Problem with Phantom Assembly

Hi expert,
I have question with BOM and production process. In packaging industry, At start we have 8 components for finish goods. but recently, 2 component 0020 and 0030 (example bottle cap and sticker) will issue from warehouse for assembly process before return to warehouse. then re-issue to use for finish goods.
usually component 0020 and 0030 will convert to another component or change to semi-finish goods.i must create this BOM , Routing , and Open Production Order.and change component in finish goods, 
if i not create BOM , Routing , and open Production Order. but create new component as semi-finish goods for item from assembly process to use in finish goods BOM as phantom assembly.
how is my resolution, possible or impossible? , will be any problem in the future. any advise is good.
regards,
kittisak.

Hi,
There are 2 possibilities in this case.
If you do not want to make stock of your HALB then make this as Phantom and include the assembly operations (manufacturing operations) in the header level material so that the activities will be captured at the Time of FERT confirmations.
If you want to make a track of the stock for re issue from Warehouse then no other way.
You should maintain it as HALB with BOM nad Routing, Pl. Order and Production Order route to capture the stocks and issue it to FERT production.
Hope this clarifies..
Regards,
Siva

Similar Messages

  • Collective Orders with Phantom assembly

    HI experts,
    Required clarity on following scenario urgently.
    Material                                                Proc Type                             Special Proc
    A                                                                 E
    B(BOM item for A)                                       E                                             52
    C(BOM item for B)                                        E                                              50(phantom)
    C1(BOM item for c)                                        E                                             52
    When we are creating the production order for A,respective production orders for B and C1 is genrated.
    Now when we are confirming the production order for C1,GI of c1 to B is happening and also for C! production order it is giving the DLV status.Up to this the scenario working fine.
    But when we are confirming the production order for B,the GI for production order A and DLV status for production order B has to happen,BUt it is not happening.
    Can anyone throw some light on this. Expecting reply at the earliest.
    Thanks in advance.
    Regards
    LN

    Hi
    ritesh,
    It is not the question of control key.
    But the error is coming at the time of goods movement,we can see the description of it in "cogi".
    "ERROR IN DEPENDENT GOODS MOVEMENT."
    Because For 'c1',After confirming the order for 'C1',it will do the GR for 'C1'and GI of 'C1'to 'B' production order.
    Up to this it is working fine.But the same when I am trying for 'B'production order,After confirmation the GR for'B'is not happning And the Issue of B to 'A' production order is not happening.
    And in COGI the above error is coming.
    I want to know weather this problem occuring because of phantom assembly with collective order.
    Hope this will clear the problem understanding.
    Regards
    LN

  • Problem with CLR Assemblies(Beginner)!!

    Hi,
    I'm trying to execute an sp which is calling a CLR assembly and on execution, i get the following error:
    An error occurred in the Microsoft .NET Framework while trying to load assembly id 65537. The server may be running out of resources, or the assembly may not be trusted with PERMISSION_SET = EXTERNAL_ACCESS or UNSAFE. Run the query again, or check documentation to see how to solve the assembly trust issues. For more information about this error:
    System.IO.FileLoadException: Could not load file or assembly 'emailserviceclr, Version=0.0.0.0, Culture=neutral, PublicKeyToken=null' or one of its dependencies. An error relating to security occurred. (Exception from HRESULT: 0x8013150A)
    System.IO.FileLoadException:
       at System.Reflection.Assembly._nLoad(AssemblyName fileName, String codeBase, Evidence assemblySecurity, Assembly locationHint, StackCrawlMark& stackMark, Boolean throwOnFileNotFound, Boolean forIntrospection)
       at System.Reflection.Assembly.nLoad(AssemblyName fileName, String codeBase, Evidence assemblySecurity, Assembly locationHint, StackCrawlMark& stackMark, Boolean throwOnFileNotFound, Boolean forIntrospection)
       at System.Reflection.Assembly.InternalLoad(AssemblyName assemblyRef, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)
       at System.Reflection.Assembly.InternalLoad(String assemblyString, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)
       at System.Reflection.Assembly.Load(String assemblyString)
    Please let me know what can i do to fix this error as i'm using this CLR for the very first time.
    Please guide me on this.
    Thanks,
    Deepti

