Problem changing clip duration

Hello All;
I am able to increase the duration of individual clips in my timeline but for some reason, I can't decrease the duration (I get a beep and the change doesn't take place). Am I doing something wrong ?
Thanks.
Tim

OK I completely rebooted and it was working for a while but then started to no longer let me decrease the duration. Here are some screen shots.
The duration of these clips varies but generally about 6:15 seconds to 7 Seconds and I am trying to change all to 6:00 Seconds.
Here are two ways I tried to change the duration. I am not sure if I can upload photos here so I'm going to provide a link to my server -
Method #1 -http://www.dedula.net/Picture%201a.png
Method #2 -http://www.dedula.net/Picture%202a.png
When I tried method #1, I got the following error message which may be a clue to what's happening here ...http://www.dedula.net/Picture%201.png
I did not receive any feedback after hitting OK for method #2 - just a beep and it reverted to my previous duration and did not change.
Any ideas ?
Tim

Similar Messages

  • Batch change clip duration - multiple photos in iMovie 11

    Hi everyone,
    Many thanks to anyone who can help. I know about clicking on the cogwheel to adjust the duration of a single photo, or to apply to ALL photos, but what I'd like to do is select a group of photos out of all the ones I've already added to my movie, and I'd like to adjust the duration of just those photos. Any ideas??
    Again, thanks so much if you can help!
    Frizzy

    Hi AppleMan1958,
    I tried what you suggested to batch-adjust clip length with 'Show Advanced Tools' checked, but under 'Paste Adjustment', there's still no 'Clip Adjustment' option. None of the available options under it (All, Video, Crop, Video Effect, Speed) works.
    This problem is very frustrating!
    Is there a setting to allow you to change clip lengths and transition as you progress through the slide show? And if you make changes in the middle section of the project, then the part ahead of it simply shunts back and forth, instead of changing clip length and transition duration on its own.
    I use a MacBook Pro running OS X and iMovie 11.
    Regards,

  • Can't change clip duration Motion 5

    I have tried all of the work arounds I have been able to find in the Support Commnity and still I can't change the duration of source clips in Motion 5.  I have trashed plist, rebooted, repaired permisions, changed timing of project, changed name of clip, used the Timeline clock instead of the Instpector window.  Cleared all In / Out points and reset them to slightly different values. I have changed Timing to Variable and back again.  I can open clips in a new project and change duration.  I have opened new project and copied some layers from working project, the problem persists.  Is reinstall the option left available to me?

    BenB,
    The specifics: Motion 5.0.4 Timeline is set to 6 minutes, the Media is 5:59;21 (QT,mp4, H264,1280x720, 24fps). Imported via File Browser into Layer Group (Group In / Out points are 0 and 6 mins, as is Play Range).  At one time the clip was in it's full duration.  Afterr a crash / restart it is only 01:52;27.  I can not Drag the clip to its full length. I cannot change it's duration thru the Inspector, not the Timeline Clock. 
    In an effort to isolate the issue I opened a new Project (same time setttings as original Project, imported the clip, which plays to it's full duration, and then, one at a time, copied and pasted all Filters and Parameters and Objects from the original Project; all play fine.  Then I copied the original Layer Group in it's entirety to the Test Project, and the clip is still limited to 01:52;27.  I then used Replace Media to select a random clips (same format) with varying Duration (all longer than 01:52;27) and got the same result every time; Duraton 01:52;27. Not one element of the Test Project has an In / Out set to anything other than the full Duration of the Project.

  • Can't fully change clip duration...

    Hello all
    My students and I are doing a claymation type project and I am having some difficulty changing the clip durations once I've imported the photos into iMovie. I can get them in and changed down to 0:00:14 but not any shorter. I should be able to set them as fast as 0:00:03... If I change the clips individually, I can set them to 0:00:03, but if I try to change more than one at a time, the lowest is 0:00:14. With 500 odd photos for each group, changing the length one clip at a time isn't really a feasible option. Any suggestions?

    Yes, the pics have to be in the Timeline before they can be adjusted.
    Great that it's now working for you. As a retired teacher myself, I know what it feels like when things don't work as they should, and you have a disgruntled class breathing down your neck! Good luck with the project - sounds interesting.
    Here's an explanation of PAL and NTSC:
    http://en.wikipedia.org/wiki/PAL
    They are Television Broadcasting formats - your part of the world uses NTSC, many other parts use PAL, and some others eg France uses SECAM. They use differing frame rates, so are largely incompatible with each other.
    Message was edited by: catspaw

  • Change clip duration iMovie

    Changing the duration of a clip in iMovie.  If 4 seconds was there originally and I want to extend it to 6 seconds then it will change to 8 seconds?

    Try setting the frame count to less than that for a full second.

