Problem in Data Scheduling and loading time

Hi,
I am loading data from r3 to bw using process chain, all are delta loads and fico data.
process chain scheduled daily at 3.00 am.
Problem is that the data which is extracted into bw is up to 1.00 am only
1-2 and 2-3 (2) hours data is not extracted into bw side.
The client wants reduce the time gap and needs to load all data which acquired into r/3 before to schedule.
Any one can help me in investigation about this.
Thanks in advance.
br,
Narayana

Narayana,
Time stamp is the delta field in your extractor, for your requirement you have enhance you datasource I think.
Thanks
Ram

Similar Messages

  • Difference Between Basic Date Scheduling and Lead Time Scheduling.

    Dear FRndz,
    Kindly help me out the difference between the Basic Date Scheduling and Lead Time Scheduling.
    Regards,
    SRini

    Dear,
    Basic scheduling :
    1.Basic dates are calculated.
    2.Exact to day.
    3.No cap reqmts are generated.
    4.Uses the inhouse production time from material master.
    5.Carried out automatically during planning run.
    In basic date calculation ( order start date/ order finish date ) the system always
    calculates backward scheduling.
    1. From the reqmts date the system subtracts the GR processing time to
    calculate the order fininsh date.
    2. From the order finish date the system subtracts the inhouse production time to calculate the order start date.
    3. From the order start date the system subtracts the opening period given in scheduling margin key to calculate the order opening date.
    Lead time scheduling :
    1.Exact to second
    2.ie production start date /time and finish date and time are calculated.
    3. cap reqmts are generated.
    4. uses times from routing.
    5. carried out only if the scheduling mode in MD02 screen is kept with indicator 2.
    From the order finish date the system subtracts the float after production to calculate the production finish date.
    From the production finish date the individual operations in the routing are scheduled backwards to calculate production start date.
    From the production start date the system subtracts the float before production
    to calculate order start date.
    Same thread.
    https://forums.sdn.sap.com/click.jspa?searchID=19281092&messageID=3548465
    Please refer this link,
    [Difference|scheduling]
    Hope clear to you.
    Regards,
    R.Brahmankar

  • The time for transit, transportation lead time and loading time of the mate

    Dear Friends,
    Please mail to me, where should I give the time for transit, transportation lead time and loading time of the material at the ware house.
    This is at the time of Transportation scheduling, for a specific material.
    With regards,

    i am giving u the exact & specific answer.
    please follow the menu path in SPRO
    IMG, Logistics execution, shipping, basic shipping functions, scheduling, delivery and tranportation scheduling, maintain duration,
    In that screen, maintain the settings
    Hope it answers
    Do reward points if it is useful

  • DIFFERENCES between BASIC SCHEDULING and LEAD-TIME SCHEDULING.

    Hello SAP Gurus,
    Kindly let me know the differences between BASIC SCHEDULING and LEAD-TIME SCHEDULING.
    Looking for your early feedback.
    Warm regards,
    Kaushik.

    Hi,
    Basic scheduling :
    1.Basic dates are calculated.
    2.Exact to day.
    3.No cap reqmts are generated.
    4.uses the inhouse production time from material master.
    5.carried out automatically during planning run.
    In basic date calculation ( order start date/ order finish date ) the system always
    calculates backward scheduling.
    1. From the reqmts date the system subtracts the GR processing time to
    calculate the order fininsh date.
    2. From the order finish date the system subtracts the inhouse production time to calculate the order start date.
    3. From the order start date the system subtracts the opening period given in scheduling margin key to calculate the order opening date.
    Lead time scheduling :
    1.Exact to second
    2.ie production start date /time and finish date and time are calculated.
    3. cap reqmts are generated.
    4. uses times from routing.
    5. carried out only if the scheduling mode in MD02 screen is kept with indicator 2.
    From the order finish date the system subtracts the float after production to calculate the production finish date.
    From the production finish date the individual operations in the routing are scheduled backwards to calculate production start date.
    From the production start date the system subtracts the float before production
    to calculate order start date.
    Regards,
    nandha

