Problem of Missing parts during the Process Order release

Hi
For a Make to Order strategy, I have run MRP for a sales order which resulted in planned order for the material. But when I try to convert the Planned Order to Process Order, I am getting error Parts are missing during the availabilty check even though the components are available in the stock.
But when I create a Process Order manually, I am not facing the problem of missing parts as stock for components are available in stock.
Please advice why I am facing the problem with Planned Orders which are created via MRP.
Regards
Brijesh

Dear all,
If we set the Individual requirement (1) in MRP4 view of the material master for the component, the system will not consider the plant stock and it will give the message like Parts are missing during the Process Order process even though the plant stock is exists for the component.
So I would like to where in customization you define this?
--> To not consider the plant stock if individual req is set (1)
--> To consider the plant stock if collective req is set (2)
Kindly advice,
Regards,
Brijesh

Similar Messages

  • Commited date for missing parts in the production order

    when i generate a prodution order and there are some missing parts for that material. its showing the list of all the missing parts but the commited date is coming out as 12/31/9999.
    I maintained the the planned delivery time for all those components.but still its giving me this date

    Dear Deepu,
    Check in OPJJ for your checking group and checking rule combination what's the scope of check
    defined --->under this you must have included the check box for Check availability without
    replenishment lead time. It Indicates whether, during the availability check, the system checks the
    replenishment lead time.
    Use
    Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.
    Procedure
    In the standard version, leave this field blank if you want the system to check the replenishment lead time.
    Dependencies
    If you want the system to check the replenishment lead time, you should make sure that you have entered a value in at least one of the following three fields in the material master:
    GR (goods receipt) processing time (Purchasing view)
    Planned delivery time (MRP I view)
    GR processing time (MRP II view)
    Otherwise, the system confirms every requirement.
    If that check box is included then system proposes the date as 31.12.9999.
    Just remove the check box setting and check once again in CO01 for material availability check.
    Even If the check box is not included and if the End lead time (replenishment lead time)of that raw
    material  is before the order start date then you will not get any mssing part's list.
    Suppose if the replenishment lead time is after the order start date means then you will get this raw
    material under mssing parts list.
    Replenishment lead time = Planned delivery start time + GR processing time of that raw material (this
    starts from today).
    Say let your finished product finish date be 30.03.2009 and order start date be 28.03.2009,and let the
    planned delivery time be 15 days and GR processing time of the raw material be 5 days.
    So in this case End lead time = 15+ 5 = 20 = 01.04.2009 starting from today ,so in this case you will
    be getting this raw material under missing parts because its end lead time time is after the order start
    date.Suppose if its  before order start date you will not get in missing parts.(Even if the check box is not
    included under RLT).
    So check with this and revert back.
    Regards
    Mangalraj.S

  • Problem in TECOing/Closing the process order.

    Hi PP Gurus,
    We're facing a problem when trying to TECO the process order and system is generating the error message
    Message no. BS013 (System status CRCR is active (ORD 1000xxxxxx))
    We're using Browser based PI sheet here to process the order.
    If anybody faced the same, please reply.
    Regards,
    Abu Arbab

    Hi Rupesh,
    Thanks for reply
    Though we set 'Clear Reservation' in intial screen of COR6N/CORK/CO15/Co11N, it'll wok only for those components which are having Backflush indicator set. As in PI sheet, Goods Issues section is completely different and Ticket confirmation is different. And the components that we're using are not backflushed components, so it makes no sense though we put Clear Reservation in confirmation through PI sheet.
    Now the actual issue comes into picture when in Goods Issue table we put Issue indicator= final and it is properly updated for that component in MSEG table. But when we go and check in RESB table or COR3/COR2 there is no final indicator set in Component detail. Is this standard behavior of SAP or are we missing something here?
    Please help
    Regards,
    Abu Arbab

  • User Exit at process order release or save

    Dear experts,
    Can any one help me which user exit will be useful at the time of process order release or save (t code COR1/COR2).
    My requirement is to stop the process order release if there is any maintenance order is already released on that date.
    Process order should not get released in between the start and finish date of PM order for the same equipment.
    I could acheive this for PM side by using a user exit IWO10002, here if any process order is released for an equipment PM order cannot be released for the same equipment in between start n finish date of the process order.
    Please help me out in finding the user exit for process order release / save.
    Thanks in advence,
    Regards,
    Praveen.

