Problem in transporting dc from development to test

Hello Everybody,
I have released nine activities for Java dictionary tables dc seperately.
Then i have clubed rest of the Java dictionary dc activities into single request and then released.
In consolidation tab of CMS of transport studio, I selected all these release activities and imported into assembly tab. But, it failed showing that Assembly failed.
I went to the log and it was saying that DC is broken.
it means Dc cannot build by CBS properly.
What should be the reason behind this?
Application is working perfectly on Development environment.
Thanks in advance,
Bhavik

Hi Helmut,
Yes I expalin you what happened actually.
We have imported those three SCAs in developement and then in consolidation system too. But, at that time we have checked the checkbox "Desable automatic deployment" in runtime systems tab for consolidation system. So, It didn't deployed automatically on consolidation system.
But, now we have changed it and unchecked the check box. Now, we have imported those three SCAs once again in development. They were successfully imported in developement system. But they are not showing in consolidation system as "waiting for Queue".
So, how can I import those in consolidation system?
I have tried importing those SCAs 3 to 4 times. But, same thing happens each time. It doesn't show those SCAs in consolidation as Waiting for import.
And because of this reason, our DC is failed in assembly.
So, how can we import those SCAs in consolidation system?
Thanks,
Bhavik

Similar Messages

  • Problem while transporting query from development  to quality

    Hi ,
    At the time of collecting objects, we are getting an error.
    Object '48NYONN6RPXN7Q9YDS6DWSM35' (ROUT) of type 'Routine' is not available in version 'A'
    (Infact similar error statements round 16 are displayed).
    I don't see any object as such.
    i don't understand what the problem is? pls help.
    Rgds,
    Raghu

    Hi
    Go to table RSZCOMPDIR and enter this in the comp id
    48NYONN6RPXN7Q9YDS6DWSM35
    it will give you the technical name of the variable or the report .
    if it is variable transport the variable first and then transport the report.
    This will solve your problem.
    Reggards
    RaM

  • Transport request from development system to testing system

    Hi,
    I have collected necessary objects in (development) the transport request except 0DUNN_AREA infoObject .Because info object  0COMP_CODE is compounded with Info object 0DUNN_AREA and 0COMP_CODE is in revised version in development system (But available in active version in testing). Suppose I release that transport request from development system to testing system  it get overwrite 0COMP_CODE  in testing system?
    Thanks

    Hi Jk,
    Depending the same technical names it will get overwrite in the testing server. But if the object 0DUNN_AREA is necessary in any objects which u have collected then u havce to collect it in the rtequest or else u will get RC8.
    Khaja

  • How will u transport Xi scenario from development to testing?

    How will u transport Xi scenario from development to testing?

    Hi,
    There are mainly two ways for transportation in XI:
    1. Transporting XI Objects:
    http://help.sap.com/saphelp_nw04/helpdata/en/93/a3a74046033913e10000000a155106/frameset.htm
    2. How To…Transport XI Content Using CMS:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/f85ff411-0d01-0010-0096-ba14e5db6306
    The second method is more useful.
    Note: Please close the thread once it is answered.
    Regards,
    Subhasha

  • How to transport/move a table with data from development to Test to Production

    Hi,
    How to transport/move a table with data from development to Test to Production..? Export-Import a Delivery Unit does only the structure and not the data
    Reg
    Sri

    Hi Sri,
    You cannot transport Data via Transport route in HANA, you can only transport code changes/Structure via DU. For Data movement, you either have a do a export/import from a flat file or replication from a Source System to HANA.
    Thanks Much,
    Abhishek

  • Problem transporting Request from Development to Quality Assurance Server

    Hi All,
    I m facing a problem of Transporting requests from one System to other.
    When adjusting the Request ,the error message reads as follows :
    <b>RFC system error in system/destination
    [email protected]_HSE</b>
    Now,when I check the RFC Connection for <b>[email protected]_HSE</b>,,
    i get the message :
    <b>" License Check required "</b>
    Please respond to this query urgently.....
    Thanks in advance

    Hi!
    I think it's better to call SAP support, if you have problems with the licenses...
    Maybe your company forget to pay their fees since a while
    Regards
    Tamá

  • Transports from development to Test/Production

    Hi there,
    While transporting objects from development to QA or Production, is there any way we can change the the name of the target staging database. For example, if TableA is the target table going to stageA database and when i move this object from development to QA or Production where staging database has a different name. So how can i handle this..should i have same database names in all the environments Dev, QA and Prod? i know we can do it manually changing staging database name one by one for each object but  how can we handle it if we have hundreds or thousands of objects?

