Hi guys i have transported my process chain to PRD but i can see it in the tree but appears as NEW i suspect that are not active....when i try to plan them i can´t do it because in PRD you cannot made changes....is needed to make changes in PRD for this?
Obviously i can´t program my jobs
I hope somebody could help me....
In DEV my Process Chain is Active
Regards
Message was edited by: Oscar Diaz

Hi,
If you want to make the Process Chain Changable
RSA1 -> Transport Connection --> Object Changability-> Slect Process chain (Changable)
let me know the out come
Regards
Happy Tony

Similar Messages

  • Process chain Error: This AND process is not waiting for event RSPROCESS

    Hi All,
    I am facing an error in the process chain in PRD.
    Error message: This AND process is not waiting for event RSPROCESS.
    We had a process chain which had two sub chains which run parallel and below of this we had AND process type and below of the AND process we had 4 more jobs.
    Once the two subchains got successfully loaded, the and process should turn to green and further 4 jobs should start.
    It is a daily load , it worked fine from past years,but suddenly the AND processtype is getting failed.The thing is in the two subchains if one got completed, the AND process process is not waiting for 2nd subchain to get completed.The AND process is turning to RED (status: cancelled) . I tried to repeat the AND process once after above 2 subchains loaded, but it didnt worked.
    And i removed the existing AND process and created a new one and placed it in same place and activated and schedules again.but still it is getting failed with same error.
    Thanks in advance,
    Sai Chand.S

    Hi,
    If you did any transports related to that metachain we face similar kind of issues.
    not only the AND process , we need to remove all the process before executing the AND process and create it again.
    It helps you, you said your in production So you should take the proper approvals and do it.
    Regards,
    Yerrabelli.

  • Process Chain Stopped in BI PRD

    Data Loading Error :
    Hi All,
    In BI PRoduction, all the process Chains are stopped and while Checking the errors, it is giving the error message as
    Errors while sending packages from OLTP to BI
    Diagnosis
    No IDocs could be sent to BI using RFC.
    System Response
    There are IDocs in the source system ALE outbox that did not arrive in the ALE inbox of BI.
    Further analysis:
    Check the TRFC log.
    You can access this log using the wizard or the menu path "Environment -> Transact. RFC -> In source system".
    Error handling:
    If the TRFC is incorrect, check whether the source system is fully connected to BI. In particular, check the authorizations of the background user in the source system.
    Morning, I have logged into BW Production, and saying BW Production is down. This is happening frequently.By the help of basis, the system is up.
    Please help on this issue.
    Thanks,
    Jelina.

    Thanks for the reply.
    I have Checked in ST22 and found, Time Out error is there.
    These are the error messages in ST22.
    The program "SAPMSSY1" has exceeded the maximum permitted runtime without interruption and has therefore been terminated.
    Error Analysis :
    After a specific time, the program is terminated to make the work area available to other users who may be waiting.
    This is to prevent a work area being blocked unnecessarily long by, for
    example:
    - Endless loops (DO, WHILE, ...),
    - Database accesses with a large result set
    - Database accesses without a suitable index (full table scan)
    The maximum runtime of a program is limited by the system profile
    parameter "rdisp/max_wprun_time". The current setting is 3600 seconds. If this time limit is exceeded, the system attempts to cancel any running SQL statement or signals the ABAP processor to stop the running program. Then the system waits another 60 seconds maximum. If the program is then still active,the work process is restarted.
    How to correct the Error :
    Programs with long runtime should generally be started as background jobs. If this is not possible, you can increase the system profile parameter "rdisp/max_wprun_time".
    Depending on the cause of the error, you may have to take one of the following measures:
    - Endless loop: Correct program;
    - Dataset resulting from database access is too large:
      Instead of "SELECT * ... ENDSELECT", use "SELECT * INTO internal table
      (for example);
    - Database has unsuitable index: Check index generation.
    If the error occures in a non-modified SAP program, you may be able to find an interim solution in an SAP Note.
    If you have access to SAP Notes, carry out a search with the following keywords:
    "TIME_OUT" " "
    "SAPMSSY1" or "SAPMSSY1"
    "REMOTE_FUNCTION_CALL"
    If you cannot solve the problem yourself and want to send an error notification to SAP, include the following information:
    1. The description of the current problem (short dump)
       To save the description, choose "System->List->Save->Local File
    (Unconverted)".
    2. Corresponding system log
       Display the system log by calling transaction SM21.
       Restrict the time interval to 10 minutes before and five minutes after the short dump. Then choose "System->List->Save->Local File
    (Unconverted)".
    3. If the problem occurs in a problem of your own or a modified SAP program: The source code of the program
       In the editor, choose "Utilities->More Utilities->Upload/Download->Download".
    4. Details about the conditions under which the error occurred or which
    actions and input led to the error.
    Thanks,
    Ram
    Edited by: Ram Siva on Jul 28, 2009 6:59 AM

  • Error encountered while running a process chain

    Hi,
    Was wondering what's the cause of this error:
    <b>Invalid call sequence to interfaces when recording changes.</b>
    We keep on getting this error message when we try to activate and schedule our process chain.
    Please help. Thanks!