  • Problem Changing Clip Speed

    Hello,
    When working with FCP I have continuously had problems with changing clip speeds. I import my .dv files, open them in the viewer window, select my desired in and out points and drag and drop the selection in the timeline. Once it's here and I attempt to change it's speed, I get this message:
    "UNABLE TO COMPLETE COMMAND. A CONFLICT OCCURRED DURING A TRIM OPERATION"
    As many of you know it's impossible to achieve your desired outcome without the ability to edit a clips speed. I would really appreciate help and I thank anyone in advance for their time.
    -David

    Welcome to the forum!
    Usually you'll get that message if there are clips further down the Timeline (to the right) from the clip your working with. This helps keep the other clips where you wanted them instead of getting pushed down by a slo-mo clip.
    One work-around is to open a new Sequence with the same settings, then copy the clip to the new Sequence. When you've made the adjustment you wanted, copy and paste the lip back into the original Sequence.
    As many of you know it's impossible to achieve your desired outcome without the ability to edit a clips speed
    I'd have to disagree with your assumption ... the need for speed changes isn't universal. I seldom (if ever) need to adjust speed for news clips, press conferences, corporate promos, etc.
    -DH
    ps: just curious as to why you're using .dv files in FCP? Was this footage captured in iMovie?

  • Can no longer access iPhoto from the iMovie camera browser..not working. Also the Inspector tool not working properly. Cannot change clip duration.

    How can I fix the INSPECTOR Tool?   Clip duration is not working properly, it is very erratic.  You type a number and a different one comes up on the clip.
    Suddenly the iPhoto Camera browser in iMovie is not working properly either.  Can not access my iPhotos to include them in iMovie project.

    Have you tried this?
    From the "HOME" screen, go to "SETTINGS > PRIVACY > PHOTOS" and see if iMovie is listed in the "PHOTOS" page. If it is, then tap the iMovie switch to "ON"
    Now your Videos & Photos should be accessible in the iMovie App.

  • Transitions changing clip duration

    I have laid out all my clips on the timeline to tightly coordinate with the audio track. I have added a number of transitions... mainly cross dissolves, without problem but then I add one more and all my clips have miraculously shortened their duration... If I try to readjust the duration using photo settings and click update all is good, the clip resizes itself in the timeline, but then until after it renders and it then reverts back to its shortened duration. I suspect this is not normal behaviour.
    I've trashed my imovies preference file, but the problem persists. I'm using iMovie HD 6.0.3 (267.2) and running OS 10.5.6 . Any thoughts on a likely fix for this annoyance would gratefully received.
    many thanks

    hmmm.... If I understand the logic correctly it would be as if I had two clips each with a duration of 5 seconds and I then put a cross dissolve of 2 seconds between them.. which would result in a sequence of 10 seconds comprising one four sec clip, the 2 sec dissolve and then the second 4 sec clip...
    However on closer examination this isn't what I'm experiencing... for example: I have two clips a) 6:13 and b) 5:11 the point in the timeline at the end of clip b) is 19:05. I put a cross dissolve of 0:24 between them... a) has now been shortened to 5:19 and b) to 4:17. So it would seem that each clip has been shortened by 24 frames...however the timeline at the start of the transition is now 13:00 and at its other side is 13:24 and the point at the end of clip b) is now 18:11. Therefore it seems to be that a 0:24 cross dissolve is in fact cutting a total of 1:18 from the clips while only adding in 24 frames of dissolve... net net the project shortens.
    So... is this normal functionality or is something amiss?

  • Problems changing clip speed

    Either I am being really ignorant, or this is another quirk to FCE.  Why, when I change the speed of a clip using Modify/Speed, does FCE shift all the clips on track 1 when the clip I am adjusting is on track 3 and selected.  Is there a way to prevent this very annoying behaviour.  I have even tried locking track one and it still shifts all the clips on that track after the clip I am editing, even though that clip is on a different track.  In fact, when track is "locked" and I change the speed of the clip on track 3, FCE shifts the video on track one negatively 17 frames and the audio for track one positively 17 frames.  Completely stumped.
    Thanks,
    Ron

    Thanks Russ,
    But the correct answer is "I am ignorant".  Your response made me look at how i had the whole sequence set up and I realized that the audio track for the whole thing was on a3 and of course it wasn't shifting clips after all but changing the whole audio track.
    Thanks again,
    Ron

  • IMovie 10.07 change clip duration default to less than 1s

    I have 100 picture stills to put on the time line.  I want each to appear less than 1 second, say 0.2s.  I can't use the clip slider to slide to less than 1 sec.  Is it doable?  Thanks.

    Try setting the frame count to less than that for a full second.

  • Is there a way to change the duration of a group of selected clips all at once?

