Process chain Activation Variant failed

Dear Gurus
In BI7 executed a process chain,in this ods activation is in 4 th step,turned in to red,i repeated and got executed.
Questions:
1.I checked in DSO all data got activated,only in process chain showed red status....how it is possible.
2.Eventhough 4th step turned in to red,below all (5,6,7...th steps) went through,how it happened,if some variants failed means next variant should not get executed?
3.When i did repeat it thrown ABAP debugging screen,i executed and went through well,ods activation variant became green.
When i was trying to see display message,it is empty no error message.
Root cause analysis i should give...pls how and where to do the analysis.....
Thanks and regards
T.Gadhatharan

Hi,
1.I checked in DSO all data got activated,only in process chain showed red status....how it is possible.
In the ODS Activation Process, is there any other ODSs existed for activation?
2.Eventhough 4th step turned in to red,below all (5,6,7...th steps) went through,how it happened,if some variants failed means next variant should not get executed?
After the 4th Step, the further processes executed means, they might have put the settings as Success or failure of the predecessor process it can through the further 5th, 6th and 7th processes.
3.When i did repeat it thrown ABAP debugging screen,i executed and went through well,ods activation variant became green.
Check for short dumps ST22.
Hope it helps.
Veerendra.

Similar Messages

  • Why process chain activation is taking more time?

    Hi BW Gurus,
    I am going to activate the process chain, but it takes more time to activate the process chain . What may be the reasons ?
    Regards,
    Raju

    Hi,
    Process chain activation becomes slow due to the following reasons.
    1)Large no of entities in RSPCCHAIN Table i.e, there is  lot of process chains and very large process chains.
    2)There is a missing index for the RSPCCHAIN Table.
    Solution for this problem is  we have to create an index for the following fields of the RSPCCHAIN table.
    EVENT_GREEN
    EVENT_PGREEN
    EVENT_RED
    EVENT_PRED
    Still  if you want further clarification on this , Refer the following sap notes.
    906512---Activating process chain is very slow.
    Related Notes: 872275, 872273& 872271 .
    Regards,
    Chendrasekhar

  • How to run change run in process chain when it fails

    HI All,
    How to run  attribute change run in process chain when it fails. Give me the procedure with clear description. Is there is any difference with 3.x versions in running this.
    Thanks,
    Pratap Reddy

    Hi Pratap.
    If BI Accelerator is not being implemented by ur company, in that case if change run fails u'll proceed by 'Repeat' process option as usual we do in 3.x.
    If BIA is exists, in this scenario u can not repeat as we do in 3.x. U have to drop the indexes on cubes effecting that change run and run the change runs. Once it is finished recreate BIA Indexes on cubes.
    Warm Regards,
    Ramki

  • In Process Chain Activation of DSO is falling

    Hello Techies,
    In the Process chain the activation of DSo is falling but when I go and check the in the Manage DSo.
    The Data is activated and available for reporting.
    I dont know why in the Process chain the activation of DSO is falling ?
    Regards,
    Quaraishi

    Hi
    It depends on background job resource availability at the time of DSO Activaton. Also check the settings of the variant DSO Activation process for each DSO activation and make it separate with number of processes to 2 for activation.
    Save the changes and activate it. Should work correctly now.
    Thanks,
    Sunil