    Hi Jonathan,
    Thanks a lot for your help. I followed the guidelines provided by you. In SSMS, under the properties of assemblies, the "permission set" was set to UNSAFE, i tried setting it to EXTERNAL ACCESS. But when i try cicking "OK" after setting it, i get following error:
    ALTER Assembly for assembly "abc" failed because assembly "abc" is not authorized for PERMISSION_SET = EXTERNAL ACCESS. The assembly is authorized when either of the following condition is true: the database owner(DBO) has EXTERNAL ACCESS ASSEMBLY permission and the database has the TRUSTWORTHY Database property on; or the assembly is signed with the certificate; or an asymmetric key that has a corresponding login with EXTERNAL ACCESS  assembly permission.If you have restored or attached this database, make sure the database owner is mapped to the correct login on this server, if not then use sp_changedowner to fix the problem.
    Please tell me what can i do about this.
    Thanks,
    Deepti

  • Phantom assembly quantity change in production order

    Hello experts,
    We are producing 1 type of goods, but for 2 different customers. each of them has their own specification for packaging. as per system it was decided to not create another finished goods partnumber with additional BOM, but instead we created 2 phantom assemblies in 1 BOM. 1 of them is the main (for customer 1), another one is alternative (for customer 2).
    Now the idea was that whenever Purchasing is maintaining materials in production orders they were supposed to switch quantity from main phantom assembly to alternative phantom assembly whenever goods were required for customer 2.
    We quickly tested the possibility of quantity change on our test server, but not entirely. the thing is, that for some reason you can change phantom assembly required quantity only if it's already has required quantity higher than 0. otherwise the item is greyed out and you can't perform any changes in it.Same happens if you simply reduce required quantity of phantom assembly item to 0. once you do so - the item becomes greyed out as well.
    So, the question is - is it some kind of settings in BOM\MMD that prevents user from changing quantities for phantom assemblies (and if it is - where exactly you can change it), or it's something else (like i dunno, maybe user authorization issue or something).
    Any help will be appreciated.
    P.S. - i know that you can still simply remove entire item from production order and put it back with quantities and etc., but that way of work has higher risk of making a mistake.
    BR
    VE

    Dear ,
    Couple of points on this issue which may help you understand the problem  : Bom Explosion With Phantom Assemblies will happen based on the following set up .
    1. You need to maintain the special procurement key-50 for the phantom Assembly
    in the MRP 2 View of the material master
    2. We can override the Phantom Assembly Setting by defining in SPRO --->
    Define Explosion Types so that MRP Creates Procurement Propasals for the
    Phantom Assembly itself.ie We can Swith off the Phantom Assembly Settings.
    This settting need to be defined in the BOM Item details screen in the Basic
    Data Tab Page under MRP Area.
    So check in your Bom whether switch off phantom assembly is defined.Make the Explosion Type-Blank
    3.Run MRP Single Item - Multi level - Transaction MD02 with Planning Mode 2 : 'Re-explode BOM and Routing'. The Phantom Item will now get exploded correctly in the Planned Order.
    4.Check the Validity of the BOM  and planning date
    5.Check the MRP4 set up in FG where you have kept the BOM/Routing selection
    6.Check wether dependent requirement  material master -MRP4 view -MRP  for Depent Requ should be blank .
    Check the above points and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jun 14, 2010 2:15 PM
    Edited by: Jiaul Haque on Jun 14, 2010 2:18 PM

  • Phantom Assembly not exploding in production order

    Hi All,
    We are using phantom assembly as a BOM component.
    When we create a planed order from MD03 or MD02 and try to convert this planed order to production order the components of Phantom assembly are not explode in production order. When I tried with read PP master data option it get explode.
    Can you please let me know the reason?
    Thanks,
    SAP PQ

    Dear ,
    Couple of points on this issue which may help you understand the problem  : Bom Explosion With Phantom Assemblies will happen based on the following set up .
    1. You need to maintain the special procurement key-50 for the phantom Assembly
    in the MRP 2 View of the material master
    2. We can override the Phantom Assembly Setting by defining in SPRO --->
    Define Explosion Types so that MRP Creates Procurement Propasals for the
    Phantom Assembly itself.ie We can Swith off the Phantom Assembly Settings.
    This settting need to be defined in the BOM Item details screen in the Basic
    Data Tab Page under MRP Area.
    So check in your Bom whether switch off phantom assembly is defined.Make the Explosion Type-Blank
    3.Run MRP Single Item - Multi level - Transaction MD02 with Planning Mode 2 : 'Re-explode BOM and Routing'. The Phantom Item will now get exploded correctly in the Planned Order.
    4.Check the Validity of the BOM  and planning date
    5.Check the MRP4 set up in FG where you have kept the BOM/Routing selection
    6.Check wether dependent requirement  material master -MRP4 view -MRP  for Depent Requ should be blank .
    Check the above points and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jun 14, 2010 2:15 PM
    Edited by: Jiaul Haque on Jun 14, 2010 2:18 PM

