Problem the PSI and Demand Management

Hi, we have a problem with using the PSI to step through stages in the workflow.
When we submit a Project to the Next Stage in a Demand Management Workflow with the PSI, the
Entry and Completion Dates of the previous completed stages changes to
the Submit date of the Current Stage:
When using the Normal Submit button in PWA this does not occur at all
Here is a Code extract that we use to do the PSI Call:
Has anyone had this before?
http://blogs.umtsa.co.za/nicoo

Hi Sai,
Please check the tabl entries in SE16 or similar
1. Assigned the site to the WH number (T340DT-LOCAT)
2. Activated TRM for the movement type/Storage types (T347A-KZINA)
2. Turned two step confirmation on for source and destination storage types (T331_B-QUEIN  & T331_B-QUAUS)
Can you see anything in LTRM TRM monitor (no selections = only enter site number) i.e. a delivery number or TO?
If not please try:
1 Transaction LTRCC
2. Deleting the data delivery/TO and recreated it?
If this does not help, I could take a look at you setup if you allow external access?
Thanks James

Similar Messages

  • Problem with Drag and drop manager

    I am noticing that the sample provided at
    http://livedocs.adobe.com/flex/3/html/help.html?content=dragdrop_7.html is not working when tried on any version of FireFox browser on a Mac OS version 10.6.3.
    So my understanding is that there seems to be some problem with the drag and drop manager in Flex when used on Firefox on a Mac OS version 10.6.3.
    It will be very helpful if you can provide any work around for this issue. We want to implement the drag and drop feature in a website that we are building for one of our clients.

    You must be an Oracle employee as you're referring to a component in the upcoming JDeveloper version which has yet been released to the general public. Oracle employee's are, I believe, directed to post on internal Oracle forums.
    CM.

  • SOP and Demand Management!

    Hello SAP Gurus, I need a litle help,
    I have created a SOP in transaction MC87 for a material/plant with quantity 100 for month 10. Then I make a copy to Demand Management and in MD04 I have the requirements. So far so good.
    The problem is: when I change the quantity in MC88 for the material/plant to 0, the system doesn't copy to demand management the 0 quantity.
    Is there any way to put this to work this way or do I have to go in MD61 and delete the requirements for the material/plant?
    Thanks in advance,
    Adelmo Silva

    Hello again SAP friends,
    Maybe I can explain myself beter:
    SAP v4.6C
    1. MC88 - I change de Rough-Cut Plan for my material/plant with production values equal to 0 (zero).
    2. I transfer to demand management and everything works fine!
    SAP ECC 6.0
    I do the same as SAP V4.6C and I get the error: "No data maintained for material ARS_PA_01 plant 1000 in transfer period Message no. MA640"
    Can someone help me with this?
    Thanks in advance,
    Adelmo Silva

  • Problem BlackBerry 8820 and Desktop Manager

    Hy i conect my BB but in the desktop manager in the pin area dont aperece my pin number aprece none and push this and push detec my pin an tell me the pin detected but in the main menu aperece none againg , what it the problem ?

    Hi and Welcome to the Community!
    Here is a KB that discusses that error:
    KB03490 Internal Error 2738. Could not access VBscript appears when installing BlackBerry Desktop Manager
    Normally, that is an install error rather than an uninstall error, but hopefully the remedies it contains will still be useful! There also are multiple existing threads on this site that discuss that exact error...your review of those might prove useful, and a search of this site, using the error message, error code, or symptom, should reveal all applicable existing threads to you.
    Good luck and let us know!
    Occam's Razor nearly always applies when troubleshooting technology issues!
    If anyone has been helpful to you, please show your appreciation by clicking the button inside of their post. Please click here and read, along with the threads to which it links, for helpful information to guide you as you proceed. I always recommend that you treat your BlackBerry like any other computing device, including using a regular backup schedule...click here for an article with instructions.
    Join our BBM Channels
    BSCF General Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

