Problem sending Faxes from Change Order(IW32) in NW 2004s
Hello Everyone,
We have just recently upgraded our version of SAP from 4.6c and we have discovered an interesting issue when trying to fax shop papers from IW32.
In 4.6c we had configured a output device in SPAD that would redirect the output to SCOT via SAPcomm to our Rightfax fax servers. With the new version of SAP the functionality for creating an output device of type 'FAX' has been disabled since SAPConnect has replaced SAPComm.
How we used to do this is we'd goto IW32, enter an order and choose the menu function Order/Print/Order you could then enter the device type and also the recipient's fax number and the country code.
When we try this in the new system no fax is created, when we remove the device type (clear the box) we still do not create a fax output. When we specify another device (i.e. printer etc) we get an error stating that this is not a Fax device and the request fails.
Does anyone know of a way to correct this problem since our users would like to continue to fax shop papers from our system.
Regards,
James
Juan,
We are able to send faxes from SAP to our rightfax system without issues. This is not the problem we are experiencing.
The issue is when you try to fax something from IW32 via the option Print/Order/Print. It requires a spool output device to be specified.
Since you cannot create an output device of type FAX anymore and you cannot use another type of device type to send the fax we are trying to figure out how to get these printouts to be redirected to SAPConnect and SCOT.
Regards,
James
Similar Messages
-
Unable to send fax from computer
Hi,
I'm unable to send faxes from my computer (e.g, from Word). I get a message: "The device is disconnected or powered off", which is not true.
The printer is an HP LaserJet 1536dnf MFP.
The OS is Windows 7 Ultimate, 64-bit, with 8 GB RAM.
I have updated to the latest firmware from the HP site, and have downloaded the latest appropriate driver package for this printer from there as well (hp_M1530_MFP_full_Solution_usb_n_w.exe)
The installation goes normally, and there are no error messages.
The printer is working fine. I am able to print and scan from the computer without problems. I am also able to fax directly from the printer without problems. The only problem is not being able to send a fax directly from the computer.
For instance, in Word (the latest version), when I print to the HP fax printer (which has indeed been installed correctly on the computer), I get a message that the doc has been send to the printer. But no screen pops up letting me type a phone number, and after about 1 minute I get this error:
Have been on the phone for several hours to HP support, and although they did a complete uninstall, and reinstall, the problem persists.
I also downloaded and ran this file from HP: HPLJ_M1530_Fax_IE_11_utility.exe, which is meant to resolve a very similar issue for people who have this Microsoft KB installed (KB2898785), which somehow interferes with the fax exactly as I have described. I do indeed have that Windows update installed. However, running the file did not solve the problem, and there seems to be no way of uninstalling that KB.
So I am at a loss, and would appreciate any help, if anybody can think of anything.
Many thanks
TimHi @Tim613 ,
I see by your post that you are unable to send a fax from the computer. I would like to help.
Since you are able to print and scan from the computer, you don't have a communication issue. The printer will also send a fax, so it isn't a hardware issue. It sounds more like something possibly on the computer is blocking the fax communication.
The Toolbox doesn't support Windows 7 64 bit, but you should still be able to fax through Third Party Software. (Word) Which you have already tried and it didn't work.
I would disable all the start up programs and temporarily turn off the Antivirus Software to see if there is a program interfering in the back ground. How to use MSCONFIG . Click on the start up tab and click disable all.
Try sending a fax again.
Then you will have to go back and enable the startup programs and turn the Antivirus Software back on again.
Let me know the outcome.
Have a wonderful day!
Thank You.
Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
Gemini02
I work on behalf of HP -
Re: Sending fax from MacPro through multi-function printer.
I am running OS 10.6.8 on my MacPro (Model4, 1), to which is attached a Brother MFC-440CN (with fax capability) through a router. I am able to print, but when I try send a fax I receive the message "NO FAX MODEMS WERE FOUND." I can send and receive fax documents directly through the MFC. Why is the fax not available to the MacPro? How can I resolve the problem?
Thanks for your help.Problem solved! At the Brother website, in the FAQS area, under "How do I send a PC-Fax in Macintosh," I found the following Solution:
Description of Solution 200000017785
To send a PC Fax follow the steps listed below:
1. Create a document in a Macintosh application.
2. From the application click FILE => PRINT. The Printer dialog box appears.
Mac OS X 10.5.x - 10.6.x Users: Click the disclosure triangle beside the Printer pop-up menu to display configuration options.
3. Choose SEND FAX from the pop-up menu.
4. Choose FACSIMILE from the Output pop-up menu.
5. Enter a fax number in the Input Fax Number box, and then click PRINT to send the fax.
NOTE: If you want to send a fax to more than one number, click ADD after entering the first fax number. The destination fax numbers will be listed in Destination Fax Numbers field.
I would assume that this solution may apply to most other MFCs (HP, etc.), depending on an applications software. -
Can't send faxes from my HP Officejet Pro 8615
Hello. I cant send faxes from my HP Officejet 8615.
Hello @Dee53,
Welcome to the HP Support Forums!
