Process Chain Flow doubt

Hi,
There is a process chain of flow start>Infopackage>DTP>ActivateDSO_->InfoPackage1>DTP1>ActivateDSO1_
Only doubt starts where it is underlined. why the infopackage1 has been linked after the Activate DSO eventhough no dependency for DSO1?
Instead the infopackage1 can be linked after start variant of the same process chain, right?
regards,
Draj S

hi,
please checkout the below link it may help you
http://help.sap.com/saphelp_nw70/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm
DataFlow of Process Chains in different SAP BW-BI
Steps for Process Chains in BI 7.0 for a Cube.
1. Start
2. Execute Infopackage
3. Delete Indexes for Cube
4.Execute DTP
5. Create Indexes for Cube
For DSO
1. Start
2. Execute Infopackage
3. Execute DTP
5. Activate DSO
For an IO
1. Start
2.Execute infopackage
3.Execute DTP
4.Attribute Change Run
Data to Cube thru a DSO
1. Start
2. Execute Infopackage ( loads till psa )
3.Execute DTP ( to load DSO from PSA )
4.Activate DSO
5.Further Processing
6.Delete Indexes for Cube
7.Execute DTP ( to load Cube from DSO )
8.Create Indexes for Cube
Thakns,
Neelam

Similar Messages

  • Reg : To view process chain flow for a cube

    HI Experts,
    I need to view process chain flow for a particular cube of sales distribution.Can you please tell me stps to perform .

    Hi,
    If the cube is already loaded then you can just to the infopackages which are loading it and in the infopackages you have option in the "schedule" tab to see which process chain it is loading.
    if not then you will have to identify which data source is loading to the cube and check for the infopackge.
    and I think the DTP will be in the same chain  as well.
    For DTP it is alreday mentioned by the others.
    Thanks
    Ajeet

  • Process chain flow - based on table values

    Hi,
    I want to control the flow of Process chain run through the values that exist in a field ZCONTROL of Z table.
    I have created an ABAP Program where I access the Ztable to get the ZCONTROL values and have added the program in the ABAP process type.
    Below the ABAP process type, I have added the Process type "Decision between Multiple Alternatives" and created a formula using Predecessor_Parameter function to get the ZCONTROL values.
    The format is PREDECESSOR_PARAMETER( <I_FIELDNAME>, <I_LOW_OR_HIGH>, <I_NUM
    How should I get the I_FIELDNAME value here?
    Please help.
    Thanks.

    Hi Eric / Steph,
    Thanks for your reponses.
    Eric,
    My table has the infopackages name and ZCONTROL field, which contains an indicator "X" or SPACE based the scheduling requirements.  If "X", the Infopackage is scheduled else, it is not.
    In the formula, how will I import the infopackage name.  The custom function can be created with export parameters as ZCONTROL values.
    But when I use the custom funtion, I will need to use the fields on the left hand side and it should have the infopackage name ideally.
    If you get any idea, please let me know.
    Steph,
    I will try your suggestion. 
    Can one ABAP program added as an ABAP Process type in the Process chain, trigger multiple events for different process chains?
    Also, if the infopackages are scheduled, one below the other, if one is not scheduled, will it move to the next one?  Will it go as an error(red) or green?  Should 2 load infopackages process types connected as success or Always?
    Please clarify.
    Thanks.
    Also,

  • Process chain running :doubt

    Hi,
    I had scheduled one process chain which is running now---
    now its in last step that is
    "deleting overlapping request in infocube----"
    i had checked this job : it is running with out any hassles--
    now after this only AND process is there to finish the chain---
    Now i want to schedule the process chain again for weekend!
    can i change the start varinat though the chain is still running??
    Raj

    Hi Raj,
    Its not a good practive to reshedule the chains which is running now..
    when u attempt to reschedule then the process will gets terminated from the point where its running .... I mean the present running job will be in active mode and it will gets finished.. but the process after the active process will gets disconnected as soon as u reschedule the chain..
    So better to wait for ur chain to finish and then proceed with the reschedule...
    Also before rescheduling try to deschedule the chain...
    Thanks
    Assigning points is the way to say thanks..
    If this resolves ur issue then close this thread by assigning points..

  • Process chain developement doubt

    Hi,
    I am developeing small process chain for loading master data(Delta).
    I have already done innitial load of master data in infoobject, now i am developing a process chain to load delta master data. My question is shall i need to use different infopackages than used for initial load OR same infopackages used for initial load can be used for delta load process chain of master data.
    please reply.