  • Phantom Assembly Planned Order in APO

    Sub : Incorrect quantity and Bucket for component in scenario of Phantom Assembly
    Hi Gents,
    I am using the Optimizer planning run for a scenario with Phantom assembly.
    The master data has been used below
    Material u2013 862700 (Finished goods)
                    1091895 (Phantom assembly maintained for above FG)
    Location - 8501
    Planning Book - ZAL_SNP_PB_BG
    Data View - ZAL_SNP_DV_BGF
    Optimizer profile - ZAL_OPT_01
    I have entered a demand for above FG on 22.02.2012 and running a optimizer by selecting both FG and Phantom assembly. As a result the optimizer has created the planned order for FG from 18th to 22nd Dec. 2012. The advancement of the planned order is due to production capacity constraint.  When i analysed System has created  planned order for phantom assembly in last two buckets of the planning book and heneceforth  the component requirement it is appearing only on last 2 buckets of the planning book. The date for this dependent demand is 28th and 29th Feb.2012 and the quantity is also wrong for the components as per the BOM.
    The result I am expecting as system should create the planned order and dependent demand for the component maintain below phantom assembly should be same FG planed order date and quantity of component should also give the right requirement as per the BOM.     
    Thanks in advance,
    Regards,
    Rajesh patil

    HI Ipsita,
    Did you try running it form SE38.
    SE38 because in SE37 it is not necessary to give all the parameters..
    But in SE38 you need to pass all the values required & Check form there.
    Also you can check the details in PLAF-Table.
    Thanks & regards,
    Dileep .C

  • I just order 8 calendars from iPhoto and they came to me fine. Now I need to order two more but when I go thru the process I get a message  saying:unable to assemble calendar. There is a probleme with the photo with the file name"(Null)"   more........ .

    Would someone be able to explain to me the following issue with Iphoto?
    I ordered 8 same calendars for my soccer team and received them fine. Although a couple of pictures on it are a little off (out of focus). I need to order two more of the same calendars but when I go thru the process ireceive an error message saying:
    "Unable to to assemble  calendar" There is a problem with the photo with the file name "(Null)" The full resolution version of this photo either cannot be located or is corrupt. Please replace this photo or delete it from your calendar.
    How can  I fine this "corrupt" photo? How did it go thru with the first batch of calendars but won't go thru now?
    Thank you for your help.   

    Apply the two fixes below in order as needed:
    Fix #1
    Launch iPhoto with the Command+Option keys held down and rebuild the library.
    Since only one option can be run at a time start
    with Option #4 and then #1 as needed.
    Fix #2
    Using iPhoto Library Manager  to Rebuild Your iPhoto Library
    1 - download iPhoto Library Manager and launch.
    2 - click on the Add Library button, navigate to your Home/Pictures folder and select your iPhoto Library folder.
    3 - Now that the library is listed in the left hand pane of iPLM, click on your library and go to the File ➙ Rebuild Library menu option.
    4 - In the next  window name the new library and select the location you want it to be placed.
    5 - Click on the Create button.
    Note: This creates a new library based on the LIbraryData.xml file in the library and will recover Events, Albums, keywords, titles and comments.  However, books, calendars, cards and slideshows will be lost. The original library will be left untouched for further attempts at fixing the problem or in case the rebuilt library is not satisfactory.
    OT

  • Problem with gcc-like inline assembly in cc

    Hi,
    I am trying to compile the following code for a sparc machine using sun studio 12.
    #define MAGIC(n)  asm("sethi %0, %%g0" : :"g"(n));
    int main(int argc, char **argv)
            int x=1;
            MAGIC(x);
            return 0;
    }I am using the following command:
    cc -xO3 -xtarget=ultra2 -m32 -xarch=sparcvis -xregs=no%appl -w test.c -o test
    and I get the following error:
    cg error (as) : "__gnu_asm_inline_fake_test.c (template for __gnu_asm_inline_temp_func_001)", line 1 : statement syntax
    cc: cg failed for test.c
    Isn't Sun cc supposed to support gcc-like inline assembly? If so, what is the problem with the code above?
    Thanks in advance,
    Nick