    You should setup and use multiple configurations on a single datastore. The whole point (well, almost the whole point) of the ability to setup multiple configurations, pointing (typically) at different databases, inside a single datastore is to be able to re-point a dataflow at a different database without recoding.  To "transport" from dev to QA, for instance, is as simple as either changing the default configuration of a datastore (from the dev database to the QA database), or making use of system configurations, which are just named sets of datastore configurations, which are, then, picked at runtime (or when scheduling a job). Of course, your schemas need to be essentially the same between environments.
    Best wishes,
    Jeff Prenevost

  • How to transport requests from development  to production server

    hi gurus
    i am new to SDN
    can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
    regards
    surya

    Hi
    Transporting
    There are help pages that discuss creation of transports.
    In simple terms, you: create a transport package
    add objects to the package  export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it  test the contents on the QA system  copy the .EPA file to the import folder of your production system and import it  Create a transport package file
    Here is the step by step procedure to create a transport package:
    For Export
    1. Go to system administration, and click on transport?export.
    2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
    5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
    6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
    8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
    11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
    For Import:
    Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
    4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration.

  • Problem to connect database from Developer 6i

    I have downloaded Developer 6i from oracle.com
    before that, I have already downloaded 9i database default_home directory is c:\orant.
    while i was installing develper 6i it was installed with forms_home, c:\orant\forms.
    I was using the forms builder to design forms but while i was trying to connect to database it is saying that "Unable to Connect to Destination"
    i was using scott/tiger.
    this time i have tried scott/tiger@rkmurari...(rkmurari is SID and Database name).
    Can anybody help me in solving this problem..
    Thank you very much..

    I have a problem to connect database from developer 6i

  • System Wide Data Formats Not copied from Development to test

    I am using OBIEE 10g. When I copy my dashboards and reports via the Catalog Manager from the development environment to the test environment the system wide data formats are not being copied over. That is, all the ones that I saved under "Column Properties->Column Format->Save As System Wide Default" are not being copied over. I am using archive and unarchive in the Catalog Manager to move from development to test environment. So my question is where are these system-wide defaults stored and what do I need to do get them copied over?
    Thanks in advance!

    Hi
    the system wide column formats are stored in catalog under system/metadata folder.
    copy this folder from dev env to test env. via catalog manager, restart ps.
    assign points if found helpful.

  • Migrating from Development to Test Server

    Hi
    I have developed an OA extension page and deployed it.
    But now once I want to move my extension page from development to test server how do I do it. My doubts are because:
    While developing the pages I specified the connection username and password which is stored in the bc4j.xcfg file.
    What is the best way to deploy the OA Extension pages in respect to migration.
    Thanks
    Abhi

    Yes my concern is the DB connection!
    My doubt is because of the following entry in the bc4j.xcfg file.
    <?xml version = '1.0' encoding = 'UTF-8'?>
    <BC4JConfig>
    <ConnectionDefinition name="DEV">
    <ENTRY name="JDBC_PORT" value="1544"/>
    <ENTRY name="ConnectionType" value="JDBC"/>
    <ENTRY name="HOSTNAME" value="HOST"/>
    <ENTRY name="user" value="apps"/>
    <ENTRY name="ConnectionName" value="DEV"/>
    <ENTRY name="SID" value="DEV"/>
    <ENTRY name="JdbcDriver" value="oracle.jdbc.driver.OracleDriver"/>
    <ENTRY name="password">
    <![CDATA[develop]]>
    </ENTRY>
    <ENTRY name="ORACLE_JDBC_TYPE" value="thin"/>
    <ENTRY name="DeployPassword" value="true"/>
    </ConnectionDefinition>
    </BC4JConfig>
    So while migrating to test server will i have to modify this file or this entry is required because we are using jdeveloper on the local machine.
    Can you tell me the relevance of this config file.
    Thanks
    Abhi

  • Transporting requests from development server to production server

    Hi gurus,
    can anyone tell me how to transport requests from development server to production server.

    You can use SAPGUI now instead of calling tp at OS level.
    Serious: Totally wrong forum!

