Pricing issue - When posting with inbound delivery VL32N

Hi Experts,
Here is the present situation. We have no info records maintained for the precious metals . Base price comes from contract and market price comes from the condition record maintained in MEK1. There is a link between PO and condition record created.
We are doing inbound delivery for the items where our present design was to have the same date populated in delivery date field and actual GR date field. This way the price of the item is determined on the day  when the item was actually delivered from the condition table maintained and posted on that day that might be only past last month assuming periods well be open.When PGR was done the actual GRdate picks up the right price from the condition record.
Issue is that insted of actual GR date the inbound delivery VL31N / VL32N progam should look at delivery date and get the right price from the condition record insted of actual GR DATE when PGR is done. Since the actual GR date is the posting date Finace has decided to closethe previous months periods and so it is a problem. We have to keep the Actual GR date as present date and delivery date should get the price for that day when item was physically delivered in past.
I have tried looking at pricing procedure  and condition types but was not able to get any success. Please advise how to resolve this issue.
Thanks in advance.
Edited by: Born-Legacy on Jan 15, 2012 7:54 PM

Hi,
Just a couple of ideas - not sure if they can achieve what you need.
There's a field in the contract, called "Pr. date category", EKPO-MEPRF. It controls which date shall be used for pricing. This field is copied over to the PO together with the pricing conditions. The value 2 to the best of my understanding means the "delivery date in the PO". Can you make the delivery date in the PO to be the same as the delivery date in the inb. delivery?
If not, you might be able to use an own developed formula in the pricing procedure, column "CalcType" (V_T683S-KOFRM).
BR
Raf

Similar Messages

  • Batch needs to be created 1st then post goods receipt with inbound delivery

    Hi,
    We are having split valuated materials with batch managed, we need to post goods receipt with inbound delivery.
    When we create inbound delivery with PO batch is blank which is correct.
    Now when we try to post GR with IBD in VL32N we need to put batch, but we are getting error message as batch is not available in receiving plant.
    In this case we have to create batch 1st with MSC1N and then we can put batch number in Vl32N and can post GR.
    If material is not split valuated we can put batch manualy(Without creation in MSC1N) in VL32N and it is allowing to post GR with batch.
    Can you please let me know this behaviour, is there any SAP note available about this behaviour.
    Thanks
    Sudhir

    Hi Uwe,
    Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
    The binary answer would be no. You should use WMMBXY or MBGMCR instead.
    But if we are doing goods receipt against Inbound delivery then answer is YES with additionally E1EDL18-QUALF = 'PIC' populated. But please remember no partial receipt is possible against Inbound Delivery.
    We should populate E1EDL20-VBELN with our Inbound delivery number and line item info should go to E1EDL24.
    I have done a similar interface recently where we are doing receipt against Inbound delivery. But our case was a bit complex because we had to support against Inbound delivery. So we had to go for a custom solution on top of IDOC_INPUT_DELVRY.
    Hope this helps. Let me know if you have more questions.
    Regards,
    Rudra

  • Inbound IDOC to post goods receipt with inbound delivery as reference

    Kindly let me know the message and IDOC type for
    Inbound IDOC to POST GOODS RECEIPT  with inbound delivery as reference
    I tried using WMMBXY but it didn;t work.
    Pls let me know asap.Your help is appreciated.
    Thanks and Regards
    Priti
    Edited by: Priti Adukia on Feb 11, 2008 4:48 AM

    Hi Nicole,
    What I've to do is quite the same as the case. Outbound and Inbound are in the same SAP system. If I've good understanding, I must set partner profile as follows :
    INBOUND - Parter LI with
                            Message DESADV
                            Operation code DELS
    OUTBOUND - Partner KU
                            Message DESADV
                            Operation code ???
    Please advise
    Suchart

  • LM71: Post GR with Inbound Delivery

    Dear all,
    I wonder how we can post GR with inbound delivery document via transaction code LM71.
    I had tried to GR with inbound delivery document, where I select the items and click "Save" buttin, but it seems that goods receipt does not happen.
    Please help.
    Thanks.
    Justin

    Hi
    LM71 is Inbound Door Log step.. Input the delivery no, Shipment details like truck, tracking no, no of pkges, the in same screen do picking, then post, it shoild work..
    Rgds

  • GR with Inbound Delivery

    Hi everybody
    I have problem with Inbound Delivery
    - I created PO with confirmation control key = ANLI.
    - After that I created Inbound Delivery refer to PO.
    - When I post GR, system says there is no item selected.
    - I go back to Inbound and see that Pick qty = 0.
    - I tried to create TO to pick full quantity but error msg:
    An internal error has occurred (L03T 0154 H )
    Message no. L3705
    Diagnosis
    No screen sequence control is defined for the argument enclosed in parentheses in the error message.
    Procedure
    Contact your system administrator about this error.  Note down the parameters in the error message and the situation that caused the error.
    Do you know what i have to do to fix this problem?

