Problem of Booking  of GRN for LOT Material

Dear Expert,
In project huge materials we are receiving in LOT, and we can not book GRN until lot is completed .  Lot completion duration is vary case to case basis ie 15 days to one year also , and due to this every month we are facing Audit observation of GRN delays.
Please help to avoid or overcome to this problem of Booking  of GRN for LOT Material like  other material ,without  waiting for lot  completions.
Regards
Tanmoy_mm.

Try like this,In material master,maintain base unit as 'PCS' or 'EA',purchasing UOM as for example 'LOT',if there is
standard conversion maintain conversion factor in additional data tab.For example 1 pc = 0.001 Lot.
Do goods receipt,for example 250 pc you receieved means,you have received 0.25 Lot.
Edited by: Jeyakanthan A on Feb 17, 2011 10:57 PM

Similar Messages

  • Problem creating a sales order for configurable material in SAP ECC

    I have a Variant Configurable material named X.
    The structure of this VC material is
    Material X has charatcertics CHARCTERISTIC1 and CHARCTERISTIC2.
    CHARCTERISTIC1 has values VALUE1
    CHARCTERISTIC2 has values VALUE2
    I created a sales order manually from VA01 using configurable material and read the values of all configuration tables to be filled from BAPISDORDER_GETDETAILEDLIST. With the help of this data i got an idea how to fill the tables of BAPI BAPI_SALESORDER_CREATEFROMDAT2. But still i am able to create a sales order but the configuration data that i give is not getting populated in the sales order.
    Where am i missing. please some body suggest. I am unable to debug and searched the forums
    for this information but dint find solution for my problem. some body please tell me where am i missing?
    Any help would be highly appreciated
    Edited by: jessica sam on Jan 12, 2009 2:59 PM

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • GRN for CAPT material Type

    Dear All ,
    Here We are Doing GR against Subcontracting  PO .
    Will thr be stock after the Migo GR ?
    Regards

    Hi,
    Please check the stock in quality stock , if not available in unrestricted stock.
    shyam kogta

  • Cancel insp.lot for batch material with serial number?

    We have a problem with an inspection lot....
    A few months ago we made a goods receipt for batch material... it ended up in Q- stock.
    The weeks went by and the material was changed ito a serial number material... that process works fine...
    But now we want to scrap the material that is batch-handeled ... the inspection dont want to let go.. it want serial numbers... even if I create serial numbers for this the inspection lot
    dont let me register any numbers.. So I cant cancel/delete it... And after all I just want to scrap the batch...
    Can someone help me?
    // Andreas

    if stock of that material with serial numbers exist, then scrap that stock and disable the serial number for the material by deleting the serial number profile in the work scheduling view of the material master.
    then try cancelling the inspection lot. After cancelling the inspection lot, activate the serial number for that material again and bring back the scrapped stock into the unrestricted use.
    Note: please advice the users not to post any stock for that material till you complete this or else block the posting t.code for all the users.

  • How to create Inpection Lot Z01 & 04 Type for same Material different Plans

    I am trying to create an Inspectoin Lot for two different Inspection Types.  One for (Z01) Incoming Inspection via MIGO and the other for (04) GR Inspection for Production via MFBF.  The problem is I have the same Material for two different Inspection Plans.  The Z01 Inspection Type was copies from the 01 Inspection Type only difference is I activated the Multiple Specs feature for Z01.
    1st Plan = Materia Group....BM206014,  Group Counter....1  (GR Incoming Inspectoin Z01 type)
    2nd Plan = Material Group....BM206014,   Group Counter....2    (GR Inspection for Production 04 type)
    A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
    B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
    Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?

    >
    dhayes12 wrote:
    > A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
    >
    > B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
    >
    > Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?
    For case A, create insp plan with usage "1- production" If you have one IP with this usage for given material then system will assign Plan to lot automatically. In your case for second plan update usage as 1.
    For case B, system should assign 1st plan make sure for both plan udage is correct. for 1st plan usage should be 5 while 2nd plan usage should be 1. Now if your 1st have status 4 and key date before lot date then system will assign plan auto.
    Thanks!!!

  • No inspection lot can be opened for this material and vendor -QA228

    Hi every one !
    Iam  getting  Error while doing Migo -"No inspection lot can be opened for this material and vendor-QA228"
    we analyze the issue asfollow -
    1.checked Quality Lot-Available
    2.Quality info record- Availble
    3. Quality plan is exist.
    But stil throwing  above Error.