  • Multiple projects and their promotion from Develop to Test to Production

    A customer has an interConnect infrastructure running about 5 projects. Each project has a Development, a Test, an Acceptance and a Production environment.
    This basically works, but is really cumbersome to maintain.
    They want to reduce the number of Interconnect installations as much as possible to ease maintenance. The iConnect version is 10gR1.
    As far as I can see there are two options:
    1) Put all projects into a single repository. You'd end up with only 4 InterConnect environments (Development, Test, Acceptance and Production)
    2) Put all hub schemas into a single DB
    The first one is obviously our favourite, but can you promote a single project to a new environment (say, from Development to Test) without affecting the other projects in the same repository? How difficult (if possible) is this? What are the possibilities and risks?
    What are the possibilities for option number 2?
    I hope anybody can give me some advice.
    Arjan

    Its slightly confusing about having multiple projects, the reason being the way Interconnect works is that it has a single database repository and when you create a project it is just a view on that repository. Therefore a project and a repository are essentially one and the same.
    Therefore it would imply that if you have 5 separate projects then you also have 5 separate repository instances.
    In terms of your options:
    1) is the general way that most projects work. Lets say you have DEV, SYS, UAT, PROD. Therefore you'd generally have a repository instance for each env, therefore 4 repository instances, HUBDEV - for DEV env, HUBSYS for SYS env etc... These repositories would usually be in separate Oracle Instances although they could be on the same servers. Therefore the Hub schema for all, would be the normal one installed by the product, OAIHUB904. Then you would also have a single project for each repository. This repository would hold all the metadata for all your interfaces that go though this HUB instance.
    As interfaces move through the various phases then you migrate between the different repositories, to move stuff from DEV to SYS etc...
    2) From my understanding, this is not much differnet to the above except you want to hold all the Hub schemas in a single database instance. This is possible by creating each schema with a differnet name, OAIHUB904DEV, OAIHUB904SYS etc... and you would need to change the necessary infrastructure ini files to use these new names. With this setup you would still have 1 project per repository but it would just point to the relevant schema.
    Let me know if you have any more queries.
    Regards
    Stuart.

  • Web Template Changes not visible after transport from Development to Test

    Weu2019ve run into a problem doing web development in BI 7.0 that I suspect someone has seen before and may quickly be able to point us in the correct direction.  Changes that are made to web templates in the Web Application Designer are correctly transported from development to the test environment, but we are still seeing the old version of the template when the report is executed.  We are able to see the web template changes in the Web Application Designer in the test environment.  We believe this is a caching issue and have cleared the query cache and the HTTP cache in SMICM.  Unfortunately, this has not resolved the issue.  Can you suggest another approach to resolve this issue?

    Not sure what you mean by browser cache.  We have deleted history, cookies, and all temporary Internet files.  The issue isn't limited to a single user, but exists for all users.  Through extensive testing we have established that you are able to see the web template changes in test in the WAD(Web Application Designer) after they have been transported from development, but can only view the changes when the web template is run for the first time.  Changes to existing templates can be seen in the WAD in test, but are not seen when the report is run.  The old version of the template appears to held in cache somewhere, but we haven't been able to find it and clear it.

  • Transporting variants from development client to testing client(ECC6.0)

    Can we use the report RSTRANSP for transporting variants(data for testing purposes) for a standard program from development client to testing client?
    Thanks & Regards,
    Savitha

    Hi,
    Follow like this.
    In SE38, give ur program name.... select the variant radio button & click on diaply button & then press F4 for variant field & choose the variant u want to transport...
    Then goto Utilities --> transport request . now execute the report select ur variant name & click on continue button .. now it will ask for the CR number ...assign it to the particular CR number & Release &  Import in the Quality Server.
    Reward Poitns if it is Useful.
    Thanks,
    Manjunath MS

Maybe you are looking for

  • Blue screen of death with LV7.0 Eval version

    I had been programming for a couple weeks with no problems, trying to see whether or not Labview could handle the data acquisition requirements that we need for our software. Specifically, I was a little concerned that LV maybe be too "high level" to

  • PDF that doesn't start as a Word document

    I need to design a pdf that is fillable and has a signature option but I want to design it as a PDF and not keep changing it in the Word file. Is this possible to make it a one-step process instead of converting from Word each time? Is Form Central o

  • How to use STRANS to translate XML to ABAP with deep structure

    every experts, I want to use Tcode: STRANS to translate XML to ABAP, But it does not work well, here is XML code,I want to translate this XML into an an Inter table gt_orders with deep structure of oeb, and colum oeb is also and intertable,how can I

  • Dynamically changing sandboxRoot?

      I want to change the sandboxRoot of an iframe dynamically but changing the property before changing the .src of the iframe to load the new url has no effect. The original url is loaded instead of from the application directory. document.getElementB

  • Consume a Web Service from a Web Page

    I had tried out the Tutorial "Consume a Web Service from a Web Page". I have encountered this error : ; nested exception is: java.lang.NullPointerException. oracle.adf.model.adapter.AdapterException: DCA-40010: The Web Service call failed. The servic