Problem in Route determination
Hi everyone,
how the route is determined automatically into a project delivery.
in CNS0 T-code we can give the ship to party and we can create delivery from the project.
here my question is whether the system takes the shipping condition from ship to party which we give here? or whether it looks for sold to party?
i my case system is not determining any route into project delivery(LP). I have done all the necessary settings. and the customer account group is ship to party.
can anybody help me out with is issue
Thanks & regards
Hi,
For the route determination to happen you must have maintained the Route based on the Origin's Transportation zone [Taken from Shipping point] , Destination Transportation zone [Taken from Ship-to-Party] for the Shipping Condition[ Taken from Sold-to-Party].
So though you have maintained the Transportation zone in Ship-to-Party the route may not be fetched in the delivery document.
So please verify if your Shipping point is having the Transportation Zone maintained.
Regards,
Karthik.
Similar Messages
-
Route determination during sales order creation!
Hello all,
I am having a problem with route determination in sales order. The issue is when I remove delivery block (LIFSK) on the sales order and select 'under minimun' in orther reason (AUGRU)field, the route is not getting determined when the partner at the header level is changed.
When if there is a delivery block and other reason is empy, the route is correctly determined when the partner (intermediate consignee) is changed.
Why is it behaving this way? Any siggestions?
Thanks,
Message was edited by:
Naren SomenHello all,
Looks like if there is credit block for a customer, the sales order is not getting updated. Is there anyway to get around this?
Thanks, -
Route determination problem in Stock transport order
Hi,
At present,i am using the plant 0001 and storage location 0001.It is determining the Route as 000001.When i changed it in STO to 000002.It is automatically coming back to old one.
How to change it to 000002?
If we need to any customizing,please tell me the path.
Thanks
SriniThe correct route should be maintained in the customizing for the departure country and the receiving country with the shipping conditions and transportation zone etc.
You need to define this in customizing under logistics execution > transportation > Basic transportation functions > Routes > Route determination > Maintain route determination.
Check the route here. Also check the route whici defined in your related customer master data -
Route determination in inbound logistics
hi
I am trying goods receipt with inbound delivery.
i have maintained shipping conditions and transportation zone in Vendor master.
Also i have maintained customising setting for route determination (without and with weight group) in SPRO.
but when I create inbound delivery, route is not getting determined.
Can you pl suggest
best regards
SaraHi
Thanks Ely.
Now route is getting detrmined in delivery......but now new problem
Route is not getting copied in shipping document (VT01N) when I include deliveries.
Route is present in the included delivery...but not getting copied into shipping document.
Pl suggest
sara -
Automatically route determination for Normal PO - Inbound delivery
dear MM experts,
we are successful route determination for STO & SO, now we wud like to know whether normal PO, route automatically determined or not.
-while creating PO, we don't find the shipping tab, unlike in sto,
or
-while creating inbound delivery
Please help in giving solution if any one as already implemented
thanx in advance
srihariHi, did you solve it? I am having the same problem.
-
Routes and Routes Determination
Hello All,
I m basically a technical person and i m doing recording for routes and routes determination.
I am facing one problem.
while executing transaction 0vtc in one system , while saving data its asking for transport request.
and when i execute the same transaction in IDES system , and when i save data it does not ask for the transport request.
Is there any config for that?
Please help me out...its required asap..
thanks,
jigs
Helpful ans will be rewarded.Hi
not sure if this would help. but going through some of the older posts here, here's something I gathered:-
++++++++++++++++++++++
It also depends on the client settings, which is done by the BASIS guys. If the client settings are done in such a way that system should not generate requests then it will not generate a request.
If the system is created as a Sandbox then also system will not ask for a request.
using the T codes SE01 where all the list can be viewed , then select the task or transport request click on the trucj button .
+++++++++++++++++++++
hope it's a start -
Update 0VTF Route Determination with a new Shipping Condition
Hello,
I have created a new Shipping Condition to have a different route determination.
I have completed the configuration as Standard SAP procedures for Routes determination.
However, in order to apply this solution in production, it's going to be necessary to update the new "Shipping Condition" for more than 8,000 routes in Production environment.