    No body help?
    I have tried to create other PO with other Vendor - same material. After create DO, it auto fully pick, then i can process GR,
    I think the problem is Vendor. I create new Vendor by copied from that Vendor but DO still have the same problem. do you know what i have to check for this case?

  • Attaching Handling Unit ID to Inbound delivery (Vl32N)

    Hello All ,
    I am trying to attach External handling unit ID to the Inbound delivery (Vl32N) .Iam using WS_DELIVERY_UPDATE ,but somehow its not working .can u help whether there are any other functions that will do this ??
    Thanks .

    Hi,
    Try with PROCESS_HU_INBOUND_DLVRY, WS_DELIVERY_UPDATE, SD_DELIVERY_UPDATE_PACKING
    Thanks,
    Abhijit

  • STO with Inbound delivery

    hi,
    Can anybody tell me how to do an intra company STO with inbound delivery..
    Kindly udate with all configuration nad T.codes also.
    what is the T code (apart from VL31N)  for creating inboud delivery..( In vl31n i have given pur oder no , but system is asking for vendor. in Intracompany STO there is no vedor.
    regards
    RAj

    1)Create one Customer for Supplying Plant Sales area and assign this Customer no with Receiving Plant in OLME---> PO -
    > Set up STO -
    > define Shipping Data for plants. and maintain the same sales area in your Supplying plant.
    2) In OLME---> PO -
    > Set up STO.....for your Document Type: UB and Suppying plant Combination assign Del. Type NL and Checking rule RP
    3) In OLME---> PO -
    > Set up STO...for your Supplying Plant and Receiving Plant combination Maintain Doc. Type : UB
    Make sure you are maintaining Sales View for your Material at Supplying Plant.
    4) Maintain Shipping point at, SPRO----> Logistics Execution -
    > Shipping -
    > Basic Shipping Functions -
    > Shipping Point Determination for Plants.....there for your Loading group,Shipping Condition, Shipping Plant combination maintain Shipping plant..
    Now Create STO in ME21N with Doc.type: UB at Receiving Plant.
    Then Create Delivery in VL10B from Supplying Plant...
    Then Do PGI in VL02N from supplying Plant.
    Then do GR at Receiving Plant based on Outbound Delivery at Receiving Plant...

  • Change Inbound Delivery(VL32N) using BAPI.

    Hi Experts,
                      Which BAPI can I use to change the Shiping & Administration data of Inbound Delivery (VL32N).
                      I would be passing the Inbound delivery No. as the input to BAPI.
                      Please suggest me the BAPI thru which I can change the above Inbound delivery data.
                      Thanks in advance for your answer & support.
    Regards
    Jitendra Gujarathi.

    Hi,
       Please try the BAPI BAPI_SHIPMENT_CHANGE.
    Regards
    Raj.

  • Collective posting of Inbound Delivery with reference to External ID

    Hi,
    I have created few Inbound Delivery (for different PO) with same External ID reference.
    Now when I try to process these Inbound Delivery through T. Code: VL06IG with reference to External ID, system doesnot consider any Inbound Delivery.
    The External Identification Type used is "Free usage".
    I have checked in the Inbound delivery all the informations are correctly copied. for e.g. the storage location, etc. Also the Storage location is WM activated
    Can you please help me if I am missing any settings.

    First of all I want to clarify this transaction will pick deliveries which are ready for goods receipt.Tat means pick and confirmation should be completed.Now you have to check all your inbound deliveries which has same external id Picking and confirmation completed ?.If yes are you entering same test external id which is in delivery in report.Just copy test in delivery and paste the text in report.System will pick those deliveries.Text is case sensitive.so you should type text correctly.I have tested your scenario and it is working fine.

  • Post goods receipt against a Inbound Delivery(VL32N) FM or BAPI Method

    Hi Expert,
       I am looking for a Function Module or BAPI Method to Confirm the Inbound Delivery i.e. that can post Goods Movement Against a Delivery Document.
    My scenario is Create PO-> create Inbound delivery-> post Goods Receipt.
    Regards,
    Kapil.
    Edited by: Kapil Kumar Gupta on May 5, 2011 2:46 PM