    Hi all,
    I'm working with good old Premiere 6 on Windows 7.
    Is there a way to change the duration of a group of selected clips all at once?  If I have a large group of clips in my timeline that are all the same duration, once I've selected them all in a group, can I somehow change the frame number duration of all the clips at the same time?
    I've found other things that can be done to a group of clips at the same time, but I can't find a way to change the duration of a group of selected clips.
    Thanks,
    digi

    Thanks Jim and Bill,
    In my efforts to work around the problems with the distortion and horizontal interlace lines that come when using the Motion Settings, I'm doing stop frame animation with hundreds and hundreds of layers in PSDs in multiple files placed in hundreds of one, four and six frame sections in Premiere, so if I find that I need to change the number of frames per clip in hundreds of consecutive clips (not actual duration of speed changes), then I need to pull out the right side of hundreds of frames after first moving them apart enough to allow for changing them if I'm making them longer.
    These animations are different from the rotating reel animations in that they are for laterally moving subjects that are long streams of moving graphics and photos.
    I read about "clip nesting", but I think that only applies to clips or groups of clips that are the same, whereas my clips are each from different imported layers times 125 or so, consecutively placed one after another to create the laterally moving stop frame animation.
    Now I've tried johnbmx4christ's alternate method of creating rotations that was just posted on the other thread about the rotation distortion, but that method results in the same oblong distortion and messed up looking horizontal interlace lines.
    What a can of worms.
    Thanks,
    digi

  • Changing the Duration of multiple clips/Gee I thought I knew how?!

    Okay folks. I have a group of pictures on the timelime. I need to shorten the duration of all clips. I highlighted the clips, control+click on one of the clips--navigated to duration.
    When I change the duration, the computer beeps and returns the time to the orginal clip length of 10:00. I can change an individual clip in this manner but not the whole timeline.
    Any ideas?
    Thanks for the help.

    Never Mind. I had a sequence in my list of clips. Took it out and that solved the problem. Sorry.
    Thanks anyway.

  • In the latest version of iMovie how do you change the duration of the clips

    In the latest version of iMovie how do you change the duration of each clip?

    Try 'window' (in the menu bar)>movie properties>settings
    http://help.apple.com/imovie/mac/10.0/#mov4e66c1a8b

  • How do change the duration of multiple clips with timestreach?

    All of the options are grayed out.

    AdminID
    What version of Premiere Elements and on what computer operating system?
    Let us assume Premiere Elements 11, 12, or 13 on Windows 7, 8, or 8.1 64 bit for the purpose of an example.
    1. Select all the clip on the Timeline (all at one time) that are being targeted for same duration change.
    2. Right click anywhere in the selection, select Time Stretch, and, then in the Time Stretch dialog, change the duration 00;00;0O;00. (hours; minutes; seconds; frames).
    Do you have one of those versions that I mentioned, making sure to select all the involved clips ahead of time before going
    after Time Stretch?
    Selections
    If you want all the clips on the Timeline, then Edit Menu/Select All
    or
    Hold down the Shift key of the computer main keyboard, and, with the mouse cursor, click on each of the clips to be involved in this duration change
    or
    With the mouse cursor, draw a rectangle around the clips to go into the selection in order to select them
    Any questions or need clarification, please do not hesitate to ask.
    Thank you.
    ATR

  • Clip duration of stills in iMovie change automatically

    HELP, I am about to throw this iMac out the window!
    I am trying to sync the length of stills to an audio track in iMovie 11 so the slide changes line up with beats in the track but everytime i change one slide iMovie automatically changes the duration of other slides putting the whole thing out of whack.
    I have tried to google the problem and just come up with a heap of other people asking the same question but cant find any answers.

    Hi,
    I work with iMovie 11 and never had any problem with previous versions. Now I'm doing my first project in iM 11and it just ignores my request.
    When I set the duration in 'Project Properties' 'Apply to all photos' of 4 sec it will set the duration anything from 5 to 7 sec and no matter how often I change it will not react.
    What can I do?
    thl

Maybe you are looking for

  • How to create event based process chains

    Hi All, I would like to know about event based process chains. In connection to this, could you please answer the following queries, 1. How to create events 2. How to link created event to the process chain in the same BI or BW system and as well as

  • Macbook Pro 2011 don't recognize Monitor AOC e224eFw, hence not displaying correct resolution

    Two days ago after i put my Macbook Pro 2011 to sleep with the Mini DisplayPort connected (always do the same) stopped identifying my External Monitor, AOC e224eFw showing it as "standard VGA" so i have no the right screen resolutions. I've tried to

  • DateTimeAxis and binding to an XML attribute

    Hi all, I'm trying to find a way to bind DateTimeAxis to a different field (other than date). but to no avail. this is a piece of the XML I'm getting from the server: <cht f1="2007-11-11" r1="677.000000000" c1="3229.000000000" c2="447.790000000" i1="

  • How do I get out of full screen?

    How can I get out of full screen and get my apple emblem and otehr at the top of the screen?

  • Making xml list with links

    I was able to create a list component in Flash 8 and load the items from an xml file, but I can't figure out how to make each line clickable in order to work as a link. The code used to populate the list is: form = new Object(); form.load=xmlConn.tri