Problem with project settlement

Hi,
  I want to settle cost in project system by exclude some cost element for example
Cost was posted against WBS Y.001 with 2 lines item. cost element 10001 -  100 usd
20001 - 200 usd
  Our requirement is only cost element in range 10000-19999 can settle to cost center, for other cost element cost remain in WBS.
  But when i excecute project settlement system generate error message as u2018Cost element 20001cannot be assigned to a settlement cost assignment in allocation structure ZGu2019. For allocation sturture ZG i was maintain cost element in source form 10000 - 19999
So, Is it possible to settled by exclude some cost element even cost have posted to?
Thanks so much,
june.

Hi Pornat,
Please check Allocation Structure before cheking the Settlement Profile.  In allocation structure the sender cost object and receiver cost object is there, pl check it.  if u need any inputs then let me know.
raj

Similar Messages

  • HT204370 I downloaded an HD movie onto my laptop from i-tunes.  It plays fine on my laptop, but when I plug in my HD projector, the movie quits.  When I unplug the projector, the movie starts again. I have never had a problem with projecting an itunes mov

    I downloaded an HD movie onto my laptop from i-tunes.  It plays fine on my laptop, but when I plug in my HD projector, the movie quits.  When I unplug the projector, the movie starts again. I have never had a problem with projecting an itunes movie before this. Someone told me that i-tunes changed something so that movies can no longer be projected.  We have a home theatre and have watched movies this way quite regularly, so it would be a drag if Apple will prevent us from doing this in the future. 

    I don’t know about projection, but I’m unable to watch HD content in iTunes because my Apple 30-inch Cinema Display is not HDCP-compliant (which is part of an HD copy-protection scheme).
    The other movies you’ve projected, were they HD as well? If not, it could be the same problem: your projector is not HDCP-compliant.

  • Problems with project when switched from Labview 8.2.1 to Labview 10

    Hi everyone,
    I recently switched from Labview 8.2.1 to Labview 10.
    Before I can run the project I get the error which you can see in the attachment.
    (The project is running well in Labview 8.2.1)
    I did already check if variables end with a space, but none of them are.
    The variables are also without any slashes, so that couldn't be the problem either.
    Does anybody has any idea what the problem can be, please let me know.
    I hope to hear from some of you soon.
    Regards,
    Kenny
    Attachments:
    Error Labview 10.JPG ‏19 KB

    Your other post in the other thread indicates you've looked at that thread. Based on that have you checked your variable names to see if any of them are multi-line? The error message is basically telling you that you have illegal characters. A carriage return (\r) or a new line (\n) is an illegal character.

  • Problem with project ordering in AppleTV

    I've got 484 projects I want to sync to AppleTV. The problem I'm having is that I can't figure out how to order my projects by date - the only available options are name, kind & manual.
    Can anyone help?

    Mr Endo wrote:
    mother,
    Heh - Mothra, actually
    Those are the only options in the Inspector for ordering projects. However, in any view you can order all photos by date.
    Are you sure that ordering within Aperture will make them ordered outside Aperture (I.e., will they be ordered that way on your AppleTV)? There was a thread recently concerning someone dissatisfaction with how things ended up being ordered outside of Aperture.
    Yes - what happens in AppleTV is that everything becomes an album, and the sorting order is exactly the same as Aperture's left-hand sidebar under "Projects & Albums" so, for example, if you have a bunch of "Smart Albums" first, they are listed first.
    In my case, after the Smart Albums, I have my projects stored in folders named after the relevant year, so 2001, 2002, etc. Although these folders are listed in chronological order, inside each folder, I haven't gotten around to sorting the projects in date order (because this currently has to be done manually).
    So, in AppleTV, what I get is a long list of albums - first the ones in folder 2001, then the ones in 2002, and so on. But the order of those albums is exactly the same as in Aperture, so a project with photos taken in June may appear before another project with photos taken in February... unless I drag the projects into the correct order in Aperture and then resync.
    I suppose I now have some manual sorting to do, but thanks for your help!
    Message was edited by: m0thr4

  • Problem with projects with transitions

    Hi everyone,
    I have a (iMac 27-inch mid 2011) with 10.7.5. When I am working with a project in iMovie and in this project I insert transitions (effects into photos), I have a problem when I make export (share) of the project: at 4 minutes the iMovie makes freeze and it doesn't response. If I delete the transitions then the process works fine. The hard drive is empty (more that 800Gb empty)
    I updated all the apps, I deleted (with AppCleaner) the iMovie and reinstalled it (with Mac App Store) but nothing.
    There is some option like iPhoto to rebuild database with CMD + ALT or something?

