Problem during Process Order creation
Hi,
I have problem while creating Process Order.
I have maintained all the basic data required to create the process order.
When I Release the order, I am able to create the control recipe also, but PI sheet is not generated along with it. System gives the message "No PI maintained in customising for CRD for which control recipe is to be generated "
If I maintain the same, then system is unable to create the control recipe.
What may be the problem here? What i can do to rectify this situation?
Pavan
Hi Pavan,
1. Maintain PI in SPRO of process management
2. Assign this PI to one of phse in master recipe
3. Plz check wheather ur created Control receipe destination or not.
4. if not then maitain the same in Spro.
5.Check the ordre type dependent parameter i.e COR4 from SPRO
see the Control recipe gerated in REL phse else maintai the asme in production scheduling profile.
if possible plz send the sctren shot fir the same to
[email protected]
Regards
Siddhesh
Similar Messages
-
Problem in process order creation.
Dear Sir/ Madam
i am facing a problem while process order creation.
the problem is:
Error when calculating cost for order ATFEDEC11 "see log Log is deleted when saving
Do you still want to save?"Hi,
The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
Hope that helps...
Regards,
Declan -
Problem during Process Order Confirmation - COR6N
Dear All,
We are into process industries
Till now we are creating different BOM for each section and different process orders for each BOM.
For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
Now we have created new BOM for FG - showing all input/output of RM, SFGs. In Recipe, define operation for each section. and assign operation to material. I have attached screenshot of Recipe Operation.
During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
I have checked in Recipe, control key is ok i.e. Automatic GR, in OPK4 setup is also correct.
We have created new BOM and Recipe. There is no change in other configuration parameter.
Thanks and Regards,
NiravHi Nirav
The automatic goods receipt is defined by the operation/phase control key.
Control key PI03 has the automatic goods receipt setting by defaul.
Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
BR
Caetano -
Missing stock during Process Order creation
Hello Masters.
I'm facing a new problem here in my client.
Thats the situation:
We are trying to generate a subcontracting process order to delivery a semi finished material to a supplier in order to be packed. We already have a contract with this ssupplier, its been saved as a supplier, we already did this operation with him more than once.
The question is that during the process to create the process order, system is giving us a message that there is no enough stock off semi finished material to be send to the supplier. (it comes a message that is missing a small quantity to fiill the right amout we want to send to the 3rd party - something around 1,5% of the total amount)
But if we go to MMBE we can see the same amount of stock we want to delivery to the supplier in free utilization.
Besides we are using here WM we didn't see any difference that could give us the error.
In QM inspection batch all the amount were released (321 movement) no sample quantity was taking/retained.
The most insteresting part is the we did the same operation for the next batch of the same semi-finished material. I mean for the batch produced yesterday (monday may 9th) we already sent to the 3rd party for packing but for the batch from last friday, we are facing the issue.
In this case we have the same kind of process order, same 3rd party, same materials, same process a so on.
Please could you give me an idea where should I look for a solution.
Thanks in advance.
HarlenHello Vivek thanks for your anwer.
However, Ive talked to a QM consultant and presented the issue for him. He told me to use a SAP program QEVAC20 ( notes 48815 and 717622 ) to check possible inconsistences between QM and IM stock.
So We will try to use this report to check if there is an issue. Have you used this program before? Do you think it should help us?
Due to the process to create the process order, there is no issue, no issue with batch number or inspection lot. The error message comes when we try to select the batch number of semi finished material in COR1 tcode.
The message complains theat is missing a small quantity of the batch.
Tks,
Harlen -
Availability check during process order creation
Hi all,
can anyone tell me significance of availability check during creation /change of process order?? ( in terms of business)
how is the usual processs?Hi,
Availability check for a material is carried out only if the material is
1. A stock item
2. Not a phantom item
3. Not a bulk material.
This can be carried out
1. during order creation
2. during order release
3. when a created order is saved
Availability check can be triggered either manually or automatically.
For this we need to define in checking control(opjk)
First define a checking group(ovz2) and checking rule and this
must be assigned to checking scope.(opjj)
In the checking scope(opjj) we should define
1. which Mrp elements are to be considered during check
2. which inventory categories are to be taken into account
3. whether Replinishment lead time is to be taken into account or not
4. whether check is also to be carried at storage location level.