    Hi,
    Best practice is to use different infopackages.
    But the same InfoPackages can also be uesd in the Process Chain. No harm.
    Anup.
    Edited by: Anup ShankarBS on May 5, 2008 10:50 AM

  • Toggle Option in Process Chain not working

    Hello SDNers,
    I am experiencing the below scenario with one of my process chain.
    Process Chain FLow
    Start
    |
    |
    Local Chain (To delete the already existing file from Application Server(ZFTP))
    |
    Local chain to rename the file
    |
    |
    Local chain (Load data to cube)
    |
    |
    Local chain to backup a file from Appl. Server
    In the above flow, the step 2 has been set to proceed further even if there are no files to delete in the application server. To achieve this I am using a toggle option between the step 2 and 3.
    At times, the chain progress further when there are no files to delete as expected but not all the times.
    I am trying to figure why the step which is supposed to progress further is not progressing some times even though it has been set to move further.
    Any advice would be helpful.
    Regards,
    Vinoth

    Hello Venkatesh,
    Thank You for your Patience.
    I have BW systems both running in the SAP_BW Versions 730 & 701.
    I have checked the folders " Other BW Processes " & "Other" and below are the process types.
    Other BW Processes
    Attribute Change Run
    Adjustment of Time-Dependent Aggregates
    Deletion of Requests from PSA
    Deletion of Requests from the Change Log
    Execute Planning Sequence
    Switch Realtime InfoCube to Plan Mode
    Switch Realtime InfoCube to Load Mode
    Reorganize Attributes and Texts for Master Data
    Execute Analysis Process
    Update Explorer Properties of BW Objects
    Other
    Event in SAP CPS
    Job in SAP CPS
    Last Customer Contact Update (Retraction)
    Regards,
    Vinoth V

  • When to use the "construct database statistics" process chain' item

    Hello, everybody.
    Information 1:
    In our BW system we have a job from DBA guys that build statistcs for the entire database. This job runs every day in the dawn.
    Information 2:
    In several process chain flows, we use the item "Construct Database Statistics" to update the statistics after cube upload.
    Information 3:
    I checked the log from both jobs and found several tables analyzed in first and second cases.
    The question:
    Is this step inside the process chain unnecessary? Exist any situation when this step is useful?
    Thanks in advance,
    Henrique Teodoro

    Hi.
    I found one advice about this issue in the follow thread:
    /message/3460818#3460818 [original link is broken]
    Regards,
    Henrique Teodoro

  • How to create process chain for this data flow

    Hi experts,
    My data flow is:
    ======================================
    2lis_11_vahdr->Transfer rules->2lis_11_vahdr->Update rules->DSO1->Transformation->DTP->Cube1.
    2lis_11_vaitm->Transfer rules->2lis_11_vaitm->Update rules->DSO1->Transformation->DTP->Cube1.
    ======================================
    2lis_12_vchdr->Transfer rules->2lis_12_vchdr->Update rules->DSO2->Transformation->DTP->Cube1.
    2lis_12_vcitm->Transfer rules->2lis_12_vcitm->Update rules->DSO2->Transformation->DTP->Cube1.
    ======================================
    2lis_13_vdhdr->Transfer rules->2lis_13_vdhdr->Update rules->DSO3->Transformation->DTP->Cube1.
    2lis_13_vditm->Transfer rules->2lis_13_vditm->Update rules->DSO3->Transformation->DTP->Cube1.
    ======================================
    Here for each datasource info package brings data upto dso and then from dso dtp fetches the data.
    For deltas i want to keep this data flow in process chain.
    Anyone please guide me how to keep this in a process chain.
    Full points will be assigned.
    Regards,
    Bhadri m.
    Edited by: Bhadri M on Sep 2, 2008 7:20 PM
    Edited by: Bhadri M on Sep 2, 2008 7:21 PM

    Hello,
    Sure it is possible to maintain that dataflow.
    Start here:
    This is a very good document about process chains:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    Let me know if you have any doubts.
    Regards,
    Jorge Diogo

  • Error handling in process chain-doubts

    Hi ,
    I have some doubts in error handling of process chains.
    1) I have  aprocess load infopackeage and subsequent process is update fromPSA.
    process load infopackage got failed  , so i loaded  the IP manually and repeated the next i.e process update from PSA .
    How to correct the process chain from now?
    2) I have  aprocess load infopackeage and subsequent process is Delete request in infocube .process load infopackage got failed  , so i loaded  the IP manually and repeated the next process i.e Delete request in infocube. Chain continued by deleting the right request . How this is possible ?
    Plz  help me  as this is urgent and daily i have to deal with this  issues. If any documents on error handling is greatly appreciated.
    My mail id is [email protected]
    Regards,
    Pavan

