Process chain execution error
Hi Experts,
I used to run Process chain on daily basis.During Process chain execution time ,R/3 server was down as a result Process chain is not executed at initial stage itself as a result i got yellow color symbol at one process(Infopackage-delta load).
I triggered that process by FM RSPC_PROCESS_FINISH as a result all the successive Processes executed successfully except triggered Process(InfoPackage).
One of the Expert suggested me to check job ,TRFCS which i failed to trace.
The Process(Infopackage-deltaload) which is in yellow color later turn into Red color.
Now I trigger process chain by "Repair" option as result i got duplicate at that process which is very common apart from that i got duplicates in all successive processes also. Lets say that A and B are successive Processes where as A1 and B1 are duplicates
A A1
B B1
After second successful Process chain execution including Infopackage i found links between A and B,A1 and B1.
Apart from this i found cross link(X) between the above links.
I checked records in all DSO in Process chain which contains two records with numbers in both records at that day where as infopackage containing two records one with red color symbol and other with number.
My question is as infopackage is deltaload is there any effect in getting duplicates in successive processes as they are executed two times in a day.
Thanks&Regards,
narasimha.
Hi Narasimha,
If the Infopackage is set to Delta then there is no chance of getting duplicate records, Delta will bring only the changed/New records. if you have any dought you can check the data in PSA level...
Similar Messages
-
Error in Process chain execution.
Pls, i'm getting the following error with my process chain.
Error TEXT : *************** From HERE ***********
WARNING 914 *** EEWO0914W An internal error has occurred. Either the joblog or the job protocol for the following job does not exist:
Job name: !1
Job ID: !2.
+++ EEWO1016I The Process Chain has been stopped:
Error Text : *************** Till HERE ***********
What is process chain doing : The process loads data from legacy (oracle db) into ODS and then splits data into 2 cubes, with ODS activation, drop indexes, create indexes, delete PSA at proper places. The PC is called from a maestro job (TWS Agent : Tivoli Work Scheduler agent). The TWSA simply calls the PC with no processing at it's end.
Fyi, When i look at the BW logs, the PC is a success (green), with all data loaded successfully. In the last step of the PC, i'm creating a txt file (0 byte file) on the server. Even this file is created with correct time stamp (as per log).
However the TWS reports back the above mentioned error.
The last message, just before the error is :
07/24/2010 17/46/37 RSM1 797Start InfoPackage ZPAK_3XYD134H7BSESPB0MRTCGHNOE
For the past few loadings, this behaviour has been consistent. Could anybody give some lead on this.
Regards,
Nagendra.Hi,
Please implement the following two notes to your system:
1460640 Correction: Synchronous run turns red during log refresh
1396417 Correction: Status "Red" if request does not exist yet
As the execution of the chain goes well on the backend, and the issue
is only reported by the 3rd party program, please get in contact with
the supplier of the TWS. Normally the external schedulers like uc4 using the
rspc_api_chain_start to start the process chains, and the function
module RSPC_API_CHAIN_GET_STATUS to receive the current status
information about the corresponding runs.
Thanks & Regards,
Vipin -
Help! about process chain execution status
hi:
we nearly have one problem about the process chain execution status,
when error occured during process chian execution, we fixed it in time,
however, even the error repaired, its status still showed yellow, and this
stop the subsequent process to excute.
Any body who can provide some help to solve this problem? thanks in advance
and looking forward to one reply.Hi ,
Try this method
Open the messages of a failed step by right clicking on it and selecting 'display messages'.
In the opened popup click on the tab 'Chain'.
In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
1. copy the variant from the popup to the variante of table rspcprocesslog
2. copy the instance from the popup to the instance of table rspcprocesslog
3. copy the start date from the popup to the batchdate of table rspcprocesslog
Press F8 to display the entries of table rspcprocesslog.
Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
Now copy the entries of table rspcprocesslog to the input parameters of the function module like
described as follows:
1. rspcprocesslog-log_id -> i_logid
2. rspcprocesslog-type -> i_type
3. rspcprocesslog-variante -> i_variant
4. rspcprocesslog-instance -> i_instance
5. enter 'G' for parameter i_state (sets the status to green).
