Problem in creating part time work schedules

Hello All,
I have to create some part time work schedules rules for part time employees
Work: Tuesdays to Fridays
a)Tues-Thurs 6.5 hours per day   i.e. 9.30 to 5
  9:30 u2013 14:30 work
  14:30 u2013 15:30 - 1hr lunch break
   3:30 u2013 17:00
b) Friday - 7 hours (9:30 to 14:30)
Total hours per week are= 26.5
1) I created one fixed break schedule 14:30 u2013 15:30 (unpaid)
2) I created 2 Daily work schedules
Tuesday to Thursday u2013 NOR & (created variant A)
Only Friday u2013 NOR1
3) I created one Period work schedule u2013
P/Time u2013 Mon is FREE, Tue to Thursday as NOR , Fridayas NOR1 & Sat, Sun as FREE
4) When I try to create Work schedule rule I got stuck in between:
I configured weekly working hours as 26.5
I configured monthly & annually working hours.
But  I had problem to put daily working hours???
because Tue u2013 Thurs are 19.5 hours (6.5 into 3) & Friday (7Hrs) =26.5
Hence how to I club both the working patterns in one Work schedule rule???
Please help me out in same
Regards,
Nithi

niti
actually i dont have SAP Login here
in the Table V_T508A
u define the annul working hours , Monthly working hours  right
Can u tell wht are the other feilds there
26.5 hrs is the Combination of two Periodic Work Schedule right ..........if yes
26.5/31  31 is ur working days
Edited by: Sikindar on Apr 6, 2009 10:10 AM

Similar Messages

  • How create flxetime in Work Schedule

    the shift schedule for the following timings as Flexi timing is 
    u2022         8.00 am to 5.15 pm
    u2022         8.15 am to 5.30 pm
    u2022         8.30 am to 5.45 pm
    u2022         also i can create (For 1st and 3rd Saturday off , 2nd and 4th Saturday off)
    This shift timings are employee come at any flexi time.

    Dear Satya,
    You can simply create a Daily work schedule with the felxi time and this will solve the problem.
    Under the Customizations:
    Define Daily Work Schedules => Under your Daily work Schedule
    Go to working times tab and here you have the option of Flexi Time
    under the planned working time you enter 8 to 5:45
    Under the core time you enter 8:30 to 5:15
    08:00 - 08:30 : Flextime
    08:30 - 05:15 : Core time 1
    05:15 - 05:45 : Flextime
    This will allow the flexi times, also please read the F1 documentation of the field for more information.
    Regards,
    Shree

  • Labview/Te​stand part time work required

    I have got, 5 years experince using teststand 2.0 > 4.0, 4 years experience using labview 6.1 > 8.5. 6 years experience using VB6, .net etc.
    I am currently looking for part time work around the south west area.

    Hi
    This is Anil Punnam.
    I have been working with GE India since June 2005. Completed Masters in Engineering with specializationin in Electronics. I have more than 3 years of experiecne in using LabVIEW. 
    I have Valid H1B VISA that valid till October 2010.
    I will be relocating to US in a month's time.
    you can reach me at [email protected]
    Looking forward to work with you
    Regards
    Anil
    Anil Punnam
    CLD
    LV 2012, TestStand 4.2..........

  • How to create/maintain individual work schedule instead of employee subgr.

    Res.all.
    We want to create a work schedule for every employee as they may come in any shift.we are implimenting negative time mgt.
    As in sap we have to group our employees for work schedule,can anybody guide on this.
    Regards
    sammeer

    Hi Sameer,
    Y u Want to go with Individual WSR its impossible to configure.
    Do one thing Create all types of shifts and in Period Work Schedule normally u assign it in normal rotation.
    Now In your scenario maintain for each employees IT2051 in which his WSR from IT0007 will be maintained directly. Now when an employee changes from the proposed shift then you can directly maintain in IT2051 his actual shift.
    Now daily Time administrator should run a report where in he must have all employees actual shift and tell him to directly upload each employee's IT2051.
    Try this
    Regards
    Pavani
    Remainder: Reward points if answer is helpful.