    Hi,
    The following enhancements are available for process order management:
    For order maintenance:
    o   PPCO0006 to predefine entries for order header fields when creating
        an order
    o   PPCO0001 to provide information at the time of saving (for
        production orders and process orders)
    o   PPCO0007 to check or change header data when saving
    o   PPCO0002 to add additional checks that are to take place when
        setting the deletion flag or deletion indicator
    o   PPCO0003 to prevent changes in sales order items that would cause
        changes in the process order for static assembly processing
    o   STATTEXT to format the status line
    o   PPCO0008 to check components that have been changed or added
    o   PPCO0005 to change the storage location and the 'backflush'
        indicator in the reservation
    o   PPCO0013 to change the priority of the selection criteria for batch
        determination in production orders or process orders
    o   PPCO0014 to restrict the selection of process orders that are
        offered when creating external relationships
    o   PPCO0020 to display additional information for another tab page in
        the process order header
    Regards,
    Dhaval

  • When I installed iTunes 10.6 to windows 7, during the process i got this message -" There is a problem with this windows installer package. A program required for this install to complete could not be run"

    when I installed iTunes 10.6 to windows 7, during the process i got this message -" There is a problem with this windows installer package. A program required for this install to complete could not be run" and after that the setup closed automatically. Plaese tell me if any setting up of windows is in order.

    Try looking at the two previous discussions listed on the right side of this page with your same question.
    Also, try searching/posting in the iTunes forum since you do not have an iPod problem.

  • I am trying to send photos to the cloud from my phone to my iPad but they are not appearing in the stream. I have read the instructions and I think I am doing it right or am I missing a part of the process?

    I am trying to send photos to the cloud from my phone to my iPad but they are not appearing in the stream. I have read the instructions and I think I am doing it right or am I missing a part of the process?

    HI,
    Have you done this before ? And if so, is photo stream turned on on your iphone and ipad. and as Alfred DeRose pointed out they must both on the same icloud account.
    If you're new to this, you might want to do some research. Photo stream is different from camera roll and albums. Many have been on this sight looking for their photos stored in icloud after restore, etc. and they're not there. Also, after thirty days icloud deletes your photos from photo stream.
    So if you're not aware, you might want to google your question. We're using the camera connection kit soon and I am learning about it. From all I've read, I'm also not the biggest icloud fan. I use dropbox. We plan to put photos taken on ipad with a camera/iphones into albums on the ipad. We'll keep all on the sd card until (and after) they can be uploaded to a computer.
    An example of an article we can learn from -
    http://www.macobserver.com/tmo/article/how-to-understand-and-work-with-your-iclo ud-photo-stream
    Hope this helps.

  • Consumption during the processing time of the production order

    Which adjustments must be made in the material master for the calculation of the lot size in the MRP run, that the consumption of the material during the processing time of the production order is considered for the calculation of the lot size.

    Hi ,
    You have to judiciously indicate  the re order point  in the material master(  the re-order point is the sum of saftey stock and consumption during replenishment lead time).
    How ever , this does not in any way influence the lot size , but only influence the no of lots i.e the procurement proposals. The lot size is determined by the lot sizing procedure selected by you , depending on various factors like agrrements with your vendor , optimum lot sizes to reduce the cost of procurment and storages etc.
    You can refer to the following url for details on lot size :http://help.sap.com/saphelp_47x200/helpdata/en/fe/819b9f643b11d3b4e40004ac160649/frameset.htm
    and  for details about re order point :
    http://help.sap.com/saphelp_47x200/helpdata/en/db/6f143ea7ec11d3a8330000e82a3c24/frameset.htm
    Hope this information will be useful.
    Regards
    Raghuramam.

  • After upgrading to ilife'11 I realized my photos were resorted during the process. I had them sorted manually to way I want them and was wondering if I could get them back in the manual order that I like?

    After upgrading to ilife'11 I realized my photos were resorted during the process. I had them sorted manually to way I want them and was wondering if I could get them back in the manual order that I like?

    Please help.
    Thanks,
    Daniel

  • Automated TR creation while release the Process Order

    I have to split the quantity into smaller units based on the ‘LE quantity’ before TR creation. In transaction LB03, there should be additional line items after the quantity split.
    I am using the EXIT ‘EXIT_SAPLLCPP_001’. It is triggering during the transaction run. But it doesn’t serve the purpose.
    Can anyone help me to achieve this functionality?