    We run into this problem every time we Activate/Schedule a Process Chain; doesn't really <i>affect</i> anything. The chain still runs as scheduled once you "OK" through the error messages.
    Seems to be some rogue message that comes up in  more Authorization-sensitive environments (Read: PRD)
    I have researched this to fruitless extents: no Notes exist, etc.
    Sorry I can't be of more help other than to say "<i>I feel your pain</i>"  :-D

  • Process chains get an error when run analysis process

    When my PRD system‘s process chains run analysisi process, I  gets below error message:
    Error occurred when starting the parser: Error when opening an RFC connection (FUNCTION: 'R
    Message no. BRAINOLAPAPI011
    Diagnosis
    Failed to start the MDX parser.
    System Response
    Error when opening an RFC connection (FUNCTION: 'R
    Procedure
    Check the Sys Log in Transaction SM21 and test the TCP-IP connection MDX_PARSER in Transaction SM59.
    It's OK when i test the TCP-IP connection MDX_PARSER in Transaction SM59.
    The Sys Log in Transaction SM21(error part):
    M Wed Mar 19 09:22:50 2014
    M  *** ERROR => ThPOpen: ExecPopen("/usr/sap/BWP/DVEBMGS00/exe/tp" bwprd sapgw00 18933904 IDX=35, r, ..) returned -14 [thxxexec.c
    M  {root-id=532810645F5D12A0E1008000C0A8642F}_{conn-id=5328109B5F5D12A0E1008000C0A8642F}_5
    A  RFC 1878  CONVID 18933904
    A   * CMRC=0 DATA=0 STATUS=0 SAPRC=0 RfcExecProgramKernel RfcRaiseErrorMessage cmd could not be started by OS (rc = 1)
    A  RFC> ABAP Programm: SAPLSTPA (Transaction: )
    A  RFC> User: JY-LKZ (Client: 900)
    A  RFC> Destination: CALLTP_AIX (handle: 8, DtConId: 530F4E5C30AF4550E1008000C0A8642E, DtConCnt: 0, ConvId: ,)
    A  RFC SERVER> RFC Server Session (handle: 1, 68443927, {5328109B-5F5D-12A0-E100-8000C0A8642F})
    A  RFC SERVER> Caller host:
    A  RFC SERVER> Caller transaction code: STMS (Caller Program: SAPLTMSC)
    A  RFC SERVER> Called function module: TMS_CI_START_SERVICE
    A  *** ERROR => RFC Error RFCIO_ERROR_SYSERROR in abrfcpic.c : 1887
    FUNCTION: 'RfcExecProgramKernel'
    RfcRaiseErrorMessage cmd could not be started by OS (rc = 1)
    PROG ="/usr/sap/BWP/DVEBMGS00/exe/tp" bwprd sapgw00 18933904 IDX=35
    [abrfcio.c    9213]
    A  {root-id=532810645F5D12A0E1008000C0A8642F}_{conn-id=5328109B5F5D12A0E1008000C0A8642F}_5
    A  TH VERBOSE LEVEL FULL
    A  ** RABAX: end RX_GET_MESSAGE
    M
    M Wed Mar 19 09:23:15 2014
    M  *** ERROR => ThPOpen: ExecPopen("/usr/sap/BWP/DVEBMGS00/exe/tp" bwprd sapgw00 18968493 IDX=61, r, ..) returned -14 [thxxexec.c
    M  {root-id=532810645F5D12A0E1008000C0A8642F}_{conn-id=532811958F750F10E1008000C0A8642F}_1
    A  RFC 1878  CONVID 18968493
    A   * CMRC=0 DATA=0 STATUS=0 SAPRC=0 RfcExecProgramKernel RfcRaiseErrorMessage cmd could not be started by OS (rc = 1)
    A  RFC> ABAP Programm: SAPLSTPA (Transaction: )
    A  RFC> User: TMSADM (Client: 000)
    A  RFC> Destination: CALLTP_AIX (handle: 3, DtConId: 530F4E7830AF4550E1008000C0A8642E, DtConCnt: 0, ConvId: ,)
    A  RFC SERVER> RFC Server Session (handle: 1, 70212851, {53281195-8F75-0F10-E100-8000C0A8642F})
    A  RFC SERVER> Caller host:
    A  RFC SERVER> Caller transaction code: STMS (Caller Program: SAPLTMSC)
    A  RFC SERVER> Called function module: TMS_CI_START_SERVICE
    A  *** ERROR => RFC Error RFCIO_ERROR_SYSERROR in abrfcpic.c : 1887
    FUNCTION: 'RfcExecProgramKernel'
    RfcRaiseErrorMessage cmd could not be started by OS (rc = 1)
    PROG ="/usr/sap/BWP/DVEBMGS00/exe/tp" bwprd sapgw00 18968493 IDX=61
    [abrfcio.c    9213]
    A  {root-id=532810645F5D12A0E1008000C0A8642F}_{conn-id=532811958F750F10E1008000C0A8642F}_1
    A  TH VERBOSE LEVEL FULL
    A  ** RABAX: end RX_GET_MESSAGE.
    ps.
    1、IT's everything ok in the development system.
    2、It’s ok when i repeat this analysis process .
    3、It’s ok when i run this analysis process in analysis process designer.
    4、Attachment is the sys log in sm21.
    Thanks everyone.

