PROBLEMS CANCELING MOVEMENTS WITH INSPECTION LOT

We have this situation:
We need to reset the GD returns but this GD returns was posted by QM and when we try to cancel in VL09 we meet the next message Message no. QA046.
So we tried to cancel in other ways with the inspection lot and the usage decision but it has not been possible to restore movement.
We found the note 175842 and we have implemented the program RQEVAC50 but, when we useit we meet the message M7226
We checked the movement Z55 and its opposite Z56. I suppose its standard movement is the 651 and 652 and I compared the customizing of them. They can be similar it just the movement Z55 and Z56 are prepared to be posted by QM and special stock E and Q.
The movement that we need to reset with the program RQEVAC50 is:
We have tried to use the program for a movement 101 and it worked well (5000795975).
We tried to test with a return delivery with Z55 movement in another environment and the program worked correctly so we think the customizing of the movement Z55 is correct.
We think the problem is when the usage decision creates some movements or we use some of the next fields in the usage decision:
In our case the movements are 321 and Z56.
But when the movements are the standards 321 and 553 program doesn’t work because we meet the next message again M7096
Program doesn’t work because we meet the next message again:
What can we do? could you check thi situation and tell us anything, please?
Kind regards

hi,
check these tables for <b>results</b> entered through lot
QAKL
QAMR
QASE
QASR
if they have used <b>inspection points</b> check this table QAPP
for i<b>nspectionlot</b> check table QALS
hope this helps !!!
Cheers
Alfred

Similar Messages

  • Goods movement with Inspection Lot

    Hi
    We would like to do a Material to Material posting including the earlier created inspection lots for the initial material?
    Is it possible in QM to transfer /link an inspection lot with batch from one material to another material?
    Ex: one material has inspection stock with assigned inspection lot/batch. we would like transfer posting this stock to other material. Is it possible by transfer the inspection lot from one material to other material with inspection lot/Batch?

    Hi,
    We can trasfer the stcok from one material to another material from Quality lot itself , but we cannot assign one lot to two materials. If you want inspection lot in receiving plant then activate 08 inspection type in Material Master and maintain inspection settings for 331 M.Type in SPRO.
    Regards,
    Vikas.

  • Cancel 101 movement with Inspection lot of closed financial period

    Hi experts,
    we are having the following problem.
    We have a 101 movement with creation of Inspection lot, which was done in a finance period which is already closed.
    Now I have to cancel this movement, but I get the error M7021 with VOR, which means that I am not allowed to cancel it, because of the period is already closed.
    But we also can not open the period.
    Which possibilities do I have?
    Maybe MI10 movement?
    Kind regards

    Hello Jürgen,
    thank you for your help.
    I am confused now.
    Becasue normally I am logged on in german and now I did check the english one.
    Deficit of BA St. in QI prev. 127 M2 : "material number" 0001 "sloc" "batch"
    But here I get QI prev, but in the F1 help there is no QI or prev.
    In german I get VOR and there in the F1 help it is written, that VOR is previous period (so I think equal to PR in english).
    Now I am a bit confused.
    But anyway, the thing is that we have to empty the stock.
    Kind regards for every help, I think there is no possibility to cancel that booking as the period is closed.
    @ Biju K, to be honest your way would really be the only correct way, but at the current situation it is a bit special.
    I will do a MI10 booking.

  • Reverse a Return Delivery with inspection lot posted (QM)

    Hello experts,
    I want to reverse with transaction VL09 a good movement of a return client delivery with inspection lot. I posted the inspection lot and transferred the material to Unrestricted use (transaction QA11).
    Then I began the cancel Return Process and I transferred the material to Quality (movement type 322) to run VL09 with material in Quality stock, but the system displays  the following error message:
    You cannot cancel GR, since inspection lot is already partly posted
    Message no. QA046
    Diagnosis
    You are attempting to reverse a goods receipt although quantity postings have already been made from the inspection lot. This means that stock for the goods receipt has already been transferred and, for this reason, a cancelation of the document is no longer possible.
    Procedure
    Ensure that the postings in QM (within the usage decision transactions) are carried out.
    Please let me know what can I do to reverse the return delivery.
    Thanks in advance.
    Pablo

    You are trying to do the process which you ahve already transferred through Transaction QA11.
    The role of Cancel return Process has already been done by this transaction as the Stock has already been into Un- restricted.
    Best Regards,
    Ankur

  • Problem when created an Inspection Lot.