    Hi,
    we have the same Problem with the inline assembler. We are using Sunstudio 12 on x86 and tried to get this code compiled (Sunstudio 12 should be gas compatible).
    any ideas ?
    thanks
    Dieter
    #define HEC_HTONF(x) \
    (__extension__ \
    register HVB::float32_t __v, __x = (x); \
    __asm__ ( \
    "bswap %0" \
    : "=r" (__v) \
    : "0" (__x) \
    __v; \
    #define HEC_HTONLF_INPLACE(x) \
    __asm__ ( \
    "leal %0, %%ecx \n\t" \
    "movl (%%ecx), %%eax \n\t" \
    "movl 4(%%ecx), %%edx \n\t" \
    "bswap %%eax \n\t" \
    "bswap %%edx \n\t" \
    "movl %%eax, 4(%%ecx) \n\t" \
    "movl %%edx, (%%ecx) \n\t" \
    : "=m" (x) \
    : "m" (x) \
    : "%eax", "%ecx", "%edx" \
    );

  • Problems with disk drive assembly Satellite pro 4200

    I have problems with a Satellite pro 4200.
    The Notbook reads no more disks. The drive assembly I exchanged ready, however did not function. The drive assembly is addressed, but it is to be read not possible disks or formatted. Also a Bios update is not possible, since the drive assembly reads no more disks.
    cu
    Eltgen

    Hi Eltgen
    Sorry but it is not easy to say what the problem is on this way. If I understand you right you have built in a new FDD because old one was defective. Am I right?
    It will be interesting to know is the new one already used part. Maybe is the new one also defective. I hope that a small control light is on if you put the disk inside.

  • Problems with Oracle.DataAccess assembly after installing Oracle 11gR2

    Windows 7 x64 SP1
    Visual Studio 2010
    ODAC112012
    Oracle 11gR2 11.2.0.1.0 for Windows x64
    Oracle Patch 12429529
    IIS 7.0
    I had my development machine setup and working with all of the above items except for the Oracle 11gR2(and patch), I was using a separate Oracle server. However everything went bad after the installation of 11gR2, I get the following error when trying to run the web application: "Could not load file or assembly 'Oracle.DataAccess, Version=2.111.7.10, Culture=neutral'"...
    My application is built in .NET 3.5 and the application pool is in 32 bit mode in IIS 7.
    Do I have to do something with the assembly rebind trick?:
    C:\Windows\assembly\GAC_32\Policy.2.102.Oracle.DataAccess\2.112.1.2__89b483f429c47342>Policy.2.102.Oracle.DataAccess.config
    Any help is very appreciated.

    I don't run Oracle server locally just avoid stuff like this, but since you installed an x64 server while having the application running in x86 mode, one potential issue is that the binding redirect you were using is no longer working because it's set for the 64 bit version instead. You don't have 2.111.7.10 on the machine at all, so try deleting that reference and pointing directly at your ODAC version.
    Alternately reconfigure the project to compile for x64 and disable 32 bit mode in IIS, then use the 64 bit client.

  • Phantom Assemblies with component for PDS - SNP.

    Hello,
    Does anyone  have planned a components under phantom assembly?  How can we  explode the BOM in PDS-SNP.
    Is it possible to used PDS for  Phantom Assemblies, what have to check and modify?
    Thanks in advance.
    Dgee

    Dear Dgee,
    please read followings on sap help about phantom assemly and PDS: http://help.sap.com/saphelp_scm50/helpdata/en/40/57454070eb2571e10000000a155106/frameset.htm
    and
    http://help.sap.com/saphelp_scm50/helpdata/en/92/b84d40eae76f13e10000000a1550b0/frameset.htm
    and
    http://help.sap.com/saphelp_scm50/helpdata/en/dc/28c13dd9279710e10000000a114084/frameset.htm
    and
    http://help.sap.com/saphelp_scm50/helpdata/en/4d/01be3d1abbe913e10000000a114084/frameset.htm
    and
    http://help.sap.com/saphelp_scm50/helpdata/en/71/513b407b686913e10000000a1550b0/frameset.htm
    I hope this helps.
    Regards,
    Tibor

  • Issue with Phantom Material in PCE

    Hi,
    While creating the PCE for one of the finished materials, in the PCE, the phantom material is not getting selected.
    There is no issue with the production version or BOM or Master recipe since in the process order after the BOM explosion the phantom material is being picked up.
    The costing date of the PCE is also as per the production version validity date. In the BOM & master the phantom item is maintained for costing.
    Let me know what else could be missing.
    Thanks in advance,
    Regards,
    Abhijit

    There is no problem with the costing run. If a material is marked as a phantom assembly (that is, it has a special procurement type with procurement type: In-house production and special procurement: Phantom assembly ), costing directly explodes the BOM and calculates the planned costs for all material components in the phantom assembly. These material components are displayed and updated in the cost estimate of the higher-level material, but not in the phantom assembly. The idea is, phantom assemblies are not needed to be costed as they are not valuated and neither stock is maintained for them. But their cost structure is exploded properly for the costing run.