Transaction: 0VTF
Table: TROLZ
According to the Abap team, the changes by CATT is not possible because the Transaction requires specific selection and "double click" functionality.
Using BDC and LSMW is not possible, since they had problem already in the past with both options.
I still have sent a message to SAP without any successfull answer.
Can you let me know if there is a Standard SAP solution for it or a BAPI to massively update the routes determination?
Thank youHi
You can use CATT to maintain the route determination. Use tcode SM30/SM31 to update view V_TROLZ01 for recording. You don't have to double click anywhere. Let me know if this works.
Thanks
Swagat -
Automatic route determination for sales order
Defined
Transportation Zone sold to party -0000000002
Shipping conditions -01
Transportation group in Material master -0001
Transportation zone ship to party - 0000000003
Assignment made -
Dep country zone -0000000002
Dest country zone -0000000003
Sc -01
Transportaion group -0001
route -zroad
departure zone and destination zone is assigned to respective customer masters. and above assignment is made in IMG for route determination for order. But when i create the sales order route is not getting determined..i wnet to most of the threads in this form..but could not find a thread for route determination for sales orderAju Joseph
-Do the shipping point detremination in OVL2.
-In Route Determination- Maintain Country & Transportation Zone For Shipping Point
-Here you will find the Shipping point whatever you have created in Enterprise Structure which is in grey i.e you cannot change.
-Just assign the departure zone which you have created in Transportation zone-000000002 to required shipping point & save it.
--Raise the sales order & check the output
Let me know if your problem is solved
Regards
Pradeep -
ATP and Route Determination at Storage Location Level
Hi Experts,
I'm working on a project currently and one of the requirements is to have ATP and Route Determination at Storage Location level. I know SAP standard for this is at plant level but was wondering if anyone has had this requirement before, and if so what course of action they took to solve this issue.
Any help would be greatly appreciated.
Thanks,
MarkHi Mark,
in my previous project we have a customized table created for all the route determination and used mv45afzz move field to vbap to determined the route.
not sure if there is a easier solution but at least it is doable through customization for sure. -
Problem in pricing determination in VA03
Hi All,
I am facing in pricing determination. There is inconsistency problem for pricing determination. For one of condition type ZCN1, we have maintained the price in condition record(VK11) but even after than the condition record does not get copied in the order. This is happening for some of the orders and not for all orders and not for all items for one order.
In VA03 T.code
E.g
Sales order:30000123 line item 15
The pricing date is 29.04.2007, but pricing in ZCN1 condition type could not be determined. In the pricing analysis screen it shows the confition record for the condition type ZCN1 but displays ''condition record found but not set'' we cheched for other orders/ line items this price was successfully copied. we are having such inconsistencies often.
Can any body suggest some solution.
Regads ,
GeethaIf it's a standard configuration that is not working, I would suggest to move this question to SD forum. Otherwise, if you have any user exits in pricing determination, the problem might be there. If it's a small piece of code, please post it here for a review.
Also in the pricing condition analysis take a look at what keys are used for the price determination. Often the problem is that the keys are incorrectly populated in the program. -
Route determination third party sales order
We are using third party sales order. The process flow is as follows.
Sales order -> Purchase requisition-> Purchase order-> Vendor ships material directly to customer.
Route is currently determinined based on the following:
1. Departure zone (from shipping point)
2. Shipping condition ( from ship to customer master)
3. Transportation Group (rom material master)
4. Destination zone (Transportation zone of the Customer in the order)
Shipping point is in US, but the vendor who ships material to customer is in China. So, we want the Departure zone for the purpose of Route tdeterimination to be based on address in vendor master, and not shipping point.
Is there anyway, we can do this?
Thanks,
SriniDear Srini,
Welcome to SCN forum....
I find route determination for third party sales not logical. Just think in Third-Party Orders, theres is no Material-Movement and no Deliveries from our Plant;
In this case Route Determination will not be applicable. Customer has placed order to you and you have placed an order to your vendor, who directly deliver the goods to your customer. And you dont have to decide which route customer's transporter will take?
So as per me you need not determine routes in case of third party sales order.
Thanks,
Raja -
Route Determination in Inbound
Dear All,
How to configure the system to automatically determine the Route incase of Inbound Delivery Process?