    Hi AppleMan1958,
    The problem is that in the event I have only pictures, no videos. When I insert transition effects between images or insert music not export the video. If I remove all the transitions and music then there is no problem when exporting.
    I tried to transfer the project with DropBox to other iMac and it works perfectly and I export the video without problems.
    So the problem is in my iMac. Some plist that not erase AppCleaner?

  • Strange problem with project. Any ideas how to fix?

    ~
    This problem occurred before the recent update, but persists after updating as well.
    I had a project about 20 minutes long. Some time after I last exported it, it broke. At one point toward the end, when I play in the preview window, a four-second segment goes to black screen with "Source clip is missing." That alone is interesting, because I don't recall doing anything to move or delete the source.
    But when this happens, the project window goes haywire. There is no longer a playhead, you can't see any of the clips after that point, the cursor stops working entirely, and iMovie all but freezes. The movie can continue to play, and you can stop and start play using the space bar, but everything else is hosed. The only way out is to quit iMovie and restart.
    This behavior is persistent and completely reproducible.
    Sadly, this happened before I backed up the movie. Not all is lost, though, for I have a version that is complete and functional up to the last segment, which is the one that broke.
    Just wondering if anyone had any ideas as to what's going on, or perhaps how to fix it.
    Thanks!
    Rob

    If it's on a windows network you have to enter your (windows) log in (name/password) credentials.
    This should be a 1 time event. It will remember it thereafter.

  • Logic Pro9,serious problem with projects: bug?

    I started working with Studio Logic suite one month ago.
    I'm very happy of it, but I have a (serious) problem.
    Sometimes (totally random) I open a project and appear a message "Some Audio files changed lenght", and I find many recorded tracjs disappeared or changed.
    In three cases I had to cancel the project and start from the beginning.
    The last time fortunately I put a backup on another hard-disk, so I cancelled the projects and copied it from the backup.
    How can I solve it?
    I use Logic Pro 9 on Macbook with Snow Leopard
    Please, help me
    PS:after the message appear, even if I close without saving and re-open the files the problems it's still the same.
    Even in backups made from Logic.
    My backup was the old folder copied on another hd
    Message was edited by: ghigo85

    Ok, found a solution so that you can work just on your old user account.
    In the new user account go to
    user (your username for the new account)/library/preferences
    Copy the files
    com.apple.logic.pro.cd
    com.apple.logic.pro.LSSharedFileList.plsit
    com.apple.logic.pro.plist
    then go to to your home (c) drive, or Macintosch HD or whatever you have called it, then go to
    Users
    and the paste the three items into the folder called
    Shared
    Then log out of the new account and into the old one, go to your main boot (c) drive again, to Users again, and to the Shared folder you have just pasted the items into, copy the three, then go to
    user (your username for the OLD account)/library/preferences
    ... and paste the three files (you will be asked if you want to replace them, just answer yet), and hey presto it should all work fine.

  • Problem with changing settlement rule

    In a serviceorder when a user changes the wbs element in the additional data tab he or she also needs to change the settlement rule accordingly
    further on their needs to be a check if the new wbs element is not TAFS and if the element is a wbs element (since also projects can be filled in here)
    I have managed to programm the check in user exit EXIT_SAPLCOIH_009
    there I can find out the new value entered by the user and check if it's correct
    I only can't get the new filled in values before save from the settlement rule
    when I use
        ASSIGN ('(SAPLKOBS)dkobr') TO <dkobr>.
        CHECK <dkobr> IS ASSIGNED.
    the new values for the wbs element are not filled in dkobr when the user exit is running
    is there any other way to find the new values for the settlement rule in memory in the user exit mentioned above ?
    or is there a bapi or function to adapt the settlement rule automaticaly ?
    I have looked at K_ORDER_SETTLEMENT_RULE but I don't see where you can enter the WBS element in this function ?
    kind regards
    arthur
    Message was edited by:
            A. de Smidt

    You can achieve this by using the BADI - CO_SRULE_CHECK. ( Use Transaction SE18).
    You implement this BADI - in the method DISTRIBUTION_RULE_CHECK you will be getting the Settlement lines. ( returned by COBRB - this table stores the settlement rules by object numbers - Object number of the Order is stored in AUFK).
    From the above mentioned method - DISTRIBUTION_RULE_CHECK , you call a FM - READ_NOTIFICATION_BUFFER. This will return all the buffered data for Notification/Order. You can check the ncessary conditions and raise exception message.
    You can use these follwing FMs from your customer exit - EXIT_SAPLCOIH_010 for changing the Settlement rules ( if you want to go that way) -
    K_SETTLEMENT_RULES_UPDATE
    K_SETTLEMENT_RULE_COPY
    or search with K_SETTLEMENT_RULE* to get the list of usefull FMs.
    Hope it helps.