    In OSS note 520813 it is said:
    16. Question:
    Which goods movements should I not post using the BAPI_GOODSMVT_CREATE BAPI?
    Answer:
    You should not post the goods receipt for the inbound delivery using BAPI_GOODSMVT_CREATE BAPI because the document base and the status of the inbound delivery are not updated. See Note 199703.
    If you check OSS note 199703 you can see that it is valid from release 45 to release 500.
    Assigned to this note you can find another: 1050944 (it's worth of reading!!!).
    I feel there are contradictions here - it might possible that the first note (520813) is not updated properly. (As far as I remember in my case this BAPI was working properly too).
    In my opinion you should send a message to OSS and ask them whether the statement in note 520813 is still valid or not - you should also tell them that the referred note (199703) is not applicable to ECC6.0.
    (there's a setting in ECC6.0 which enables that document flow is updated if GR is posted via MIGO with reference to IBD - V_TVSHP-SPE_INB_VL_MM)
    I would like to ask you if you have a reply from them, please update this thread - it may be helpful for us.
    Edited by: Csaba Szommer on May 9, 2011 2:34 PM
    One more remark: (based on OSS note 1050944) it seems that you cannot use it only in case of packing (IBD with HU).
    Edited by: Csaba Szommer on May 9, 2011 3:05 PM

  • Issue with BATCH SPLIT with Inbound Delivery

    Hi,
    We are in an SAP upgrade project from 4.7 to ECC 6.0, we would require to develop an Interface Program to perform BATCH SPLIT for an Inbound Delivery, I tried with BAPI BAPI_INB_DELIVERY_CHANGE but it seems to be work only to change the existing line items, by requirement is to create new BATCH SPLIT for a given inbound delivery, can anyone help me in finding the appropriate BAPIs, thanks in advance.
    Regards
    Bala

    Hi Bala,
    Have you tried BAPI_INB_DELIVERY_CONFIRM_DEC? If you check the documentation of this BAPI, at the bottom of it there's a statement:
    If you report back batch splits that were created in the ERP system, you cannot fill the hierarchy fields HIERARITEM and USEHIERITM.
    If you created split items in the WM system and have reported back, these two hierarchy fields must contain information.
    BR
    Raf

  • Exit or Badi to prevent MIGO Goods Receipt on PO with Inbound Delivery

    Hi,
    I am hoping that someone can provide me with some direction on how to prevent the use of MIGO for GR when the PO being received is (or should be) linked to an inbound delivery.
    For purchase orders with a confirmation control key an inbound delivery is to be created and the goods receipt needs to be done from the inbound delivery. This scenario also includes the case of stock transport orders whereby an inbound delivery is created form the outbound delivery. On the other hand for purchase orders without a confirmation control key no inbound delivery is created and the MIGO transaction is to be used to post the goods receipt.
    Since both processes are possible, I would like to prevent people from posting the GR using MIGO if certain conditions pre-exist.
    Can anyone suggest a means to accomplish this goal? Is there an exit or badi in MIGO that you would suggest using?
    Thanks,
    Paul

    Hi,
    The following user eixts and badis available for migo transaction:
    Enhancement/ Business Add-in            Description                                                                               
    Enhancement                                                                               
    MB_CF001                               
    Customer Function Exit in the Case of Updating a Art. Doc.     
    MBCF0011                               
    Read from RESB and RKPF for print list in  MB26                
    MBCF0010                               
    Customer exit: Create reservation BAPI_RESERVATION_CREATE1     
    MBCF0009                              
    Filling the storage location field                             
    MBCF0007                              
    Customer function exit: Updating a reservation                 
    MBCF0006                              
    Customer function for WBS element                              
    MBCF0005                              
    Article document item for goods receipt/issue slip             
    MBCF0002                               
    Customer function exit: Segment text in article doc. item                                                                               
    Business Add-in                                                                               
    MB_RESERVATION_BADI                    
    MB21/MB22: Check and Complete Dialog Data                      
    MB_QUAN_CHECK_BADI                    
    BAdI: Item Data at Time of Quantity Check                      
    MB_PHYSINV_INTERNAL                    
    Connection: Core Inventory and Retail AddOn                    
    MB_MIGO_ITEM_BADI                      
    BAdI in MIGO for Changing Item Data                            
    MB_MIGO_BADI                           
    BAdI in MIGO for External Detail Subscreens                    
    MB_DOC_BADI_INTERNAL                 
      BAdIs when Creating an Article Document (SAP Internal)         
    MB_DOCUMENT_UPDATE                    
    BADI when updating article document: MSEG and MKPF             
    MB_DOCUMENT_BADI                       
    BAdIs when Creating an Article Document                        
    MB_CIN_MM07MFB7_QTY                    
    Proposal of quantity from Excise invoice in GR                 
    MB_CIN_MM07MFB7                        
    BAdI for India Version exit in include MM07MFB7                
    MB_CIN_LMBMBU04                        
    posting of gr                                                  
    MB_CHECK_LINE_BADI                     
    BAdI: Check Line Before Copying to the Blocking Tables         
    ARC_MM_MATBEL_WRITE                   
    Check Add-On-Specific Data for MM_MATBEL                       
    ARC_MM_MATBEL_CHECK                    
    Check Add-On-Specific Criteria for MM_MATBEL     
    If it is helpful rewards points
    Regards
    Pratap.M