I know that the Route is getting detemined through the transportation zones & also the transportation group of the material.
I have given the departure transportation in my vendor master record & receiving zone in my shipping point/receiving point address tab & also maintained a route for the shipping condition which I maintained in my vendor master & Trans.group in the material master.
Inspite of doing all the above the route is not getting determined automatically.
So please suggest a solution.
Regards,Hi Amol,
As you have suggested I have checked my material master trp group & its assignment to Shipping condition & route determination.
Please note tht the goods receiving point is getting automatically determined as per the config but even though I have done the necessary assignment my route is not gettin determined automatically when I create a Inbound Delivery.
To be more specific.
I have given the Route for the TP zone given in my vendor master & TP zone given in the goods receiving/shipping point.
I have maintained the Route for the combination of TP group given in my material master (sales view) & Shipping conditions given in my vendor master.
Please help if you have any solutions.
Regards, -
Installing Oracle RAC problem: Could not determine /tmp mount point
Folks,
Hello. I am installing Oracle 11gR2 RAC using 2 Virtual Machines (rac1 and rac2 whose OS are Oracle Linux 5.6) in VMPlayer and according to the tutorial
http://appsdbaworkshop.blogspot.com/2011/10/11gr2-rac-on-linux-56-using-vmware.html
I am installing Grid infrastructure. I am on step 7 of 10 (verify Grid installation enviroment) and get this error:
"Free Space: Rac2: /tmp"
Cause: Could not determine mount point for location specified.
Action: Ensure location specified is available.
Expected value: n/a
Actual value: n/a
I have checked the free space using the command:
[root@Rac2 /]# df -k /tmp
Output:
Filesystem 1k-blocks used Available Use% Mounted on
/dev/sda1 30470144 7826952 21070432 28% /
As you see above, the free space is enough, but could not determine mount point for /tmp.
Do any folks understand how to determine the mount point for directory /tmp ?
Thanks.Folks,
Hello. I have found the file ./bash_profile under /home/ora11g/ and the file is invisible. However, I edit the file using the command:
[ora11g@Rac2 ~]$ vi /home/ora11g/.bash_profile
I add the 2 lines into the file as below:
TMP=/tmp; export TMP
TMPDIR=$TMP; export TMPDIR
I save the file .bash_profile and reboot Oracle Linux 5.6 and check again on step 7 of 10 in the Installer, but the problem is still not solved.
Can any folk help to solve the strange problem "could not determine mount point for /tmp" ?
Thanks. -
Open STO reports with route determination
How to get Reports for open STOs with route determination.
ME2N will find the open STO's but I agree finding them based on route is not standard
or even vl10g can be used to find STO's needing deliveries
after delivery creation data based on route can be found in many way's
hope that helps -
Route determination for PO and Delivery
Hi Experts,
I would like to ask how to set up route fro deliveries and Stock transport orders.
Hope you can help me on this.
Thank you very much.
Regards,
MyleneWorking with Route Schedules
Use
Using a route schedule, you can control periodic customer deliveries of a particular shipping point to different ship-to parties (for example, customers or stores) in a certain sequence on a certain defined route. The planning is based on calendar weeks. The period unit is a day. Also, route schedules have a goods issue time.
The route schedule function supports the following processes:
Periodic deliveries from a shipping point to stores or customers are planned in advance on the basis of calendar weeks and weekdays, also without reference to particular deliveries.
You adapt the schedules in the specific cases to the planning. For example, you can plan a GI date for a Monday at 8 oclock, without knowing the exact date or the delivery.
On the basis of this planning, deliveries that are to leave the warehouse at the same time are combined into groups. In Shipping you can thus distribute the workload by processing these groups.
Features
You can display all deliveries for a particular route schedule on a particular day, for a particular shipping point, and so on. In this way, for example, you can choose picking lists on the basis of route schedules.
You can create route schedules for the following documents:
Sales orders
Stock transfer orders
Deliveries that are based on sales orders, store orders, stock allocations, stock transfer orders, and deliveries without reference.
The route schedule is displayed in the header data of the delivery. For each delivery within the route, the system prints the expected date and the expected time of the delivery (on the basis of the local time at the original shipping point) on the delivery note; the goods issue date is used for the goods issue posting and the stock valuation.