  • Problem with project stock valuation class

    Dear All,
    We have an issue regarding the Revenue Inventory and Capital Inventory. There is a certain balance amount which should be in capital but system is showing in Revenue and vice versa.
    The reason for this is that when the material was created, in some materials the main valuation class was 3032(Project) and in some it was maintained as 3030(revenue). But project stock valuation class was not maintained.
    Now the problem persists in the G/L balances, the G/L of project stock (132006)displays some amount of revenue(132000) and vice versa.
    We tried to maintain the project stock valuation class (3032) for materials for which the main valuation class is 3030 (Revenue),but still the G/L for revenue (132000) is getting hit.
    At the end, the requirement is that G/L for revenue (132000) should hit when revenue procurement is there and G/L for capital (132006) should hit when capital procurement is there.
    Kindly suggest the way forward.
    Regards,
    Harsh

    Thanks Venkat, we have thought of the same as a last stop but there are hundreds of materials which has this problem and there would be many open documents for them.
    If anything could be suggested other then this, and I wanted clarification on one more point that the materials for which main valuation class was 3030 and later we added 3032 in project stk Val class but after maintaining it. When we procure(Capital procurement), it is still showing the balance in G/L 132000(Revenue).
    Regards,
    Harsh

  • Problem with project after upgrading to 10.1 and moving libraties to external drive

    I need to make some updates to a project I created over a year ago prior to upgrading to 10.1.  Also since creating, I moved my Final Cut Libraries off to an external drive.  The only about 25% of the clips in the project appear to be linked to the original media even though all appear to be in the Original Media folder.  I have tried as a test to put the original video files into a folder outside of any FCP files and used that to use the "Relink Media" function under "Edit"  The attached link to a pdf doc shows the error message I get.  I have no idea how to proceed from here to recover this important project.
    Running Yosemite
    https://www.dropbox.com/sh/96zy244yeh3mjb7/AADGTQRjeJPBlRmQ4L5f9Xcna?dl=0

    Russ
    I copied the Original Media folder to a new location and then relinked to the new folder.  The process ran without error.  However that did not fix the problem.  The clip content isn't there for 80% of the clips.  The system was rendering in the background for hours.  I went to bed.  When I got up and checked using the view background tasks it stalled at some point.  I tried exporting the XML and importing into a new library.  I got a waring message about an unrecognized cross dissolve transition.  When I opened the project in the new library the time line looked exactly the same and it behaved exactly as the original project. Thoughts? 

  • Problem with Project 2007 gantt chart in Acrobat X

    Good morning,
    We are experiencing an issue with certain, rather large gantt charts in Project 2007 when converting them to PDF using Acrobat X. The issue is that the last portion of the chart is broken when converted to PDF. The chart will print properly when sent to a real printer, and it also renders correctly in the print preview. Here is an example of the issue:
    As you can see, it has broken the last section of the chart and "stretched" the bars across the page. I couldn't find anything in the knowledge base that related to this issue, so any assistance would be apreciated.

    Unfortunately it seems that this is still occuring, I guess nobody has ever come across this issue?

  • Problem with Order settlement

    When iam settling the order through - KO88, iam with the below error.
    Error : You can not post to Asset in Company code XXXX fiscal year 2009
    When I double clicked on the above error, the description is saying the below information.
    You cannot post to asset in company code 0408 fiscal year 2009
         Message no. AA347
    Diagnosis
         A fiscal year change has not yet been performed in Asset Accounting for
         company code 0408.
    Procedure
         Check the asset value date.
    How can i change the fiscal year for the company code in asset accounting? I mean to say what is Transaction code to change the Fiscal year for a particular Companycode?
    Thanks in Advance for the help

    You need to do the below two activities.
    AJAB - for closing fiscal year in Asset Accounting
    AJRW - for opening new year.