    Hi,
    Check the below threads,
    [No inspection lot can be opened for this material and vendor;
    [No inspection lot can be opened for this material and vendor;

  • I have a issue with my mac book pro. For some reason it won't stay powered on. I can't get past the apple loading logo. The battery is fully charged so it is not the problem. Can anyone tell me what the problem may be and how can i get it resolved?

    I have a issue with my mac book pro. For some reason it won't stay powered on. I can't get past the apple loading logo. The battery is fully charged so it is not the problem. Can anyone tell me what the problem may be and how can i get it resolved?

    The battery is fully charged so it is not the problem.
    What happens when you use the MagSafe?

  • My wrt160n is starting to have a lot of problems.. should i ask for a replacement??

    i had no problems before with this router. but lately i'm noticing a lot. first, it started to reset itself. all my setting went back to default and was configured for open access (unsecured wireless connection). this happened a few times last week. i had to configure my settings again and again and again.
    second, my wrt160n wifi LEDs keeps on blinking. even when no wifi devices are accessing it. i checked the client table on the setup page and i see no devices listed. how come the wifi LEDs are still blinking??
    third, i noticed that my bittorrent dl speed went down. i can't reach top dl speed unlike before. and my network connection on bittorrent is always red or orange. it takes a long time before it turns green(Network OK). i'm actually downloading an episode of heroes right now with hundreds of seeders and peers and i'm only getting 15kB/s!! i had way less seeders before and i still get top dl speed. now with even more seeders I GET LOWER DL SPEED!! EVEN WHEN THE NETWORK CONNECTION ALREADY TURNED GREEN.. WHAT THE HELL??!!
    can someone please tell me if my wrt160n router is already defective?? i already tried upgrading the firmware, but nothing happened. is there any kind of setting i should be doing, or does it sound like my router is already defective and i should ask for a replacement??
    help please anyone..
    any help, info, and suggestions would be very much appreciated.
    thanks.

    richard804 wrote:
    It is not your router.  It is your ISP lowering the speed of your torrents.
    i don't think its my isp. i'm getting good results now from my router. i don't know how i did it but my router seems to be working fine now. i'm getting top dl speeds and it stopped from resetting itself.
    one last problem though. is it normal for the wireless lan LED to be blinking all the time even though there's no wifi device accessing it??
    it was'nt like that before. it never blinks when all our laptops are turned off. but lately it never stops blinking even with all the laptops turned off. i always check my client table at the settings page and i'm the only one accessing the router thru a wired connection (no wifi devices).
    does it sound like my router has a problem?? or is it normal for the wireless LED to be blinking non-stop??
    what do you guys think??
    tia.

  • I created a book on iPhoto. I click on the buy button, and I get a connecting message with a blue striped rectangle. I am connected to the internet and I have made books before without any problems. I have tried for the past two weeks at various times.

    I created a book on iPhoto. I click on the buy button, and I get a  message that says Connecting with a moving blue striped rectangle. I am connected to the internet and I have made books before without any problems. I have tried for the past two weeks at various times and I get this same message each time. Any ideas about what is going on? 

    First confirm that you can create a PDF file of your book as described in this Apple document: iPhoto '11: Preview a book, card, or calendar before you order or print it. Post back with the results.
    OT

  • HT3275 Hi, I have backed up 2 IMACs and one Mac Book Pro but for some reason, the 3rd IMAC come up with this problem: The backup disk image "/Volumes/Data/Anthony's iMac.sparsebundle" could not be accessed (error -1). Why? They computer system is up to da

    Hi, I have backed up 2 IMACs and one Mac Book Pro but for some reason, the 3rd IMAC come up with this problem: The backup disk image “/Volumes/Data/Anthony’s iMac.sparsebundle” could not be accessed (error -1). Why? The computer system is up to date and I have had no issue with the other computers, just this one.
    Many thanks
    Anthony

    Try this Discussion...
    https://discussions.apple.com/message/18783684#18783684

  • Problem with Revision level for a Material

    Hi All,
    I have a problem with Revision Levels for a Material.
    I want to know the Revision Level for a particular Material for BOM Creation.
    Can anyone please let me know from which Table or Funtion Module can I get the Rev Level, once I pass MATNR (Material) and AENNR (Change Number).
    <REMOVED BY MODERATOR>
    Thanks and Regards,
    Harish Kalla
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

    HI,
    You can use table AEOI.
    Hope this helps.
    <REMOVED BY MODERATOR>
    Regards,
    Sipra
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