  • Problem to create a time-lapse video

    Hello all,
    I'm encountering a problem with my CS5.1 , let me explain . I want to create a time-lapse video from many pictures i've taken,  But when i go to File------Automate------Batch , then I'm supposed to find in Actions something called "Time-Lapse processing " or something like this, but it's not there !!
    Can you help me in how i can get this work,please ? much appreciated.

    Welcome to the forum.
    It appears that you are looking to process your Still Images in Photoshop, with an Action, and then via Automate to Batch. Is that correct?
    Premiere Pro does not use Actions, and has no Automate>Batch.
    However, if one is doing Time-Lapse Video, PrPro can do that nicely.
    First, will you have any Video, or only Still Images?
    If ONLY Still Images, then you must address your intended delivery, say DVD-Video, or BD, or streaming media. That will determine your Project/Sequence Preset.
    Let's say that you intend to create a BD (Blu-ray Disc), in full-HD, then you can choose a 1920 x 1080 Project, at a FPS for where you are, such as NTSC = 29.97 FPS.
    After you have perhaps Scaled your Still Images in Photoshop, and named them in sequence, such as ____00001 through ____0000x, all in one folder, you can then Import that Numbered Still Sequence into PrPro, and even add a Transition, if needed.
    For most true Time-Lapse, one would choose a Duration of 1 Frame, but for a bit of a Stop-Motion "look," then 3 - 5 Frame Duration might be better. You can always experiment with a few of your Images, to see what suits your tastes and desires. For most of what I do, the Stop-Motion look is my choice, and I will usually choose a Duration of 3 Frames, with a tiny Cross-Dissolve between those Frames. This is your artistic choice. There is no right, or wrong choice.
    Hope that helps, and for the Photoshop aspect, you might want to post the question here: http://forums.adobe.com/community/photoshop/general
    Good luck,
    Hunt

  • Problems with Creating Real-Time InfoCube in BI 7.0

    Hello, Everybody,
    I try to create Real-Time cube for BW-BPS planning, but when i want to insert a key figure into real-time info cube i get error:
    <i><b>Short dump has not been completely stored(too big)</b></i>
    <i><b>Exception condition "Node_related_missing" raised.</b></i>
    Could You help me?
    Thanks in advance,
    Best Regards,
    Arunas Stonys

    Hi Arunas,
    I think you are not on SP10. you may need to implement the SP10 or advance correction as in this note:
    Note 968097 - Error in BI metadata maintenance (InfoCube, MultiProvider)
    Symptom
    Note that the attached corrections cause follow-up errors. You must also implement the corrections from Note 971918.
    You are in the maintenance dialog for an InfoCube or a MultiProvider. When you enter new key figures in this provider, a program termination occurs with message "NODE_RELATED_MISSING" in class CL_RSO_DATA_TREE.
    This problem occurs because the InfoProvider does not contain a unit dimension yet and the system tries to insert the relevant unit into the unit dimension (that does not exist).
    Other terms
    Transaction RSA1, RSDCUBE, RSDMPRO
    Reason and Prerequisites
    This problem is caused by a program error.
    Solution
    SAP NetWeaver 2004s BI
               Import Support Package 10 for SAP NetWeaver 2004s BI (BI Patch 10 or SAPKW70010) into your BI system. The Support Package is available once Note 0914304 "SAPBINews BI 7.0 Support Package 10", which describes this Support Package in more detail, has been released for customers.
    In urgent cases, you can implement the correction instructions.
    To provide information in advance, the note(s) mentioned above may already be available before the Support Package(s) is/are released. In this case, the short text of the note still contains the words "Preliminary version".
    Thanks,
    Raj