    Hello PP Guru's,
    I have a major problem with Inspection Lot.
    I have created an Inspection Lot but forgot to create an Inspection Plan for the Material for which the lot has been created.The Inspection Lot is in CRTD status which doesnt allow me to record the results.
    I know one method that I can do GR reversal so that the material can be removed from Quality stock(Lot will come to LTCA status) and then can do GR again so to fetch Inspection Characteristics of the material from Inspection Plan which I have created so the new lot created will be in Release status which allow me to process the lot.
    I want to know if there is any other method by which I can Include the Inspection Plan for the Lot which is in CTRD status without reversing GR Document.
    Thanks for the help in advance.
    Points will be rewarded to useful answers.
    Rgds,
    Rakesh Wade.

    Hi
    create the inspection plan appropriately.
    Then go to QA32.select the ispetion lot .
    Press tab Inspection specifications.
    Then press the button 'task list/specification'
    It will be assigned.
    Then refresh the screen.
    The it will solve your problem.
    Regards
    YMREDDY

  • QM Manual Inspection Lot - with Inspection lot origin 89

    Hi QM Guru,
    I did maintain inspection type 10 in this material but while i would like to create the inspection lot manually.
    I try to create manual inspection lot manually , i encounter this error with Inspection lot origin 89.
    No valid inspection type for material 10000037 was found or selected
    Message no. QA280
    Diagnosis
    An active inspection type for the material 1XXXXXXX in plant XXXX could not be found for the specified origin 89 or none of the available inspection types was selected.
    System Response
    Inspection lots cannot be created.
    Procedure
    Check the inspection type setting in the material master.
    Is there anything which i missing ?
    Thank you.

    Hi,
    I hope you have got the answer for this query. You get this error because you are trying to create a manual inspection lot (origin 89) of a material for which Inspection type 89 is not activated.
    From your statement,
    I did maintain inspection type 10 in this material but while i would like to create the inspection lot manually.
    I try to create manual inspection lot manually , i encounter this error with Inspection lot origin 89.
    It is clearly stated that you are using different inspection types. As Rama has suggested, activate Inspection type 89 in the material master and make corresponding master data.
    Other than that, you cannot create manual inspection lot for the origins 10, 11, 12, 13 & 14. Similarly, Automatic inspection lots cannot be created for origins 07, 15 & 89. This answers your further query raised in the thread.
    ntn

  • Weighted from quality score of chars. with Inspection Lots

    Dear QM Guru's.
    My question is about Quality Score with Inspection Lots.
    The Scenario:
    1. In a Quality master View in Material Master I use  the option number 05 of The Q-Score Procedure (Weighted from quality score of chars.)
    2. I use Inspection Points.
    3. I have 10 Inspection Points in a Characteristic.
    4. When I make the Usage desicion,  the Quality Score takes the last Inspeciton point.
    The questions:
    1. Why the  Quality Score  does take the last Inspection points, ?
    2. Is there a chance The Quality Score taking the average of all inspection points ?
    Thanks in advance.
    Federico

    This procedure calculates the quality score as the weighted average of the characteristic scores.
    The score for the characteristic is determined on the basis of the defect class score for the characteristic result. You define the weight of the characteristic in the inspection plan.
                                          Sum ( E_KQD(characteristic) * WEIGHT )
               E_KQD =                 ___________________________
                                                     Sum ( WEIGHT )
    With E_KQD (charac.):       Score for characteristic defect class.
                                  If the defect class is blank or zero,
                                 the result corresponds to the maximum
                                 allowed score.
         WEIGHTING:      Weight of characteristic according to
                                 inspection plan.
    Now
    As I understand It is Maximum allowed score which you have defined or the Avg one.
    If you want to have the Avg of all inspection points then Copy & modify  the function module   KQD_COPY_REFERENCE_FORM  ( originally KQD_FEATURE_CLASS_WEIGHTED )

  • Problem in mapping MIC with Inspection Lot

    Dear All,
                        I have two problems I am making the form for Equipment Inspection but not able to find how should I map the Testing equipment and MIC with the inspection lot I mean from which table they are coming or is their any Standard function for that.
    Thanks in Advance
    Sachin Gautam

    hi,
    check these tables for <b>results</b> entered through lot
    QAKL
    QAMR
    QASE
    QASR
    if they have used <b>inspection points</b> check this table QAPP
    for i<b>nspectionlot</b> check table QALS
    hope this helps !!!
    Cheers
    Alfred

