PRINTING DELIVERY CHALLEN - MATERIAL DOC OF 541

We have a requirement of printing Delivery challen which is Material document of 541 movement type.
Now I have to link the Material document line item to P.O line item. for this I was referring MSEG table where I have P.O No but not the line item no. Without which I am not able to link P.O with material document.
I am taking this linking  to display the receiving material (Subcontracted material) on Delivery challen.
Can anybody tell me how to link this.
Thanks
Dhananjay

For subcontracted material we issue input material to vendor through MB1B (Mov type-541)
My client want take printout of this material document which should have the material issued to vendor and the receiving material against this issued material (Which is subcontracting material / Converted material).
Now To fetch the subcontracting material / Converted material code having material document with me I use MSEG where I will get P.O no but line item no is not available which is required to link material doc with P.O.
Is there any other way fetch the subcontracted material code based on MB1B material doc.
Hope it is more clear.
Thanks
Dhanu

Similar Messages

  • Print out of Material Doc

    Hello
    What is the process of configuring Std Print program for Material Document
    What are the steps
    Regards
    Niti Narayan

    Hi Niti,
    Chk your setting as below to get GR print out.
    . Maintain the Printer Name in MM->Inv Mgmt and Phy Inv->Print Control-> Gen Settings-> Printer Setting Enter the local printer where you want to print your Goods posting document
    2. Ensure that in MM->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In MM->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In MM->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for Goods Receipt/GI/Transfer Posting Documents
    Here for Particular mvt type 101,201,121,311,313,501,521,561 etcu2026 Maintain the Print item as 1--Material document printout
    5. In MM->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the following--
    Select the particular Output type then goto Details
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Transmission medium is 1
    b. Print Parameter is 7
    6. In MM->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Printer Determination by Plant/Str Loc , Maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.
    Regards

  • Print Delivery after PGI (Doc is Partially Processed ? )

    Hi All,
    We are trying to print the Delivery doc on completing PGI. The config has been set up with routine 1 and it's working correctly and creates a output line with appropriate output type.
    The issue is the output line in the output determination in VL02N is 'Partially Processed' (yellow indicator). We want to get it in 'Completely Processed' (Green) automatically as soon as we complete the PGI.
    For the output type we have used 'Dispatch time' = 4 (Send Immediately)
    Any suggestion is welcome.
    Thanks,
    Ashok

    Before i give you a solution, i want you to first run RSNAST00 program for the delivery in question. Check if after executing this program for the delivery, the yellow status turns to green.
    Note:- Object key should be prefixed with zeros - for instance 0080000123 and application = V2

  • Cancellation of Invoice, Material doc, Inbound delivery and TO

    Hi
    I have run the following business ME21N->VL31N->LT03(TO)->LT12(TO confirmation)->Material doc is created->MIRO.
    Now i want to reverse the whole process. I have cancelled the Invoice then cancelled the Material document (MIGO), after the material document is cancelled a TR(LB11) is created, then i have created a TO from the TR created(LT04) ->TO confirmation. After this the quants are reversed from the bin to the GR area external reciepts.(nullifying with the first TO)
    My question here is how to post the stock again i.e. from where should i start ? When i am trying to create TO wrt VL32n its not happening because the status showing as completed and is it possible to cancel the inbound delivery created, If yes how to do that.
    The reason for this scenario is that the customer for some reason entered incorrect values and want to cancel the documents created.Everything should be cancelled except PO

    Scenario 1
    While creating the customer master my client forget to give the account assignment group in the billing tab of the sales area data. Because of this it did not hit the proper G/L Account. Automatically it went to some other accounts.
    My question is weather we want to cancel only the invoice or we want to reverse the delivery
    If your GL accounts will be determined based on the customer account assignment group and material account assginment group combination then you can enter manually in Billing document (if accounting document is not created), No need to reverse the invoice and delivery.
    Second Scenario 2
    My client taken the invoice without calculating the TAX and the same also released to accounts.
    Now he wants to Add the TAX
    You can cancel the previous invoice and create new invoice with taxes.

  • Label printing should be only once for a material doc number

    Hi,
    we have a tcode in which if we provide a material doc no. and number of prints..but once we print the labels,
    then again if we have to print for the same material doc no..it should not print..instead it should ask for permission to print that number again..is there any option available in scripts to do like this?

    try to maintain ztable
                     ztable fields document no , printed...
      such that to identify the docu no has been printed previously r not...
    select single printed  from ztable into printed where  docu no = p_document.
        if printed = X
          if it is printed then try to pop up a screen such thst to approve it ....
           else.
         print it strightly.....

  • How to get print of material doc Posted Through MF65

    Hi,
    I want to print Material document created through MF65,
    I have a option in menu , when I execute and print then no spool request is generated,
    I also gone through the notes 185751 and 143088, but unable to close the problem
    Kindly help me to resolve the issue,
    Thanks,

    Hi,
    Do refer the below OSS Note which explains you the detail situation why the automatic print option for material document created through MF65 is not processed and solution for the same.
    312600 - MF60: Automatic print of the material document
    You need to maintain the Print version in OMBR T-code against transaction MF65 as per below screen shot.