  • Problem in Task and Ressource Management

    Hi Guruu2019s
    I am working on Task and Resource Management, configured the system as per the requirements for TRM, then created inbound deliveries and Transfer order for that deliveries the TO is not confirmed. But when I am executing the TRM Monitor and dragging thes site to inbound delivery number onto the transfer order, the TO do not exit in the TRM Monitor.
    Why itu2019s not coming any suggestion please.
    Thanks in Advance
    Regards,
    Sai

    Hi Sai,
    Please check the tabl entries in SE16 or similar
    1. Assigned the site to the WH number (T340DT-LOCAT)
    2. Activated TRM for the movement type/Storage types (T347A-KZINA)
    2. Turned two step confirmation on for source and destination storage types (T331_B-QUEIN  & T331_B-QUAUS)
    Can you see anything in LTRM TRM monitor (no selections = only enter site number) i.e. a delivery number or TO?
    If not please try:
    1 Transaction LTRCC
    2. Deleting the data delivery/TO and recreated it?
    If this does not help, I could take a look at you setup if you allow external access?
    Thanks James

  • Problems with psi and irssi.

    I installed Arch few hours ago. I packmaned psi, but it can't fint such a lib:
    [vrok@ankh vrok]$ psi
    psi: error while loading shared libraries: libXss.so.1: cannot open shared object file: No such file or directory
    I've got XFree86 4.3, straight from 0.6 ISO. I hope it can be solved without upgrading to X.org (maybe later...).
    btw. I also made Psi installation from source, but the same happens.
    And, second thing. I've installed irssi, but it puts out nothing. I mean:
    [vrok@ankh vrok]$ irssi
    [vrok@ankh vrok]$
    Ncurses is ok. So, any advices?

    Argh, now I know why Psi from source also hasn't worked. Psi from ArchLinux places its executable in /usr/bin, and original Makefile does it in /usr/local/bin - a directory which is searched after the first one. I executed old Psi and thought its that new one. Oh, you foolish Vrok But thanks for suggestions.
    And I think I'll bite into that ABS - I liked Gentoo and Portage in the past

  • HT201401 Plug in the battery charger to the iPhone5 seems to be reducing the contact and demanding tricks as time goes. Is this a common problem?

    I am having increasing difficulties making a proper connection to recharge the battery. It seems that the contacts are not working properly.
    I thought it was some dirt in the little hole but sometimes I need to move the plug to start the charging process.

    Both the charger cable and the phone are still under warranty.  If you're having difficulites, bring the to Apple for evaluation.  If one or the other is defective, it will be replaced free of charge, unless there's obvious user damage.

  • Problem with Aris and Solution Manager

    Hi,
    I'm trying to synchronize Aris and SAP Solution Manager.
    I'm doing installation and configuration following Administration Guide
    chap. 7 from Aris for Netweaver guide, but, I have a problem when I
    try to transfer projects from Aris to SolMan.
    In the main ARIS menu from ARIS Business Architecture for SAP NetWeaver>
    Aris Network>LOCAL>Synchronization>Maingroup, a SAPLogon screen appears
    to logon to SolMan system, ask for Client, User and PWD.
    I put the same user/pwd that I use to logon to SolMan, but ARIS cannot
    connect to, an error message appears "User or password incorrect".
    Does anyone have idea about this problem??
    Thanks

    Mariana,
    try changing your password to all CAPS in Solman.
    regards,
    Jason

