Print layout - Goods issue & Issue for Production

I designed two print layouts separately 1 in Goods issue for Goods issue in inventory module
and 1 in Issue for production for Issue for production in production module.
If i take a print preview or print in Issue for production , it will reflects the print layout designed in Goods issue.
regards
kavitha S

Hi Kavitha,
I think, are you duplicate the Goods issue PLD Template to Issue for Production PLD Template on Duplicate Layout Template.
Best, Try to create a New PLD from Issue for Production(System) PLD.
Regards,
Madhan.

Similar Messages

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • BAPI or FM to get material goods issue for a prod order

    Hi
    I need a FM to get the material goods issue for a prod order. Please let me know.
    Thanks and regards
    Harish

    Hi Harish,
    use FM <b>BAPI_GOODSMVT_CREATE.</b>
    have a look at this thread ..
    FM for good issue for production order
    Regards,
    Santosh

  • Goods Issue on Production Order

    Dear PP Gurus,
    The requirement is,
    while doing Goods issue for Production order of X material, during operation Confirmation ' CO11 & CO12' , System should allow only BOM components of X and restrict or give warning message for goods movement of other materials.
    I tried to use available User Exit for PP Orders but none of them gives desired output.
    Can nybody guide me.
    Thnx in advance.

    In customizing materials management -
    > Inventory Management and Physical Inventory->Goods Issue / Transfer Postings make--> Set Up Dynamic Availability Check
    For 261 movement type set Dynamic Availability Check as "F"
    and then in omcq transaction M7 362 message set "E"
    This customizings prevent good ıssue more than reservation quantity

  • Goods Issue for GR qty to Production

    Hi
    While doing goods receipt for a Standard Purchase order (no a/c assignment), we receive goods into stock. But, if there is open Production order (material is due for goods issue to production order) or open Sales order (but delivery yet to be created), then GR stock qty should comedown this extent as a goods issue to direct production / Sales and Balance qty should come into Stock.
    Is this possible is in standard SAP with Inventory Management transactions? Please let me know your suggestions on this scenario.
    Best Regards,
    Suresh

    Please see the documentation below by SAP
    Manual and Automatic Reservations
    The R/3 System supports manual and automatic reservations. Manual reservations are entered directly by the user. Automatic reservations are generated automatically by the R/3 System. There are two types of automatic reservations:
    Reservations for orders, networks, WBS elements:
    When an order, a network, or a project is created, the components from the warehouse are reserved automatically.
    Stock transfer reservations:
    If reorder point planning is used at storage location level and the available stock on hand falls below the reorder point, the system generates a stock transfer reservation in the plant for the replenishment quantity.
    <b>You cannot manually process automatic reservations. For example, it is not possible to change reservations for an order directly. You have to change the components in the order. The system then updates the reservation automatically</b>.
    <b>What are the Results of a Reservation?</b>
    When a reservation is entered, the following events occur in the system:
    The system creates a reservation document, which serves as proof of the request.
    In the material master record, total stock and unrestricted-use stock of the material remain unchanged. Reserved stock is increased by the reserved quantity.
    In MRP, available stock is reduced by the reserved quantity. This is visible in the current stock/requirements list. The reservation causes an entry to be made in the requirements planning file.

  • Good issue to Production order - Allows it in back posting date

    Dear all,
    Good issue to Production order ( 261 Movement ), allows us to post the component in back dated eventhough stock is not avaible on that date.
    Example - Component stock on date 10.02.2010 = Zero , I made it Good receipt on date 18.02.2010 and now stock is available on date 18.02.2010.
    Now GI to Production it allows the qty on current and back Posting date also , I want control on date with error message. It should not allowed the GI for back date from 18.02.2010.
    Because of this our MB5B report shows the negetive issue qty if i post in back date.
    Waiting for reply
    Thanks and Regards,
    Saurabh

    Hi SAurabh,
    PLease check whether Negative Stock is allowed for the valuation Area (plant).
    GOTO >> SPRO >> MM>> Invetnroy management and physical inventory >> Goods issue/ Transfer Posting >> Allow Negative stock.
    Untick the Negative stock allowed for your valuation area (PLant)
    Regards,
    Pravin

  • Error While Updating Issue For Production

    Hi,
            When i am trying to update an UDF in issue for production i am getting the following error message.
      Item is Not a Component to the Referenced work order[Goods Issue - Object Type] Message 3560 -5

    Dear Manikandan K,
    Regarding the message we can tell you that the error message           
    "Item is not a component of the referenced Work Order" usually appears 
    because there is a case sensitive problem between the item code given  
    in the BOM and the item code given in the item master data.            
    Please check if the item codes of the BOM are exactly the same as the  
    codes given in the item master data. There should not be any differences
    between spelling of the codes (for example item code in the item master
    data is with capital letters X00014447 while the item code in the BOM  
    is with normal letters x00014447).                                                                               
    In case you find item with this issue please correct its item code     
    in the BOM manually so it will be exactly identical with the code given
    in the item master data.                                               
    Regards,
    Marcella Rivi
    SAP Business One Forums Team

