Problem with Accounting view in Material Master

Hi,
One of the material master does not have the accounting view and the costing views attached to it. When trying to extend the views thru MM01, the system shows the following message -
       Material already maintained for this Transaction/event
What we understood is that the views were already extended earlier but still does not show up.
Any help extended is highly appreciated.
Regards,
Mike
Edited by: Michael Gerard Leo on Mar 10, 2009 4:35 PM

Hi,
After we extended the accounting view in MM01 for a particular plant and saved it, we are not able to view it through MM02 or MM03.
Again, if we try to extend the view for the same plant in MM01, the system gives an error message that it is already extended.
Any reasons why the accounting views are not showing up in MM02 and MM03.
Regards,
Mike

Similar Messages

  • Problem with mass IDoc for Material Master

    Hi All,
    Can anyone suggest a solution to work with mass IDocs for Material master?
    We have DEBMDM and CREMDM as mass capable IDocs for Customer and Vendor. How do we get mass Material Master IDocs from R/3 in a single XML file?
    Also the standard Material repository supplied with SAP MDM 5.5 SP3 doesn't have any XSD definition for MATMDM. Can anyone throw some light on this problem?
    Regards
    Pooja

    Hello Pooja:
    The standard way to do it is to generate a single file containing multiple idocs (And for the sake of performance, I suggest you stick to this technique).
    In the case of material master, everything is straight forward. In the case of customer and vendor master, when data flows from R/3 to MDM no idoc conversion needs to be performed by XI.
    However, for the case of customer and vendor master, when data flows from MDM to R/3, XI needs to separate the data in CREMDM to CREMAS and ADRMAS in order for R/3 to be able to process the idocs; as well as separate the data in DEBMDM to DEBMAS and ADRMAS.
    The good thing is that you do not need to worry about all this mappings and conversions in XI. The only thing you need to do in XI is to import the standard business content for SAP MDM 5.5 into XI.
    Hope this helps.
    Regards,
    Jorge.

  • Period change is not appearing in accounting view of material master

    Hello SAP lovers
    As we know once we close the period with MMPV, Latest perion appeared in material master --> Accounting view.
    Now period open is March 2007 for a company code. It is expected that material created in all the plants assigned to same company code should display latest period in accounting view. This is happening for all thousands of material in system but i found 1 material which is displaying the period as Nov 2006.
    I have doubled check that this material is created for the same plant which is assgned to the company code for which Mar2007 is open....
    Anybody ......Any clue......
    Best Regards
    Avinash

    Hello Mani
    I have already checked all the open items.....
    No sale order. No entry in table MSEG.
    Only one PO without GR.....So that should not make any difference.
    Br
    Avinash

  • Mass Change Standard Price in Accounting view of material master

    Hi anybody,
    I am maintaining more than 5000 records material master . Each time  change material prices using MR21, but I don't want go MR21. need to develope one abap program for change material standard prices using BAPI or normal ABAP Program. how do I develope?
    please give me sample program for that.
    Thanks
    S.Muthu

    Hello Mani
    I have already checked all the open items.....
    No sale order. No entry in table MSEG.
    Only one PO without GR.....So that should not make any difference.
    Br
    Avinash

  • Problem with *serial no. profile* in work sheduling view of material master

    Hi ! !
    I am here with a problem with serial no. profile in work sheduling view of material master.
    By mistake for some FHMI type ( PRODUCTION RESOURCE TOOLS )materials, serial no profile exist in 'work sheduling' view. Due to that we are facing problem in GRN.
    when I am trying to remove that with MM02. i m getting a message as Serial numbers already assigned to this material
    Please suggest how to remove serial no. profile.
    Thanks in advance,
    Prab

    Hi,
    go to MMBE and check the Current Serial number...for  FHMI type
    and go to IQ02 and close the Serial number range at the Current number range...
    Now you can assign this serial number range to another material type...
    Thx
    Raju

  • Current period in Accounting 1 view of Material Master

    Dear Experts,
    In Accounting 1 view of Material Master there is a current period, now it is 12 2009.
    Is it possible to make it 11 2009, if yes how to do it.
    Please help if you have solution. it is very crucial for me.
    Thank you for your support.
    Regards,
    Zusen