  • Material doc, accounting doc, and profit center doc in vl03n

    Hi All,
    In VL03N how can i see Material doc, Accounting doc, and Profit Center doc.
    thanks in advance,
    kumar.

    yes he meant the exact same thing which you have understood my friend, you can have any sales document number with you f& rom that you can trace all the documents relavant to that, say you have inquiry which lead to quotation then to order, delivery, invoice & finally the accounting document so by simply entering VA13 you will get the inquiry display screen where you enter your inquiry number & click on the document flow, you will get all the details which i just mentioned, double click on the particular document number which you want to see in details
    Reward Points if it helps
    Regards,
    N

  • Material Doc printout

    I did all the setting to take the printout of GR
    WE01 is the output type
    i did the settings like
    1 Define Printer...at OMBR
    2. Enable material doc printout at OMB5
    3. Also Assign the printer to WE01 output type in OMJ3 Tcode
    5. Maintain the condition record in MN21 Transaction/Printed version/Print id
    Eventhough system is showing the msg
    No messages for initial processing exist
    Message no. VN108

    Hi,
    Pls try these steps,
    1. Maintain the Printer Name in SPRO->Malt Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for >Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, >WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    Thanks

  • Link Between delivery and material document

    Dear All,
    how do we link between delivery document,
    and between delivery document and accounting document,
    with regards
    Mohammed Raees

    Hi there,
    Material doc is the PGI document which is created whenever there is material movement either GR or GI. In VL02N --> document flow, select the GD goods issue & click on display document. It will take you to the material doc. There is a field called material slip in that. The value stored in material display is the delivery num. That is how you link the delivery & material doc.
    From the material doc if you click on accounting docs, it will give you the A/c document num & the costing doc num (if available).
    From the material doc, select the item & click on details from ityem, it will give you the GL account for which the GI is posted.
    Regards,
    Sivanand

  • Invoice referening reversed GR material doc

    Hi All,
    Our client is using a scenario, where the invoice will check delivery note on the GR document and will add the material doc number as 'Reference Doc' in IR doc. It is working fine for a single GR scenario. When a GR is revered due pricing reason and a new GR has been done with a reference to the same delivery note, the incoming EDI invoice is still picking the first GR, which is actually reversed and sitting in the system with blocked state with pricing difference. Is there anyway we can make changes in the system by config or ABAP to make the invoice point to the right material doc?? Please help.
    -Tirumala

    Hi,
    The answer is there in your question only.Since you used  a proram for doing the iv with the reference document ,have a debug for the prog while posting and find the problem for the same and fix the same.
    Regards,

  • Print Delivery Pick list.

    Hello,
    As per my business process, I would like to print delivery pick list by transaction VL70. We did created new output type YM00 same as EK00, and assigned YM00 to form (New pick list program).
    As of now, we do not have TO created. We just have open Delivery ready for picking. Now i do want to print delivery pick list, so based on Pick list i can start my picking and create a TO, with reference to what i have picked.
    Issue - I do not know configuration setup from WM side. What needs to be configured and how to print pick list. I do want my pick list to be printed at storage type level. 
    I have done setup with NACE in past, But i guess as of now we can not do setup in NACE dues to SAP upgrade. (As i was told)
    Can any one help me?
    Smit. 

    Hi Smit
    if you want setting for EK00 then please follow the below mentioned steps
    However looking at your thread it seems you want a picklist which should have the storage type / storage bin detail from where you can pick the stock.if my understanding is correct then you have to create Transfer order against the deliver and look to print the Transfer order detail using T-code LT31
    Necessary configuration detail for the same is under  node
    T-Code : LT31, enter the warehouse, TO number , Print code, Printer and Put a check mark on TO document and press Print button from menu bar (Transfer order option) this will give you the detail of Transfer order (storage type , bin material qty based on which you can do the physical picking from the warehouse) if standard SAP form is not meeting your requirement you can always look for custom form and assign to the above print code

  • Printing of Output material in Subcontracting challan

    Hi all,
            We are creatinjhg the subcontracting challan(India) with reference to the transfer posting document(541 Movment type). and then printinng the same. In print output only the material and quantity supplied to subcontractor only comes in  the challan. But we want to print the output material(after process) and the relatinve quantity in the challan.
               How do I get the output material with refernce to the input material and the corrosoponding quantity. Is there any table with reference to the Purchase order where output(finished component) and input(component supplied) is stores so than we can get the corrosponding output material with reference to input material?
        Please provide me how to get the above?
    with regards,
    Vivek Swarnapuri

    Hi,
    I am facing one problem  agianst the PO of 450 nos finish good materials  for 450 nos one raw material required is 900  and we have send 900 material  and have made 5 GRs  4 of 100 each and one GR of 50,  in all 4 GR of 100 it has use 200 qty. in each  but in GR of 50 Qty. in MIGO it is showing as it has use only 98 qty.  short fall of 2 qty.  also it is showing as no matreial is pending with vendor  now how to do the seetlement agaisnt that PO  as it is not alowing to close the challan due to short fall qty.  and how to do the analysis of this 2 qty whcih is not in GR and not pending  with vendor too.
    regards,
      zafar

  • BATCH in Material Doc - MSEG-CHARG, BAPI_GOODSMVT_CREATE??