    Hi Pavan,
    Hope the following links will give u a clear idea about process chains and clear ur doubts.
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Errors in monitoring of process chains can be categorized into 4 different sections...
    Master data - Full Update
    Master data - Delta Update
    Transaction data - Full Update
    Transaction data - Delta Update.. in terms of loading of data which can be due to server shut down or system maintenance... errors due to incorrect entries in the OLTP system in which case you'll have to fix the errors in the PSA and manually load the data...
    Otherwise it can have errors on Attribute change run being locked by some other job... Aggregate Roll up failing because of attribute change run being run at the same time... Problem with hierarchies and save hierarchies...
    There can be problems with the data store activation if the ODS object contains any incorrect request sitting inside it... then, you need to delete the incorrect request and reload the data again...
    In case of Transaction Delta failure, you'll have to request for a repeat either manually in the infopackage or using the repeat option if available on right clicking the load event...
    For Master Data Delta failures, you need to do an Re-init by deleteing the previous initalization condition in the "initalization option for source systems" in the menu scheduler or reschedule the enitre chain... because, master data generally do not support repeat of last delta ...
    U can even look into these links:
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    For common data load errors check this link:
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    ****Assign Points if Helpful****
    Regards,
    Ravikanth.

  • How to redirect loading flow in process chain based on logic?

    Hi Experts,
    I have a scenario where I want to keep data for last 3 years in 3 different cubes.e.g. lets say cube 1 holds data for current 2006 year, cube 2 holds 2005 and cube 3 holds 2004.Now in next year 2007, I want to keep data for 2007, 2006 and 2005.I want to keep data for 2007 in cube 3 which was holding 2004 data.(delete 2004 data and load 2007).
    This process should be automated i.e. which cube to load should be done auto.In short, <b>data for new cube should go into cube which is holding data for oldest year.</b>
    I want to know :
    1) Which Options I can use to do this?
    2) What about ABAP program : custom table can be maintained to know which cube is holding what data, but how to redirect loading flow?
    3) What about "Decision process type" in process chain?
    4) Also would custom process type solve this functionality?
    Any ideas would be highly appreciated.
    Thanks in advance,
    Sorabh

    Hi Sorabh,
    Its just an Idea, Im assuming that this would work. This should also work for INIT DELTA I guess. But would need proper testing.
    Have a Custom Table ZCUBEYEAR and maintain the CUBE as the Key.
    ZCUBEYEAR
    CUBE     YEAR
    Y1       2004
    Y2       2005
    Y3       2006.
    In the update rule->Start Routine for Cube Y1, extract this entry from the table ZCUBEYEAR for Y1, which in this case would be 2004.
    DELETE DATA_PACKAGE WHERE YEAR NE YEARFORCUBEY1.
    in our case YEARFORCUBEY1 = 2004.
    For cube Y2 and Y3 the Delete statement would be as follows in their Start Routines.
    DELETE DATA_PACKAGE WHERE YEAR NE YEARFORCUBEY2.
    DELETE DATA_PACKAGE WHERE YEAR NE YEARFORCUBEY3.
    This would ensure that only 2004 data would flow to Y1, 2005 for Y2 and 2006 for Y3.
    Once we come to a NEW YEAR, We need to run a program or Manually change the CUSTOM TABLE "ZCUBEYEAR" updating the cube Y1 with 2007, the Deltas would flow correctly.
    Please email me at [email protected], we could have a detailed discussion.
    Hope the above helps your cause.
    Regards,
    Praveen.

  • Trigger informatica work flow using process chain

    Hi,
    tell me how to trigger the informatica work flow using the process chains.
    Please tell me the steps.
    Babu

    Currently, we have a custom trigger file on the BW system.  We have a workflow in Informatica that loops periodically and checks the data in this table.  When the file changes, the workflow in Informatica then continues. 
    However, I think a better solution is to use a <i>pmcmd</i> and set up a batch file that runs a command that will schedule your workflow.  You can then put this batch file on the BW server and call it from the process chain (use process OS command).
    The command will look something like this:
    <b>pmcmd scheduleworkflow -s</b> (server)<b> -u</b> (user) <b>-p</b> (password) <b>-f</b> (workflow)
    See Chapter 23 in your Informatica Help on using <i>pmcmd</i>.