  • Time :- Work Schedule Customizing Error

    Hi Time Gurus,
    I am running PT60 for a employee and getting the following error "Customizing error in work schedule rule 1 56 04 WW -A".
    For this employee IT0007 look like this
    01.07.2010 - 22.08.2010          WSR = WW -A
    23.08.2010 - 03.10.2010          WSR = 05
    04.10.2010 - 31.12.9999          WSR = WW -A
    Now WW - A belongs to
    ES Grping 1
    PS Grouping 04
    Holiday Calendar 59
    and WSR 05 has following entries
    ES grping 1
    PS grping 04
    Holiday Calendar 56
    And there is no entry for 1 56 04 WW -A in T508
    Than why i am getting this error for this employee ? ANy ideas?
    Regards,
    Navneet

    Hi,
    As per the details given by you, i understand that WSR = WW -A is assigned currently. Please check if the you have generated work schedule after changing from 05. If not, generate and than try.
    Regards
    Chandrashekar

  • Problem in creating a Windows Service Scheduler Agent

    Hello,
    I have different Listener agent created as NT Services which work fine, but for my new scheduling need I have tryed to transform them into Scheduler Agent NT Services but I'm facing error.
    In the agentservice.log I obtain the following error code:
    STATUS | wrapper | 2008/04/17 16:49:00 | OracleDI Agent Scheduler Agent_Gensapp12 installed.
    STATUS | wrapper | 2008/04/17 16:49:19 | --> Wrapper Started as Service
    STATUS | wrapper | 2008/04/17 16:49:19 | Launching a JVM...
    INFO | jvm 1 | 2008/04/17 16:49:19 | Wrapper (Version 3.1.0) http://wrapper.tanukisoftware.org
    INFO | jvm 1 | 2008/04/17 16:49:19 |
    INFO | jvm 1 | 2008/04/17 16:49:20 | Starting Oracle Data Integrator Agent...
    INFO | jvm 1 | 2008/04/17 16:49:20 | Version : 10.1.3.4.0 - 30/10/2007
    INFO | jvm 1 | 2008/04/17 16:49:20 | com.sunopsis.tools.core.exception.SnpsRuntimeException: java.sql.SQLException: [GENSAPP12]Invalid object name 'SNP_CONNECT'.
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.n.a(n.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.j.f.run(f.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.i.y(i.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.i.run(i.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at java.lang.Thread.run(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | Caused by: java.sql.SQLException: [GENSAPP12]Invalid object name 'SNP_CONNECT'.
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.a.a(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.if(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.a(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.for(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.c.int(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.c.executeQuery(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.sql.SnpsQuery.executeQuery(SnpsQuery.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.DwgObject.refresh(DwgObject.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.e.h(e.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | ... 5 more
    INFO | jvm 1 | 2008/04/17 16:49:20 | Caused by:
    INFO | jvm 1 | 2008/04/17 16:49:20 | java.sql.SQLException: [GENSAPP12]Invalid object name 'SNP_CONNECT'.
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.a.a(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.if(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.a(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.g.for(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.c.int(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.inet.tds.c.executeQuery(Unknown Source)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.sql.SnpsQuery.executeQuery(SnpsQuery.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.DwgObject.refresh(DwgObject.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.e.h(e.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.n.a(n.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.j.f.run(f.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.i.y(i.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at com.sunopsis.dwg.cmd.i.run(i.java)
    INFO | jvm 1 | 2008/04/17 16:49:20 | at java.lang.Thread.run(Unknown Source)
    It seems to be a connexion error but I have regenerate all the repository connexion information for OdiParams.bat and nothing change.
    If you have an idea I really need it.
    Thanks in advance.
    BM

    Hi Micropole,
    It may have something to do with
    SNP_SECU_USER & SNP_SECU_ENCODED_PASS pointing to something other than the Master Repository schema.
    Can you please double check?
    thanks.