    Hi,
    Please read the Solution part of  note 487381. There is still a few things need to be carry out before you can proceed
    with the initialization :
    Bear in mind that the initialization of a posting period has the
    following effects concerning the period stocks:
        o  The initialization of the posting period to a previous or to any
           posting period may lead to the loss of the information of the
           inventory balances of the previous periods.The book value of the
           current posting period is taken as the basis also for values of
           the previous period in this case.
           If you want to continue working with this new posting period, in
           addition you should execute report Z_DEL_HIST_ENTRIES attached so
           that history entries greater or equal to the new posting period
           will be deleted.
        o  If you have to briefly reset the posting period by one period
           (for example, postings must still be posted in a certain period)
           just to make a correction (and for a small number of postings),
           you should initialize the posting period back again to the old
           value so that the values of the previous period will not be lost
           (you should forbid postings when carrying out corrections).
           However, afterwards the values of the previous period or the
           history records (as of Release 4.5) of the materials posted in
           this case are inaccurate.
           You should NOT execute report Z_DEL_HIST_ENTRIES in this case.
        o  However, if the posting period is generally reset again to a
           previous posting period and if postings were made during this
           time, all information on the inventory balance of the previous
           periods is lost.
           As of Release 4.5a, you should use the cited correction report
        Z_DEL_HIST_ENTRIES in order to delete history records that are
        more current than the current posting period.Otherwise, it can
        result in deviations (inconsistencies) for the update of the
        history records.
    o  Important! If there are open physical inventory documents that
        have status 'counted' or for which indicator 'Freeze inventory
        balance' has been set, you should reject these if they refer to a
        previous period or have been created in the former previous
        period.The inventory difference to be posted can be determined
        from the current book value of the previous period and the book
        quantity frozen in the physical inventory document (ISEG-BUCHM)
        and does not match the inventory balance of the previous period
        that is currently valid.

  • Problem with replication based on materialized view

    Problem with replication based on materialized view...
    Given:
    1. Source: S-1
    2. Targets: T-1, T-2
    3. DB links: from T-1 to S-1, from T-2 to S-1
    Required replicate table TBL on S-1 to T-1, T-2 via db links.
    On S-1 was created materialized view log with PK on TBL. On T-1, T-2 were created mat.views as "on prebuilt table refresh fast on demand". In case of get "ORA-12034: materialized view log younger than last refresh" or initial load - perform complete refresh. Initial load on T-1 takes about 1 hour, on T-2 - about 12 hours. Refresh is executed via job with minutely interval. If refresh is running then it is not performed.
    Problem: after initial load on T-1 performs fast refresh, but on T-2 raised ORA-12034 and complete performs again.
    What's wrong?

    34MCA2K2, Google lover?
    I confess perhaps I gave a little info.
    View log was created before MV.
    It was the first initial load.
    No refresh failed.
    No DDL.
    No purge log.
    Not warehouse.
    There is no such behavior for MVs on another sites.
    P.S. I ask help someone who knows what's wrong or who faced with it or can me  follow by usefull link.
    P.P.S. It's a pity that there is no button "Useless answer"

  • What is the concept of  view in material master?

    Hello sap gurus
    Some quetions regarding Material Master
    what is  the concept of views in material master ?
    what is determined by specifying industry sector in material master ?
    To sell material which views are material are maintened in Material master?
    Regards
    Amit

    Hi,
    <b>Material master  for finished ggods is related with SD, MM & PP departments</b>. If you carefully go through the various screens in MM record you will realize the importance of the respective fields and the department to which they belong.
    <b>1.Suppose Base unit of measure</b> in Basic data 1 screen. The production people will keep the stock of the item using this UOM.
    <b>2. In Sales:Sales Org.1</b> screen we have sales unit in which we will sell the material.
    <b>3. Then we have the plant</b> data in which we enter the delivering plant. Also the taxes are determined from the plant so we have the settings for taxes also - whether this material is fully taxable/50% tax/Tax exempted.
    <b>4. Then we have purchasing</b> screen in which the data like the purchasing group, variable units,etc are entered. This will effect the purchasing cycle when we are procuring a material from outside. This is related to MM.
    <b>5. The we have MRP</b>, this is related to PP as to how to manufacture the product, the MRP type, the strategy group - whether it is MTO/MTS like that.
    <b>5. Sales:Sales Org.2 screen</b> - Here we mainatin the account assignment group which is very important as far as the generation of the accounting document is concerned. This triggers the system where to post the value in which G/L account. Accounting document is generated when we create the invoice in VF01 & save it.
    <b>6. Work scheduling</b> - Related with the sceduling of the production as to whether underdelivery or overdelivery is allowed, the storage location
    <b>7. Quality</b> - Here you can select for a particular finished item where where it has to be checked for quality during its journey from the raw material stage to the finished goods store as a finished item.
    <b>8. Accounting</b> - Related to accounting, product costing, total value of the stock in hand, etc. Also related with FI & PP
    So all the screens have data which effects one or more modules for the proper functioning of the system to give the optimum results.
    <b>Industry Sector:</b>
    Key that specifies the branch of industry to which the material is assigned.
    <b>Use</b>
    When you create a material master record, the industry sector you specify determines
    1. which screens appear and in what order
    2. which industry-specific fields appear on the individual screens
    <b>Screens for Sales:</b>
    Sales:Sales Org.1, Sales:Sales Org.2. But other screens also have data which is related to sales. You cannot just maintain the sales views and save the master. It has to be properly linked with the other modules also for the proper functioning of the system. That is why the system is called as "Enterprise Resource Planning" You have to paln the resources of your company and these resources are related with all the modules.
    Reward points if solution helps.
    Regards,
    Allabaqsh G. Patil

