Problem in Cros company STO Billing

Hi,
I have done the cross company code STO customization, assignng of document type, delivery type, biling type IV assign to doc. type DL etc. plant data is also maitain for the plants, everyhink work OK till the PGI, but while creating the billing document with VF01 system issuing the message
The bill-to party could not be determined
The payer could not be determined
what can be the problem
also our delivery plant is depot and and reciving plant if manufacturing the duty which i have post in J1IJ in delivery plant all amount required to come while GR in reciving plant.
regards,
zafar

Solve,
The problem was in the partnet function solve with ref. to consulting note : 109254
REGARDS,
ZAFAR

Similar Messages

  • Problem in GRN while Capturing Excise Invoice in Cross Company STO Scenario

    Dear All,
    In the Cross Company STO Scenario we are following the steps as below:-
    1.) Creation of the purchase order to the supplying plant of type u201CNBu201D
    2.) Creation of the Outbound delivery in VL10B
    3.) Post Good Issue in the VL02N.
    4.) Creation of the billing doc.
    5.) Creation of the Excise Invoice.
    6.) MIGO w.r.t to the Outbound delivery in the receiving plant
    During MIGO ,initialy system is picking the excise rates and excise base value by its own from the purchase order and the moment  when we refer the Excise Excise Invoice created in the supplying plant , system takes the Excise rates from the excise invoice created in the supplying plant and Excise Base value is becoming ZERO and we are getting the error :u201D *Please check excise base for the item is ZERO
    Message no : 4F121
    Please Suggest what to do and why this error is coming.
    When I am giving any other Excise no is the Excise Invoice feild in MIGO , it is taking and refering the rates in PO and giving one information message that Excise invoice no is different from the supplying plant excise invoice no.
    Thanks & Regards
    Nitin

    HI,
    Check the excise base vlaue in the Supplying plant excise invoice. If its 0, maintain the assessible value in J1ID & Check.
    If everything is found OK,  check if any SAP notes are available.
    Thanks & Regards,

  • Cross Company STO w/billing through 3rd Company Code

    We have the following situation with our Plants and Company Codes:
       1)     Company Code 1, Plant 1 (Manufacturing and Distribution), US
       2)     Company Code 2, Plant 2 (Manufacturing), Asia
       3)     Company Code 3, Plant 3 (Distribution), Europe
    We are implementing functionality to move product directly from our Manufacturing Plants to our new DC.  Product can be directly shipped from Plant 2 to Plant 3, but the invoice must flow through Company Code 1 due to legal reasons.  This is only an invoicing requirement as they are not required to ever u201Cownu201D the stock (no transfer of ownership).
    The solution being proposed right now utilizes 2 Cross-Company STOs (both with Delivery and Invoicing - NB and NLCC).  This would involve creating an STO that would move product from Plant 2 to Plant 1 (invoicing between CCode2 and CCcode1), and then a 2nd STO (Cross Company) moving Product from Plant 1 to Plant 3 (invoicing between CCode1 and CCode3).  However, the product would never physically arrive in Company Code 1/Plant 1.  This is a "virtual" movement to meeting the invoicing requirements.  I see this option as complicated logistically and probably requiring customization to keep the documents in sync and provide visibility to their relationship with each other.
    I have spent a lot of time researching the forums, Wiki, etc. to see if there is an SAP Standard/Best Practice for the process of moving the Product (once produced) directly to the DC but invoicing via another (3rd) Company Code.  It seems that many manufacturing companies must face this same situation.  I just want to be sure forcing another complication in the Supply Chain is the best way to meet the financial requirements or if there might be a better option out there that others have implemented.  Our goal is to simplify and optimize the Supply Chain, so it seems it just should be easier to meet this financial requirement than forcing Goods Movements in and out of a Plant and creating additional documents.
    Does anyone have experience with this situation (Product sent directly between 2 entities, but billed through a 3rd entity) that they could comment on what is considered u201CBest Practiceu201D for this?

    Hi,
    I want to share one idea that during STO between company code 2&3, you need to createvendor master record in 3 company code. During creation of venor master create invoicing party (IP) as company code 1. Then invoice will be paid to company code 1.
    Another solution is third party scenario. Any way this is intercompany STO, SOME WHAT RESEMBLES EXTERNAL PROCUREMENT INTERMS OF PAYMENT. Why can't you go for third party scenario. In this treat the company code 3 as customer and company code 2 as supplier of the material. Company code is the actual vendor, but orders the msterial from company code2. Company code2 directly delivers the materail to 3 and in company code 1 can do invoice. If required logical MIGO can br done. Hope it helps you. Thanking you.