  • Problems with creating a Time Machine backup on external HDD

    Hello!
    I tried to make a new Time Machine backup file on my external harddrive today.
    Unfortunately it stopt after about 6 or 7 gb with the popup:
    ''the backup was not performed because an error occurred while copying files to the backup disk. The problem may be temporary.  Try again later to back up.  If the problem persists, use Disk Utility to repair your backup disk''
    I'm certain that the HDD (Western Digital 1Tb) was correctly formatted (Mac Os Extended (Journaled)). It's the same type as my internal harddrive.
    I also have a Time Machine Buddy logfile. Maybe that will help in finding the problem.
    Also noticable is that after the backup failure, I can't seem to restore or format the external HDD. Once I connect it to a regular pcc and remove and reinstall the driver, I can use it again.
    here is the logfile from the latest backup try:
    Starting manual backup
    Error determining directory contents for /Volumes/Time Machine: Error Domain=NSCocoaErrorDomain Code=256 "The file “Time Machine” couldn’t be opened." UserInfo=0x7faa73422f70 {NSFilePath=/Volumes/Time Machine, NSUserStringVariant=(
    Backing up to: /Volumes/Time Machine/Backups.backupdb
    Error -36 applying backup protections to /Volumes/Time Machine/Backups.backupdb/MacBook Pro van Rolf Perdok
    Error: (22) setxattr for key:com.apple.backupd.HostUUID path:/Volumes/Time Machine/Backups.backupdb/MacBook Pro van Rolf Perdok size:37
    Error -36 applying backup protections to /Volumes/Time Machine/Backups.backupdb/MacBook Pro van Rolf Perdok
    Error: (22) setxattr for key:com.apple.backupd.HostUUID path:/Volumes/Time Machine/Backups.backupdb/MacBook Pro van Rolf Perdok size:37
    Backup failed with error: 2
    Thanks in advance!

    And I spoke too soon, backup just failed with:
    22/10/2012 15:44:24.266 com.apple.backupd[555]: Stopping backup.
    22/10/2012 15:44:24.267 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:24.267 com.apple.backupd[555]: Error: (-47) SrcErr:NO Copying /Applications/Xcode.app/Contents/Developer/Documentation/DocSets/com.apple.ADC_ Reference_Library.DeveloperTools.4_5.docset/Contents/Resources/Documents/recipes /xcode_help-project_editor/Art/BuildingTargetsintheCorrectOrder.m4v to /Volumes/Storage/Backups.backupdb/cizin/2012-10-22-152514.inProgress/ED608989-4 CF3-4713-8E62-3A32E8CC3917/Cizin/Applications/Xcode.app/Contents/Developer/Docum entation/DocSets/com.apple.ADC_Reference_Library.DeveloperTools.4_5.docset/Conte nts/Resources/Documents/recipes/xcode_help-project_editor/Art
    22/10/2012 15:44:28.221 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:28.222 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:28.222 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:28.222 com.apple.backupd[555]: Copied 249786 files (10.64 GB) from volume Cizin.
    22/10/2012 15:44:28.222 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:28.222 com.apple.backupd[555]: Copy stage failed with error:11
    22/10/2012 15:44:31.231 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Resource busy
    22/10/2012 15:44:34.239 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Resource busy
    22/10/2012 15:44:34.239 com.apple.backupd[555]: Error writing to backup log.  NSFileHandleOperationException:*** -[NSConcreteFileHandle writeData:]: Invalid argument
    22/10/2012 15:44:34.358 com.apple.backupd[555]: Error: (22) setxattr for key:com.apple.backupd.HostUUID path:/Volumes/Storage/Backups.backupdb/cizin size:37
    22/10/2012 15:44:44.739 com.apple.backupd[555]: Backup failed with error: 11
    Time fo a bug report.