In Customizing, you define for each shipping point, delivery type, stock transfer order, and order type whether or not route schedules are to be used.
You create the route schedules in the master data for shipping. Here you define the route schedule determination and the validity period for the route schedule and the itinerary.
As soon as the legs have been defined, you can branch to another screen to determine the actual itinerary, as well as the time (days/hours/minutes) required to get from one unloading point to the next. In this screen there is a field beside each leg. Here you can enter the number of the itinerary for the individual legs of the route. If, for example, you enter legs A and B, but assign itinerary number 2 and 1 to these, B is the first unloading point on this route. If you press Enter, the legs are displayed in the correct sequence.
At the same time it is possible to control the route schedule determination for each delivery type, stock transfer order, and order type. It is activated in the same manner as the repeated route determination. If the route schedule determination for a delivery is active, the system automatically attempts, during creation or change of a delivery, to determine a route schedule and records this in the delivery. Simultaneously, the scheduling is adjusted. All the deadlines, for example, the transportation planning time, the picking time, the loading time, the goods issue time, and the delivery time can change.
Deliveries with the same route schedule and the same date can be selected for the same picking run and the same goods issue. The same procedure can be used for printing delivery notes and freight lists, for the grouping of deliveries into shipments, and for confirmation of picking orders.
Deliveries that leave the warehouse at the same time, but are assigned to different routes and can therefore have different route schedules, can be combined together and processed through the creation of wave picks. The only condition is that all deliveries have the same goods issue time.
Route Schedule Determination
If exactly one route schedule is defined for a particular combination of requirements, then the system will use this.
For each combination of requirements for the route schedule determination, you can define several route schedules.
In the case of a delivery without a preceding document, the system determines the route schedule with the earliest delivery time at the ship-to party.
In the case of deliveries based on preceding documents (for example, stock transfer orders), the system searches for the route schedule that is nearest to the planned date/time of the delivery. The system uses the following search algorithm:
- If a route schedule exists for the specified time, this is assigned to the delivery.
- If there is no route schedule for the time specified, the system searches for the previous route schedule up to the GI time.
- If there is no route schedule from the GI time to the planned time, the system searches for the next route schedule in the future and assigns this to the delivery.
Requirements for Route Schedules
The route schedules are determined by the following conditions:
· Shipping point
Where are the goods coming from?
Ship-to party and unloading point
Where are the goods going to?
Shipping condition
How are the goods being shipped?
Transportation group
Which goods are shipped?
® For example, which type of goods?
Calendar week / year
When are the goods to be shipped?
If you do not explicitly enter the week and the year, the entry applies for each calendar week. If you enter a week and a year, the route schedule only applies for this week.
You can only use route schedules if you have maintained the working times and therefore at least one of the following times in minutes:
· Transportation planning time
· Pick/pack time
· Loading time
· Transit time
A route schedule can leave the warehouse exactly once in a week. If a route schedule runs several times, either on several days or several times a day, it must be copied to another route schedule.
Special schedules and public holiday weeks are possible.
Processing a Route Schedule
Implementation Options
Wholesale trade customers and stores can receive goods at regular intervals. These delivery rhythms have an influence on the workload in the warehouse. To help delivery planning, the route schedule serves as a tool for planning regular, repetitive customer deliveries on a particular route. At the time of planning, potential deliveries that have not yet been created are grouped in the route schedule. When the deliveries are created, the system can automatically determine a route schedule and assign it to the delivery. All deliveries with the same route schedule and the same date can be processed together in the shipping point. All these deliveries leave the shipping point together at a particular time. They are distributed along the same geographical route.
· Deliveries for route schedule MO10H leave the shipping on Mondays at 10:00 in the direction of Philadelphia.
· Deliveries for route schedule MO10M leave the shipping point on Mondays at 10:00 in the direction of Boston.
· Deliveries for route schedule MO10S leave the shipping point on Mondays at 10:00 in the direction of New York.
You can print picking lists for all deliveries that belong to route schedules MO10H - MO10S together.