  • Problem with inspection lot

    HI
    We get the usage decision via IDOC to SAP from LIMS
    Due to some technical issue for one inspection lot,only the status UD got updated to the inspection lot ,stock posting ,valuation codes etc are blank and not updated
    Now the stock is stuck in quality
    We are not able to process that inspection via QA12/QA11/MB1B
    QA12 u2013 u201CUsage decision has not been made yetu201D
    MB1B u2013 u201CChange the inspection stock in QM onlyu201D
    QA11 -The functcannot be carried out as  Status UD is updated
    Can you please suggest how to release the stock from QI
    Appreciate your quick reply
    Thanks
    SVP

    HI,
    Apply SNOTE  174877.
    Copy the program ZQEVAC22 in the SNOTE and create a tcode for that.
    Then the inspection lot UD system status will reverse after executing
    Now through QA32 do the usage decision and quantity postiing
    Regards,
    Alagesan M / Bijoy

  • Link of material movement with inspection type

    Hello Masters,
    I have scenario where component at shop floor will be segregated for inspection. The requirement is to do result/defect recording for those parts and if required then those parts need to be scrapped. So one way of doing that can be to move those parts to either blocked stock or QI stock (ideal option) or to specific storage location so that planning can be taken care of (if material are still in unrestricted then planning will consider those part as OK part and planning may fail). And to record result/defect we require inspection lot, which can be created by using above mentioned material movement.
    But problem is how to create inspection lot so that we can do result/defect recording for those materials and scrap those material.
    Please note that material master will have QM setup active (inspection type 01 - Goods Receipt Insp. for Purchase Order) and hence we can move material from unrestricted stock to QI stock only through QM.
    I am not sure if we should use inspection type 08 - Stock transfer inspection, as there can be many instances of material transfer within plant. And with inspection type 08 active, system will create inspection lot every time there is any material transfer.
    One way can be to create new goods movement only for this kind of transfer and new inspection type and link both together. So that when ever material is transferred using that particular goods movement, system creates inspection lot as well as material will be in QI stock. But I am not sure how this is possible or not and if yes then how this can be done.
    I know query was too long to read and I think I was clear enough to explain what the requirement is.
    It would be great if I can get some guidance from you masters at the earliest convenience as it is bit of importance.
    Thanks and regards,
    Devang

    Hi Devang,
    I guess this is Line rejection scenario. Correct me if understanding goes wrong. You have okayed the material against 01 inspection lot and UD has been given. Now you find this material defective on shop floor.
    I think the 2nd option suggested by marwadi sounds better. I suggest one more possibility, just check whether feasible.
    1.     Create quality notification Q2 type through QM01. While creating you can give references of original PO and material document, which fetch vendor name and material code automatically.
    2.     Record defects and all other required information in notification.
    3.     After this, you find an option in action box, transfer post unrestricted - >block . Click there. This will transfer the stock from unrestricted to block.
    4.     If you want planning persons should not consider this stock as OK, remove block stock from MRP stock availability check. As a result of which stock lying in block will not be considered as available stock.
    5.     From block stock you can send this material back to vendor through MIGO. Otherwise you can create return delivery from notification through action box also. Check what is feasible in your case.
    Here you need not create inspection lot, no need to use any user exit.
    Regards,
    Anand Rao

  • Re: Cancellation of an inspection lot

    Hi All,
    I need to reverse an GR posting. In this case QM is being implemented. So At the time of GR posting an inspection lot has also been created .Now due to some error in the document,The user need to reverse the Goods receipt .But  as he tries to do it Message is prompted by the system "No items were transferred"
    I do believe is that the system is not allowing to cancel the GR posting because of the inspection lot.
    Now please advice how to proceed further.
    REgards,
    Vivek

    Hi,
    1. If the inspection lot not yet cleared, then you can cancel the GR document by using MBST.
    2. If the Inspection lot has been cleared, you can't cancel the GR.
    Instead cancel you can reverse the GR by using MB31 with 102 movement type and stock type as unrestricted.
    3. Go to QA02 enter inspection lot number press enter Got to menu -- > Function ---> Cancel Lot
    Revert for any query.
    Regards,
    S.Babusingh
    Edited by: Babu Singh on Sep 8, 2008 8:08 AM

  • Using 05 inspection type, all the materials moves to inspection lot

    Dear SAP Gurus,
    Using the 05-inspection type in material master for by product material, all the material goes to inspection lot.
    how to control the inpection lot movement, i have set a plan that the inspection will be carried through  a workcenter,but it moves all the materials to inspection lot.
    Since all the materials are moving to inspection lot, i have changed my inpsection type to 02 (goods issue), but the problem is,  i couldn't able to record the results for the created inspection lot.
    Kindly guide me and correct my process flow,
    Thanks in advance
    Thanks and Regards,
    R.Diwakar