    HI Experts,
    I got a requirement like,
    Threre is a item 10 of qty 5, in a delivery, its batch is BATCH SPLIT.
    I need to create a material document from this delivery/item.
    So, currently material doc is creating via BAPI_GOODSMVT_CREATE from this delivery, fine, but, when come to BATCH.........ONLY the last batch of delivery item 10, is coming over/populating in MSEG-CHARG..........but, I need to bring all the batches of the item of the delievry into materail doc.........so,
    (In this BAPI, I can see the goodsmvt_serialnumber for serial #s fine.)
    1- for when coming to batch issue, Is I need to populate the goodsmvt_item table for EACH BATCH as a seperate item/record in this table , for the same 10 item of delivery?
    I mean, Is I need to create a ITEM/record in Materail doc - MSEG tbl, for every BATCH of item 10 of delievry?
    replies appreciated
    thanq
    Edited by: SAP ABAPer on Oct 29, 2008 6:06 PM

    i clarified from my other func guy, answer is YES

  • EDI - Material doc not created

    Hello,
           Iam working with WMMBXY/WMMBID02 (WMMB)  to post a GR on receipt of an inbound IDOC.Iam able to post the GR but material document is not created.Iam posting against an inbound delivery created against a stock transfer order.In my case I need a material document to be created.Can any one help me out in this?
    Thanks,
    Larry

    Hi,
    I believe you are posting it using the FM L_IDOC_INPUT_WMMBXY thru we19(i sa ur earlier post)...
    Could you pls check the following...
    goto se37...display the FM...put a break point at line no - 414-427 (the FM MB_CREATE_GOODS_MOVEMENT is called here)....
    goto we19...execute on foreground and check the return values after this function call...like sy-subrc...the i_emkpf to get the material doc no. etc...
    hope this helps...
    Thanks,
    Renjith

  • Cancel Material Doc. problem

    Dear friends ,
    I have a Material doc must  be canceled used MBST to cancel Mtv 101 GR, and that mateirla has Enoutgh Qty in Project stock.
    But system reprot error :"Deficit of Delivered Quantity of item ......" if we operation on it by T-code :MBST.
    I have checked Doc date and Post date has in one finance Periered. 
    Could any one help me ?

    Hi,Csaba
    Thanks for your help first !
    THis Material GR with WBS is correct as same as it in Stock Qty.   and those error message when i MBST :
    "Deficit of Delivered quantity 1 EA : 11000057466 9119 0003 Q
        Message no. M7328
    Diagnosis
        This message can occur in the following situations:
        o   At goods receipt:
            The quantity planned for the inbound delivery falls short
        o   Upon a reversal or return delivery:
            This posting will return 1 EA more than the quantity poste
            receipt with reference to the inbound delivery.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow yo
    input, but the warning is intended to prevent you entering a wron
    quantity.
    cedure
    In the case of a warning message, check the quantity entered.
    Note:
         The abbreviations in the short text of this message can have the
         following values:
         BA  = batch
         OR  = order
         PL  = plant
         PR  = previous period
    PU  = purchasing document
    RE  = reservation
    SL  = storage location
    VC  = consignment stock from vendor in storage location
    Br .
    WangYong

Maybe you are looking for

  • SQL Conectivity error (1418) on SQL Mirroring in SQL Server_2014 Enterprises

    I perform this subjected task/activity in DOMAIN environment with Multiple VPN. No matter what I try, I constantly run into a 1418 error, I've check all my tcp/ip configs both in sql, and the server 2012 os, on both vms/physical machine.  I've enable

  • Implementation of SEM-BCS

    Hi Experts, i am trying to implement SEM-BCS. I am still new in it. Are there any documentation about step by step to configure SEM-BCS? Thanks a lot for your help.

  • VL01N help needed

    Hello, people. Two subjects: 1) When I access the transaction VL01N (or VL10G and then VL01N), inform a sales order and enter it, sometimes all items appear in the delivery and sometimes not. The intention is to show only the materials which have alr

  • Calling a Classes constrictor explicitly with out editing the Class

    Hi All, I am looking for a way to call the a Classes static constructor of a class so that the static fields get initialized. Here is some pseudo code to illustrate class Singleton {     private static instance = new Singleton();     private Map map

  • Launch Finder Without Opening a New Window

    Hello, I'm making an application that resizes the icons on the desktop, and I would like to know if it's possible to launch the the Finder without it automatically opening a new Finder window. My, Applescripts look something like this right now.. on