  • Process Chain Master Data Failed.Showing Entire chain has status R

    Hi,
    Everyday SDMasterChain is running successfully.
    Today one of the localChain or subchain  has failed.
    I have noticed that it has failed because last delta for one infoPackage has not yet completed and chain showing status "Entire chain now has status 'R'"
    Can anybody resolve the issue?
    Below is te log for the error.
    Job started
    Step 001 started (program RSPROCESS, variant &0000000113991, user ID ALEREMOTE)
    Last delta upload not yet completed. Cancel
    Data saved successfully
    Start InfoPackage ZPAK_3VB5JI5I0N6QJ7RFSFU7Z3PF2
    Last delta upload not yet completed. Cancel
    Last delta upload not yet completed. Cancel
    InfoPackage ZPAK_3VB5JI5I0N6QJ7RFSFU7Z3PF2 created request
    Request REQU_449HFL0OFD22BSU2GX1X2MJJJ could not be generated with InfoPackage REQU_449HFL0OFD22BSU2GX1X2MJJJ without errors
    Last delta upload not yet completed. Cancel
    Error After Starting InfoPackage ZPAK_3VB5JI5I0N6QJ7RFSFU7Z3PF2 in Process Chain
    Entire chain now has status 'R'
    Process Attribute Change Run, variant Compounding Object has status Undefined (instance )
    Process Save Hierarchy, variant Generated from LOADING ZPAK_3VBSFASA7NWCNP1JX9WXI5 has status Undefined (instance )
    Process Execute InfoPackage, variant 0CUST_SALES_ATTR - Full has status Undefined (instance )
    Process Execute InfoPackage, variant 0CUST_SALES_TEXT has status Undefined (instance )
    Process Execute InfoPackage, variant 0CUST_SALES_TID_LKDH_HIER has status Undefined (instance )
    Process Execute InfoPackage, variant ZMAT_SALET - TEXT has status Undefined (instance )
    Process Start Process, variant Bekaert Master Data Loads - Start Variant has status Undefined (instance 449HEDPDI8N6AP5XKDUODJS6N)
    Process Execute InfoPackage, variant Load from 0MAT_SALES_ATTR into ZMAT_SALE has status Undefined (instance REQU_449HB4K9K3W7GPJEF52YM83N3)
    Process Execute InfoPackage, variant Load from 0MAT_SALES_TEXT into ZMAT_SALE has status Undefined (instance REQU_449HJOO6322QV09OL73P18ODR)
    Process Execute InfoPackage, variant ZMAT_SALEM -  ATTR - FULL has status Undefined (instance REQU_449HEJW4S44QAUTY9LQKH4QY7)
    Process Execute InfoPackage, variant Delta load from 0MAT_PLANT_ATTR into 0MAT_PLANT has status Undefined (instance REQU_449HFL0OFD22BSU2GX1X2MJJJ)
    Termination of chain has been reported to meta chain 449CKM1O64AHRLQJLNZ2GBWQ7
    Message sent successfully
    Job finished
    Rgds,
    CV.

    Hi,
    There are times when Master Data load compel us to do Re-Init. I guess you need a Re-Init.
    Check theses links:
    1: Re: Update mode R is not supported by the extraction API
    2: pl help me with repeat delta for text info object
    Regards
    Happy Tony

  • Process chain program variant will not change from yellow...

    Hello,
    <b>Problem:</b>
    I have a process chain that has two branches with 3 process chain variants on each leg in a parallel configuration.  The process chain variants run different program variants.  I am using variant object called "ABAP Program with Success/Failure " which can have a yellow, green, or red status and has status arrows that can be either red or green that connect to other process chain variants.  The program executed with these variants is a customized BPS UPC_BUNDLE_EXECUTE program.  When I run this PC the first variant on each leg usually hangs indefinitley on the yellow status.  In the Backg tab log (double click PC variant in Log View) I can see the various SQL code that was ran.  The last line of the log is an SQL-END:...  Sometimes it will get past the first 2 varaints and hang on the next set of 2.  Other times it will just hang on the last variant of one leg.  It is very sporadic.
    <b>What I have observed and tried:</b>
    If I check my SM51 for the server the chain is running on I can see that the program in question is not running.  If I run the same program through SE38 that runs via a PC variant it runs sucessfully in an appropriate amount of time.  If I kill the process that has been running indefinitley through SM51 the process chain variant will go from a yellow status to a red as expected.
    I changed they way I ran the programs from running in parallel in 2 legs to running all of them in one leg serially.  That did not work.  At least one program variant will hang on the yellow status.
    I replaced all the variants using "ABAP Program with Success/Failure" to "ABAP Program" which has a red/green status but no red or green arrows, but black coming out of the variant forcing it to move down the chain on a sucess or failure.  The process chain variants also hung in the yellow status using the "ABAP Program" variant. 
    I have tried starting the process chain using both "Direct Scheduling" with "Immediate" and "After Event."  I have also kicked it off using "Start Using Meta Chain or API" so it was functioning as a sub process chain. Programs were still yellow in every case without changing to red or green. 
    I created new process chain variants for every single program/variant that I am using.  Still no luck.
    I have tried removing the chain from the schedule and re-activating and re-running and still no luck. 
    Thanks in advance,
    Gary Martins

    bump

  • Admin cockpit - Business Content Process chain Activation failure

    Hi,
    we are working in Admin cockpit in sand box server.
    we are activating the Business Content Process chain by taking all variants (begin with 0TCT) but we are getting the error message that Process AND has no predecessor.
    Could you kindly suggest any thing to move further.
    Thanks & Regards,
    Shaliny. M
    Edited by: shaliny mega on Mar 19, 2008 7:04 AM