  • Lot quantity to order for a material set as reorder point planning

    Dear All,
    Suppose the requirements of a material are as follows:
    Week1 Required quantity - 100
    Week2 required quantity - 150
    Week3 required quantity - 300
    Week4 required quantity - 500
    This material is set as "VB" (Reorder point planning in the material master)
    My questions is:
    Can we use periodic lot sizing procedure for a material planned based on reorder point planning , so that MRP run will consider the requirements of a month (1050) and use that as the lot size to order material.
    We want to plan the material if it falls below the reorder level, but we want the system to dynamically calculate the quantity to order based on the actual demand (and not on either fixed lot size or maxmimum stock level).
    with regrds
    Laxmipathi.G.V

    Hi
         Use Anyone of the following
    1. Use automatic reorder point with forecast planning requirment.Where ssytem will calculate reorder point automatically based on weekly /monthly Forecast req.In this case Lot size you can use EX itself.
    2. Use Planning type PD and lot size EX and Instaed of ROL use safety stock so that system will consider weekly sale req. and  also safety stock according to that procerement proposal will be created.
    Regards,
    Velmurugan S

  • Linking delivery schedule in a PO for a material into GRN posting date

    I have maintained a delivery schedule in a PO for a material
    Say PO qty 100
    Del Schedule
    10.04.09 - 60
    20.04.09 - 40
    While GRN, for 60 qty, if posting date is greater than 10.04.09, system needs to throw error.
    I want to do it for selected materials only.
    If  OMCQ to be updated, then which msg No. has to be set.
    Is there a way to do this.

    Dear Kumar,
    As per my understanding about your thread
    You created PO from XX country to YY country
    You will recieve the delivery fromm YY to XX so the delivery date and comitted date will be based on the YY calendar not based on the XX calendar so you make the changes accordingly (Saturdat and sunday are holiday) in YY calendar.
    Now try
    I hope this will help you,
    Regards,
    Murali.

  • Automatic PR generation Problem for a material..???

    hiii Experts
    Can  anybody give some your suggestion and idea trouble shoot this problem by your valuable knowledge and by ur exeperience..
    Here my problem. For one material ( ROH ), every month automatically around 20 to 25 PR's are generating .
    How to locate the problem and rectify the same . what might be cause for this issue.
    THis are all the details we have maintained in material master
    For one material assume XXXX,
    Material type - ROH,
    In master , MRP - PD
    MRP controller- ABC.
    Thanks
    SAP-MM

    hi
    Correct wht u have said..
    But wht i m asking , system why should it generate Auto PR for 1 kg, 0.5 kg, for 5 kgs ..
    Becas there is no production order also for this quanities .
    If we maintain in MRP view as PD.. it should generate as per requirement only.
    So kindly explaibn me clearly wht might be the problem , and how to locate it..
    Wht is procedures for MRP run based on MRP type in material master..
    Thanks
    SAP-MM

  • Skip lot across multiple batches for same material

    Hi,
    I am looking for a way to control skip lots across multiple batches for the same material.
    We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
    Any ideas how to set that up?
    Thanks for any hint
    Andreas

    Hi mergler,
    Ref to your query pls check this link Stock Posting for Skip Lots
    Thanks in advance

Maybe you are looking for

  • ICal Update failure to sync

    I responded to the invitation to update to the latest version of iCal but part way through the update my screen background was changed to a version from 2009 and the sync ran for over two hours but failed to produce any data in my mobileme version of

  • The Status bar bubble shows up at the bottom, but there is no link, it is blank. Can you please help me getting this working?

    This happens for every link, there is no text in the bubble. It seems to be the correct size for the link, but nothing appears. I have an add-on called Noia4 Theme Configuration, which can change the color of text on toolbars, but I have messed with

  • User lock and Unlock from CUA

    Hello All, I have a scenario where locking and unlocking a user in a specific child system has to be done through CUA. The TCode SCUM allows to do that. However, I'm looking for the underlying BAPIs corresponding to this TCode, so that my external ap

  • Why I can't connect to Oracle Enterprise Manager via browser after install?

    I've installed Oracle9iAS Release2(9.0.2) with Windows 2000 server (servicepack3) and Oracle9i database on the same host.After installation, I can use Oracle enterprise manager(via browser) by connect as "ias_admin" and "12345" for password (It's a p

  • Where to learn how to repair ipods

    Sorry of this is in the wrong place I couldn't find a suitable forum category. Basically I want to be able to repair Ipods, Iphone and Macs/macbooks etc.. so not just changing a battery or a screen and stuff like that because I can already do all tha