  • Problem with project naming

    Have anybody managed to change the default project naming parameter? When I import my photos into a new project, the Aperture always name the new project like '16 Dec,2010', and I would rename it as '20101216' every time when I have finished importing. I don't want rename them any more.
    So, how can I change the project naming format to something like '20101216' by default?
    I've tried to change the Folder naming preset in Aperture menu, now my project naming format is 'ImageYear ImageMonth ImageDay', and the example shown above is '20080101', but when importing photos into new project, the new project still names as '16 Dec,2010' and the preset seems doesn't work at all.
    Anybody knows how to deal with it?
    (Now I've checked 'automatically split projects' in the import setting and set 'split projects by date' in preference.)
    Message was edited by: bromoethane

    When you import you can name the project you want to import into. Look at the right hand side of the import browser in the section labeled *Aperture Library*. You're destination can either be an existing project or a new project. If you select new project you can enter the name of the project.
    Unfortunately I don;t believe that there is a way to change Aperture default project naming convention.

  • I have a problem with Project Administrator Menu

    I'm trying to cut some projects with Premiere CS4 for free disk space and, though I try, the new projects have the same size as the originals. I use the Create new project cut option and I use only the final assembly sequence with the video exclusively used for export. It means I should cut the original footage and leave them only the part that is used in assembly, something like Avid makes with the option Consolidate deleting original media files, but nothing, my Premiere CS4 leaves the complete original footage, although the final sequence uses only a quarter of them.
    Any solution?
    Greetings and I'm sorry, mi english is too bad.
    Esteban Gómez

    Hi Esteban,
    Your English is just fine.
    If your source footage is GOP-based, like MPEG2, MPEG4, H.264, DivX, etc., then Pr will not trim the original clips.  Does this apply to you?
    -Jeff

  • Problem with periodic settlement rule

    Hello everybody.
    We are working with SAP ECC 6.0, in a poultry industry which produces egg for consumption. We have defined for address the production costs, a periodic Settlement Rule, considering the percentage of egg production by type (A, B, C, Jumbo, and so on), for each shed. The order is created with 18 weeks of life during the growing chickens phase, and 62 weeks during the production phase (eggs production). The process requires settling them on a daily basis to be able to update the cost of the product. Due to the own typical of the process, each bird produces a variable amount of eggs by type and day, therefore it is not possible to be established with exactitude the percentage of the daily production of each type of egg. Due to it, when we establish the percentage of the Settlement rule, these do not reflect the reality of the production of the day, because they are fixed by the system after the first settlement. We need to know if a possibility exists of being able to daily update the percentages of the Settlement rule before you settle each order daily maintaining the same order.
    Waiting you could help,
    Kind regards,
    Elvis E. Henriquez A.

    I am a hobby farmer and have 5 chickens as well. The closest thing to this which I have seen here in the security forum is an abstract discussion about the chicken-or-the-egg-first dilemma in general... and another about some users being "like a fox in a chicken house"...
    Perhaps you want to take a look around the SDN site for a more appropriate forum and let me know which one you would like to have this thread moved into.
    Also search the blog area for this, as I distinctly remember some blogs on the topic a few months ago.
    Cheers,
    Julius

Maybe you are looking for

  • GREP: Zero or more break characters (e.g. ~R*) doesn't work?

    I'm trying to make a GREP rule that includes something to pick up any frame break characters at the start, if there are any, and carry on if there aren't. This should do the job perfectly... ~R*.someGREP ...but it doesn't pick anything up. The .someG

  • Why do I have 2, 3, 4 copies of Firefox shown in Windows Task Manager Processes Tab?

    After a few days, Firefox will get real slow, has lots of disk activity when opening a new Tab or going to another website. When I look in Task Manager, I'll see as many as 4 instances of Firefox in the Processes Tab. Even if I restart Firefox, some

  • SSH Tunnel to an Oracle SQL Server

    Hi all, I am attempting to set up an ssh tunnel from my local machine to an Oracle SQL server operating on a remote computer, and use it to run a perl script to extract things from that database. My question is, do I need to have an SQL client on the

  • Why does my Movie Library say I have more items than I do??

    HI I have a question about my Movie Library. When looking in my library at the bottom the count says I have 248 items. When Selecting all in the library it tells me I have 240 items selected. This is a little confusing as I've just done a data transf

  • Crashes since downloading Yosemite

    After downloading Yosemite my computer crashes every day. Is there a fix for this or can I uninstall? How to uninstall safely? I have Passport external drive that was filled up recently but could be used to back up? Can Time machine back up original