    Hi shaliny,
    As mentioned in this post
    https://www.sdn.sap.com/irj/sdn/forums.
    Have u collected the Source system for which ur collecting the PC when u r activating Business conent?
    Collect the source system when u  r activating the PC. Give a try.
    if it is useful assign points.
    Regards,
    Senthil

  • Process chain activation :  0 c hains were selected

    Hi all
    I have scheduled process chains in production.
    Because one of the metachain is showing error while loading infopackage,in the production I have created a new infopackage and added it to the chian.Then activated the metachain.
    But when i was trying to activate the main chain it showing message"0 chains were selected"
    As a result when i scheduled the chain the old meta chain comes into picture instead of the modified chain.
    ERROR MESSAGE
    0 Chains Were Selected
    Message no. RSPC031
    Diagnosis
    Specifying process chain ID 'ZN_0MATERIALATTR, type V2&', and variant '' has resulted in the selection of 0 process chains. The selection has been called without confirmation by the user. This means that the user was unable to make a selection.
    System Response
    The function is terminated.
    Procedure
    There is porbably an error in the program. Look for corresponding notes.
    Please let me know how to solve this issue.
    Thanks,
    harika.
    Edited by: harikag on Nov 9, 2011 6:33 AM

    Hi harika,
    Looks like the new meta chain was not in activated state....
    Was the meta chain active and scheduled?
    Is the meta chain running for the first time?
    Also check the scheduling options how the Meta process chain is triggered?
    if so , Make sure the event  exist in the new meta chain. this may be causing the error.
    if you had changed and created a new meta chain try to activate the new meta chain once and schedule it again and check.
    Have you transported the PC or created in Production directly?
    if transported from dev to prod check the log if there are any errors?
    Also check if the below s note helps you
    Note 1323015 - Correction: RSPC031 during transport of metachains
    Regards
    KP
    Edited by: prashanthk on Nov 9, 2011 12:16 PM

  • Process Chain e-mail fails

    Hello.
    I have e-mail messages being sent via Process Chains when the chains complete.  It's easy to set up and it works fine for....but for some reason it is not working for my Cost Center process chain.  I tried deleting the process variant and re-creating it, but that did not work.  Again, e-mail messages go out for other cubes and process chains.  Any thoughts on why it does not work for this one?
    Thank you.

    The user-id under which this process-chain runs shall have an internet mail-id associated with it.
    You can set the trace on in SCOT, and then check the error as to why mail-send fails.

  • Iin process chain master dataload failed

    Error when sending data request
    Diagnosis
    The request IDoc could not be sent to the source system using RFC.
    System Response
    There is an IDoc in the Warehouse outbox that did not arrive in the ALE inbox of the source system.
    Further analysis:
    Check the TRFC log.
    You can access this log using the wizard or menu path "Environment -> Transact. RFC -> In Data Warehouse".
    Error handling:
    In particular, check the authorizations for the background user in BI.
    main problem is this is  not occuring daily .only in sundays it is failing with this particular error.
    please help me providing a clear solution
    advance thanks

    May be there are some RFC connection issue during Sunday?
    This might be due to Basis activity to clean up the failed logs and the other acttivities...
    So check with your basis to get the proper status.
    The only thing what you do is that you need to get thedetails of their activities and timings and accordingly you need to change the loading timings of the process chains.
    Hope this helps..
    Murali

  • Error in process chain activation

    HI
    I am learning on 3.0b,(on my pc) while using process chains, at the time of activating the process chain it is giving the following error "JOB BI_PROCESS_PSAPROCESS COULD NOT BE SCHEDULED, TERMINATION WITH RETURN CODE 8". Why am getting this error, is there anything wrong with my system or software or there any mistake in activating process chain" (what ever may be the process type i use, i am getting this error), plz help me.
    thanks

    Hi Ganesh,
    The possible reason for that error is the User type of the background user. Please check out OSS note 511475 which talks about this problem and possible solution. I have used this earlier.
    You can see this for info on how to make the change:
    /message/685940#685940 [original link is broken]
    Hope this helps...