I understand that you're experiencing issues when trying to send faxes from your HP Officejet Pro 8615 e-All-in-One Printer. I would like to assist you today with resolving this issue. However, in order for me to provide you with accurate support to resolve this issue with you I do need to clarify a few things.
1. Are you using a dedicated fax line or is it shared with your phone?
2. If the fax is shared with your phone, is there an answering machine or voice mail service on that line?
If so, how many rings does it take your answering machine or voice mail to pick up on?
3. Do you use distinctive ring?
4. Are you using a DSL or VOIP phone line? If you're not sure you would have to ask your phone company.
5. Are you getting an error message when trying to send a fax?
6. Are you able to receive faxes?
Once I have the answers to my questions above I will be more than happy to guide you to a solution. I look forward to hearing from you!
X-23
I work on behalf of HP
Please click "Accept as Solution" if you feel my post solved your issue, it will help others find the solution.
Click the "Kudos, Thumbs Up" on the right to say "Thanks" for helping! -
I have a Mac mini operating on Mac OS X(10.6.8) Snow Leopard. In the last couple of weeks I have been having intermittent problems sending mail from Mac MAIL, especially if I hit the reply button. It whirls around for ever and then tells me to 'Try Later' or 'Try Again'. When I shut down my computer and open up mail again, I hear the mail whizzing off. I have just tried it now and it went in the time that it has taken me to compose this email. But sometimes the mail doesn't go at all. Could it me because I have too many messages in my inbox and sent boxes (around 1000 in each)? I read somewhere that you should delete Mail in library/pref/com.apple.mail.plst and reinstal it. But I'm frightened to do this in case I can't re-instal it as I don't know how to.
I have a Mac mini operating on Mac OS X(10.6.8) Snow Leopard. In the last couple of weeks I have been having intermittent problems sending mail from Mac MAIL, especially if I hit the reply button. It whirls around for ever and then tells me to 'Try Later' or 'Try Again'. When I shut down my computer and open up mail again, I hear the mail whizzing off. I have just tried it now and it went in the time that it has taken me to compose this email. But sometimes the mail doesn't go at all. Could it me because I have too many messages in my inbox and sent boxes (around 1000 in each)? I read somewhere that you should delete Mail in library/pref/com.apple.mail.plst and reinstal it. But I'm frightened to do this in case I can't re-instal it as I don't know how to.
-
How do I set up the fax program so I can send faxes from my mac
How do I set up the fax program so I can send faxes from my mac
Do you have a fax machine or fax modem? If not, then you cannot fax over telephone lines, but you can subscribe to one of many eFax services.
-
Problem sending mail from iPhone
Hello
I have a problem sending mails from a Horde account in iPhone 5S. I guess the problem is about configuring the outgoing mail server, but I tried several things and nothing seams to work. The message I get is :
"Can't send mail. No password provided for account x
Please go to Mail account settings and enter a password"
Here goes the detailed configuration of the SMTP:
SMTP server: mail.account.pt
User name and Password: xxxxxx
SSL: OFF
Authentication: Password
Server port:587
What am I doing wrong?
Thank you for your help!
Best regards,
PedroAfter talking with my e-mail service provider I understood some more configurations, which might help you to help me:
SMTP Settings:
Authentication method: encrypted password
Connection Security: STARTTLS
How can I copy these settings into my iPhone 5S? In Authetication there's only the following options:
Password, MD5 challenge-response, HTTP MD5 Digest and NTLM...
Thank you!
Best regards,
Pedro Santos -
I'm having a problem sending pictures from my Lucid phone, what's wrong
I'm having a problem sending pictures from my Lucid phone, what's wrong?
I'm trying to send a text message
(aka Duchess)
"I will lift up mine eyes unto the hills, from whence cometh my help. My help cometh from the LORD" PSALM 121:1-2a
>Personal info removed<
Message was edited by: Verizon Moderator -
TS3276 Anyone having problems sending mail from Os X10.7.2?
Anyone having problems sending mail from Os X10.7.2?
i have Mac book pro, I mac Desk top and i pad:All can receive mail but not send. I have checked and re checked set up etc No luck
ThxHi Ernie,
Sorry I don't understand the first question :{
Connection Doctor says everything is connected. i can send mail from the server's own web site ,just not from the Apple Mail program.
The problem did begin when I was travelling from one hotel to another.
Any ideas?
Susan -
TS3899 Problems sending email from hotmail addresses in iPad Mail
Hi
I am having problems sending email from my hotmail addresses (live.com) in the Mail program on my iPad. I get a message that says "An error occurred while sending this message". Tis morning the program worked perfectly. Now, not so much!
I have turned my iPad off and on. I have deleted and reinstalled the mail accounts. Neither strategy helped.
I have no problems with my gmail address. I can send mail if I log on to the hotmail website in Safari.
Any ideas?
Thanks23circles:
I would like to find a way to only have the gmail inbox but still send from any three of her accounts.
You can do it this way:
Set up only one account. The one from which you want to receive mail.
In Mail > Preferences > Accounts > +gmail acct+ > Email Address insert the other email addresses, separating each with a comma and single space.