  • INTER company STO with Billing

    I want to setup STO for inter company with billing. Meanings, Plant A belongs to company code 1000 and plant B belongs to company code 2000.
    Should I be using document type NB or UD?
    What delivery type should I be using under Assign Delivery Type and Checking Rule?
    I have tried with doc type UD with delivery type NLCC (it doesnu2019t work)
    I have tried with doc type NB with delivery type NLCC (it works fine)
    If I have to use doc type NB, can I just use ZNB or some customer doc type for this? Because, I need to have different number rage then standard SAP NB number range. So, I can separate number range by PO and STO. Please adviseu2026..

    Hi
    Should I be using document type NB or UD?
    Use NB
    What delivery type should I be using under Assign Delivery Type and Checking Rule?
    Delivry tyep NLCC AAND Cheking rule B
    If I have to use doc type NB, can I just use ZNB or some customer doc type for this? Because, I need to have different number rage then standard SAP NB number range. So, I can separate number range by PO and STO. Please adviseu2026..
    you can use ZNB some customer doc type also
    If need
    steps
    To set up Intercomopany process you need to do following config,
    1. Go to SPRO --- MM --- Purchasing -
    Purchase order -
    Set up Stock Transport order
    2. Firest step is to define shipping data for plants, here you have set rthe data for both the plants who are doing transaction.
    For eg. XYZ1 as supplying plant & ABC1 as receiving plant are the two plants from company code XYZ & ABC respectively
    Set data for plant XYZ1 as give the value of sales organization for eg for XYZ company sales organization XYZS will be responsible & other data as distribution channel & division.
    Se the data same way for plant XYZ1 also with sales area of company code XYZ.
    3. Second step is to assign delivery type to supplying plant & document type that should be NLCC and as per our example it is to supplying plant XYZ1 & doc type NB.
    4. Next step is optional whether you want to use one step procedure or two step procedure.
    5. You need to set up master data alaso such as XYZ1 to be set up as vendor in company code ABC,.
    6. You need to set up receiving plant ABC1 as customer in company code XYZ.
    With this minimum requirement you can set up Intercompany process with delivery.
    Process will be as follow,
    1.Create Intercompany Purchase order with vendor as XYZ1 & plant as ABC1 from receiving plant.
    2.Process Outbound deleivery with VL10D
    3. Post Goods Issue from supplying plant.
    4. Post Good receipt in receiving plant.
    5. Post billing invoice VF01 from supplying company code XYZ w.r.t delivery.
    6.Post Invoice receipt in receing company code.
    Regards
    Kailas Ugale

  • Intra Company STO with Billing

    Hello,
    Let me explain the Basic requirement from our client.
    One Company code has 15 plants.
    Material are being transferred across plants
    We record revenue or expenditure to the respective plant when transfer.
    As I had inquired and surfed in many threads,we couldnt get the better solution as everyone suggesting to create separate plant as company code and do STO Inter company for getting the billing.
    But we required intra company STO with Billing.
    Any advice would be appreciated
    with regards,
    Vignesh

    Hi,
    Expenditure occur for transferring material between two plants, can be capture in a condition type and then do invoice for transferring value
    Refer a discussion to capture transferring amount in STO
    Freight Expenses for Transportation to Depot Plant
    Regards,
    Biju K

  • Inter company sto

    hello experts,
    I'm trying to create a inter company STO.but while creating Po it gives an error as
    "Customer XXX does not exist (please change entry in plant xxx)"
    but i have created a customer with sales area and company code of supplying plant.
    and it exists.
    please help me
    ria

    Hi,
    In Shipping data for plants assign the customer number which you created
    Check the following
    1) MM> Purchasing > Purchase Order > Set up STO> Define shipping data for plants > select the Receiving plant >assign customer here & Supplying SA (for billing) to Receiving plant here
    2) MM> Purchasing > Purchase Order > Set up STO> Define shipping data for plants > Select Supplying plant and assign the sales area of receiving plant.
    This will solve your error
    rgds
    gsc

  • Inter company STO-how to reduce the stock where no physical stock is kept in receiving plant

    Dear All,
    I am facing one issue. Suppose if there are two plants belongs to two company codes A & B.Plant A is in TN & Plant B is in AP (both belongs to two different states). Plant B is the place where no physical stock is kept, it is a place where JJ form & other documents are given to the vehicle to move it to other state. From there it ll move to end customer.
    In plant A stock reduce-- inventory credit
                                        COGS----Debit
    In plant B stock increase=---Inventory debit
                                             GR/IR--credit
    Now my problem is in plant B no stock is kept, my client wants to reduce the inventory automatically without any manual entry (since no stock in plant B)
    Can i use MB1A to reduce the stock automatically & what would be the actual entry for that. How to offset the other account which is getting debited against inventory?.
    Regards
    Subbu.

