Problems getting print-out of Sub-contracting challan

Hi all,
we,ve had real problem getting the print0out of sub contracting challan.
System wouldn't show any print-preview of the sub contracting challan.
but at assign forms and procedures in customizing of Inv management, at 51IF FOR SC challan, the system does show a print-preview of the sc challan form.
but, after creating a SC challan and trying to view the print-preview of sc chalan, the system would neither show print-preview nor get a print-pout of the sc chalan.
please do help in this regard,
thanks and regards
Nabil

solve with other thread

Similar Messages

  • Sub-contract challan output- configuration details..?

    Hi gurus
    Can anybody send me the configuration details for sub contracting , and sub contracting challan output screen layouts in SPRO.
    Because in my company i m not getting Company details in Sub-contract challan print out in front sheet,
    1 challan with 2 pages.
    Thanks
    sap-mm

    r u using std SAP format or Devoloped format
    because if ur using std format unless and untill u put company details in config u cant create 57F4 challan
    if ur using developed report then contact the ABAP person
    regards,
    snb

  • How to take sub-contracting challana print out

    Hai friends,
    How to take sub-contracting challana print out.
    Where i have to do the message settings for taking return delivery excise document print out ( rejected RM  material return to vendor ).
    Please guide me.

    Hello,
    During creation of 57F4 Challan in J1IF01, in Basic Data Tab Page, scroll down the screen, you will get a check box of "Print immediately" just activate it before saving, it will print the Subcontracting challan once you save it.
    And to re-print the same go to J1IF11 and activate this indicator again and save.
    Configuration Checks: -
    SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes > Check whether Subcon Output Type - J1IF is maintained here.
    Also check in M706 - For Output Type - J1IF should be in place.
    Note: - There is no need of maintaining condition record for output type J1IF in MN21 and also no need to do any further configuration.
    Maintain printer in the SPRO - IMG - MM - Inventory management - Output determination - printer determination.- printer determination by plant / storage location ( OMJ3). Here for the application area ME, condition type J1IF, assign the printer.
    regards,

  • Sub-Contract challan print out

    Hi All,
    Can any one give the T.Code for printing the Sub-Contract challan?  I know that most of the org. will use Z program/t.code to print the challans, but I am sure there must be SAP (CIN) std T.Code for printing the same.
    Regards,
    Mani

    Hi Seshagiri,
    Thanks for the response..
    As you suggested, we can print, while creating the challans, however, I would like to print the challans, which were created already (may be second, third time)  Is it possible?
    Regards,
    Mani

  • Quantity reconcilation of sub-contracting challan error

    Hi Experts,
    I am facing problem while doing Quantity reconcilation of sub-contracting challan.
    Challan material is different from material document
    Message no. 8I572
    Thanks in advance

    hi..
    please go to spro>log general>tax on goods movement>india>business transaction>subcontracting>maintain movment type group
    and maintain as given
    0001 102
    0001 122
    0001 541
    0001 544 O
    0002 542
    0002 543 O
    and
    Also This can be solved as under. ( check for following also)
    You will have to activate PO number as a required field for 541 mvmt.
    Materials Management -> Inventory Management and Physical Inventory ->
    Goods Issue / Transfer Postings -> Define Screen Layout.
    For movement type 541 the purchase order field has to be maintained as
    an optional entry or as a required entry here. (under normal condition it will be suppressed)
    This has not been done, otherwise the error message would appear as the mseg-ebeln would not hold the PO number.
    After doing this carryout a new cycle. you will not get any error.
    Edited by: Kedar Kulkarni on Nov 12, 2009 6:06 PM

  • Run time error while reconcillation for sub contracting challan

    Hi,
       Gurus please solve this issue ,
       When i am trying to reconcillation for sub contracting challan against the GR DOC number.When we are assing the quantity for challan and save at that time i am getting abap dump

    Analyse in ST22
    U may take abaper help

  • Sub-contracting challan reconcilation..?

    hi all
    I have problem in reconcilation of callan,
    While doing reconcilation , its showing error as challan already completed..
    But still the challan is not reconciled, in status its showing completed.
    Thanks
    sap-mm

    hi
    check the status as "Completed" for the Sub-contracting challan.
    also Check in SAP OSS for any notes to be applied

  • Unable to create sub contracting challan

    Dear All
    While creating sub contracting Challan i am getting this error
    Please specify the number of line items for the challans.
    Message no. 8I802
    Kindly help me resolve this!
    Thanks
    Srini

    Hi,
    SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes >
    Here specify the no of items per challan in EI items  pl. put 10
    Pl. maintain it for the Right Excise group.
    Biswajit

  • Sub Contracting Challan

    Hi All,
    In Subcontracting process first we are sending the raw material to sub contracting  vendor with Sub Contracting Challan. Now subcontrating Vendor return the raw material due to quality problem. So, please suggest what process we have to do in SAP ? Because we have to closed the sub contracting challan and stock of raw material should come under  unrestricted  use.
    Thanks in Advance.....
    Sanjay

    HI
    Take back material with MB1B mov type 542. Reconcile the challan wrt this 542 mov type document.
    And then complete the challan also.
    Your Subcon PO is still open and u can send fresh material to vendor with MB1B 541 and make a new challan and then complete ur process.
    Thank You

  • Error while creating sub-contracting challan

    Dear Sap Gurus,
                              when i was creating a sub-contracting challan in j1if01 for raw material there is an error message stating that "sub-contracting indicator not maintained for the material".. I dnt knw why it is showng the error..I think i dnt hve to maintain any indicator for raw materials while it is being sent to vendor..kindly clarify my doubt...Thank you...

