Dear All,
                    I have two problems I am making the form for Equipment Inspection but not able to find how should I map the Testing equipment and MIC with the inspection lot I mean from which table they are coming or is their any Standard function for that.
Thanks in Advance
Sachin Gautam

hi,
check these tables for <b>results</b> entered through lot
QAKL
QAMR
QASE
QASR
if they have used <b>inspection points</b> check this table QAPP
for i<b>nspectionlot</b> check table QALS
hope this helps !!!
Cheers
Alfred

Similar Messages

  • Assigning MIC to inspection lot

    Dear all,
    I have created around 15 MICs in the system.
    I am trying to assign these MIC in inspection lot in QA32.
    In QA32 I select the lot & click on 'Result' icon.
    In the next screen I follow path, 'Edit--- Create additional characteristics'
    A pop up appears. I give required input but no MIC is displayed.
    Please help me to solve this problem.
    Am I doing anything wrong?
    SmanS

    Prasobh,
    I have tried each n every possible way but still the problem is there.
    Let me explain you the whole scenario.
    We are set in process inspection type in material master of an FG.
    We have assigned the MIC in the routing.
    But under certain conditions we need to insert some extra operations in the order.
    Now it is clear that we can't assign the MIC in the order.
    What we can do is we can assign the MIC in the inspection lot.
    But it is not happening.
    Pls guide
    SmanS

  • Reverse a Return Delivery with inspection lot posted (QM)

    Hello experts,
    I want to reverse with transaction VL09 a good movement of a return client delivery with inspection lot. I posted the inspection lot and transferred the material to Unrestricted use (transaction QA11).
    Then I began the cancel Return Process and I transferred the material to Quality (movement type 322) to run VL09 with material in Quality stock, but the system displays  the following error message:
    You cannot cancel GR, since inspection lot is already partly posted
    Message no. QA046
    Diagnosis
    You are attempting to reverse a goods receipt although quantity postings have already been made from the inspection lot. This means that stock for the goods receipt has already been transferred and, for this reason, a cancelation of the document is no longer possible.
    Procedure
    Ensure that the postings in QM (within the usage decision transactions) are carried out.
    Please let me know what can I do to reverse the return delivery.
    Thanks in advance.
    Pablo

    You are trying to do the process which you ahve already transferred through Transaction QA11.
    The role of Cancel return Process has already been done by this transaction as the Stock has already been into Un- restricted.
    Best Regards,
    Ankur

  • QM Manual Inspection Lot - with Inspection lot origin 89

    Hi QM Guru,
    I did maintain inspection type 10 in this material but while i would like to create the inspection lot manually.
    I try to create manual inspection lot manually , i encounter this error with Inspection lot origin 89.
    No valid inspection type for material 10000037 was found or selected
    Message no. QA280
    Diagnosis
    An active inspection type for the material 1XXXXXXX in plant XXXX could not be found for the specified origin 89 or none of the available inspection types was selected.
    System Response
    Inspection lots cannot be created.
    Procedure
    Check the inspection type setting in the material master.
    Is there anything which i missing ?
    Thank you.

    Hi,
    I hope you have got the answer for this query. You get this error because you are trying to create a manual inspection lot (origin 89) of a material for which Inspection type 89 is not activated.
    From your statement,
    I did maintain inspection type 10 in this material but while i would like to create the inspection lot manually.
    I try to create manual inspection lot manually , i encounter this error with Inspection lot origin 89.
    It is clearly stated that you are using different inspection types. As Rama has suggested, activate Inspection type 89 in the material master and make corresponding master data.
    Other than that, you cannot create manual inspection lot for the origins 10, 11, 12, 13 & 14. Similarly, Automatic inspection lots cannot be created for origins 07, 15 & 89. This answers your further query raised in the thread.
    ntn

  • Goods movement with Inspection Lot

    Hi
    We would like to do a Material to Material posting including the earlier created inspection lots for the initial material?
    Is it possible in QM to transfer /link an inspection lot with batch from one material to another material?
    Ex: one material has inspection stock with assigned inspection lot/batch. we would like transfer posting this stock to other material. Is it possible by transfer the inspection lot from one material to other material with inspection lot/Batch?

    Hi,
    We can trasfer the stcok from one material to another material from Quality lot itself , but we cannot assign one lot to two materials. If you want inspection lot in receiving plant then activate 08 inspection type in Material Master and maintain inspection settings for 331 M.Type in SPRO.
    Regards,
    Vikas.