Now press F8 to run the fm.
Now the actual process will be set to green and the following process in the chain will be started and the chain can run to the end.
Regards,
Ravi -
How to follow process chain execution history
Hello All;
I need to follow all process chain execution history, is there any way to follow a process chain execution for example over a week ?
Example :
Day 1 PC failes
Day 2 PC success
Day 3 ...
Day 4 ...
Day 5 ...
Regards
AnisGo to tcode RSPC and open your process chain and select log view icon .
check the logs as follows -
Avoid Livecache Lock during process chain execution
Hi All
I have a situation where the DP planners in Asia geographies have a lockout in planning books due to process chain exceutions in US evening time.
Have you come across any such situation where lock out due to process chain execution can be removed/reduced
It will be really helpful if you can provide some inputs on thisHi Vijay,
Probably you have a program to lock all users. You can contact your ABAP team, to change the code, so that the user group maintained in a table (Z) to be excluded out of locking.
We have this type of program in our project, but your code might be different from ours.
Let me know if you want further information...though I cannot share the entire code with you.
Regards
JB -
Process chain scheduling error( Job BI_PROCESS_DROPINDEX could not schedule
Hi,
I am scheduling the process chain but it was throwing an error.
Job BI_PROCESS_DROPINDEX could not be scheduled. Termination with returncode 8
Message no. RSPC065
Diagnosis
Program RSPROCESS is to be scheduled as job BI_PROCESS_DROPINDEX under user ALEREMOTE.
System Response
Scheduling terminated with return code 8. The meanings of the return codes are as follows:
SY-SUBRC = 4:
Scheduling terminated by user
SY-SUBRC = 8:
Error when scheduling job (JOB_SUBMIT)
SY-SUBRC = 12:
Error in internal number assignment
Procedure
Check the system log for more detailed information.
Execute Function
for this i have already checked
in RSPC menu tab
Process Chain >> Attributes >> Execution User
Choose "BW Background User" which should be ALEREMOTE.
above settings i have done.
even though when i am scheduling the process chain i am getting the same error
thanks
sumanSuman,
You are not able to schedule it b'coz it is getting scheduled from user RFCUSER whereas the background user should be ALEREMOTE.
There is an option somewhere in the Menu bar in RSPC to change the Execution user. Please change that to ALEREMOTE,
Please check whether your BW user has enough authorization to run this job. The above post tell you how to do it. -
Process chain Transport error in BI7
Hello All,
We are facing an error while importing a transport request in the BI7 system. The objects collected in the transport request are
InfoPackage
Process chain
Process variants
Table Contents
The error which we are facing is as follows,
Start of the after-import method RS_RSPC_AFTER_IMPORT for object type(s) RSPC (Activation Mode)
Version 'M' of chain LAP_ROM_CS_LOAD_DAILY was saved without checking
Results of check for process in chain :
Results of check for process in chain :
Results of check for process LOADING ZPAK_3GBB2YPFIQL01BW1IDLUNON45 in chain LAP_ROM_CS_LOAD_DAILY:
Kindly let us know if you had faced similar problem before.
regards,
ChandranHi Chandran,
I think that if you expand the transport/import log further there will be a more detailed error message. Can you
check this? If yes can you let us know what the error message text and error code is? It might be the case that
the note 659160 is relevant for the problem.
Best Regards,
Des. -
Send process chain in error by abap
Hi all,
I want to send in error my process chain by abap code, because i've a routine in transfer structure and on the particular conditions this code must stop the load.
How to send in error my process chain by abap?
The following code send in error the infopackage but not the routine in trasfer roule.
l_s_errorlog-msgid = 'Z_my_message_class'.
l_s_errorlog-msgty = 'E'.
l_s_errorlog-msgno = '001'.
APPEND l_s_errorlog TO g_t_errorlog.
thanks,
AlessandroAlessandro
Check this link. It may give some info.