    Hi Vignesh.B,
    Yes,it's not user's problem . But i don't  think it APD's problem .Cause all APD has the same problem and .
    Below is one of APD souce and target :
    Hope this information  is useful .
    Regards,
    Lian

  • How to put system info. in error mess. sent by email through process chains

    When I get an error message by email from the process chain saying that the process bombed, it does not tell me from which SAP system the problem occured? (Whether Dev or QA or Prod). Is there a way to put the SAP system in the email along with the error from the process chain?
    Thanks
    Ram

    Hi Akshay,
    I am in version 3.5. I believe you can do it in 7. We have a standard user id called ALEREMOTE coming from all 3 systems. We would ideally like the message to say ALEREMOTE - (the error message with DEV specified), ALEREMOTE - (the error message with QA specified) and ALEREMOTE - (the error message with PRD specified).
    Thanks
    Ram

  • Process chains in red(errors occurred), monitoring in green

    Hi friends,I have same problems with the monitoring / process chains.
    For exemples in the Monitor for OMAT_SALES in the tab Status I have green for Total and Technical with the message:
       Data successfully updated
       Diagnosis
       The request has been updated successfully.
       InfoSource : 0MAT_SALES
       Data type : Texts
       Source system: PRD-600
    In the tab Details I have:
    -the Overall status in red, error occures or missing messages
    -the requests, extractions,transfers,processing-everything is Ok-green
    -the Process Chains-errors occurred-red
    In the transaction RSPC the infopackage for load data OMAT_SALES is red,the next infopackage in the chain is green.
    What can I do to fix this problem  for Process Chain in RSPC and also in Monitoring (tab Details)?
    I will apreciate any answer,
    Thanks,
    Claudia

    The next connected infopackage must be connected with Always link that's why its processed even after the failure node. Go and cross check what errors you got for the failed process, and reload it manually.

  • Process chain is not visible in Quality after TR transport

    Hi,
    I have transported process chain to Qua, but its not visible, only the technical id of process chain is displayed in RSPC tcode. I've tried activating through RSPC_CHAIN_ACTIVE_REMOTE, but still, its not visible in rspc tcode.

    Thru not assigned nodes you have issue.
    All objects are at prod not in place or not inactive.
    So first transport your data flow objects(one by one as suggested at another thread) one by one again to prod and make them proper activation.
    at final you can transport your process chain into prod and check it.
    With out info pack/dtps at prd, connected process chain how will display the chain.
    One the data flow you have issue, please try understand the issue and re transport whole data flow.

  • Process chains issue:very urgent

    Hi All,
    This issue is related to process chains.Last weekend our Basis team changed the BW PRD from BWBPRD to BWBPRD1.The process chains were schedlued previously on BWBPRD, so after the server change none of the process chains were triggered.
    We have rescheduled our process chains in the new server yesterday, but no success.
    We could not find any log in the SM37 also.
    Kindly suggest how to overcome this issue
    Thanks,
    Manjula

    Hi,
    Check do you have connection with this new system( BWBPRD1) to your source system (R/3), and check the changed server is reflecting in SM66 or SM50. try to execute the job immediate and check chain is running or not. at the time of execution you can assign the new server to run this particular chain.
    as for as your problem concerned i think your application is not active.

