Problem in Process order confirmation ( while doing batch splitting)

Hi All
In our Industry we have sceneraio
we create Internal order and assign internal order to sales order
Once MRP run take place
Planned order created and converted to process order
Process order released
once we try to do confirmation of process order
example suppose process order header matl qty : 8
and in final confirmation while Goods receipt(101) of Fert
we do batch splitting (example 4 batch : each qty : 2)
but some time system not allows to do Goods receipt (movement type101)
system gives "Error confirm order not allowed"
please need urgent help
Thanks in advance
Sunil Singh

Hi Sunil,
During your first confirmation you must have activated "Final confirmation" Indicator, probably this is blocking from further confirmation.
Please check whether current system status of the order contains "CNF" if so, please cancel the previous confirmation and then redo confirmation with "partial" button active. Final confirmation should be activated only when it is the last confirmation for the order.
Hope this will resolve the problem, reward your points....
Regards,
Prasobh

Similar Messages

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano

  • No 101 for Co-products in Process order confirmation

    Hi All
    I have a problem in Process Order Confirmation.
    I have a order with Co-products.  When I do confirmation, 101 Mvt type is not happeneing for all the co-products along with the main product.
    The configs looks fine
    1.  Control key has "Automatic GR"
    2.  Confirmation parameters have "GR Co-products"
    What else could be the problem?

    Hi Jack,
    I'm not sure how it works with process orders but in case of production orders is it not possible to do auto GR for co-products - according to my best knowledge.
    Please check:
    http://help.sap.com/saphelp_erp2004/helpdata/en/b1/c04d01439a11d189410000e829fbbd/content.htm
    You can use MB31 + PrdOrd reference to book the co-products by mvt 101.
    (You can also search in this forum to find threads in connection with this.)
    BR
    Csaba

  • Setting of tolerance limit while Process Order confirmation

    Dear Experts,
    I want to set tolerance limit onto the components of Process Order while doing the Process Order confirmation, Please teach me what all the steps do i need to follow for doing that.
    Thanks!
    Regards
    Sumit Kalyan

    Tolarance limit what you are speaking about is for the components. In wS view what you are setting up is the for the product, not for component.
    As I am aware we cannot set any tolarance limit for the component as such.
    I am not sure what actually you want.
    example - component  A, as per the planned qty in production order is lets ussay 10, now when doing confirmation user can enter 10+ or - 1, if he neters moer than 11 or less than 9 system should not allow? is that you are trying to implinment?
    If so that mayn not be possible unless otherwise you impliment some user exit.
    In OPK4 what settings are there is for product and not for raw material/component

  • Problem with creating Process order confirmation using BAPI

    Hello,
    While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
    Thanks in Advance.
    Regards, Senthil G.

    Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
    Thanks for your help.
    [email protected]
    Guatemala, Cempro ADATSA

  • Process order confirmation error in COR6

    Hi Gurus,
    I am working as sap manual tester and facing below issue in Process order confirmation in t-code COR6.
    Batch 456 for component 350515 does not satisfy BOM requirements
    Message no. Z_MFG017
    Need ur help.
    Regards,
    Imran
    Edited by: imran.shek38 on Jan 25, 2011 7:16 AM

    Hi,
    Please check whether the Batch-Management checkbox is maintained for the component in the Material Master (MM02).
    Also, check the Transaction MSC2N for this component and activate the checkbox for batch-managed item in the BOM.
    Hope it helps.
    Regards,
    Kaushik

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N

    Hi Experts,
    How it is fixed the loss qty percentage at the time of process order confirmation.
    I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
    For Example:
    If the Total processed quantity = 100
                            Yield Quantity = 20.
                             Loss              = 80.
    This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity.  I want to set the loss quantity  to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
    NB: Scrap quantity is not maintained at the time of  process order confirmation.
    Regards,
    Umapathy.

    Hi Umapathy,
    Yield and Scrap are user entry fields where you can have restriction on entered qty by changing  under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
    OR
    You can define the operation scrap. Read the below doc for more details.
    http://scn.sap.com/docs/DOC-52834
    OR
    Another option is to use exit and write your logic based on input yield and loss.
    Thanks & Regards,
    Ramagiri

  • Create process order confirmation

    Hello,
    I use the Bapi 'BAPI_PROCORDCONF_CREATE_TT' to create a confirmation in our Z program to replace 'COR6N'.
    The only problem I meet is that it makes a material document for the good movements but don't write it in the table AFRU (field WABLNR).
    Do I miss something in the BAPI??
    I run the BAPI like that:
      CALL FUNCTION 'BAPI_PROCORDCONF_CREATE_TT'
        IMPORTING
          return                   = lwa_return
        TABLES
          timetickets              = gt_timetickets
          goodsmovements           = gt_goodsmovements
          detail_return            = lt_detail_return
    The tables gt_timetickets & gt_goodsmovements are filled with relevant values.
    Could anyone help me to know what make the doc no. to be written in AFRU?!!!
    Thanks in advance,
    Fariba

    Hi Fariba,
    I am facing the same kind of issue that you faced long back. If you have resolved this issue, can you help me by replying back to the thread Problem with creating Process order confirmation using BAPI
    Thanks in Advance.
    Regards, Senthil G.