  • Route and Loading Time

    All Gurus:
    I am trying to create a route for a specific shipping point (one plant) where the loading time is different for every route.  I am looking at configuration for defining shipping point:
    IMG > Enterprise Structure > Definition > Logistics Execution > Define, copy, delete, check shipping point.  Under "Determine Times", there is "Determine load. times" and 4 options:
         No loading time determination
    A     Route dependent
    B     Route independent (Route '      ')
    C     Default from shipping point
    If select "C" and specify 11 days for "Loading Time with Days", the system will always have 11 days defaulting on the sales order schedule lines between the "Loading Date" and the "Goods Issue Date".
    What I need is to have more flexibility as to the number of days on the Loading time.  If I select A or B, can you please let me know what that would do and where I can configure it so that the system gives me more flexibility as to the number of Loading Days?
    Thanks in advance,
    Ta

    Tal -
    When the loading date and GI date is same you can change the GI date by adding number of days in the field "TransLdTm". This time will get calulated as loading time. In each route definition this may vary according to requirement. this will give you different transit time determination for single ship point.                         
    In configuration do setting as below e.g.
    TransitTime               10
    Trav.dur.                    
    TransLdTm.               1
    TrLeadTimeHrs            
    With this system will calculate in reverse way from delivery date to customer based on route transit time.
    Material availability date + loading time (1) + transit time (10) ... this will be the calculation.
    Hope this answers your question. Let me know anything else you require on this.
    Regards
    Amol

  • Logistic Data source and loading sequence

    Hi Gurus ,
    Can anyone help me explain the use of the 2lis_02_CGR and 2lis_02_SCN.
    I also need to know the data loading sequence for the following data source
    2lis_02_HDR,
    2lis_02_ITM,
    2lis_02_SCL,
    2lis_02_ SGR,
    2lis_02_ CGR,
    2lis_02_SCN
    Thanks for your help

    Hi,
    i.Purchasing Data (Header Level)
    Technical name: 2LIS_02_HDR
    Technical Data
    Type of DataSource:
    Transaction Data (Movement Data)
    Application Component:
    Materials Management (MM)
    Available as of OLTP Release
    SAP R/3 4.0B
    Available as of Plug-In Release
    PI 2000.1
    RemoteCube Compatibility:no
    Prerequisites:
    Activation of the DataSource.
    Use :
    The DataSource is used to extract the basic data for analyses of purchasing documents consistently to a BW system.
    ii.Purchasing Data (Item Level)
    Technical name: 2LIS_02_ITM
    Technical Data
    Type of DataSource:
    Transaction Data (Movement Data)
    Application Component:
    Materials Management (MM)
    Available as of OLTP Release
    SAP R/3 4.0B
    Available as of Plug-In Release
    PI 2000.1
    RemoteCube Compatibility:no
    Prerequisites:
    Activation of the DataSource.
    Use :
    The DataSource is used to extract the basic data for analyses of purchasing documents consistently to a BW system.
    Delta Update:
    A delta update is supported. Delta process: ABR – Complete delta update with deletion indicator using delta queue (Cube-compatible).
    iii.Purchasing Data (Schedule Line Level)
    Technical name: 2LIS_02_SCL
    Technical Data
    Type of DataSource:
    Transaction data
    Application Component:
    Materials Management (MM)
    Available from OLTP Release
    SAP R/3 4.0B
    Available from Plug-In Release
    PI 2000.1
    RemoteCube Compatibility:No
    Prerequisites:
    Activation of the DataSource.
    Use:
    This DataSource extracts consistent basic data for analyzing purchasing documents to a BW system.
    Delta Update:
    A Delta update is supported. Delta process: ABR – Complete delta with deletion indicators using delta queue (Cube-compatible).
    iv.Allocation - Schedule Line with Goods Receipt
    Technical name: 2LIS_02_SGR
    Technical Data
    Type of DataSource:
    Transaction Data (Movement Data)
    Application Component:
    Materials Management (MM)
    Available as of OLTP Release
    SAP R/3 4.0B
    Available as of Plug-In Release
    PI 2002.1
    RemoteCube Compatibility:No
    Prerequisites:
    Activation of the DataSource.
    Use:
    This DataSource is used to extract the schedule line quantities allocated with goods receipt quantities consistently to a BW system.
    Delta Update:
    A delta update is supported. Delta process: ABR – Complete delta update with deletion indicator using delta queue (Cube-compatible).
    v.Allocation - Confirmation with Goods Receipt
    Technical name: 2LIS_02_CGR
    Technical Data
    Type of DataSource:
    Transaction Data (Movement Data)
    Application Component:
    Materials Management (MM)
    Available as of OLTP Release
    SAP R/3 4.5B
    Available as of Plug-In Release
    PI 2002.1
    RemoteCube Compatibility:No
    Prerequisites:
    Activation of the DataSource.
    Use:
    This DataSource is used to extract the confirmation quantities allocated with goods receipt quantities consistently to a BW system.
    Delta Update:
    A delta update is supported. Delta process: ABR – Complete delta update with deletion indicator using delta queue (Cube-compatible).
    vi.Allocation  – Confirmation with Schedule Line
    Technical name: 2LIS_02_SCN
    Technical Data
    Type of DataSource:
    Transaction Data (Movement Data)
    Application Component:
    Materials Management (MM)
    Available as of OLTP Release
    SAP R/3 4.5B
    Available as of Plug-In Release
    PI 2002.1
    RemoteCube Compatibility:No
    Prerequisites:
    Activation of the DataSource.
    Use:
    The DataSource is used to extract the schedule line quantities allocated with confirmation quantities consistently to a BW system.
    Delta Update:
    A delta update is supported. Delta process: ABR – Complete delta update with deletion indicator using delta queue (Cube-compatible).
    If it helps assign points.
    Thanks,
    Akshay a.