    Hi,
       It seems to be a combined scenario of third party and inter company STO scenario, where you want to send the send the stock directly to your customer. Standard SAP doesnt support the third party scenario for a vendor assigned to the plant. The standard design is well explained in the note: 1918552 - Third Party Purchase in Cross Company STO: error 06769
       If you dont want to update the stock in the receiving plant, use a consumption account assignment category (like K) in the intercompany STO, so that the stock will be directly consumed. But one question - how do you map the goods issue to the customer and the outgoing excise invoice? Could you please share the details.
    Regards,
    AKPT

  • Inter-Company STO configuration steps needed in detail !!

    Hi
    My Client is using SAP-AFS (IS) ECC 6.00.
    Client wants an Inter-company STO to be done with full fledged Deliveries configured.
    1. I am facing problem while my Replieshment delivery unable to pick the Quantity for Post Goods   Issue. (PGI).
    How do i solve this problem ?
    2. Also, kindly give me the full procedure for Inter-company STO sothat i can cross check while configuring in my client.
    Thanks
    Maruthi
    Edited by: MARUTHI RAM on Dec 24, 2008 9:08 PM
    Edited by: MARUTHI RAM on Dec 24, 2008 9:09 PM

    Hi
    I have got NO errors.
    I am trying to create just a delivery for Inter-comp STO.
    But its not getting picked automatically any quantity.
    what should i do ??  I cannot do PGI with zero quantity.
    Its not giving any errors !!
    cheers
    MaruthiRam

  • Cross Company - STO

    Hi All,
    I am facing a error in Cross Company - STO. After creating Purchase Order and releasing it on the vendor (which is a plant belonging to another Company Code), during PGI it is throwing an error, " Purchase Order 45......... does not contain item relevant for Stock Transport order"
    I have maintained material in both the plants (supplying and receiving) under different Company Code, maintained receiving plant as customer in Supplying plant company code.
    Please help at the earliest.
    Regards
    Anil

    Hi Anil
    For below take help from your MM consultant if reuired.
    Configure Intercompany Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assaigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assaign the supply source ( Delivering Plant).
    Create a puchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assaign the purchase order number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
    Billing (Intercompany pricing conditions should be set).
    One more Process
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007
    via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the
    route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing
    procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area.
    Similarly select the receiving plant and assign the company code and sales area (The
    company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the
    receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data
    creation.
    Stock transfer between two plants in deffernet company codes is known as inter company
    stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area
    XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Deliveryy VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....
    STO
    Reward if useful to u

  • Inter-Company STO Transfer Price and Invoice

    HI All,
    I was wondering what setup i Need to do in order to get the sales price (transfer price) to automatically flow into an inter-company STO? Also, how to assign an inter-company billing document to the STO?
    Thanks, Erik

    Hi chidambaram,
       Thank you for your feedback.
       Can you give me more detail about requirement 22? What's its usage? What does it mean? I cann't get this requirement code in the access sequence. Do I need to customize it? Thanks.
    Leo

  • Same Company STO

    Dear SAP Guru's,
    A little confusion over the STO from one plant to other plant (OF THE SAME COMPANY CODE)
    We create PO.
    Then Replinishment Delivery NLCC
    Then GRN of the STO.
    After which is there any necessity for billing of the Delivery(NLCC) for STO of Same company Code.?
    If its a different company code plant then billing is necessay that is certain.
    regards,
    A S

    Hi
    For intra company STO(STO Between same company codes)
    Order type UB
    Delivery type is NL
    Goods movement type is 641
    Item category in del is NLN
    Thses are the standard settings
    Regards
    Raja