  • Delivery date from PO not updated with inbound delivery (EDI) date

    Dear all,
    The delivery date in the purchase order (as per my understanding) is the purchase order creation date + the planned delivery time.
    We are using EDI and an inbound delivery gets created when the shipping notification is received from the vendor.
    The real inbound delivery (EDI) date is usually different from the planned delivery date of the purchase order. But the problem is that the delivery date from the PO is not getting updated with the EDI delivery date.
    Is it possible to have the delivery date from the PO updated with the real EDI delivery date?
    I need this because I want to calculate planned delivery costs based on the EDI delivery date, and so far when I post the goods receipt (Price Date Category = "Delivery date" in the PO), the system is taking the price valid at the delivery date from the PO instead of taking the price valid at the delivery date of the EDI message.
    Thanks a lot,
    Annabelle R.

    We have applied the note 793478 "Change of the pricing date in EXIT SAPLEINR 003".
    In our process flow, an inbound delivery is created with reference to the PO, then the goods receipt is done with reference to this inbound delivery.
    When the option 5 "Goods receipt date" is selected in the Conditions Control tab of the purchase order, now when the goods receipt is posted, the price is calculated based on the inbound delivery date, which is what we wanted.

  • Transfer Requirement with Inbound delivery.

    Hi Guys,
    I have the following problem:
    The Warehouse is HU managed.
    When I have a Purchase Order and I do a Goods Receipt the system is creating a Material Document and in addition a Transfer Requirement.
    But
    When I have a Purchase Order and I have an Inbound Delivery, before I can do my Post Goods Receipt I have to do my TO creation and confirmation.
    In IMG under Handling Unit Management > Basics > Delivery > Define Sequence of Transfer Order - Goods Receipt I can make my settings so that I can do my Post Goods Receipt before my TO creation and confirmation.
    This means that I have again first a Material Document. Only in this scenario I do not get a TR, although in the WM - IM interface for movement 101 TR creation is set to X.
    How can I get my TRs?
    Thanks in advance for your help.

    Answers to your questions:
    Yes                 Yes             No.
    The MIGO transaction is there to do the GR at the moment the truck is at your door, the inbound delivery transaction (VLxxx) is there to have an ASN creating the inbound delivery days before the truck will arrive. To avoid open TRs sitting there for days, the system normally doesn't create the TRs. The posting of the GR (and the availability for MRP etc) can only be done after the TOs are created and confirmed. If you look at an inbound delivery under the subsequent functions it says "create TO".
    So you create TO from the inbound delivery and after that you post the GR.
    Only, there is a way to turn around the sequence (when using HUs) but then the Mat Doc is created and not a TR.
    We need the TR to be send by IDOC to another system.

  • Intercompany STO with inbound delivery with freight....Urgent

    Hi,
    I have following scenario to map.
    There are 2 company codes A & B and a shipment of goods is to be transferred from A to B.
    I wish to use Intercompany STO process with UB.
    However, A & B are geographycally separated so there involves transportation costs which will be beared by B.
    How can I have the pricing procedure if I wish to have one in STO ?
    If I create some freight conditions then I can add the values but I will not able to know the exact freight charges till B receives the shipment and the invoice for the same.
    In this case how can I use pricing procedure ?
    If I do not enter any freight charges in PO then how can I add them before I do the GR in B as this is requirement to add freight costs on material at the time of goods receipt so to arrive at exact landed cost for that material in B.
    Once I wish to transfer the goods from A to B, I will do delivery so that stock gets reduced from A otherwise if I wait till the stock is physically transferred to B and then B changing the PO and add freight and subsequently doing picking, PGI and GR ,it will not correctly reflect stock positions in A.
    What is the better way I can map this process.
    If I wish to use inbound delivery before receiving the goods in B can I add conditions in Inbound delivery ? If so how it can be done ?
    So my intended procedure will look as
    Intercompany STO-UB
    Outbound Delivery
    Picking/PGI
    Inbound Delivery with freight
    GR
    Please suggest as this is very critical and important requirement
    Thanks in advance
    regards,
    manOO

    Hi,
    Thanks for the feedback.I wished to use NB but I don't want to go with the regular NB and subsequent billing cycle.
    I want to use UB.
    Anyways, is there any way by which I can have freight cnditions added at the time of Delivery.Be it Outbound or Inbound.
    Please suggest.
    Thanks in advance
    Regards,
    manOO