This checking rule must be linked to checking control(opjk)in which you can say
1.No availability check for the material
2.Availability check when saving the order
3.What type of check is to be carried
whether ATP CHECK or Check against PIR quantities
4. Whether order should be released or not if there is
any missing parts.
The checking group is assigned to material master MRP3 view.Please check whether checking gorup is assigned to all the components in the BOM.
Regards,
nandha -
Error during process order creation
while i create a process order following error is coming "recipe is empty"
please tell me where exactly i'm going wrong.Dear Dhaval,
Welcome Back
Long time heard from you and nice to see your reply from long time
Good Luck !!!
Regards
Madhu -
Update error in RV_SALES_DOCUMENT_ADD during Sales order creation
I get an Update/ ABAP runtime error during Sales order creation. The error occurs during processing of the update module -RV_SALES_DOCUMENT_ADD.
This error does not occuring always, as I am sometimes able to create a Sales order without getting update error. I am getting the error of all types of Sales orders and even contracts.
Am I missing any configuration parameters?
Thanks,
ChitraYes , I can see the error in ST22.
While exceuting VA01 (Oder type OR, Entering Sold-to-party, Purchase order NO, Material, Qty, Plant),
- I get run-time error "Run-time error "GETWA_NOT_ASSIGNED" occurred".
Analysis of error shows:
Update terminated in "Update module: RV_SALES_DOCUMENT_ADD"
Fails in the Read table in one of the form
Termination occurred in the ABAP program "SAPLV45U" - in "VBAP_BEARBEITEN"
The main program was "RSM13000 ". In the source code you have the termination point in
line 147 (READ TABLE FYVBAP WITH KEY VBAP_KEY.)
of the (Include) program "LV45UF0V".
The ABAP's say the functional module is trying to do an 'UPDATE' instead of 'INSERT" in the internal table FYVBAP.
Thanks,
Csuman -
100% advance payment during sales order creation
Dear Experts,
One of our international client is having one requirement for collecting the 100% advance payment from customer during sales order creation itself. Our customer is in Germany.
For high risk customers they want to collect the advance payment for 100%. And if this 100% advance payment was not paid by customer then, sales order should not be processed.
And during regular sales invoice creation the same down payment also needs to be displayed in the invoice as advance payment.
Is it possible to setup this process using milestone billing.?? .or some other process is available to setup this process.
Thanks for your cooperation.
Warm Regards,
VelmuruganHi
Try with this with Credit management.Put High Risk with Error message.
When ever you will Create Sales Order it will Block due to Credit Chech.For this scenario Enter the Parking Vale at F-66.
Then make a entry for Customer-CR to BANK-DR.
This may solve ur requirement.
Regards
JS -
Batch no assigning during production order creation
Sir,
We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
Kindly help
Regards,
PSHi
For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
This is easy to handle.
Please check and come back
Regards,
srihari -
Dump during sales order creation for a config material (uding order BOM)
Dear all,
I am getting the following error during sales order creation for a configurable material
When I click on 'Engineering' tab in the characteristics value assignment for the parent material i.e. sales order material I get dump with following message,
'Field symbol has not yet been assigned'
Thanks,
YogeshYogesh,
what was the problem ?
Thanks,
Pavan Verma
Edited by: Pavan Verma on May 11, 2010 9:31 AM -
BAPI - Problem in Sales order creation
Hi Friends,
I have problem in Sales order creation using BAPI ,I am getting a messsage - Error in creating document ,I have sent the code along with this mail ,can you help it out.
Code:
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text FOR FIELD p_auart.
PARAMETERS: p_auart TYPE auart OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Sales organization
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text1 FOR FIELD p_vkorg.
PARAMETERS: p_vkorg TYPE vkorg OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Distribution channel
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text2 FOR FIELD p_vtweg.
PARAMETERS: p_vtweg TYPE vtweg OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Division.
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text3 FOR FIELD p_spart.
PARAMETERS: p_spart TYPE spart OBLIGATORY.
SELECTION-SCREEN END OF LINE.
SKIP 1.
Sold-to
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text4 FOR FIELD p_sold.