  • Weighted from quality score of chars. with Inspection Lots

    Dear QM Guru's.
    My question is about Quality Score with Inspection Lots.
    The Scenario:
    1. In a Quality master View in Material Master I use  the option number 05 of The Q-Score Procedure (Weighted from quality score of chars.)
    2. I use Inspection Points.
    3. I have 10 Inspection Points in a Characteristic.
    4. When I make the Usage desicion,  the Quality Score takes the last Inspeciton point.
    The questions:
    1. Why the  Quality Score  does take the last Inspection points, ?
    2. Is there a chance The Quality Score taking the average of all inspection points ?
    Thanks in advance.
    Federico

    This procedure calculates the quality score as the weighted average of the characteristic scores.
    The score for the characteristic is determined on the basis of the defect class score for the characteristic result. You define the weight of the characteristic in the inspection plan.
                                          Sum ( E_KQD(characteristic) * WEIGHT )
               E_KQD =                 ___________________________
                                                     Sum ( WEIGHT )
    With E_KQD (charac.):       Score for characteristic defect class.
                                  If the defect class is blank or zero,
                                 the result corresponds to the maximum
                                 allowed score.
         WEIGHTING:      Weight of characteristic according to
                                 inspection plan.
    Now
    As I understand It is Maximum allowed score which you have defined or the Avg one.
    If you want to have the Avg of all inspection points then Copy & modify  the function module   KQD_COPY_REFERENCE_FORM  ( originally KQD_FEATURE_CLASS_WEIGHTED )

  • PROBLEMS CANCELING MOVEMENTS WITH INSPECTION LOT

    We have this situation:
    We need to reset the GD returns but this GD returns was posted by QM and when we try to cancel in VL09 we meet the next message Message no. QA046.
    So we tried to cancel in other ways with the inspection lot and the usage decision but it has not been possible to restore movement.
    We found the note 175842 and we have implemented the program RQEVAC50 but, when we useit we meet the message M7226
    We checked the movement Z55 and its opposite Z56. I suppose its standard movement is the 651 and 652 and I compared the customizing of them. They can be similar it just the movement Z55 and Z56 are prepared to be posted by QM and special stock E and Q.
    The movement that we need to reset with the program RQEVAC50 is:
    We have tried to use the program for a movement 101 and it worked well (5000795975).
    We tried to test with a return delivery with Z55 movement in another environment and the program worked correctly so we think the customizing of the movement Z55 is correct.
    We think the problem is when the usage decision creates some movements or we use some of the next fields in the usage decision:
    In our case the movements are 321 and Z56.
    But when the movements are the standards 321 and 553 program doesn’t work because we meet the next message again M7096
    Program doesn’t work because we meet the next message again:
    What can we do? could you check thi situation and tell us anything, please?
    Kind regards

    hi,
    check these tables for <b>results</b> entered through lot
    QAKL
    QAMR
    QASE
    QASR
    if they have used <b>inspection points</b> check this table QAPP
    for i<b>nspectionlot</b> check table QALS
    hope this helps !!!
    Cheers
    Alfred

  • Problem with inspection lot

    HI
    We get the usage decision via IDOC to SAP from LIMS
    Due to some technical issue for one inspection lot,only the status UD got updated to the inspection lot ,stock posting ,valuation codes etc are blank and not updated
    Now the stock is stuck in quality
    We are not able to process that inspection via QA12/QA11/MB1B
    QA12 u2013 u201CUsage decision has not been made yetu201D
    MB1B u2013 u201CChange the inspection stock in QM onlyu201D
    QA11 -The functcannot be carried out as  Status UD is updated
    Can you please suggest how to release the stock from QI
    Appreciate your quick reply
    Thanks
    SVP

    HI,
    Apply SNOTE  174877.
    Copy the program ZQEVAC22 in the SNOTE and create a tcode for that.
    Then the inspection lot UD system status will reverse after executing
    Now through QA32 do the usage decision and quantity postiing
    Regards,
    Alagesan M / Bijoy

  • Cancel 101 movement with Inspection lot of closed financial period

    Hi experts,
    we are having the following problem.
    We have a 101 movement with creation of Inspection lot, which was done in a finance period which is already closed.
    Now I have to cancel this movement, but I get the error M7021 with VOR, which means that I am not allowed to cancel it, because of the period is already closed.
    But we also can not open the period.
    Which possibilities do I have?
    Maybe MI10 movement?
    Kind regards

    Hello Jürgen,
    thank you for your help.
    I am confused now.
    Becasue normally I am logged on in german and now I did check the english one.
    Deficit of BA St. in QI prev. 127 M2 : "material number" 0001 "sloc" "batch"
    But here I get QI prev, but in the F1 help there is no QI or prev.
    In german I get VOR and there in the F1 help it is written, that VOR is previous period (so I think equal to PR in english).
    Now I am a bit confused.
    But anyway, the thing is that we have to empty the stock.
    Kind regards for every help, I think there is no possibility to cancel that booking as the period is closed.
    @ Biju K, to be honest your way would really be the only correct way, but at the current situation it is a bit special.
    I will do a MI10 booking.