  • Pull list for the component of the phantom assembly

    Hi
    I am in rem process. while doing the pull list for the fianl product using Entry with bom explosion.
    i did not get the components (level 3)for 1 assembly(level 2 ) which is phantom one under the final product (level 1) BOM.
    i also maintained the production stor loc for the components and the phantom assmy.
    i check the stock in the production storage location . no stock is there in the location.
    what is the problem . how to get the component of the phantom in the pull list.

    Dear Raj,
    If your FERT contains a HALB and inturn this HALB contains say HALB1 which is a phantom assembly
    and and another 2 raw materials means,when you execute MF60 For HALB,you will get the 2 raw
    materials along with the component's of phantom assembly.
    Check and revert back.
    Regards
    Mangalraj.S

  • Phantom Assembly order

    Hi
    I am working on a scenario where I have to collect dependent requirement of two material under one material. BOM of this materials is same but different physical properties so different matrial code. i am trying with phantom material ...so that i collect requirement for this materials ...club together and make the order for it. is it possible to make production order for phantom material. please suggest any other possible solution for this.
    regards
    Rajesh

    Dear Mr.Rajesh,
    Go thorugh this.
    <b>I hope you will not be facing any problem with your scenario.</b>
    Also
    Check with the setting in SPRO - Production - Basic Data -BOM - Item Data -
    DefineExplosion types.
    <b>Indicator: phantom assembly off</b>
    This indicator controls the explosion of a phantom assembly in BOM explosion functions.
    <b>Use</b>
    Explosion of phantom assembly in standard SAP system
    If a special procurement key for a phantom assembly is entered in the material master (MRP 2 detail screen) of the header material of a phantom assembly:
    Dependent requirements for the superior assembly are transferred directly to the components of the phantom assembly
    Planned orders or purchase requisitions are generated for the components of the phantom assembly
    If the explosion type determines that the standard explosion for a phantom
    assembly is switched off, dependent requirements are generated for the header
    materials of phantom assemblies, as well as the components.
    If useful reward points.
    Regards
    Mangal

  • Phantom assembly confirmation

    if I have an Product, and in its BOM there is a phantom assembly item which has its own routing. Question is, can i confirm also the operations for that phantom assembly? How is confirmation done, when there is only one production order (which is for the Product itself)

    Hello,
    Yes it's same, you have to move all the operations of the phantom material routing to the header material, then only those operations are used for scheduling, costing puposes.
    Even in costing system will not consider the phantom routing for the cost calculation when co is doing with qty. struc.
    They will encounter problem.
    so make sure that there is no routing for the phaantom materials and all the operations are moved to the header material.
    Regards,
    Manick.

Maybe you are looking for

  • DHCP Clients Not showing in Server Admin....but are there

    Hi, DHCP has just recently stopped showing me the MAC addresses of connected clients. It always says 0 though I know through the logs that DHCP is working. Any ideas? I will give more info if needed but wondering if it's maybe a bug or something? Tha

  • Photoshop CS6 (CC) とwacomの使用で残念な不具合多々 macOS 10.8

    業務でポスター原稿等の大型データをレタッチするためにphotoshopとwacom intuosを使用しています. レイヤーをかなり積み重ねるため.時にレイヤー状態で10GBを超えることも多々あるのですが. こういった重たいデータをあつかう際に.問題が起きているのでご報告を. もしかるするとphotoshopではなくwacomドライバに起因するトラブルかもしれませんが. みなさまと情報を共有したいためこちらに書き込ませていただきます. 私の作業環境 macpro2012 2.4Ghz 12コア

  • I know how many the ipod touch last genreation cost how many but I want to know with taxes?

    Me I'm going to have an ipod at Christmas I'm really excited but I have to pay my ipod so I know the last genreation cots 300$ but not exactly because taxes are not incloud.So people who did buy the last generation of the ipod touch can tell me how m

  • Update fails behind a MS ISA proxy server

    We have all our clients behind a MS ISA proxy server. When Flash player tries to update itself, or when you try to install it from the download site, a network connection for the update times out over and over. The only way to get around this has bee

  • How to handle PropertyNotFoundException

    Hello, I’m evaluating an expression in the backing bean. I have a try/catch around the expression evaluation. In the debugger I see that I do get the PropertyNotFoundException, which I handle.  And yet, I see the exception popup in the UI, why is tha