Thnaks
Sat
https://www.sdn.sap.com/irj/sdn/docs?rid=/webcontent/uuid/ee14e25d-0501-0010-11ad-8eb2861a7ec0 [original link is broken] -
Process chain - After error ABAP - trigger a metachain start does not work.
Hi,
I have a process chain, where after an ABAP runs into red (ERROR MESSAGE triggered), another process type, like start a new meta-chain, or start an infopackage starts.... But is does not work. After i go to logs, it asks me whether i want to trigger the following jobs, if i choose yes, it works. But i need to start it automatically, when the ABAP Routine has an error message (RED) in the chain.
Any idea, because I tried to solve it all the day, but i did not manage to get itwork...
Many Thanks,
L.Hi,
the problem is not the ABAP Program.
I have the following situation:
A Metachain contains as second step a call of local chain. After the local chain, according to the status of it (green o red), we have other different steps. So we have two different link (red and green) starting from the local process chain step.
Inside the local process chain there is the ABAP program that check several parameters and if something is not as expected fails with status red. if this situation happens, the local process chain becomes red and in SM37 inside the job i see the error that i forced, but the status is not triggered to the first metachain , so the corresponding following steps are not triggered.
This issue happens only if fails the ABAP program because, for example, a Infopackages loading fails every thing works and the corresponding steps in the metachain are executed.
In the ABAP program in order to force the status red we have the following code:
MESSAGE e162(00) WITH 'Status' 'Red'.
Any idea?
Thanks,
Veronica -
Process chain activation error in BI7...
hi gurus,
we are creating process chain for master data for
0PROMOTION_ATTR
0PROMOTION_TEXT
0SALESORG_ATTR
0SALESORG_TEXT
0CUSTOMER_ATTR
0CUSTOMER_TEXT
0VTYPE_TEXT
0DIVISION_TEXT
0SALES_GRP_TEXT
0DISTR_CHAN_TEXT
0CUST_GROUP_TEXT
0SALES_OFF_TEXT
0MATL_GROUP_TEXT.
we have created 1 start process and then execute info packages and DTP'S and used 'OR' conditions to connect to Attribute change run.
while i try to save my process chain its giving warning that 'Add at least one process to the chain before saving' and when i try to activate the chain its giving below error
Chain has no starter. Add a starter.
Message no. RSPC020
Diagnosis
The process chain has no start-process. A process chain always requires exactly one general starter.
System Response
The system is unable to activate the process chain.
Procedure
Add a general starter to the chain, and schedule it as the first process in the chain.
please suggest me how to rectify the problem.
regardsHi Harish,
Will you please goto process chain start varint and give the new varint for that and try to execute it once again..it will work for you...
If you could check once the check button all will be green and you can able to activate the process chain...I hope you are maintained the infoobjects in attr bute change run...problem might be with the start varint ionly...change the start varint and if you could not able to activate please let me know....
Regards
Srini -
Process chain creation: error:
Hi,
i am creating process chain for the data upload of three info packages!
Two are master data IPs and one is transactional data IP. ( Requirement is to make single process chain for the master data and transactional data ).
Before transactional data upload, i had included the process delete indexes.
When i check the process chain, it says:
"process DROPCUBE variant is referenced but not in the chain "
May i know what is wrong with this process flow? i had actually done similarly in dev system it was not giving any error:
Please suggest me
Thanks,
RaviHi Ravi,
Did you go for Meta chain, if not please try that. Be a bit clear on the question.
regards,
ashok. -
First DTP in Process chain giving Error "CX_RSB_WRITE_ERROR"
Hi All,
I am facing a problem when I execute a process chain.
I have a master process chain and 3 sub process chains. Each of these sub process chains are having some DTP in it in a sequential order. These DTP's are Independent of each other, so even if the first one gives you errors, the remaining ones will get executed.
These DTP's are used to put some files in to the Open Hub Destination, which is the application server, using logical files names.
now the problem is that, when i execute the master Process Chain, the first DTP in each of the sub Process chains are getting failed by giving an error. the error is as follows.
Error : Uncaught_exception.