  • "Closing" Unused, but Released Orders with Inspection Lots

    We have Process Orders which have been released, but been unused.  When We come to Financially Close them we have problems as the Inspection lot is still on without a UD
    Is there a way we can mass process UD of Inspection Lots (or deletion of IL) with Nothing Produced on the Order?
    Thanks & Regards,
    Vivek Kumar

    hi,
    if you the process orders, make a list of those. now in qa16, you can do the mass UD.  in that transaction, you can find out an option called " dynamic selection". if you expand that option, you will have an option called " production"; under that order. So you can put all those process orders and with the lot oringin 03, you will ge tp know the concerned inspection lots. then you do mass ud. this was your requirement.
    Partha

  • Login Problems in an Application with a lot of Pages

    Hi,
    I have a problem with the authentication.
    I have an application with a lot of Pages and I want to have one Login for the whole Application.
    So I created an authentication scheme and set the logging for the application to 'yes'.
    So far all works well, but when I use the application and branch throu the different pages I must Login everytime when I want to open a new page.
    I know that I can set the authentication(in page definition) for every page to 'Page is Public' but that isn't what I want, because then you can access the single pages without a Login!
    So I need an authentication for the first time where I access the application and then no more authentication is needed.
    Can anybody help me, please?
    Thanks,
    Tim

    Sorry Jes,
    I solved the problem.....
    My mistake was that I didn't pass the Session in the links to the different pages!
    Sorry I'm still a beginner...

  • Process Order Close with Inspection Lots

    At month end we need to close process orders that have not had their usage decison made, generally the inprocess inspection UD.  Is there any way to close these POs without having to enter a usage decision?

    > Hi
    > You can activate the inspection completed status
    > activated for the inspection lots with out making
    > UD.
    > Regards'
    > YMREDDY
    Your suggested solution to being able to flag the inprocess inspection lot as being completed without making a UD, to allow the process order to be closed, sounded very, very interesting, but we are not familiar with the file/record/configuration parameter you noted.  Is there any way that you might be able to clarify your answer, so that we can have our technical team figure out how to implement that change?
    Thank you very much.....this has had us stymied since we went live.

  • Bapi to create quality notification with inspection lot and defects of char

    Hello experts,
    Can any body tell me how to create notification using inspection lot.
    regards
    Narendranath Reddy

    Hi Narendranath,
    Have you tried BAPI_QNOTIFICAT_CREATE? Based on inspection lot data, you should have the data you need to create a quality notification.
    Good luck.
    Best regards,
    Guus
    Edited by: Guus Jansen on Feb 2, 2011 10:05 AM

  • Stock transfer from Plant to Project with Inspection Lot

    Hello,
    Our client procures consumable material in bulk quantity at plant level and then issues it to project as and when required. We want inspection lot to be generated while we are transferring material from Plant to project stock.
    Question -
    1) We are using movement type 412 Q for transferring plant stock to project stock. Is there any other movement available for this requirement?
    2) What configuration is required so that inspection lot will be generated when material is transferred from plant to project stock?
    I have tried following configuration but but inspection lot is not getting generated -
    Quality Management - > Quality Inspection -> Inspection Lot Creation -> Inspection for goods movements - > Deactivate Quality Inspection for a movement type. QM not active tick removed.
    Please help for resolution.
    Regards,
    Milind Dumbre

    Question -
    1) We are using movement type 412 Q for transferring plant stock to project stock.
    Is there any other movement available for this requirement?
    Use movement type 415 for transfer posting from unrestricted stock to project stock

  • Filtering MICs in inspection lot.

    Dear Friends,
    Please help me in following scenario,
    I am having one inspection plan with group 001with group counter 01 usage 6 ( while dispatch)
    In this group counter I am having 5 char. say A, B,C,D,E, which I maintain as required char.
    Now, my one particular customer say 200001 need extra parameter say F which is not mandatory for other customers.
    I am maintaining this additional parameter in above group counter.
    Now, while result recording screen if I am recording results for customer 200001 then all the 6 parameters should come. Else, if I am recording results for other customers, then in result recording screen only 5 mandatory parameters should come.
    I am doing dependent char assignment for customer 200001in inspection plan.
    Please guide me for this.
    Regards,
    Amit Shirsath.

    Dear Sujit,
    Actually I think you are not clear with the requirement.
    I want to filter out the sixth characteristics for other customers in result recording screen. (which is comming as per std. SAP)
    Hope I have cleared my self properly.
    Regards,
    Amit Shirsath

Maybe you are looking for

  • SOAP on Sun Java System Application Server 9

    I am running the Sun Java System Application Server 9 (SJSAS). My goal is to have SOAP running on the server to handle incoming messages. I cannot find the answers to the following critical questions anywhere. 1. Should I be creating my own soap clie

  • V_T510 and infotype 0008

    When updating V_T510 how can i have delimited (automatically) the infotype 0008 for the begin date i have in V_T510 ? Thanks MColaço - Somincor Portugal

  • Ftp error on SunOS 5.8

    Hi, I am getting something unexpected behaviour while doing ftp from our SunOS 5.8 server to some other server. When i do ftp in following way : ftp -v -n $hostname << EOF user $username $passwd bin lcd $path mget filename1 mget filename2 mget filena

  • Import statements-- Please clarify Easy one...For You

    Hi, Please clarify and i hope it would be easier one. I have imported two packages of same type like: import java.util.*; import java.util.*; in my programme and what will be the cause, i know that i dont get error, i wan to know that wat compiler wi

  • [Solved]no sound after suspend/resume after kernel 3.9.2 upgrade

    I don't know  what to provide to help solve this problem. Leave me messages.Thank you! Last edited by chu887 (2013-06-06 08:54:16)