  • CLD seeks Part Time Work in RTP NC

    I am a Certified LabVIEW Developer who is very interested in working on some small projects.
    My email address is [email protected]
    Brian

    I am willing to work remotely.
    Brian
    Attachments:
    BrianMcLeanExperience.doc ‏62 KB

  • Time Management - Work Schedule /Absence Quota / Part-time quota generation

    Hi Experts,
    Need your help!
    We have a requirement where we need to create distinct work schedules for each irregular / part-time work pattern and the number of work patterns we have identified is more than 1000.  We are using report RPTQTA00 to generate quota. We have used work contract, employee sub-group & employee payscale group in the QUOMO feature to get the base entitlement picked up. We have defined base entitlement for the full time workschedules with 37.0 / 38.5 hours and there is a reduction rule which reduce the absence entitlement for part time employees as per the employement percentage in IT0007. Now we have a scenario where we have created a work schedule with different no of hours for each day of week (M-4, T-6, W-4, TH-6, F-4, S-OFF, SU - OFF); this work schedule is treated as full time work pattern by the system and quota is generated as full time work schedule refering to the QUOMO settings, but as per my client employees with this work schedule have reduced hours of working hours (24 hours, not 37.0 or 38.5 hours)and hence it should be treated as part-time employees, and the quota generated should be proportionately reduced. I have very limited scope to create any ESG or PSG as we do not have any distinct emplyee sub-groups maintained for full-time and part-time employees and the project has already gone-live with payroll/time. It is worth mentioning over here that we are recording absence through ESS and it takes into account the daily planned working time maintained in IT0007, so we are very particular to keep it as accurate as possible.
    I would really appreciate if somebody can please suggest any possible solution for the above issue, or guide me on what would be the best way to tackle it. I can give more details in case anybody need to have a better understanding of the issue to suggest a solution.
    Thanks in advance
    Sujit

    Hi Kathy,
    Yes, i have found the solution to it. I do not know whether it will fit into your situation or not, but i got two solutions for my issue mentioned above, please check it may help:
    1) To use capacity utilization field in IT0008 to get the FTE hours and defining the reduction rule of absence quota based on the capacity utilazation percentage.
    2) There are three user exits available in the standard report RPTQTA00, i have used one of them to write my own rules for the calculations (deduction rule)
    Do let me know if i can help you in any respect. Thanks.
    Regards,
    Sujit

  • Doubt Regarding Creating Work Schedules

    Hello People,
    I have recently started taking SAP HR training and currently in Time mgt module...I am stuck up in the creation of work schedules.
    I have created a scenario /requirement where i have got 3 shifts in a day and i want my production people to work 24/7 in the factory as i dont want the manufacturing machine to be idle.I have created 3 shifts namely
    Shift 1- 7 am - 3 pm
    Shift 2- 3 pm - 11 pm
    Shift 3- 11 pm - 7 am next day
    I dont want the machine to be idle on any day ,so i want people to keep on continously working on the machine.Each shift has got 2 breaks.There are 3 batches of people(say 30) who are in the prod dept.
    Batch 1 will work from Mon - Sat(sun day off)
    Batch 2 will work from Tue - Sun (Mon day off)
    Batch 3 will work from Wed - Mon(Tue day off)
    Remember all the 3 batches will have one day off.i have not gone more further in time mgt(so wont be aware of shift planning ,dynamic work schedules) so will it be possible to create thework schedules for the above requirement.
    Please advise me how to create DWS,Period Work Schedules and how many should i create.If anybody can clear the basic concept of creating /how to create the work schedules .
    Help/Guidance would be highly appreciated.