  • Transportation of process chain

    Hi,
    I have transported Process chain from Development system to Quality system,but i cannot see my transported process chain in BWQ, i did't get any problems while transporting request from development to Quality, in STMS also succesfully imported.but my problem is why i cannot see my process chain in RSPC of Quality system.
    Thanks&Regards
    YSN

    Hi,
    You can use T-code se10, searched the request numbers by userID. Then, you can check the request with your Process Chain to see if you have included all process variant and elements for your process chain.
    In my experience , if you collected elements of process chain  by Transport Connection and transported, you should be able to see everything of transported chain on QAS/PRD.
    Hope it helps
    Best Regards
    S.F

  • Process chain execution using program

    hi,
    i want to run process chain 10 times using a program.
    can any one tell me how to write a program in pc in order to run the chain 10 times.
    any example of running the process chin using program .any nice code will be really useful
    please suggest me.
    i will assign points

    Hi Venkat,
    Go to SE37 input CHAIN  F4 then you will get various function module that can be used for process chain.
    IN you program call the function module RSPC_CHAIN_EXECUTE_REMOTE pass the required parameters and exceute.
    Test throughly in DEV system before moving to PRD. I have not used this earlier.
    Hope this helps.
    PV

  • Creating process chains in production environment..

    Hi,
    We are planning to create process chains in our project , can we directly create process chains in the production environment? the data and the set up is very very small here  so the number of chains and processess are very less , is it ok if we create the process chains in Production environemnt directly, or we need to create in development and transport it to production (note: there is no quality instance for BW in our project).
    Solicit your help!!
    Regards
    Srinivas

    Hi ,
    Best practice would be to create PC in DEV and move it to PRD .
    Actually what happens in real time is sometimes your data mismatch happens or some other data loading activity you are doing in PRD system . So you need the freedom of creating DTP or Infopackage directly in PRD system . otherwise it would be a time consuming process to make it from DEV to PRD .
    Similarly when you are Infopackages & DTPs in PRD environment, there is a chance that your process chain might also be changed . So yes we can create it in PRD system .
    Kind Regards,
    Ashutosh Singh

  • Transport of process chains

    I added new mail messages to my Meta chain in each local chain process type. will I have to transport the entire process chain again the underlying process types
    or only the mail message variants are fine to be sent to QA and PRD
    Edited by: AAL123 on Sep 19, 2011 1:04 PM

    Hi,
      You can move the variants only but its always recommended to move the entire chains to next systems. But make sure that in case if the process chain was included in any of the previous transports, then that transport should have been released.
    Also while collecting make sure that you are not including any objects like Data sources etc. Also in case if the chain is already in production then no need o worry. But in case if the chain is being transported for first time then do use the option "Start using a Metachain or API" or set the schedule date to future date else the chain starts running automataically as soon as the chain is moved to production.
    Also check the below link, it might be helpful to you:
    http://www.sap-img.com/business/transport-process-chains-to-test-system.htm
    Hope that the above info is helpful for you?
    Thanks

  • How to reuse the process chain which has been deleted?

    hi
    guys
                  how to reuse the process chain which has been deleted?
    your regards
    suresh

    if you want to "recover" the deleted process chain, try to check DEV / QAS / PRD. Maybe there is a copy still available
    Or check the following tables in SE11: RSPCCHAIN / RSPCCHAINATTR
    Good luck !

  • Transport process chains

    Hi all
    Please list out the steps to transport process chains from QAU to PRD.
    We have all hte infopackages,DTP's,infoobjects int he production.
    Now we need to transport ProcessChains.
    Intransport connection->Grouping option?collection option?
    Please suggest me.
    Thanks,
    Harika.

    Hi Harikag,
      The problem that you are facing is most often faced when the transport is made from DEV / QUA system to production system. This occurs more often when objects already existing in production are re-transported to production. Most of the times the corresponding transformation / DTP's get inactive. Nothing can be done as the the entire thing depends on way you transport the objects to production, only prevention is possible or else you need to apply the cure :). Don't worry as this is common scenario during transports. Try activating the transformations manually or you can try to re-transport objects in correct order. Please check the below thread, it will help you to find out the programs that can be used to activate the inactive objects manually.
    ODS and Transformations get inactive after i transport it in PD.
    Also check the below SCN doc which would be really helpful in case of handling inactive transformations:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/10858449-1f59-2e10-0095-dde76e16d330?QuickLink=index&overridelayout=true
    Also in case you are transporting a chain then do remember that the start variant of your Metachain & all the local chains if any should be for future date else the chain starts to run automatically once the chain is moved to production. Once the chains are moved then you will need to manually change the scheduling option as per your requirement i.e main or metachiain for the required time & local chains with "start using a metaching or API option". This point should always be remembered during a fresh transport for a new process chain.
    Hope that the above info helps you in solving your problem.