  • Deleting of future price in accouning 1 View from material master.

    Hi,
    During month end process of CKMLCP, we have done the marking activity. so that the system updated the future price for all materails under specified plants. this is valid from 31.03.2008. by this time the system was not released the price automatically even, the valuation area (plant) is activated with automatic release. when doing of production confirmations for the current period, the system is throwing error as "future price and standard price exists". when we deleting the future price manually through MM02 transaction the systm is allowing to do production confirmation.
    Kindly suggest me any transaction code which deletes the future price in accounting 1 view of material master, which is  updated because of marking done through CKMLCP.

    Hi,
    Thanks for your reply,
    We tried to delete the price through CKR1 transaction. after giving of parameters of material and plant blant screen is coming.
    i think CKR1 is useful for deleting of future price updated through costing run i.e., CK40N marking.
    But in this case when we scrutinise, this is updated through CKMLCP transaction.
    after performing of "post closing"  activity through CKMLCP,
    i think SAP has provided another Tab i.e., Mark Material Prices. by this time the system will mark future price at current periodic cost. and at the same time there is a provision to give date either manual date or select the radio button of beginning of following period in parameters tab.there is no provision for giving of valid date upto.
    may be this is useful to update the standared cost estimate with current actual.
    I am also not sure why user have given data as 31.03.2008. usually they are not suppose to do this marking, but, by mistake they have performed.
    Kindly correct me if any mistake and suggest any other way which will delete the future price in accounting 1 view of material master.

  • Adding fields in costing view of material master

    Hi gurus,
    I need to add 4 fields in costing view of material master. I have followed the steps in SPRO, for configuring customized screen in material master.
    1) Created a function group YMMCO and copied the screen 2904 from program SAPLMGD1.
    2) Added 4 fields in my customized screen.
    3) Created copy of 01 ( Screen reference ) to z1 in OMT3B.
    Since 2904 is not there in the sequence . I changed one 0001 sequence at the end to 2904 . I also assigned my program
    SAPLYMMCO to it. I can see the changed fields in data screen and subscreen.
    4) Then I assigned the SSq to z1 in transaction OMT3E.
    But unfortunately, when I go to MM01 to create a material , I am not able to view the fields I added in costing view.
    I have checked the screen for the previous field, it shows 2904 only.
    Two days back, I did the same thing in basic data view 1 , it was working properly. As per client's suggestion I put it in
    costing view, it is not working . Please give me suitable suggestions.
    Thanks in advance.
    D. Mallick

    Hi,
    I also need to add custom fields to Basic data view. After copying & changing the screen sequence in Config, I could able to see the custom fields in Basic Data view.
    I have appended structure with custom fields to MARA table.
    But the values I enter in the screen is not getting updated to the table MARA.
    Can you please let me know the code, I should have have in PAI (Process After Input) module in the Sub Screen to update the values?
    Thanks,
    Dasa

  • Problem with a view in XK01 transaction

    Hi All,
    I am working on upload conversion for Vendor Master. While doing conversion, i am getting a problem with a Contact person view in XK01 transaction. In contact person view the telephone field column sometimes allowing to add data ,sometimes it's not allowing data which results an error in conversion program saying that the telephone field in not an input field. I don't know why the view is showing the telephone field like that.
    Can any one suggest the solution for this problem. I know this is configuration problem with a view but i posted in ABAP forums.
    Thanks

    Hi Ben,
    I assume that you are writing a BDC program to upload contact person information. If so, you are trying to populate a table control here. Please check to see if you are calculating the index to assign values to the correct rows.
    if you are calculating index in your program then i think it should be configuration problem as you said.
    Thanks,
    Ganesh.