  • Problem with drawLine and GridLayout Manager

    Hi
    I am writing a piece of software that lets you design a local area network. Currently I have a JPanel with a GridLayout of 10 squares by 10 squares. Each of these grid spaces is filled with a small custom component that is blank if empty or displaying the relevant graphic to the user if a node has been placed. The difficulty that I am having is that I want to be able to draw a section of cable between nodes. As an example, when the user places a Server and a client, I want them to be able to hold down SHIFT, select the two nodes, then press a key (probably 'c') to automatically generate a run of cable between the two nodes. The software achieves this by getting the co-ordinates of the center point of the two nodes and drawing a line between them using the graphics class drawLine() method. I have all of this working fine apart from the bit where the cable needs to be drawn. The reason is that I can only create a section of cable by creating a new component and then using g.drawLine(). Fair enough. However, I can only draw within the small grid section designated by the GridLayout manager in the JPanel. What I am asking is how would I go about getting the software to draw a line between two relative co-ordinates on the screen, disregarding any positioning that the GridLayout manager tries to impose. To put it another way, how would I go about getting the software to draw a line between two absolutety specified co-ordinates, as opposed to relative co-ordinates currently being used? Any help would be greatly appeciated, thanks

    Here's a way to draw lines between component centers irrespective of layouts.
    import java.awt.*;
    import java.awt.event.*;
    import java.awt.geom.*;
    import java.util.*;
    import java.util.List;
    import javax.swing.*;
    public class GridDrawing
        public static void main(String[] args)
            JLabel[] labels = new JLabel[100];
            JPanel loPanel = new JPanel(new GridLayout(0,10));
            for(int j = 0; j < labels.length; j++)
                labels[j] = new JLabel(String.valueOf(j + 1), JLabel.CENTER);
                labels[j].setBorder(BorderFactory.createEtchedBorder());
                loPanel.add(labels[j]);
            OverdrawPanel overdrawPanel = new OverdrawPanel();
            CableSelector selector = new CableSelector(overdrawPanel, loPanel);
            JPanel panel = new JPanel();
            OverlayLayout overlay = new OverlayLayout(panel);
            panel.add(overdrawPanel);
            panel.setLayout(overlay);
            panel.add(loPanel);
            JFrame f = new JFrame();
            f.setDefaultCloseOperation(JFrame.EXIT_ON_CLOSE);
            f.getContentPane().add(panel);
            f.setSize(400,400);
            f.setLocation(200,200);
            f.setVisible(true);
    class OverdrawPanel extends JPanel
        List cableList;
        public OverdrawPanel()
            cableList = new ArrayList();
            setOpaque(false);
        protected void paintComponent(Graphics g)
            super.paintComponent(g);
            Graphics2D g2 = (Graphics2D)g;
            g2.setRenderingHint(RenderingHints.KEY_ANTIALIASING,
                                RenderingHints.VALUE_ANTIALIAS_ON);
            g2.setPaint(Color.red);
            for(int j = 0; j < cableList.size(); j++)
                g2.draw((Line2D)cableList.get(j));
        public void addCable(Point2D p1, Point2D p2)
            Line2D line = new Line2D.Double(p1, p2);
            cableList.add(line);
            repaint();
        public void register(CableSelector cs)
            addMouseListener(cs);
    class CableSelector extends MouseAdapter
        OverdrawPanel overdrawPanel;
        JPanel loPanel;
        boolean firstPointSet;
        Point2D firstPoint;
        public CableSelector(OverdrawPanel op, JPanel lp)
            overdrawPanel = op;
            loPanel = lp;
            firstPointSet = false;
            overdrawPanel.register(this);
        public void mousePressed(MouseEvent e)
            Point p = e.getPoint();
            Component[] c = loPanel.getComponents();
            Rectangle r;
            for(int j = 0; j < c.length; j++)
                r = c[j].getBounds();
                if(r.contains(p))
                    if(!firstPointSet)
                        firstPoint = new Point2D.Double(r.getCenterX(), r.getCenterY());
                        firstPointSet = true;
                    else
                        Point2D p2 = new Point2D.Double(r.getCenterX(), r.getCenterY());
                        overdrawPanel.addCable(firstPoint, p2);
                        firstPointSet = false;
    }

  • I have installed succesfully a PCI cards seen by windows but it does not appears in the device and interfaces tools of the Measurement and automation manager?