Only the GMail account will receive incoming Mail. However, when you want to send from another address, in the From dropdown menu toggle the address from which you wish to send mail.
You will, of course, delete the other accounts you have created to avoid getting incoming messages.
cornelius -
I am on OS X and i am having problems sending pictures from the new pictures app via email. when i hit the sharing button i have the option to send via iMessage or Facebook but the email option is ghosted and can't be checked off. any suggestions?
I've resolved my problem now. It wasn't iphoto: preferences:@ that I needed but iphoto:preferences:general where there is the option to choose email for sending photos. Can't believe I missed that before.
-
What software do I use to send FAXes from my IMAC?
What software do I use to send FAXes from my IMAC?
I'd recommend looking in the Mac App Store for fax apps. BTW do you have a modem or do you have an AIO printer with fax capability?
-
MFP M521dn Can't Send Faxes from PC
When printing to the fax feature of the M521dn, the message in the fax status window that comes up says PRINTER BUSY and the fax is never sent. The printer is not in use and has been reset before testing the feature in a controlled way. The firmware version on the printer is dated 20140605. Sending faxes from the printer itself (using the touchpad and console) works just fine. It is only when attempting to print from a PC using the FAX device.
Desktop O/S is Windows 7 Professional.Hi @mab5113,
Welcome to the HP Forums!
To get your issue more exposure I would suggest posting it in the commercial forums since the HP LaserJet Pro M521 Multifunction Printer is a commercial product. You can do this at HP Enterprise Business Community.
The support page for your product may be helpful in the meantime:
HP Support Center.
I hope this helps!
RnRMusicMan
I work on behalf of HP
Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
Click the “Kudos Thumbs Up" to say “Thanks” for helping! -
[Fwd: (forte-users) Sending Fax from forte]
Tamas Deak
Lufthansa Systems Hungary
(forte developer)
2-6 Mazsa ter, Budapest, 1107, HUNGARY
(36-1) 4312 973
[email protected]
[email protected][email protected]-I've never done this but I think MS-MAPI might be a good solution.
Sure, it's not platform independent, since it will only work on NT,
but it is fax-gateway independent. MAPI is an interface to several
messaging systems (mail, RFC's, fax, etc.) regardless of what
kind of implementation is behind it.
Pascal Rottier
STP - MSS Support & Coordination Group
Philip Morris Europe
e-mail: [email protected]
Phone: +49 (0)89-72472530
+++++++++++++++++++++++++++++++++++
Origin IT-services
Desktop Business Solutions Rotterdam
e-mail: [email protected]
Phone: +31 (0)10-2428100
+++++++++++++++++++++++++++++++++++
/* All generalizations are false! */
-----Original Message-----
From: Zulkifli Mohamad [SMTP:[email protected]]
Sent: Friday, October 08, 1999 3:16 AM
To: '[email protected]'
Subject: (forte-users) Sending Fax from forte
Hi guys,
Does anyone know how to send a fax from Forte application.
Any ideas appreciated!
For the archives, go to: http://lists.sageit.com/forte-users and use
the login: forte and the password: archive. To unsubscribe, send in a new
email the word: 'Unsubscribe' to: [email protected] -
How to Send Fax from Java Code ?
I want to send Fax from my Java Program without using any third party tools like RFax etc.
I have explore that it is possible by using Java Communication API , but I can''t get the exactly. Can anybody help me Please?Ankit_B wrote:
I want to send Fax from my Java Program without using any third party tools like RFax etc.
I have explore that it is possible by using Java Communication API , but I can''t get the exactly. Can anybody help me Please?Have you tried searching the web? These open-ended questions like "I don't know how to do X, can someone help me" are almost never answered.
However, if you have some specific question, feel free to ask it here.
Maybe you are looking for
-
How can I sync two seperate ipads to the same computer without the apps from one ipad being loaded on the other?
-
I/O Error while trying to make an image of the bootcamp partition
Hei all. I want to backup my Win-partition on my MBP. But every time I try to make an image of that via Disk Utility, it gives me an i/o-error. I tried to do it logged in, while booted via the restore DVD, in Firewire-Target-Disk mode, on the interna
-
Function Module to create Delivery with JIT Calls
Hi SAP Guru's, We are working on SAP 4.6C version. I am looking for a function module to create delivery with JIT Calls. We are currently using the SAP standard function module "SHP_VL10_DELIVERY_CREATE" to create Delivery with JIT Calls. Each JIT Ca
-
Has copyRecord been deprecated?
I've upgraded to ESP 5.1 SP04 PL03 on the server side of things (but not my Studio on Windows) and am getting messages about copyRecord having been deprecated. I understand these are likely warnings, as my project still compiles, runs and does what
-
1. REUSE_ALV_VARIANT_DEFAULT_GET 2. REUSE_ALV_VARIANT_F4 3. REUSE_ALV_VARIANT_EXISTENCE 4. REUSE_ALV_EVENTS_GET 5. REUSE_ALV_COMMENTARY_WRITE 6. REUSE_ALV_FIELDCATALOG_MERGE 7. REUSE_ALV_LIST_DISPLAY 8. REUSE_ALV_GRID_DISP