  • Pick/pack time and loading time in route

    HI People,
                If  I make entry in the shipping point that loading time and pick/pack time as route dependent then where do I enter these times in route as I didn't find any feild to enter these in routes.

    You can control scheduling by sales doc type & shipping point. Logical path - Logistic Execution-shipping-basic shipping function -scheduling-delivery scheduling & Transportation sch.
    Trasportation planning will determine below mentioned fields.
    Check-in
    Loading start
    Loading end
    Shpmt completion
    Shipment start
    Shipment end.
    Picking, packing will be controlled by delivery scheduling
    give me ur email id will forward u the document for it
    Regards,
    Krishna O

  • Core Data - Save and Load

    Hi
    I need to add functionality to my iPad app so that I can save and load notes from a UITextView then load them when the user selects the date in the UIDatePicker that it was originally saved on, much like a calendar, notes for different dates.
    I have asked around on StackOverFlow and people have been spoon feeding me code samples but I am not quite latching on. Complain all you like, but I really want to learn how to do this, however currently its fairly important that I get the functionality added in.
    Here is where I asked:
    http://stackoverflow.com/questions/4133405/core-data-iphone-save-load-depending- on-date
    http://stackoverflow.com/questions/4177398/save-and-load-data-coredata
    I have unsuccessful so far and if anyone can help me here I would be ever so grateful and even more so if you would take a short time to take a peek at my project. You can email me at [email protected], its a fairly simple project and Im sure especially for you guys you could see what I am doing.
    Hope you can help me out.

    Core Data pretty much does away with the concepts of saving and loading. The data is just there. If you want a particular view of data, on a specific date, for examples, you create a predicate to pull only the matching data into a particular controller/UI control.

  • Problem with Date Picker and wwv_flow_item.date_popup()

    I have a Report based on the HTMLDB How-To “Build Tabular Forms for Multi-Row Operations”
    This is my code:
    select
    X.RRIT_UID,
    X.DOS,
    X.CPT_CODE,
    X.MOD,
    X.DX_CODE,
    X.CHARGES,
    X.UNITS
    from
    (select
    htmldb_item.text(1,RRIT_UID) RRIT_UID,
    wwv_flow_item.date_popup(2,null,RRIT_DATE_OF_SERVICE) DOS,
    htmldb_item.text(4,RRIT_SUBMIT_SERVICE_CODE,6) CPT_CODE,
    htmldb_item.text(5,RRIT_SUBMIT_MODIFIER,3) MOD,
    htmldb_item.text(6,RRIT_ATT_DIAG_CODE,6) DX_CODE,
    htmldb_item.text(7,RRIT_BILLED_CHARGES,9) CHARGES,
    htmldb_item.text(8,RRIT_UNITS,3) UNITS
    from
    RRIT_REPRICE_ITEM
    where
    RRRR_UID = :P5_RRRR_UID
    union all
    select
    htmldb_item.text(1,null) RRIT_UID,
    wwv_flow_item.date_popup(2,null,null) DOS,
    htmldb_item.text(4,null,6) CPT_CODE,
    htmldb_item.text(5,null,3) MOD,
    htmldb_item.text(6,null,6) DX_CODE,
    htmldb_item.text(7,null,9) CHARGES,
    htmldb_item.text(8,null,3) UNITS
    from
    dual)
    X
    My problem is when I run the page and select a date from the Pop-Up calendar I get this error:
    Line 10
    Error: ‘opener.document.forms.0.f02.0’ is null or not an object
    I know it is something to do with data formats and the fact that I do not fully understand the use of wwv_flow_item.date_popup().