  • Process Chain Data load fail /send email  is not woking

    Hello Experts,
    I have created a process chain for daily data load. And created a message variant to send an email if the data load fials, but it's not working. I am not sure what I am missing. Here are the step I did...
    1. Right click on the Info Package in the process chain and select Create Message, select errors radio button and then created new variant.
    2. In the variant screen, clicked on Maintain Recipient list and enter the Recipient names and mail options like express mail, send copy etc there and then saved.
    Didn't select any under REcip type. Not sure whether it's needed.
    I greatly appreciate your help.
    Thanks
    Ram
    Message was edited by: Sri Vani
    Solved by myself.
    Thanks a lot.
    Message was edited by: Sri Vani

    did you configure the Basis process to send external emails and the automatic output process?
    You could see this in tx SCOT
    If there´s any record in tree (SAP SERVER)->INT->SMTP
    Here.... if is not configured the automatic output you can manually send the emails.....
    If this doesn´t works you need to talk to your basis support for the email basis configuration....
    Regards

  • Process Chain Activation Error

    Hi Experts,
                    We are Transferring  Data from Flat file to Infocube using PROCESS CHAIN..
    Process chain Formation:
    Start -
    >> Infopackage----->>Delete Index--->>DTP--
    >>Create Index
    While Connecting START Variant with Infopackage i am getting following Error....
    Access via 'NULL' object reference not possible.                    
    A Short Dumb Created Contains Following Messages
    Error in the ABAP Application Program                                   
    The current ABAP program "CL_RSPC_FRONTEND==============CP" had to be                     terminated because it has come across a statement that unfortunately cannot be executed.
    Note :
    1. we are also  try to drag the start variant with Infopackage it is not connected .
    2. Datasource and Infopackage are Delta Enabled.
    Need Solution?
    Thanks

    Hi ,
              We are allready  give our file  in Transaction Code :  AL11 ==> DIR_HOME , But Same Error Coming ?
    What is the Problem?
    Thanks

  • New Process Chain Activation

    When a new process is transported to qa or prod it has to be MANUALLY activated one time before the NEW: prefix is removed and the chain can be used by a meta chain.
    Is there a configuration setting or some way to have the chain AUTOMATICALLY activated when it is transported to qa or prod?
    Thanks,
    Mike S.

    Hi Mike,
    Welcome to SDN!!
    You would need to do that to enable the schedule the process chain. I did notice an OSS Note or some document which stated the settings usinh which we can avoid this. I dont have access to my documents now. Would search and post.
    Meanwhile all the posts discussed here talk about manual activation:
    Process chain scheduling in QA
    Process Chain Status is new after transport to QA
    Also chek this blog:/people/sap.user72/blog/2005/09/05/sap-bw-and-business-content-datasources-in-pursuit-of-the-origins
    Bye
    Dinesh

  • Process Chain - Start Variant

    Hi Guys.
      I have a process chain and a start variant, but then when I transported. It seems not be transported the variant. CAn you please help me with this?
    Regards,
    Iván.

    check in forum, you will find lot of threads...
    1. Goto RSA1 --> Transport Connection.
    2. select objects by Object Types.
    3. You can see "Process Chain"
    4. double click on it. inthat select your process chain. go with transfer selection.
    5. Your process chain will transferred to right hand side. check the Grouping options on the right side tool bar. go with "Necessary Objects" under Grouping.
    6. you can see all the list od variants in that. go with transport icon on right side tool bar. you need to make sure all process variants collected in this.
    Nagesh Ganisetti.

Maybe you are looking for

  • Lightroom (Win7) 4.3 "Edit in" function opens Elements 11 but doesn't open image

    Howdy All, I'm running Windows 7 64bit Lightroom 4.3, right clicking on the current open image and selecting "Edit In" "Photoshop Elements 11.exe" which does cause Elements 11 to open but without opening the image originally selected from within Ligh

  • Problem  in PDF output in Chinese

    Moved to correct forum.  Please select the correct forum for your questions in future. Hi, My smartform contains english as well as chinese words. Im tring to get PDF output from RSTXPDFT4 with spool request.Now  if I login in ZH or EN and use RSTXPD

  • OS X's Equivilant to Windows Remote Desktop?

    I just ordered my first Mac today, a 1.66Ghz Mac Mini, and I was wondering if there is anything similar to the Remote Desktop functionality built in to Windows XP Professional, where simply by knowing the IP address of my computer, I can log into it

  • Selecting Multiple columns in Sub-query

    Hi All, I've been using three co-related queries to fetch data as shown below in the pseudo code. All these sub-queries are same, except the column name. I want to avoid the same query to be executed thrice for three columns. Is there any way to avoi

  • New ABS coming soon?

    Two questions: 1. Any ETA on the arrival of the revised ABS program?  I noticed it was in testing already. 2. Any reason why the revamped ABS system hasn't been mentioned in the announcements section of the forum or on the main page?  I'm sure there