  • How to use frieght cost in intra company STO

    how to use frieght cost in intra company STO

    For Inter company STO, pls follow the below steps.
    1) Create delivering plant as vendor in receiving plant’s company code & sales area – XK01
    2) From the vendor number created in step 1, create Vendor info record for the material that needs to be stock transferred.
    3) Ensure material is extended to both plants
    4) Delivering plant must be assigned to the receiving sales organization
    5) In the Vendor info record, go to MK03 and change the “add purchasing data” to delivering plant.
    6) Create receiving plant as customer in delivering plant’s company code & sales area.
    7) Ensure Purchase organization for the receiving plant is maintained
    8) Go to IMG- Materials Management-Purchasing-Purchase Order-Set up stock transport order ( transaction code:OMGN) and complete all the settings.
    Note:
    Maintain receiving plant / customer number from step 6/ delivering sales area
    Delivering plant/ customer number from step 6/ receiving sales area
    Maintain NLCC replenishment for cross company stock transfer with delivery type NB
    9) ME25- Create Purchase Order from receiving plant
    10) VL10B - Create delivery order from delivering plant’s shipping point with reference to the purchase order number raised in step 9.
    Save.
    11) Go to VL02n & pick /post goods issue for the delivery order number created in step 10
    12) Do VF01 & bill to customer
    In step 8 You have the option of UB type in place of NB
    In step 10 you can also use VL04.
    In step 12 you select F8 type (pro-forma invoice).
    Reward if useful.
    raaj

  • Intra Company STO pricing Procedure assignment

    Hi
    In intracompany STO we need to raise invoice from the supplying plant to receiving plant.So i created STO pricing Procedure with Cost price plus Profit margin and transportation cost .Now where to assign this pricing procedure?Whether to assign this to NL Delivery doc type or in IV billing doc type.
    Regards
    Jyoti

    JYOTI PRAKASH KUNNAR,
    1. The Delivery Type that you use is NL for Intra company STO
    2. PO Document Type you use is UB
    you will mainatin Assignemnt of the above
    img>material managment>purchasing>purchase order>set up stock transport order--->assign delivery and checking rule
    3. NLN is item category used for Intra STO
    4. STock Transfer pricing procedure is maintained in SD for Billing with Docu PP + Custpp
    5. The Flow of Pricing is taken care by copy controls VTFL choose NL Delivery type and intra company billing type , choose item category NLN where Pricing type = B, Price Source = Purchase order.
    BEing INTRA stock scenario we don't use IV billing. Because transaction is happening within company code between two plants.
    Check the link it will be useful
    [http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm]
    Regards
    Sathya

  • Acc Entrie in Inter Company STO

    Dear All,
    What are the acc entries we need to get in case of Inter Company STO, like when we do the GR against PO we will get Stock acc Dr & PL-vendor will get Cr.
    I want to know for these below transactions....
    When we do the Goods Issue from Supplying Plant/CC
    When we do the Billing from Supplying plant
    When we do the GR in the receiving plant
    When we post the invoice
    regds,
    CB

    Hi,
    Generally...Inter company STO...everybody follows Two Step Method only.
    The entries are:
    1.Intra-Company STO -  One Step Method
    At Supp.Plant: Stock Acc. BSX is Credited  
    At. Rec.Plant : Stock Acc. BSX is Debited
    If you maintain Std. at Rec. Plant and if there is any Price Diff., then Price Diff. Acc.( AUM) will be triggered....
    Here all the Acc.Doc. will be generated while doing PGI only.....No Acc. Doc. will be generated at GR...
    2. Inter Company STO - Two step Method:
    At Supplying .Plant....While doing PGI..:
    Stock acc. BSX is Credited
    Cost of Goods sold Acc.(VAY) is Debited(+)
    At. Receiving Plant While doing GR:
    Stock Acc. BSX is Debited(+)
    GR/IR Clearing Acc is Credited
    If you maintain any Std. Price and if there is any price Diff. then Price Diff. Acc will be triggered...
    Regards,
    Biju K

  • Inter company STO - Issues

    Hi All,
    I am working on a subproject Inter company STO. 
    The following steps I am following:
    1) Created Partners and done all other related configurations
    2) Created Purchase order type NB
    3) Created Outbound delivery using VL10B and doing the necessary picking and PGI
    4) Creating billing document using VF01 and the output type is EDI.  Here the IDOC generated should be Inbound which will do MIRO posting ie the IDOC will be used as vendor invoice posting. But the Idoc type created is  Outbound one - how it is happening
    Please guide me how it is happening..
    Thanks,
    Vengal Rao.
    Edited by: vengalrao jalgam on Jul 14, 2011 2:35 PM

    I think the below link which i have explained is more relevant to this tread, please check from your end and let me know if it still is not working?
    Intercompany stock transfer with no accounting document
    thanks,
    Srinu.