    Dear Guru,
    Thanks for your response
    Sorry for not so clear ....
    My scenario is that, the user requires to have a inspection lot for their By-Product. during the production order, after manufacturing say 30000 material, for them the 30000 material should directly posted to the unrestricted usage and a sample maerial should go to inspection lot, where same will be inspected and transfered to unrestricted usage, through QA32.
    Based on their requirement, i have set the inspection type -05 in material master and a workcenter specifically created for the quality testing, so that a sample quantity can be produced and flows to the inpection lot,
    but it doesnt works,the produced materials are all going to inspection lot.
    Kindly guide me on this,
    Thanks in advance
    R.Diwakar

  • You cannot cancel GR, since inspection lot is already partly posted

    I get the error message when I try to reverse the GR posting in MF41. However, how can this be possible when the inspection lots created for these have a CRTD status, meaning they cant be accessed because they have lacking characteristics.

    Hii,
    Stock postings can be reversed with movemnt type 102, (GR for P.O- Reversal). Goto MIGO >w.ref to P.O. Once doc is revesed u need to cancel the Inspection lot. To cancel Insp lot goto QA32 , select insepction lot choose Usage decision>Functions--.cancel lot in UD screen.
    If UD is taken & u want to reverse stock posting, use SAP note 175842.
    However, how can this be possible when the inspection lots created for these have a CRTD status, meaning they cant be accessed because they have lacking characteristics.?
    For CRTD status also u can cancel lot with above procedure. CRTD status is bcoz in improper inspection plan. goto QA02>selct lot>goto Insp spec tab for grp & grp no. Then goto QP02-> check for any Miissing MIC or control key or any param at header,opearation / chrac level. Save inpsection plan then reassign.
    with regards,
    K.Lokesh.
    Edited by: Lokesh K on Jun 15, 2010 10:53 AM

  • 655 Movement: No Inspection lot created.

    Dear Expert's,
    My End user are doing 655 for a Return delivery, In Material Master "05", inspection type is Set, but it is not active.
    No inspection Lot has been Generated , but in MMBE , the Stock is in Quality.
    1) Now, how can i do result recording for the same .
    2) Even though "05", is not active how did it allow to do 655 Movt.
    <<Text removed>>
    Edited by: Matt on Jul 6, 2011 2:42 PM

    Hi Sandy,
    Getting stock posted to quality inspection without inspection lot generation is possible in standard SAP. Firstly I try to explain why this happens.
    1.     Go to material master in QM view
    2.     You must have ticked on u201CPost to inspection stocku201D tick
    3.     And you have not activated 05 inspection type.
    As a result of which, system is posting the stock to quality inspection without generating lot. For this case you need to carry out 321 movement through MB1B transaction for transferring stock from quality to unrestricted.
    1.     Regarding your first question, that how you can carry out result recording.
    a)     In order to carry out result recording inspection lot must exist. And for that inspection type 05 must be activated in material master.
    b)     You must have valid inspection plan with appropriate usage also.
    c)     Inspection type activation has no co-relation 655 movement. Movement typeu2019s customization is associated with delivery type.
    d)     Hence it doesnu2019t matter whether you have activated or deactivated 05 inspection type in material master.
    e)     Inspection type activation is useful only for lot generation.
    2.     Regarding second question that how you can carry out 655 movement
    a)     This is automated movement with respect to outbound delivery and generally done through VL02N and not in VA01.
    b)     I donu2019t think this movement is possible through MIGO. Better if you consult with good SD consultant.
    Regards,
    Anand Rao

  • "Closing" Unused, but Released Orders with Inspection Lots

    We have Process Orders which have been released, but been unused.  When We come to Financially Close them we have problems as the Inspection lot is still on without a UD
    Is there a way we can mass process UD of Inspection Lots (or deletion of IL) with Nothing Produced on the Order?
    Thanks & Regards,
    Vivek Kumar

    hi,
    if you the process orders, make a list of those. now in qa16, you can do the mass UD.  in that transaction, you can find out an option called " dynamic selection". if you expand that option, you will have an option called " production"; under that order. So you can put all those process orders and with the lot oringin 03, you will ge tp know the concerned inspection lots. then you do mass ud. this was your requirement.
    Partha

Maybe you are looking for