    Cannot install new objects in device and interface to use the ni-imaq library and to take image from my camera.

    Which PCI card did you install? The PCI-8252 and PXI-8252 will not appear in MAX. Does your card appear in the Windows Device Manager?

  • Synch problem - Server.app and Workgroup-Manager

    Hello everybody,
    I have been having troubles with this OS X Server from the very beginning - I even went through the hassle of a complete new installation - Server.app failed from the very begining.
    I found something new today. Take the Network-Accounts or Groups (it is an Open Directory Master)  and view them in Server.App and in Workgroup-Manager to compare entries. Every group in Workgroup-Manager is visible in Server.App as well - BUT - the members of a group (visible in WM) aren't showing up in the respective group if viewed at through Server.App?! What is going on here?

    Hello everybody,
    I have been having troubles with this OS X Server from the very beginning - I even went through the hassle of a complete new installation - Server.app failed from the very begining.
    I found something new today. Take the Network-Accounts or Groups (it is an Open Directory Master)  and view them in Server.App and in Workgroup-Manager to compare entries. Every group in Workgroup-Manager is visible in Server.App as well - BUT - the members of a group (visible in WM) aren't showing up in the respective group if viewed at through Server.App?! What is going on here?

  • SOP and transfer to Demand management for MTO material

    Hi all,
    I have the following situation:
    I have a material, a finished goods product with planning strategy 20 Make to order defined in the material master. I enter a sales forecast for the material in SOP in SAPECC (transaction MC87), works fine.
    But when I try to release the forecast to Demand Management (MC74), I get the following error message: "No requirements type exists for material 110100 1 in plant 2". I can see that planning strategy 20 MTO does not have any requirement type defined.
    But what is the best practice then to forecast on MTO materials (with strategy 20 MTO)?
    What I want to do is to bring down the requirements of the MTO material to Long term planning to get a BOM explosion for the components. I realize that I should not start a production plan for the MTO material, but I want to plan the requirements for components several months ahead.
    What is the best practice? Should I use a different production strategy? Am I missing config or any fundamental thinking here?
    I need to have the material as a MTO strategy, but I want to plan the components.
    Please, give me input on this if you have any solution.
    Regards,
    Lars

    Hi Lars,
    Here's what you need to do:
    1. Instead of pure 20, customize a strategy group that has in it 20 and 10, and attach this strategy group to your material.
    2. In MC74 specify requirements type LSF, demand management version, and make sure to uncheck the "active" box (otherwise you will get requirements in the operative system, and not only in LTP).
    3. Do the transfer, and include the version in a LTP scenario.
    Regards,
    Mario

  • Demand management split the requirements

    Hi
    I wonder if anybody knows how to make a daily split for the requirements in demand management.
    I have made it but the split is made only for the 5 workdays (monday to friday) but i need to be done in weekdays (monday to sunday).
    I've got the restriction of not changing the calendar of the plant because it will affect the others modules of SAP.
    Wait for your answer
    Please
    The points will be waiting
    Taka care
    Francisco O.

    Hi,
    Even if you split the reqirement in demand managmant system will not plan the planned order on holiday,
    To split the PIR qty
    1. goto schedule lines and select the line
    2. goto edit mode choose split per online
    3. popup will appear
    4. enter the period indicator and start and end date of the requirements period
    5. enter the qty to be split and enter the period indicator for split enter
    6. PIR qty will be split daily
    7. daily qty =Total reqmts qty / no of days
    Can you try order splitting (FS) and in the takht time enter the number of in house production days (1). In the rounding value assign the quantity for the daily lot size.
    Reagrds
    R.Brahmankar

  • DP - Sales and Demand Forecast values in the Planning book were increased.