    Hi,
    In Process Order Header Screen Go to ---> Log ---> On Release.Here you will find the detail error behind this problem.Go though it .Resolve it and then try to release the Process Order, and if required get back to us.
    Suppose reason may be,
    - Missing part
    - Missing Capacity
    - Batch Determination is required to perform.
    - Any User Exit (Other then std. SAP)
    Regards,
    Dhaval

  • Error while releasing the Process order

    while releasing the Process order i am getting the follwing error message
    Message no. CO118      Release of order not possible
    Cna you Please any body explain me detail of thi error ie where the error lies.
    Thanks

    Hi,
    In Process Order Header Screen Go to ---> Log ---> On Release.Here you will find the detail error behind this problem.Go though it .Resolve it and then try to release the Process Order, and if required get back to us.
    Suppose reason may be,
    - Missing part
    - Missing Capacity
    - Batch Determination is required to perform.
    - Any User Exit (Other then std. SAP)
    Regards,
    Dhaval

  • Process Order does Confirmations and GR even after the Process order is CNF

    Not Sure why the Formatting is lost.
    Hi Gurus,                                                                               
    I am a beginner in this area and request your help.                                                                               
    We are implementing a project where the process order Confirmation in SAP ECC 5.0 in SAP PPPI module is done using xMII which call the BAPI_PROCORD_CREATE_TT     RFC.
    The customer wants to (certain times) do a final confirmation without actually completing the order e.g if the Order Qty is 100 then, they want to just manufacture 25 and then do a final confirmation, after which SAP GUI screen does not allow any Process order Confirmations against that process order.
    We are using the BAPI_PROCORDCONF_CREATE_TTRFC to do multiple PO Confirmations and GR for particular Process order. Below is a scenario
    Case 1:
    1. Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only 100 is accepted.
    2. 100 Quantities are produced and confirmed using the BAPI_PROCORDCONF_CREATE_TT (with Final confirmation value as 1 , which mean auto confirmation)
    3. Next when the BAPI confirms & GR's against the same order, the Complete qty is not visible in the COR3 status. And is visible only in the COGI transaction.
    That is expected behavior. and i am ok with that.
    Case 2: (The one with the problem)
    1.  Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only the 100 is accepted.
    2.  25 Quantities are produced and confirmed using BAPI_PROCORDCONF_CREATE_TT (with Final Confirmation value as X , which mean Final confirmation)
    3. The Confirmation and GR go through and the status of the process order now changed is CNF and the Deliverd qty is 25.
    At this point , if you logon to SAP GUI and try to make a process order confirmation you get an error messages which says the Process Order is already confirmed and no more confirmations or GR can be done against this Process order.
    4. But when you Again Run the BAPI_PROCORDCONF_CREATE_TT, it goes ahead and confirms and makes the GR for that Process order.
    The Expected Behavior should have been that this quantity is now in the COGI transaction.
    5. The Process order  allows any number of Further confirmations till the Ordered Qty and Delivered quantity are  same .
    so dear gurus I know i have written a very long doubt but would be very happy to get a response from you. I would ideally not like to enhance or change the BAPI and want to understand if I have missed some setting or parameter that I have to pass in the BAPI for the final confirmation so that once the Status of the Process order is CNF , no more Confirmations are allowed even from the BAPI.
    Thanks in Advance.
    Regards
    Suraj

    Hi Suraj,
    I am not positive, but I suspectt the problem lies in the BAPI.  It might be how you have the data set in MII, but it sounded like you are doing it correctly. 
    However there are a number of things you can do to troubleshoot your situation.
    First create a few process orders to test with. 
    Record the confirmation numbers and counters for each of the following:
    1) Do a final confirmation (for quantity of 25 instead of the 100) in CORK (or whichever transaction you are using). 
    2) Do a final confirmation (for quantitiy of 25 instead of the 100) in SE37 or BAPI in ERP using the BAPI_PROCORDCONF_CREATE_TT.
    3) Do a final confirmation (for quantitiy of 25 instead of the 100) from MII using your current transaction. 
    Review the confirmations in ERP to see if there are any differences.
    Review the confirmaitons in MII to see if there are any non visible differences (use a Tracer to retrieve the response segment from an execution of BAPI_PROCORDCONF_GETDETAIL using the recorded confirmation numbers and counters) 
    Case 1) If there are differences in the results, that should tell you how to modify your transaction to include or change the appropriate values in your inputs. 
    Case 2) If there are no differences, then it is most likely that there is something not working properly in the BAPI you are using.  It may not completely replicate the functionality in CORK (or whichever transaction you are using in ERP).  Then open a ticket, because the BAPI is not working as it should.
    Good luck,
    Mike
    Edited by: Michael Appleby on Aug 17, 2009 8:20 PM

  • Fiscal Year Not allowed while creating the Process order (COR1)