PARAMETERS: p_sold TYPE kunnr OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Ship-to
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text5 FOR FIELD p_ship.
PARAMETERS: p_ship TYPE kunnr OBLIGATORY.
SELECTION-SCREEN END OF LINE.
SKIP 1.
Material
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text6 FOR FIELD p_matnr.
PARAMETERS: p_matnr TYPE matnr OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Quantity.
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text7 FOR FIELD p_menge.
PARAMETERS: p_menge TYPE kwmeng OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Plant
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 2(20) v_text9 FOR FIELD p_plant.
PARAMETERS: p_plant TYPE werks_d OBLIGATORY.
SELECTION-SCREEN END OF LINE.
Data declarations.
DATA: v_vbeln LIKE vbak-vbeln.
DATA: header LIKE bapisdhead1.
DATA: headerx LIKE bapisdhead1x.
DATA: item LIKE bapisditem OCCURS 0 WITH HEADER LINE.
DATA: itemx LIKE bapisditemx OCCURS 0 WITH HEADER LINE.
DATA: partner LIKE bapipartnr OCCURS 0 WITH HEADER LINE.
DATA: return LIKE bapiret2 OCCURS 0 WITH HEADER LINE.
DATA: lt_schedules_inx TYPE STANDARD TABLE OF bapischdlx
WITH HEADER LINE.
DATA: lt_schedules_in TYPE STANDARD TABLE OF bapischdl
WITH HEADER LINE.
Initialization.
INITIALIZATION.
v_text = 'Order type'.
v_text1 = 'Sales Org'.
v_text2 = 'Distribution channel'.
v_text3 = 'Division'.
v_text4 = 'Sold-to'.
v_text5 = 'Ship-to'.
v_text6 = 'Material'.
v_text7 = 'Quantity'.
v_text9 = 'Plant'.
Start-of-selection.
START-OF-SELECTION.
Header data
Sales document type
header-doc_type = p_auart.
headerx-doc_type = 'X'.
Sales organization
header-sales_org = p_vkorg.
headerx-sales_org = 'X'.
Distribution channel
header-distr_chan = p_vtweg.
headerx-distr_chan = 'X'.
Division
header-division = p_spart.
headerx-division = 'X'.
headerx-updateflag = 'I'.
Partner data
Sold to
partner-partn_role = 'AG'.
partner-partn_numb = p_sold.
APPEND partner.
Ship to
partner-partn_role = 'WE'.
partner-partn_numb = p_ship.
APPEND partner.
ITEM DATA
itemx-updateflag = 'I'.
Line item number.
item-itm_number = '000010'.
itemx-itm_number = 'X'.
Material
item-material = p_matnr.
itemx-material = 'X'.
Plant
item-plant = p_plant.
itemx-plant = 'X'.
Quantity
item-target_qty = p_menge.
itemx-target_qty = 'X'.
APPEND item.
APPEND itemx.
Fill schedule lines
lt_schedules_in-itm_number = '000010'.
lt_schedules_in-sched_line = '0001'.
lt_schedules_in-req_qty = p_menge.
APPEND lt_schedules_in.
Fill schedule line flags
lt_schedules_inx-itm_number = '000010'.
lt_schedules_inx-sched_line = '0001'.
lt_schedules_inx-updateflag = 'X'.
lt_schedules_inx-req_qty = 'X'.
APPEND lt_schedules_inx.
Call the BAPI to create the sales order.
CALL FUNCTION 'BAPI_SALESDOCU_CREATEFROMDATA1'
EXPORTING
sales_header_in = header
sales_header_inx = headerx
IMPORTING
salesdocument_ex = v_vbeln
TABLES
return = return
sales_items_in = item
sales_items_inx = itemx
sales_schedules_in = lt_schedules_in
sales_schedules_inx = lt_schedules_inx
sales_partners = partner.
Check the return table.
LOOP AT return WHERE type = 'E' OR type = 'A'.
EXIT.
ENDLOOP.
IF sy-subrc = 0.
WRITE: / 'Error in creating document'.
ELSE.
Commit the work.
COMMIT WORK AND WAIT.
WRITE: / 'Document ', v_vbeln, ' created'.