    Dear DP Experts,
    The Sales and Demand Forecast values in the Planning book were increased.  Is there a way to tract who user could have made the changes?  Can we view the last change like in the document flows?
    Thanks,
    Glason

    hi Glason
    if the values have been changed by the user community, I am not sure if there is a way to find out. However if there is technical flaw in data processing, you can check for the steps as posted in the above post.
    We faced a similar issue in our project. We were not able to trace the user ids under which the values were changed. However since we retain the 15 days of back up, we were able to check that the values were changed on a certain date but not the user ids. but we were still able to restore the original values.
    As an additional step, we also developed macros to store (in the form of alerts) the exisitng value and the updated value incase the there was a manual change in the Sales forecast and other editable key figures.  This ensured that there was a check if there was a manul change. we also ensured that these macros were not executed during the background jobs.
    SAP also provides a standard SAP APO Change Monitor add-on which can be used to track chnages to the key figures. Please refer to note 1308968 for further information on the add on.
    let me know if this helps.
    Rgds, Sandeep

  • Negative Qty in Pick and Pack Manager

    Hi all, I've the following problem with SBO 2005A, is there someone who can help me?
    I need to print pick lists even if "qty available to release" is less than the open qty.
    Scenario is when I have to provide information to the wherehouse about sales order to prepare with goods already arrived but not yet registered in Sap.
    In other words: in the morning I receive goods from my supplier, in the late morning I must issue sales orders. I would need to print pick lists before acquiring goods (in Sap).
    Problem is that Sap checks available qty without considering Purchase Orders.
    example is:
    regarding article ABC
    qty in stock = 4
    qty in a PO = 100 (delivery date today)
    qty in a Sales Order = 30 (delivery date tomorrow)
    I would like to print a pick list with qty 30. Total available could be 74 (100+4 -30) or -26, it doesn't matter.
    At the moment the answer I have when I try to "allocate" 30 pieces in Pick and Pack Manager screen is "Released
    quantity exceedes available quantity [message 81-13]
    Is there a way to make it working as I want?
    Thanks in advance

    I have the same problem at my client site and I think we need to rethink the logic for the Pick and Pack Manager.  What if inventory quantity is wrong?  Or, what if you need visibility of the whole Sales Order in the warehouse and the shipping people do not have access to the Sales Order module.  I suggest you allow the user to print Sales Order Items on the Pick List that, according to Sap, does not have availability.  The Picker could find sufficient quantity on the shelf or the order may need to be partially picked and staged until the rest of the order becomes available. 
    If you check the Block Negative Inventory box in Document Settings, then prevent the zero quantity item from appearing on the Pick List.

Maybe you are looking for

  • My iPhone 5 sounds tinny.

    After almost a year with my iPhone 5 I noticed somewhere along the line that my music had suddenly become tinny. The best way to describe it is when I listen to the song "1901" by Phoenix, I can "feel" the oscillating texture of the synthesizer intro

  • Error calling function in Oracle

    Hi All, I am calling the function in Oracle the following way cs = conn.prepareCall( "{? = CALL package_name.function_name(?)}" ); But on the above line in my code, I am getting the error java.sql.SQLException: Malformed SQL92 string at position: 5.

  • Error in Archives data in SharePoint 2013 blog site

    Hi, I have created a blog site in SharePoint 2013. Here when i clicked on the month of june, it shows the header as May but showing the posts of july. Is there any solution for this issue. Please help. Thank you

  • Please help! Cannot connect to Itunes with Iphone or on laptop!

    I dont know whats going on but I need someones help. I just bought an iphone today and cant log in into app store. It says "Cannot connect to Itunes store" when entering my apple id. I have made an account online. The weird thing is that my girlfrien

  • BIG PROBLEM WITH ZEN MICROPHOTO! I NEED THIS FIXED BAD

    ?Ok, Ii've already gone through a Zen Neeon and another ZPM because of different problems, but this one is the worst. I was listening to my player and then put in my side?pocket. ?When I pulled out the player which was shut off, I went to turn it on,