    Hi DK,
    It is a WD Java application, Backend is ABAP (MM module).
    The UI is input field, where the context attribute type is Date, So its been changed to Date Picker.
    The problem is when the user runs the WD application in Portal, The calendar format is being changed for some users. That is for few users the Week starts with Monday and for few users the week starts with Sunday.
    I need all the users to have Monday as the First day of the week.
    Please let me know, what will be solution for this.
    Since I haven't done anything in regard to date, it is a simple Date format.
    Thanks & Regards,
    Palani

  • Help to read a table with data source and convert time stamp

    Hi Gurus,
      I have a req and need to write a ABAP prog. As soon as i excute ABAP program it should ask me enter a data source name, then my ABAP prog has excute teh code, in ABAP code i have to read a table with this data source as key, sort time stamp from table and should display the data source and time stamp as output.
    As follows:
    Enter Data Source Name: 
    Then user enters : 2lis_11_vahdr
    Then out put should be "Data source  :"  10-15-2008.
    The time stamp format in table is 20,050,126,031,520 (YYYYMMDDhhmmss). I have to display as 05-26-2005. Any help would be apprciated.
    Thanks,
    Ram

    Hi Jayanthi Babu Peruri,
    I tried to extract YEAR, MONTH, DAY separately and using
    EDIT MASK written it.
    Definitely there will be some STANDARD CONVERSION ROUTINE will be there. But no idea about it.
    DATA : V_TS      TYPE TIMESTAMP,
           V_TS_T    TYPE CHAR16,
           V_YYYY    TYPE CHAR04,
           V_MM      TYPE CHAR02,
           V_DD      TYPE CHAR02.
    START-OF-SELECTION.
      GET TIME STAMP FIELD V_TS.
      V_TS_T = V_TS.
      CONDENSE V_TS_T.
      V_YYYY = V_TS_T.
      V_MM   = V_TS_T+4(2).
      V_DD   = V_TS_T+6(2).
      V_TS_T(2) = V_MM.
      V_TS_T+2(2) = V_DD.
      V_TS_T+4(4) = V_YYYY.
      SKIP 10.
      WRITE : /10 V_TS," USING EDIT MASK '____-__-________'.
              /10 V_YYYY,
              /10 V_MM,
              /10 V_DD,
              /10 V_TS_T USING EDIT MASK '__-__-__________'.
    If you want DATE alone, just declare the length of V_TS_T as 10.
    Regards,
    R.Nagarajan.
    We can -

  • Is there a problem with the itunes and quick time download pages or is it my internet.

    Is there a problem with the itunes and quicktime download pages or is it just my internet.

    Some more developments ... the issue appears to be browser-specific. I can't see the download controls at the moment in either IE 8 (I'll get your message) or Safari for Windows 5.0.5 (I'll just get the blank box). But I can see the download controls in Firefox 4 and Chrome (whatever version I have of that).
    So it might be worth installing Firefox and seeing if you can get the downloads via that:
    http://www.mozilla.com/en-US/firefox/new/

  • How to create XML data source/ and load data from a web service to BI

    All,
    I m trying to find a 'how to' document (or any document) that shows how to create an XML data source to load data directly from a web service or from an XML file.
    I appreciate any help.

    Hi Mike,
    Two more for you:----
    /thread/111488 [original link is broken]
    http://help.sap.com/saphelp_nw70/helpdata/en/e6/1dd53bb90cbb1ae10000000a11402f/content.htm
    Regards,
    Suman

  • IWeb Text Font Problems and Loading Times

    Why does my home page show the correct font yet on all other pages the font is the default and won't change?
    Also why does it take so long for the iWeb Wesite I created to load on mine and other computers?
    MacPro   Mac OS X (10.4.10)  

    What is my URL?
    Whatever address people need to type into their browser so they can see it. Usually it looks like
    http://web.mac.com/username

  • Problem with Data source- full load is not extracting where as delta can.