    Hi Friends,
    My Indian client is following the Fiscal year of 2011 for the period of April 2010 to March 2011). We have gone live one month before. But now the problem we are facing is while creating the process order (T.Code COR1) system gives the error message "Fiscal year 2010 is not allowed".
    The Diagnosis shows as below
    Fiscal year 2010 is not allowed
    Message no. F5568
    Diagnosis
    The fiscal year entered (2010) is different from the fiscal year derived from the posting date and fiscal year variant (2011).
    System Response
    Error.
    Procedure
    Correct the fiscal year entered.
    I have Checked the Controlling area version. Fiscal Year 2011 starts from 01.04.2010. This issue is only at the time of Process oder creation and not in other module like FI, MM, SD, PS, QM and PM. I have checked with V3 Variant also and there is no problem with that.
    Can any one help me where the setting is missing or what whould be the probable reason for this issue.
    Regards,
    Deva

    Hi Prakash,
    Thank you for your reply. I have checked the MMPV and MMRV set up and that is fine with fiscal year 2011. We are also processed lot many Material receipts for the fiscal year 2011. I have checked with OB52 for finace it is opened for the entire year of 2011 from 2009 for all periods.
    We are facing only when we try to create the process order. When we enter the starte date as 24.11.2010 the derived period shows as fiscal year 2011. But entered fiscal year shows as 2010. We are not entering any other dates in the process order.
    Is there any other probablity the date is picking from any Production related set ups??
    The costing version fiscal year 2011 starts from 01.04.2010. So no problem with Controlling area. I have Checked the Factory calendar. The calendar starts from 01.01.2010 to 31.12.2010 for the year 2010.
    Is there any other possibility of the missing settings or problem in date control???
    Regards,
    Deva

  • Material Availablity check of the Process Order......

    Hi there,
                  If the reservations of material  are made against the process order & the material is not available and the stock is expected in near future........ then during the material availablity check of the process order........will it show that the material is available............
    Please elucidate me.......
    Thanks
    Kaushik

    Hi Kaushik,
    Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date.
    Therefore the system checks the current available quantity of stocks.........
    but, for example imagine if the available stocks are not sufficient to meet the order............then the system checks replenishment lead time of the material i.e. time taken for the material to become available either internally (in house production) or externally (from a vendor) and then issues a material availability date.........i.e. date on which material would be available for delivery.
    Depending on the above checks, the systems issues the delivery date.
    <b>Reward if helps</b>
    Regards
    Sai

  • Batch determination during process order release

    Dear Experts,
    I am facing a problem, and not able to figure out the reason. There is material having base unit as 'EA' and Issue unit as 'NO' and conversion is 10 NO= 1 EA. The same material is maintained in the BOM as 1 NO. At the time of creation of process order, system is copying the same quantity in the process order (1NO). When I release the process order, the batch determination is happening. Now the issue comes, instead of doing batch determination of 1 NO, system is doing batch determination for 1 EA (which is equivalent to 10 NO.!). Can anyone help me to find out the reason for same.
    Thank you.
    Sagar

    Dear Mohit,
    If you want to go for external batch numbering during order release then
    - Set no automatic Batch creation in order in T.Code CORY.
    This setting only restrict the automatic Batch Creation in order only.But to fulfill second your requirement of restricting order release or save without assigning external batch no you have to either go for,
    - User exit.Below are the user exits which are trigger at the time of order saving
    PPCO0006 to predefine entries for order header fields when
    an order
    PPCO0001 to provide information at the time of saving (for
    production orders and process orders)
    PPCO0007 to check or change header data when saving
    or
    - Create screen variant using T.code SHD0 and make Batch Field compulsory.
    Regards,
    Dhaval

  • Im trying to download itunes 10.5 but keep getting error message that says: There is a problem with this Windows Installer package. A problem run as part of the setup did not finish as expected. Contact your support personnel or package vendor.

    im trying to download itunes 10.5 but keep getting error message that says: There is a problem with this Windows Installer package. A problem run as part of the setup did not finish as expected. Contact your support personnel or package vendor. I am using windows XP 32 bit, all the other computers in my house downloaded just fine, no problems, however this is the computer my iphone is set up to, ive tried doing a virus scan, windows update, downloading other things, updating everything possible, everything works fine, its just itunes that wont download, anyone have any other ideas?

    Yes, I had found a similar solution also.  I'm running XP Pro, SP3.  I went Control Panels/ Add-Remove programmes/apple software update/ change/ repair.  Then run the 10.5 exe.
    While the programme updated from version 8 of iTunes, my new iTunes is now a mess.  Not all of my music was in the same folder previously but it all showed up on iTunes.  Now many albums have been left out, some have only a few tracks and some have two copies of some tracks as well as having other tracks missing.  I haven't begun to work on that.

Maybe you are looking for