    Hi,
    As Ravi said, I'd like to explain in more detail:
    3 DWS needed as follows:
    Shift 1:  7 am - 3 pm
    Shift 2:  3 pm - 11 pm
    Shift 3:  11 pm - 7 am next day
    Also create a DWS for the OFF day.
    Then apply these DWS' in PWS as:
    001- Shift A  Shift A   ShiftA   Shift A   Shift A   Shift A    OFF
    002-   OFF    Shift B    Shift B  ShiftB    Shift B    Shift B   Shift B
    003- Shift C    OFF      ShiftC   Shift C   Shift C    Shift C   Shift C
    While creating Work schedule Rules, we need to assign the 'Start point in PWS' field as 001 keeping 'Ref. date' field as any day which comes as Monday
    Use this Period work schedule in creating your Work schedule rule and generate the WSRs.
    Thanks,
    GowthamR

  • Work Schedule Problem

    Dear All,
    I have a scanerio where the client works on the Odd saturdays of every month and have a weekly off on even saturdays. It is possible to have 53 line items in Period work schedules and get the WSR, but is thare any other method we can use(For eample Day Types, or VArients etc) Any imputs are helpful
    Thanks
    Raghu

    Hi,
    While creating your Period work schedule..do so for all the weeks of the year (52/53) marking every relavant saturday as OFF or working.
    The system wil allow you to create 53 lines for 53 weeks for a PWS. This is actually one of the methods used to incorporate ur requirement.
    The other is by using "special days" where in you can have a normal PWS as 6 day working and then under Special days node, you can specify the dates of all the saturdays u want to be as OFF and define a day type for them as "1 - OFF/Paid" to make them as non-workin days.
    Use documentation on "Day types" node for more help.
    Hope this helps.
    Regards,
    Shreyasi.

  • How to create work schedules for hours calculation

    HI Experts,
    We are working on payroll process which has to be consider  the number of working hours  for calculation.
    Now we need to generate the workschedule based on hours.
    What is the process of creation of workschedule  with respect to the consideration of number of hours.
    Please share your ideas on creation of workschedules with respect to number of hours.
    Thanks and regards,
    Sairam.

    Dear Siki,
    I want to create a new work schedule for the employees for whom the  salary calculation to be based on  working hours.
    Is there any preacautions to be maintained for the generation of work schedules in these directions.
    Regards,
    Sairam.

  • Report to check work schedule - If case more than hundreds of work schedule

    dear experts,
    I have one issue to create work schedule for the next year. I want to create(pt01) active work schedule for the next year(2012).
    However i have issue because I don't remember which work schedule still active.This is because we have hundreds
    of work schedule rule based on emp sub group grouping, holiday calendar,psa grouping and w schedule rule.
    Is there any reports to check all the active work schedule .I'm afreaid ihave missing certain  work schedule for next year...

    If you use the IMG node for automatic generation of Work Schedule Rules
    (Time Management > Work Schedules > Work Schedule Rules and Work Schedules > Generate Work Schedules in Batch)
    you can generate all work schedules associated to a Holiday Calendar
    and only the active work schedules will be generated.

Maybe you are looking for

  • Error - Can't open more than one image in CS3

    My Photoshop CS3 was working fine until all of a sudden it no longer lets me open more than one image at a time without crashing. Anyone else have this problem? How do I fix it?

  • Toshiba DVBT-Stick PX1211E isn't working with Windows 7

    Hey, i bought a Toshiba PX1211E DVBT-Stick for my Laptop. My system is Windows 7. I downloaded and installed the newest drivers, but the dvbt isnt working. Can you tell my what drivers i need and how i correctly install it? That would be very nice!

  • Dbms job change in schedule time

    Hi Just not sure about the dbms jobs reschedule on oracle 11g on linux .. I have a dbms job running every day by hour 20 now i want to change it to 23 hours for today and again back to normal hour 20. can some one help me in the working steps for thi

  • How are the third party apps for the iPhone?

    Being a long time Palm user, then moved to BlackBerry I watched the quality of third party apps really plummet due to a more restrictive development agreement. Now considering an iPhone, I'm curious about how healthy the 3rd party app community is fo

  • Clean install Lion wont recognize iPad

    Hi, I just completed a clean install of Lion. Everything went okay, but it turns out iTunes no longer recognizes my iPad as its device. It says that the iPad is synched to another computer, and it needs to erase the contents before allowing me to syn