    Hi All,
    I have a problem in loading of the region values into BW.
    Data Source 0CRM_OPPT_I is used to fetch opportunities ( same as Sales Orders in ECC) from CRM system.Data source has a field 0CRM_TR which gives the values of region values pof the employee responsible. problem here is that CRM_TR value is not being fetched when the record was first created, but the value is being flown to BW in the delta run i.e. when a change happened in record.
    Please anyone help us out in resolving this issue.
    Regards,
    Haaris.

    Hi Hari.......
    Hav u done init........if yes........What u hav done....I mean.....init with or w/o data transfer.....?
    It has picked records or not? if yes...........after init.........hav u checked the Delta queue(RSA7) in the source system...........is the Total field is 0 or not.........if 0..then....
    Look if u r using Direct delta.then after init.any changes or new records will get recorded in the Delta queue(RSA7) directly..........but if the Update mode is Unserialized V3 update or Qued delta.then data will accumulated in the Update table and the Extraction Queue respectively...........in that case u hav to schedule V3 jobs to pull them in RSA7............otherwise delta load will pick 0 records only........
    Check the update mode of the Datasource in LBWE.......
    Check this..........it may help u........
    Steps to do init load from CRM
    Regards,
    Debjani.......

  • Problem with currency translation and variable time ref. with 0FISCPER

    Hello,
    We have a problem with a currency conversion with a variable time reference (as iobject we use 0fiscper)
    We created a currency conversion for several key fig:
    Our settings:
    Exchange rate Type: EURX
    dynamic ex rate determination
    Source cur from datarecord
    Fixed Target Curr (EUR)
    Variable time ref.: End of Period
    Special Infoobject: 0fiscper
    When we run the DTP we get the following error:
    <i>Enter rate GBP / EUR rate type EURX for 00.00.0000 in the system settings.</i>
    ending the DTP in a message type X.
    In table TCURR and T009/T009B all necessary information is available.
    After debugging the function module, it looks like the created date (created from the FISCPER) is set to 00.00.0000. This results in the error above.
    Does anybody have experience with this error and more important know how to solve it?
    We also have a 0FISCYEAR available but in the TCURR table al rates are defined per end of the month. When trying to use 0FISCYEAR as InfoObject in the variable time reference, a diffrent error occurs:  Enter rate GBP / EUR rate type EURX for 01.01.1001 in the system settings. While  the 0FISCPER is 2001001.
    Is there a bug in the function module? (couldn't find a SAP note)
    We are working with BI 7.0 and SP12
    Best regards
    Steven

    Please can you give more detail on how you were able to resolve this issue?  How did you add 0fiscper to the transformation?  I am on BW 3.5, how do I fix this same issue on it?  Please help, this is urgent.

Maybe you are looking for

  • How to print text/data in flex 3 using printer???Plz help...

       Hi,           plz tell me the way to print text/data using printer in flex.  I tried the FlexPrintJob class. but it takes object of a container to be printed & prints the visible content of that container(along with scrollbars), bt i want to print

  • Enabling Installation of CS3 and CS4 products that will not install on Windows 7 64Bit.

    Adobe installers are not known for their helpful or forgiving ways & I have more than once had to reinstall Windows when installation of CS3 and CS4 products has failed with patently inscrutable errors. The background to the current issue that I was

  • Oracle 11gR2 install query

    I have downloaded the Oracle 11g Release 2 form the Oracle website for installation. Oracle Database 11g Release 2 (11.2.0.1.0) for Microsoft Windows (x64) win64_11gR2_database_1of2.zip (1,213,501,989 bytes) (cksum - 3906682109) win64_11gR2_database_

  • Recon

    hi, would like to ask as below 1) say vendor account. when make payment to vendor, the payable amount will reduce. the same goes to vdr recon acc? say payable 10k. when payment made, 10k will net off from vendor acc. when posting, vendor recon acc wi

  • Field selection for combination of Mat.type and Plant

    Hi Friends, How to  make Valuation category (in material master) mandatory for paricular material types for specified plants Ex: I want to make val. category mandatory for mat. types ROH and HALB , only for Plants P1 and P2 and not for plant P3. Rega