    Go to J1ID and Select Maintain Material and Chapter Id Combination and Put tick mark Against Subcontractors and save.
    This is Mandatory If the Material Can Be Sent to Subcontractors.
    Regards,
    Ashok

  • Not getting print out of PO

    Dear all,
                 I am not getting print out of PO. In the message out put, the config ( NACE , MN04 ) and as well as all setting are correct. in FURTHER DATA tab, the despatch option id 4 : Send immediately ( when saving the application) ; but it is not generating any spool request for print out. i have checked in SP01 and SP02 , but I could not find out any spool request. More interesting, with the existing config and message setting , we were getting print out till one day ago but presently it is not working.
                  Hoping for corrective solution.
    Regards,
    Partha

    Hi,
    check t.code SPAD and involve Basis Consultant.
    Also check NACE t.code for Program, std form,routine, medium
    Note:
    Customisation steps for Output of Purchase Order
    1. Condition Table
    SPRO > Material Management> Purchasing -> Message -> Output Control->Condition Tables->Define Condition Table for Purchase Order
    Select:
    Purchasing Doc. Type,
    Purch. Organization,
    Vendor
    2. Access Sequences
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Access Sequences->Define Condition Table for Purchase Order
    3. Message Type
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Types->Define Message Type for Purchase Order
    4. Message Determination Schemas
    4.1. Message Determination Schemas
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Schema->Define Message Schema for Purchase Order-> Maintain Message Determination Schema
    4.2. Assign Schema to Purchase Order
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Schema->Define Message Schema for Purchase Order-> Assign Schema to Purchase Order
    5. Partner Roles per Message Type
    SPRO -> Material Management-> Purchasing -> Message -> Output Control-> Partner Roles per Message Type ->Define Partner Role for Purchase Order
    6. Condition Record
    Navigation Path: SAP Menu-> Logistics -> Material Management -> Purchasing-> Master data->Messages-> Purchase Order-> MN04-> Create
    Now you create PO (ME21N) and save it. Go to ME22N and print the PO by giving output type.
    Regards,
    Biju K

  • Sub contracting challan reconcillation

    Hi Friends,
                                 I am doing the subcontracting for sales order
    1. I have created the po with account assignment E
    2. Transferred the material from main store to sub contracting store
    3. created sub contracting challan
    3. created goods reciept and in that i have given reference of sub contracting challan
    4. now i want to do the reconcillation , but system is giving error message as " challan material is different from material document..
    so please suggest , what i have to do? please reply....

    Hi
    Since you are transfering the material to subcontracting store, which is under your premises.You cannot do a reconsiltion.
    If you have seprate subcontractor ,then its possible to do the reconsilation.
    follow the  below procedure subcontracting for sale order :
    1.created the po with account assignment E
    2. Issue the material to Subcontractor by creating a new mvt type 541 E. You cannot issue the sale order stock to subcontractor with 541 mvt.
    3.Create Subcontracting challan
    4.Do GR
    5.Do the reconsilation
    Thanks & Regards
    Dhanapal.

  • Print out of unreleased Contract ? How .

    Dear All ,
                                                           I have to take print out of a contract which is not released yet . But i want to have it's print out by ME9K , But here the released contracts are displaying but the unrel. contr. is not displyaing , can u explain that is it necessary that Contract should be in rel. state for  print out .
    sap11
    Edited by: sap11 on Apr 21, 2009 7:49 AM

    thanx anjali , I have simulated the scenario in dev server . I m able to take print out after release of contract only .
    pts. given & closing this issue .
    sap11

  • Sub contracting challan creation

    HI,
    ERROR:
    when i gone to save the sub contracting challan system saying "Number range generation failure".
    1)i maintained the number range in J1i9 for J_1i57fc component..
    there is any other requirement for this..
    thanks,
    Mohan

    go to SNRO
    give the J_1I57FC give the serives group, then click intervals.
    in that give
    no:  01-it should start with 01 only if you give different it will give the error in creating.
    year:2008
    and give the form to TO number
    while creating subcontracting challan use same series group.
    regards
    jrp

  • Need help for multipule handling unit get printed out

    Hi ,
    I have multipule handling unit in case of issuing the output for selected multipule handling unit using output type . I am getting one handling unit to be printed out . Please can u suggest any configuration is recquired to get selected printed out all the select handling assigned to output type
    Any configuration is recquired to get printed out .
    process followed .
    give DO no  for vl02n (tcode)  and then pack from the menu we get handling unit need to be selected  3 or 4 handling unit then go to extra's and select output given here output type and save it .Then in nace i got only one handling unit.

    You can use the t-code VL74 for printing handling unit output.

Maybe you are looking for

  • Export to text procuding different results between SDK and Report Viewer.

    We have a 3rd party app that uses Report Viewer v2.5.991 to generate reports. We use the export to text feature and specify 60 lines per page. This produces a report with 60 detail lines and a footer that comes after the sixty for a total of 64 lines

  • How to overwrite IDoc Control Record - DOCREL

    Hi Gurus, Is there a way to overwrite the DOCREL field when IDoc is generated in XI? XI always send '700' but i need it to have value '46B' so it will be processed properly by the receiving system. My scenario is, XI is picking up a flat file in AL11

  • Separating images within a photo

    I have many birding photos with several birds in one image, such as 3 terns flying.  I want to be able to move one bird closer to another bird. Is that possible?

  • PLSQL FUNCTION (variation of earlier question)

    -- Attempting to COMBINE two parts of -- a table name using a function -- 1. MANY tables begin with the string: -- FT -- 2. each suffixed two digits refer to the -- year of -- the data in the table -- eg. TABLE FT99 includes all 1999 -- data -- how c

  • JEditorPane - mouse click simulation doesn't work

    Hi all, I have a little problem with my JEditorPane. I want to implement the posibility to put signs on a document loaded in a jeditorpane and save them. One solution is to save the position of the scrollbar, but because the font size can be changed