    But this is based on the assumption that there is always an equipment installed.

  • User exit IPRM0002 for preventive maintenance

    user exit IPRM0002 for preventive maintenance
    has anyone used this user exit? or BADI: BAdI: IPRM_MCP_SCHE_CHANGE  ?
    I seem to have some difficulty in knowing how to use these....
    I need to basically be able to influence a calling date for next PMorder to be opened but documentation is not explanatory and, even if I do know what these exit/badi are used for, i do not understand how to use the parameters provided.
    can anyone help?

    Hi,
      I dont think you would be able to test the exit if you dont implement them for the user exits simply passing the parameters wont help,actually there is a process of implementing a USER-EXIT i suppose u would already be familiar to it, I order to activate the exit you have to create a project in CMOD transaction and assign the enhancement to that and then also create the include that is avaliable inside the FM and there you would be able to put your code.
      For the BAPIs ,yes the control should go inside the BADI once you put a breakd point inside the right method but there to you need to implement the BADI and then you can put your code in the method for the effects to take place and you can test.
    The detail process of implementation are already avaliable on SCN, It seems that you dont have developer authorizations so i would suggest to take help from some one who has, Best of Luck:).
    Regards,
    Himanshu

  • Table for Preventive Maintenance Generated Maintenance Orders for Equipment

    Dear All,
                   I want to Extract no of Preventive Maintenance Orders (PM02) for a month (according to Planned Date)  for a set of Equipments.
                   Which table I should refer so i wll get the Orders with specific order type , for specific equipments for a month ( Date Range).
    With best regards,
    Narendra

    for that use the following tables for report generation:
    AFIH : for equipment number selection and order numbers
    AUFK: For order dates and other data
    T003P: for order type.
    In a single you will not get all the answers. You have to join three four table for this. try using these tables. Or also you can create a query for this using SQ01.

  • Regular Preventive Maintenance schedule for xsan volume ??

    hi
    Is there is any weekly , monthly regular Preventive Maintenance schedule which we should perform for xsan volume like defragment , some commands etc
    What are the steps for regular Maintenance for xsan ,servers which apple recommends ?
    thanks

    Hi,
    I do not do such maintainance. However every night a cvfsck -nv is run. This is a readonly file system check. If in the result of this a line exist which says:
    Filesystem would have been modified
    Then a real filesystem check is needed.
    A defrag is only performed on files, not on empty space. It takes very very long, and I do not expect much of it. So I do not do this.
    Hope this helps,
    Regards
    Donald

  • VS Exp 2013: Unable to create the Web site ... The components for communicating with FTP servers are not installed.

    I have MS Visual Studio Express 2013 It has worked fine for many months and then suddenly (I have made no configuration changes or added new programs) when I try to publish I am getting the message:
    Unable to create the Web site 'ftp://ftp.xx.xx/xxx.org.uk/www/htdocs'. The components for communicating with FTP servers are not installed.
    (I have replaced actual name with x's).
    I had a similar problem some months ago and found that saving all files, closing VS 2013 and re-starting the program fixed the problem. This time it has not.
    I am at a loss to know how to take this forwards. I do not use IIS.
    Any help would be appreciated.
    Michael.

    Hi Michael,
    For web site development, so you use the VS2013 express for web, am I right? We have to make sure that it is not the VS version issue.
    As you said that it worked well before, did you install other add-ins or tools in your VS IDE like
    Xamarin or others?
    Maybe you could disable or remove all add-ins in your VS IDE, test it again.
    please also install the VS2013 update 4 in your side.
    Best Regards,
    Jack
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Valid instance type for this instalation optiion are SCS, ER2, j2eedi, J2

    Hello . I want to install a NW7.3 based BI system. I found reccomendation to start with ABAP instance an then start of Java central server installation
    However I have checked option BI Java and additionaly I had EP, AS, EPC, and BASIC.
    however on next screen I am asked about SAP system ID(I entered the ABAP installed one  i.e. BI4)
    However this gets recognized that BI4 is already existing after ABAP.
    SAP system BI4 exists and is not suitable for this installation option. DIAGNOS: Valid instance type for this instalation optiion are SCS, ER2, j2eedi, J2eeci , but instance ASCS01 has different type
    Solution: Choose a different SAP system ID or unistall the existing one
    What to do?
    Thank you in advace for help

    Hello
    Now when I have suceesfully installed both (java @abap systems) I wander how to connect them.
    I red somewhere I should establish a JCO connection but I wander where
    I found new netweawer administrator http://<host>:5<sysnr>00
    JCO can be established via http://<host>:5<sysnr>00->configuration->infrastructure->JCO RFC provider.
    But which programID to use and..
    Is there somewhere some guide how to build BI out of this 2 (java @abap) systems. I only during java instalation entered users to get user communication  between java@abap
    Thank you in advance

  • I bought Plants vs zombies for my iphone but now I have a ipad tells me that I have to install the plants against zombies hd as I do not return to spend

    bought Plants vs zombies for my iphone but now I have a ipad tells me that I have to install the plants against zombies hd as I do not return to spend

    He comprado Plants vs zombies para mi iphone, pero ahora tengo un ipad me dice que tengo que instalar las plantas contra zombies HD, ya que no volver a gastar

  • Restrict the Preventive Maintenance Order creation through IW31 for few users.

    Dear Guru's,
    Good Day.
    My client requirement is he wants to restrict the Preventive Maintenance Orders through Transaction IW31 for few users. Is it possible through authorization? Please do the needful.
    Regards,
    Bhanu.

    possible for order type.
    create a role with all order types (optional) including Prev. Maint Order type, obviously having T.code IW31. and create another similar role excluding Prev. Maint Order type.
    Assign earlier role to few users (want to give the permission of IW31 Prev.) and later role to all remaining users.
    Auth. Object: I_AUART, first test in sandbox or testing client.