Exception : CX_RSB_WRITE_ERROR
Any idea in how to correct this? Any help in this regard will be highly appreciated.
Thanks
AjithYou might have missed some parameters in the FILE transaction.
Check the below links so that u may get idea wht u missed out.
Re: Can any one tell me how to write open hubs to application server?
http://help.sap.com/saphelp_nw2004s/helpdata/en/8d/3e4ec2462a11d189000000e8323d3a/content.htm
This might not be an security or authorization issue if u did not face such issue earlier. if so check with BASIS and add security roles to the generic user. -
Process Chain Authorisation Error.
Hi All,
While i am executing process chain i am getting error message " You don't have the authorization for infosource...........".
Can anybody tell ,what i have to do to resolve this issue.
Thanks in Advance...
Points assigned.hi,
Looks like an authorization issue.Please check if you have authorizations for all the objects used in the process chains like execute infopackages, infosources and data targets where you are trying to load data.
hope it helps,
regards,
Parth. -
Process Chain : Communication error
Hi, i have DataSource from UDConnect and working good loading data, but when use the InfoPackage in Process Chain then have the Error :
<b>Communication error: Incoming call is not authorized</b>
Any idea for help me in detect the problem ?Hi any can help in tris problem, only happen in data from UDConnect, the user is BWREMOTE, i test using user by SAP_ALL and not working.
Any idea the Autorization for UDConnect when using Process Chain ? -
Subject: Continue Process Chain Execution Despite a Process Type Failure
My process chain is made of several process types; process type 1, process type 2, etc.
Generally if a process type fails, e.g., process type 1 failed, subsequent process types are not executed.
1. Is it possible to continue to execute process type 2 despite errors in type 1.
2. If process type 2 was an ABAP program, is it possible to get in this program whether process type 1 was success or failure because I want to do certain things only if process type 1 was a failure,Hi,
Here are my answers,
1) Is it possible to continue to execute process type 2 despite errors in type 1.
It is possible to execute subsequent process even if the process fails.
when you are developing the process chain, whilee connecting processtype1 and processtype 2, a popup appears with three optionhs "success", "failure", "always".
select "always" in your case.
If you are asking about the process chain already developed, go to edit mode, removelink between process1 and process2 and follow above steps.
*2) If process type 2 was an ABAP program, is it possible to get in this program whether process type 1 was success or failure because I want to do certain things only if process type 1 was a failure *
let me assume that you want to run programA if process1 is succesful and programB if process1 fails.
include programA in process2 and ProgramB in process3
connect process1 to process2(ProgramA) and select "success" n the popup
connect process1 to process3(ProgramB) and select "failure" in the popup.
hope this helps you,
please let me know if you need any more information.
Regards,
Sri...
Maybe you are looking for
-
Trying to create index cards in pages
Hello, I am trying to create a 3x5 flash card template to study, and can't find an easy way to set this up on Pages. I need to make about 150 double-sided cards with text on the front, and text wrapped around a small picture on the back. So I need to
-
COMPUTE_BCD_OVERFLOW
In ECM, the compensation planning iView, we get a runtime error when trying to apply a percentage adjustment to salary. Here is the error message. We're on ECC 6 EHP4, NW 7 EHP1. Runtime Errors COMPUTE_BCD_OVERFLOW Exception CX
-
After Installing ML on the second Mac
After downloading and installing OS X Mountain Lion on a second macbook pro at home which belongs to my brother and earlier he had been using another apple ID for it. After he installed the OS X ML, I'm unable to find the ML in my purchases at the ap
-
AMConsole - modify password change
Hey guys and gals, We are currently using Access Manager in conjunction with Samba to provide a primary domain controller. We are utilizing the user profile section of amconsole in order to change the users LDAP password. However, we also need to gen
-
Different speed related issue than i've ever heard of ------PLEA​SE READ!
Ok so I've been paying for and receiving 3mbps for a few months now with no problems. I recently upgraded to the 4-7 plan because the central office says my house should receive 5mbps just fine. Well a week after asking for the upgrade I received an