  • Goods issue in production order using BAPI_PRODORDCONF_CREATE_TT

    Hi All,
    This is regarding goods issue in a production order.We are trying to do this using BAPI_PRODORDCONF_CREATE_TT.
    We have a finished good say FK_PROD_ORD_CONV(with BOM -FKTESTOUT2).we need to do a Goods Issue for this which implies that at reporting point 0001,we need to issue x quantities of BOM FKTESTOUT2 from a particular plant and storage location, and of a particular batch. Therefore, we need to pass the following:
    Production order number
    Plant
    Material (BOM) = FKTESTOUT2
    Movement indicator (which is u2018Fu2019 for goods movement) = u2018Fu2019.
    Movement type = 261(for Goods Issue)
    Storage location of BOM
    Batch
    Operation (Routing point) = 0001
    Entry quantity
    Entry Unit of measure = PC.
    In addition, we need to maintain entries in Link_conf_goodsmov-INDEX_CONFIRM and link_conf_goodsmov-INDEX_GOODSMOV. The value for both would be u20181u2019.
    In the Test program, although I am passing all these values, Goods Issue is not happening. I am not getting any error.The message just says that the production order has been confirmed but when i check for goods Issue,no corresponding data is there.
    After this i am calling fm to commit the work as well.
    Please let me know if I have missed something.

    Good day!
    Do you see you confirmation with CO14 transaction?
    What on movements tab?
    Look at postprocess transaction COGI CO1P.
    Check LINK_CONF_GOODSMOV TABLE with 1,1 record.

  • ABAP Error:Illegal interruption of the event LOAD-OF-PROGRAM (in MIGO-Goods issue to Production)

    Hi Experts,
    while i am doing MIGO(Goods Issue to Production Order, I am getting the below ABAP Error:
    Please give solution, It is urgent requirement.
    THE ERROR IS:
    Short text
         Illegal interruption of the event LOAD-OF-PROGRAM.
    What happened?
         Error in the ABAP Application Program
         The current ABAP program "/MRSS/SAPLRAP_INT_OB" had to be terminated because it
          has come across a statement that unfortunately cannot be executed.
    Error analysis
         During the flow of the event LOAD-OF-PROGRAM (event for the
         initialization of an ABAP program), a condition occurred under which
         the event was to be left early. This is not permitted as it would
         result in an inconsistent status in the ABAP program.
    Trigger Location of Runtime Error
        Program /MRSS/SAPLRAP_INT_OB
        Include /MRSS/LRAP_INT_OBF00
        Row                                     34
        Module type                             (FORM)
        Module Name                             GLOBAL_INIT
    Source Code Extract
    Line  SourceCde
        4
        5 *&---------------------------------------------------------------------*
        6 *&      Form global_init
        7 *&---------------------------------------------------------------------*
        8 *       text
        9 *----------------------------------------------------------------------*
       10 FORM global_init.
       11
       12 * local data
       13   DATA lv_badi_impl_exists TYPE flag.
       14
       15
       16 * get ref to BAdIs
       17   CALL METHOD cl_exithandler=>get_instance "#EC CI_BADI_GETINST
       18     CHANGING
       19       instance = gv_ref_badi_inter_company.
       20 *  CALL METHOD cl_exithandler=>get_instance
       21 * CHANGING
       22 *      instance = gv_ref_badi_rap_back.
       23 *  CALL METHOD cl_exithandler=>get_instance
       24 *    CHANGING
       25 *      instance = gv_ref_badi_ps_int.
         26   CALL METHOD cl_exithandler=>get_instance "#EC CI_BADI_GETINST

    Hi Rob thanks for your response.  I thought about doing an OSS note however; I would think I would need to get the problem in config corrected first as it contradicts each other.  The problem I am talking about is how they are to return material to vendor....I have never even seen this as a process in my 10 years....
    Process.....when the PO is a return to vendor PO they go to migo and choose the goods receipt and mvmt type 101 and the system will default the 161 in the item level....the two are inconsistent.  If I try to change the top level to a 161 mvmt (as this is what I am used to seeing) it gives the error that the PO is not a stock transport order... Would you agree that I should correct that problem first before creating an OSS note?

  • How to execute 261 goods issue for REM order items other than with MFBF?

    Our users are looking for an easy way to post a 261 goods issue for a single component of a repetitive manufacturing order without using the MFBF transaction where they have to deselect all other components of the order.
    The ideal situation would be to use a transaction similar to MB1C or MB11 to simply enter the planned REM order, component material id, and its respective quantitiy and then post. 
    Any information you can provide will be helpful.