ENDIF.
Regards,
Dineshwhat messages u are gettting in RETURN ? Please check the RETURN tables data.
[code]CALL FUNCTION 'BAPI_SALESDOCU_CREATEFROMDATA1'
EXPORTING
sales_header_in = header
sales_header_inx = headerx
IMPORTING
salesdocument_ex = v_vbeln
TABLES
return = return
sales_items_in = item
sales_items_inx = itemx
sales_schedules_in = lt_schedules_in
sales_schedules_inx = lt_schedules_inx
sales_partners = partner.
Regards
Prabhu -
I have Problem in Process Order ,
Dear , I have Problem in Process Order ,
See we have Numbe of process order , that status is REL CRCR DLV PRC CSER BCRQ BRRQ GMPS*
Now i want to Mass TECO all order , but i can not TECO because status should be CRFI ,
So
1) how can i change staus all order at once to CRFi?
2) Can i do the TECO in staus CRCR ?
3) Any other solution
REGARD
SAPHi,
It is NOT possible to do the process order TECO with the status CRCR , this has to be changed to CRFI
you can change the status to CRFI from CRCR in the following way
1) go to CO54 -T-code
enter the plant & Date range
enter the process message category PI_CRST ( sap std) or relevent category defined for you plant
select the to be sent option
2) here you will get list of process messages related to control recipes, click on the SEND (ctrlshiftF12)
process message will be processed & Control recipe status will be cahnged to CRFI for CRCR
Thanks,
Rajaniaknth -
REGARDING PROCESS ORDER CREATION
Hi All,
While creating the process order for material, system showing the message that "Manual process order cannot be created for this product". But if we try with another user id, i could able to create the order for the same material.
Plz suggest the solution to get rid of this error.
Thanks
Arvind SHi,
The message "Manual process order cannot be created for this product" clearly indicates that the user is not authorized for Manual process order creation by COR1 transaction for this material and may be this material is planned through MRP or SOP etc. and in critical or certain situations manual process order creation is allowed to another user/user id for the same material ( type of materials/material code).
Some time organizations put such restrictions through enhancements. You can search the exact reason or logic of restriction by the help of ABAP consultant.
Regads,
Narresh -
External Number gneration for process order creation
Hi,
I need to generate external number range for process order creation and at the time of goods receipt.
How can I do this in the include ZXVBZU02.
Regards
SAiYou might want to try search first:
http://www.google.com/search?hl=en&source=hp&q=externalnumberrangeforprocessordersite%3Asap.com -
Restriction during process order confirmation
Hi,
I want one validation during process order confirmation (mile stone) through t code COR6N if resource capacity & shift intervals not maintained ( t code CRC2) then process order should not confirmed & there should be error message. Plz advice how it is possible through customization.
regards,
sps.Dear shukla,
Check with this User Exit,
CONFPI02 Process order confirmation: Customer spec. input checks 1
CONFPI03 Process order conf.: Cust. spec. check after op. selection
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when saving
If the above is not working then check with this BADI
WORKORDER_CONFIRM at the time of saving,
Regards
S Mangalraj
Maybe you are looking for
-
Can't combine InDesign files to single PDF file
I'm using Windows XP, Acrobat 8 Professional, InDesign (CS3). Here is the problem: When trying to combine three InDesign files into one single PDF file with Acrobat 8, I get an error message saying something about expecting PDF default presents but g
-
Can I run I movie on a MacBook Air late 2010 ?
Can I run imovie on a MacBook like this? Will it run fast? Can I covert videos into the YouTube format "WMV"
-
Can I use a S-Video to USB from a DVD player to my MacBook so that I can edit a DVD I burned of old family movies? I used an old VHS tape to record the DVD-R of the movies. I no longer have a VHS video camera. I tried using the DVD-R in the MacBook w
-
hai, i have a AM and PM table view report with more or less 50 columns for each report. According to the user requirement only One table either AM or PM table must be displayed, as user selects form the drop down menu.(AM or PM). thanks in advance...
-
I am trying to set up a connection, but I keep getting an error that the "file is not available". I am running IIS on my web server (windows XP), on which I created an ODBC connection to a db that resides on a separate server (Linux). While logged in