  • Ristrict Cancelling Process Order Confirmation (CORS) after FI MM period cl

    Showing current date as posting date after Cancelling Process Order Confirm:
    Issue with FICO and PP :-, after settlement (ko88) and all period end closing, system still allowed doing Cancelling Process Order Confirmation (CORS) and Showing current data as posting data
    For example:
    My order created on 30th September 2010 and order confirmed on the same day ie my posted date (30th September 2010)
    I have done order reversal on 3rd October 2010 and posting date should be 3rd October 2010 but system showing current data as posting data. Can you please guide me why this unusual behavior happening

    Hi Arun
    Is this  congif change will help me
              1)In BS22 first search for TECO.
               2)Double Click on TECO.
               3)New entry.
               4)Now search FI posting.
               5)Select status as Prohibited
    My Requirement : Ristrict Cancelling Process Order Confirmation (CORS) after FI, MM period closed, and Materail Ledger done
    I want to ristrict the (CORS) reversal of Process Order Confirmation after FI MM ML closed
    right now as per standard its giving warning masage as " Posting with carent date YES or NO, if you say YES then system doing CORS on system carent date, i want to restrict it
    Is above steps you refered will help me
    please confirm
    Regards
    MKbinnal

  • Goods Issue- Process Order Confirmation

    Hi,
    During Process order confirmation, in Goods Movement tab the BOM components with qty are displayed. But some components OTHER than BOM items ISSUED for the process order is not displayed in the goods movement tab. Why?
    Is there any additional configuation to be done?
    Thanks....
    JK
    Edited by: J K on Apr 15, 2008 6:04 AM

    Hi
    As said by Mr sateesh,
    If u r doing confirmation phase/operation wise(COR6), then the material assign to phase/operation is only seen according to phase/operation wise.so have to check in which phase u have confirm the component quanity.
                    or
    If u confirm the process order collectively(CORK), then their must missing in OPK4 (confirmation Parameter) of All component tick at Goods Movement.
    Kindly check the same & coem back if their is any other issue
    Parminder

  • CORK error at process order Confirmation

    Hi all
    While Process order Confirmation (CORK) iam getting the following error
    G/L account 499999 is not defined for chart of account 1000
    Message no.F5507
    I have run the same in Dev. Client
    but unable to do in the quality client
    i have checked in OBYB in both the clients
    setting are same
    plz.. provide the solution
    thanx in advance
    useful solution points will be awarded

    Hi,
    While confirming the Process Order, the following will be the effect in Accounting
    FG Stock Account Dr.
    To COGM Account
    The followings are the possibilities in your quality client
    1. whether you have defined the above account in Chart of Account and Company code segment level?
    or
    2. You should check it in OBYC > GBB > AUF (COGM account) and in BSX key (Stock account for Finished Inventory)
    or
    3. Whether it is blocked for posting or marked for deletion at Company Code level or Chart of Account level?
    Regards,
    Jigar

  • Standard Value doesn't carried to Process Order Confirmation

    Dear Experts,
    I was trying to run Process Order Confirmation via COR6N but I found out that the Activities shown are NOT consistent with the Activities set in Master Recipe.  The following are the figures shown in master recipe, process order and order confirmation.
    Master Recipe (via C202)
    Base Qty =1
    Operation/phase = 0020
    1st Standard Value (activity 3 setup) = 1Hr
    2nd Standard Value (acitivity 1 machine) = 2Hr
    3rd Standard Value (activity 11 labour) = 3Hr
    Process Order (via COR2)
    Order Qty = 1,000
    Operation/phase = 0020
    Setup (to be confirmed) = 1Hr
    Machine (to be confirmed) = 2,000Hr
    Labour (to be confirmed) = 3,000Hr
    Order Confirmation
    Operation/phase = 0020
    Machine time (to be confirmed) = 1Hr
    Labour time (to be confirmed) = 2,000Hr
    My question are as follows :-
    1) Why the Machine time NOT same as in Process Order
    2) Why Setup time NOT shown in Order Confirmation
    Does anyone have any idea?
    regards,
    Abraham

    Hi,
    all the master recipe, process order and order confirmation, including the material master are maintained by myself alone.
    Is it due to some parameters are not defined properly such as in the formula key?
    The formula key are defined as below.
    Formula key defined in OP21
    Setup  = SAP005 = SAP_01 x SAP_11
    Machine = SAP006 = SAP_02 x SAP_09 / SAP_08
    Labour = SAP007 = SAP_03 x SAP_09 / SAP_08
    Paramater defined in OP17
    SAP_01 = Setup
    SAP_02 = Machine
    SAP_03 = Labour
    SAP_08 = Base Quantity
    SAP_09 = Operation Quantity
    SAP_11 = Operation Splits
    I'm a bit confused with these formula keys.  Could you explain to me how they work?
    regards,
    Abraham

  • Process order confirmation without 101mvt type

    our client is  a process industry.client need during process order confirmation Background 101 not happen.
    Step : 1 Process order create
    Step : 2 Goods issue The material -261
    Step:  3 Process order confirmation   (No 101)
    Step:  4 Goods Receive (MIGO) 101 happen 
    Following Steps Process only,
    cork-only activity confirmation only,after Activity  confirm GR will Happen , how to configure in the system,any user exit or sap note there in the sense tell me?
    Thanks For Advance

    Hi Thiyaharaajan,
    For Goods issue i believe you are using MB1A/MIGO. You also use backflush to automatically issue the material during confirmation.. For this maintain Backflush - 1 in material master MRP 2 view.
    Also during confirmation for doing Auto GR (101 movement type) you need to assign the control key ticked with Auto Goods Receipt for Last operation/phase of Master Recipe.
    Thanks & Regards,
    Ramagiri

  • BAPI For Process Order Confirmation

    Hi,
    For Process Order Confirmation we are using the following tcode. COR6N. in the t-code we are include a new field (Shift Field) with help of CONFPP07. and we made the field as mandatory also. in cor6n it is working fine.
    now we are using the bapi for same Process Order Confirmation. here the new field is not available. we want to include the new  ( Shift ) Field also. we are using the following
    BAPI Fm: BAPI_PROCORDCONF_CREATE_TT .
    Regards
    Sathis

    BAPI_PRODORDCONF_CREATE_TT to confirm a production Order
    Erwan