Prerequisites
If you want to define route schedules, you must perform the following tasks:
- Activate the route determination
- Activate the delivery scheduling
- Activate the route schedule for your shipping point and make the following settings:
Transaction
Activity
Delivery
Route schedule determination for delivery type
Sales order
Route schedule determination for sales document type
Stock transfer order
Route schedule determination for delivery type
Set delivering plant and order type
Maintenance of the itinerary should be uniform for all the route schedules used. To ensure exact planning, maintain the itinerary for all the route schedules. If rough planning is sufficient in this case, you do not need to maintain the itinerary for a route schedule.
If you do not define any goods accepted times in the customer master for the unloading points of the ship-to party, the system assumes that the goods acceptance is possible at any time. The system determines the delivery time from the departure time in the route schedule plus the required traveling time to the ship-to party, as set in the itinerary (specific move time). This delivery time must be within the goods acceptance time of the unloading point of the ship-to party. If not, the respective route schedule is not determined during delivery creation.
For more information on route schedules, refer to the Implementation Guide (IMG) under Route Schedules.
Process Flow
Select the shipping point you are working for and enter the number of the route schedule.
Enter the data that defines the route schedule more exactly:
- Description of the route schedule
- Route
- Departure day (weekday)
- Departure time
You define the route schedule determination. When you create the delivery, the system can determine a route schedule on the basis of the following data:
- Shipping point
- Ship-to party
- Unloading point (if available)
- Shipping condition
- Transportation group
- (Optional) year/period
You enter this data (with the exception of the shipping point already entered in step 1).
You decide whether or not you wish to define the itinerary for this route schedule.
(Optional) You enter the itinerary and, if required, also the travelling time.
Creating a Route Schedule
Choose Logistics ® Logistics Execution ® Master data ® Transportation ® Routes ® Route schedule ® Create.
In the screen Create Route Schedule: Initial Screen, enter the shipping point and the number of the route schedule.
If you wish to use data from an existing route schedule as a reference, enter the respective shipping point and the number of that route schedule. If you also wish to copy the itinerary, check the Copy itinerary box.
Press ENTER .
The Create Route Schedule screen appears (here the system displays the number you just entered for the route schedule and the shipping point).
Enter the following data:
Description of the route schedule
The respective route
Departure day (weekday)
Departure time
In the Determine route schedule section, enter the following data:
Ship-to party
Unloading point (if available)
Shipping conditions
Transportation group
(Optional) Year/period
If you wish to define for this route schedule the itinerary according to which the individual ship-to parties are to be delivered to, choose Extras ® Itinerary.
The Create Itinerary screen appears.
Enter the itinerary and, if necessary, the travelling time.
When you determine the travelling time from one ship-to party to the next, you should include the wait time of the vehicle at the previous ship-to party.
If the same route is planned for several route schedules, define for each of these route schedules the same itinerary that should correspond to the stages and legs of the route.
Choose Goto ® Back.
You return to the Create Route Schedule screen.
In this screen, the Itinerary maintained field is now selected. If you wish to add other ship-to parties, you must also maintain the Itinerary for them.
Check your data and save your entries.
Reward if helpful...
Regards,
Diogo
Maybe you are looking for
-
I installed a samsung 840 pro SSD to my primary slot and relocated my 1.5 TB HDD to a data double where my optical drive was. I transfered my apps and Mac OS X to my SSD for fast boots and all my itunes movies, music, Iphoto etc to my HDD. I rebooted
-
Filtering out non assigned category
I want to create a query from a multicube. Can I filter out the not assigned node from queries? Thanks
-
VBAP-POSEX field defaulting item number
When we first set up sale orders in SAP the field VBAP-POSEX (purchase order item) always remained blank. We only use this field for a specific order type. Now the system is always putting in a number, based on the line item and I can not figure ou
-
Custom function module raises exception CX_SY_NO_HANDLER
Hi there! Does any one here know what this exception is? CX_SY_NO_HANDLER It is raised when I try to call a custom function module within a rule routine in a transformation. I've checked the input and output parameters and they're consistent. Thanks
-
IPhoto Mac and PhotoStream on iOS7
My friends and I just came back from a vacation trip. We all have iPhone's, and created a shared photostream (iOS7) so we all can add our photos to one place. I would like to use iPhoto on my mac to create some photo books, presentations, etc. But