    Strat,
    Thank you for your response but LT01 does not seem to provide the functionality that I am looking for.
    To clarify, our users would like to complete a 261 movement for a single component within a particular repetitive manufacturing, without going into the MFBF transaction and having to deselect all of the unnecessary components just to single out one. 
    So ideally we would like to use the MB1C transaction for a 261 movement. Enter in a REM order, the material id, and the quantity to be issued and simply post a single material.  Currently when we attempt to do this with MB1C we receive the error M7162 that our order, which is a product cost collector, cannot be processed with this transaction.
    Hope this helps clear it up and thanks again for your response.
    - Nick

  • Collective goods issue in production

    Hello All,
    We want to do a collective goods issue in production. Is there a chance in SAP that we can do a goods issue by supply area or MRP controller. We don't want to enter manually the group of production orders in MB1A or don't want to do backflush. Is there any way, please advice.

    Dear,
    In standard SAP are we issue the good In MB1A (261 Mov type) with reference to order and which having the reservation.
    The dependent requirements are planned as per BOM explosion. Item materials are issued against header material to complete header material production.
    Goods issue takes place against the production order at the start of the header material prod order.
    But MB26 will allow you to issue for serval orders,
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Issue for Production Query

    Hi,
    I'm having a situation when I print "Issue for Production" for an item, sometimes the batch issued printed out wrongly. I'm wondering is there a way to write a query to display issue for production (item code, item description, quantity, batch) based on production number? Please advise. Thank you for your help and time.
    Cheers,
    serene

    Try the code below. You will have to replace the XXXXXXXXX with Document Number of the Production Order.
    SELECT     dbo.OIGE.DocEntry,dbo.OIGE.DocNum, dbo.IGE1.ItemCode, dbo.IGE1.Dscription,
    dbo.IBT1.BatchNum,dbo.IBT1.Quantity, dbo.IGE1.LineNum
    FROM         dbo.OIGE INNER JOIN
                          dbo.IGE1 ON dbo.OIGE.DocEntry = dbo.IGE1.DocEntry
    INNER JOIN dbo.IBT1 ON dbo.IGE1.ObjType = dbo.IBT1.BaseType
    and dbo.OIGE.DocEntry = dbo.IBT1.BaseEntry and dbo.OIGE.DocNum = dbo.IBT1.BaseNum
    and dbo.IGE1.LineNum = dbo.IBT1.BaseLinNum
    and dbo.IGE1.ItemCode = dbo.IBT1.ItemCode
    where dbo.IGE1.BaseType = 202
    and dbo.OIGE.DocNum = XXXXXXXXX
    order by dbo.IGE1.LineNum
    Krishnan

  • Excess goods issue against Production order

    HI PP Gurus,
    My requirement is to block excess goods issue of raw material against a production order.
    Ex. Production order qty = 10 , For producing 10 Finish goods i require 10 raw material. When i do confirmation via CO11N  the system automatically shows GR & GI Values in Goods Movement tab. there i change GI value of RM from 10 to 20 the system takes the value and does the GR & GI.
    My requirement is that the system should not do GR & GI if the GI value is more than that is calculated at the time of creation of Prod. Order.
    Thanks in Advance,
    Deven

    Hi,
    Rstriction of excess goods issue against production order is not possible in standard setting.
    For achiving this you have to go for User exit.
    The logic should be
    In MIGO check mvt. type 261
    Pass the order through table RESB and select all the components with quantity.
    Capture the header material of order and use this as input along with the order creation date, plant and BOM application to explode function module CS_BOM_EXPLOSION.
    THis will give you the BOM components which were valid at the time of order creation.
    Now compare these BOM components with the components from RESB with quantity.
    Here conditions will come in picture
    If quantity is exactly matching then GI will be possible
    or if you want to keep tolerance limit say for 10% then accordingly you can map the condition.
    Regards
    Amit Parkhi

  • How to restrict reversal of Goods issue against production order.

    Dear All,
    How to restrict reversal of Goods issue against production order if production order status is CNF or DLV.
    i want that user can not reverse the goods issued against production order, if they want to do so, then user has to reverse the GRN and reverse the GI then only.
    Please suggest the solution.
    Regards,
    Sandeep Dhruve

    Hy Sandeep,
    You have to use User Exit for this.
    The following enhancement is available for production orders:
    o   CCOWB001    User exit for modifying menu entries
    You can use this function module to deactivate menu entries or
    functions. The locked functions can then no longer be executed by the
    user.
    The enhancement CCOWB001 contains the following components:
    Function exit
    o   EXIT_SAPLCOWB_001   Good movement: Deaktivate functions
          Display documentation
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Aug 22, 2008 3:01 PM

  • How to stop excess goods issue against production order from MB1A

    Hi Gurus,
    In our organization goods issue against production order is done by using MB1A T.Code manually.Due to this reason sometimes excess quantity of RM issue against production order.Now I want to stop the excess goods issue against production order by using MB1A but I want to mainatain a certain tolerence.
    Please advice what to do?
    Regards
    Nirmal

    Hi ,
    Use user exit MBCF0002
    This is called when u do goods movement for production order.
    Regards,
    Vishal

Maybe you are looking for