  • Process chain doubt

    Hi All,
    In process chain in one process step which is delta load
    for master data infoobject failed due to error as idocs not updated to business warehouse an d avlble in ale inbox,now below the step there are amny steps connected ,if we do no manuall update by going to the monitor screen ,status -process manually .then we have to do manually other steps ,so to avoid that i repeated the step,it fetched 0 records saying there are new deltas on r-3 side,so how can i know that the delta updated is with correct delta records compared to r-3 side records.
    Thanks
    venkat

    Hello Venkat
    You performed repeat step and it fetched 0 records saying that there are No new deltas on R/3 side and you want to check if you have missed delta records.
    Few tips - Find out from RSMON , Generally everyday how many delat records are updated for that Info object .
    If you know the tables for master data on this Info object on R/3 side then check what are new entries and changed entries (created on yesterday & changed on yesterday ) and validate it with BW Master data table .
    Hope this helps
    Regards
    Pradip

  • HI doubt on Process chain...

    Hi Sap folks...
           Could any one tell me about the different issues we get when running process chains, especially on data loads. i want to know issues which comes like Collar 70, 90 and so many.
    Points will be rewarded to all the active members.
    Regards
    Sujan

    nice interview question for BW Support role.
    Plese refer to http://help.sap.com/saphelp_nw04/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm
    It will answer all your questions.
    I seriously think that we should have seperate subforum dedicated to 'BW Interview questions'
    rgds
    Pradip

  • Doubt on Process Chain

    Hi BW Experts,
    Due to some problems , we have stopped all process chains on 20/09/2007.
    We have MM process chain.
    Just now i see the Delta Infopackage of MM. In PROCESSING TAB only PSA is checked. 
    Update Subsequently in Data Targets in not CHECKED.
    We have not changed anything in Processing Tab.
    But before 20/09/2007, we have the data in Infocube.
    How it is possible.
    This Process Chain looks:
    START--> DELETE INDEX>LOAD DATA (INFOPACKAGE)>CREATE INDEX>COLLAPSE-->DB STATISTICS.
    Please can anyone tell me the solution.
    Regards,
    Anjali

    Hi Anjali,
    First of all, what exactly you wanted to ask? Whether how the setting changed? or How to correct the setting?
    Regards,
    Habeeb

  • RE: Process chain doubt

    Hi Guru's
    I am loading 4 flatfile data loads(4 info packages) to the same ODS. my question is while creating, a single process chain with the 4 infopackages should i create 4 ODS0 DATA ACTIVATION or a single ODSO DATA ACTIVATION is ok?
    Can anyone help me?
    Thanks In Advance
    Regards
    VS Rao

    Rao -
    if we have indexes in infocube they improves the performance (execution time) of  report on that infocube,but it take much time to load data into infocube when infocube have indexes.to avoid this we always delete the indexes before loading data into infocube after the data load is done then we create those indexes again (deleting indexes improves data load perofmance in infocube). we can do whole cycle in process chain.
    Edited by: anesh babu boddapati on Jan 11, 2008 7:08 PM

Maybe you are looking for

  • Unable to open Hyperion workspace with weblogic 8.1

    HI .. I m Using Web logic 8.1 as application server for Hyperion Reporting (Workspace,WebAnalysis). I forgot the password of weblogic . During the Hyperion configuration its accepting any password what i enter , and its also showing successful config

  • Mac Mini mid 2010 Moutain Lion Memory full without working any program

    My Mini works very slow and the memory(5Gb) get's full during night in sleep modus. And sometimes the free memory space is only ~40Mb What is the problem with memory ? Best Regards

  • Publish as an exe with links

    Hi all, I've been trying to use the 'Publish as an exe' option in Captivate 4 but I'm coming up against a problem - although the swf and flv files are embedded within the exe I can't get the links to do the same thing. There are buttons on slides tha

  • Sign in irritation

    I installed one CC licence on two machines. The first machine has no problems: all CC apps start immediately. The second machine is bugging me with a pesky login screen all the time, if I dare activate a CC app. I logged in dozens of times but every

  • HD and PAL-M or Pal only

    Hi, I have been thinking about HD a lot. The thing is: If I buy a HDV camera, Can I work with both NTSC and PAL. I have been working with FCS2 but still very new on it. So can I capture my movies on HDV camera and brodcast it on a country that works