  • PO creation without Purchasing view in material master

    Hi
    i am using 4.6 version
    system is allowing to create PO without purchasing view in material master.
    how it would be possible ?
    Regards
    Rahul

    Hi,
    i have checked with MARA for that material PSTAT value it is showing there "KDALBPCGV"
    please suggest
    regards
    rahul

  • Purpose of maintaining classification view in material master

    Hi gurus
    can anyone explain Purpose of maintaining classification view in material master with example
    Regards
    Vishal...

    Hi
    One of the reason we maintain classification is for batch management where characteristics like shelf life expiry date is being attached to a class & that class is maintained in material master so whenever transactions takes place it will read from the characteristics value.
    the other purpose is with variant configruation, for a configurable material there will be more than one characteristics for ex: in a car it comes with A/C - non a/c, metallic - non metallic, normal steering - power steering all these are mainatained as characteristics & assigned to a class & we use that class in classification for materials.
    there is many more advantages & ways of using classification in material master.
    Regards
    Rang

  • Control inspection lot in QM view of material master

    Hi
    this is regarding the setting for control inspection in QM view of material master.
    can anyone give me a prictical example of
    1.  'X' An inspection lot for each purchase order item/order item
    2. '1' An inspection lot for each material document and material
    3. '2' An inspection lot for each material and batch
    If my requirement is to create one inspection lot out of several batches made from a production order( eg, 10 batches are created, only 1st one needed for RR and UD), which one should I use?

    Hi,
    the concept of batch comes when there are some property changes (property in terms of business, that may be quality or something else). if you are confirming production order partially, it means there is something that changes with batches. that's why std sap does not allow to create single lot though all those batches have been created from same production order.
    and henceforth, your requirement cannot be fulfilled by any config. you can try for development.
    partha

  • Label Data View in Material Master

    Dear Team,
    Despite of performing all below standerd steps, i am not able to view Label Data view in Material Master.
    pls guide
    steps performed.
    1. Check whether the screen sequence SP exists in Customizing for the Material Master under Define Structure of Data Screens for Each Screen Sequence.
    2. Check whether screen 92 has been assigned to screen sequence SP and has the screen type 1 (main screen).
    3. Check under Subscreens whether the subscreens were assigned to screen 92 of the screen sequence SP.
    4. In the Assign Screen Sequences to User/ Material Type/Transaction/Industry Sector IMG activity, set up the users who are allowed to edit the screen sequence and when it appears.
    also I have SAP_ALL Authorization.
    Regards,
    Amol Joshi

    Hello Amol,
    For IMG activity: Define Structure of Data Screens for Each Screen Sequence, for screen sequence 21, with logical screen 92, in subscreen, please see below settings:
    Program: SAPLMGD1 , screen no. is 1002
    Program: SAPLCBGL_LD00 , screen no. is 8020
    Program: SAPLCBGL_LD01, screen no. is 1010
    Regards,
    Niraj

Maybe you are looking for

  • 6.40 Ramp-Up: Dispatcher problem

    Hi, we have installed the WAS 6.40 unicode version (ABAP + Java) and Adobe Document Services as part of the Ramp Up. The installation was done successfully without any problems and Support Packages (ABAP, BASIS) have been applied up to level 3, in ad

  • Nef file corrupted but preview looks fine

    Hi everyone, That's the first time I get an error when opening an image in Photoshop and I dont really know what to do to get it to work. Its actually almost half my sd card that got corrupted, the preview image looks normal but as soon as I try to o

  • Unable to see the Solid DB in ATG9.4

    HI All, I have installed the ATG9.4 from the oracle site. At the time of installation I had select the ATG Web Commerce from the product pack and I had choose the Microsoft Windows (32-bit) and then I had select "Oracle ATG Web Commerce (9.4) Media P

  • Display data drom ArrayList String in Strunts

    Hi everybody, I'm very new to Struts. Can anyone tell me how to display data drom ArrayList<String> in Strunts in JSP page?

  • Do I need to subscribe to Creative Cloud to use Acrobat Pro?

    Hello, I have purchased and downloaded Adobe Acrobat Pro 11 but it won't open - I get an error message saying to renew my subscription. Do I need to subscribe to Creative Cloud to use Acrobat Pro?