Process Chain is not triggered

HI Gurus
I have Scheduled the process chain on daily basis at 5:00pm (IST).But its not triggering every day.
I have checked in sm37 no jobs are scheduled.So  I have to trigger it manually.
Why it is not triggered. What do I need to do resolve it.I am doing it in prod server.
regards
Loyee

Hi,
try to execute RSPC_CHAIN_ACTIVATE_REMOTE function module in, it will ask for process chain and continue with execution then ur chain will be activated and scheduled.
Now trigger the event
Also Check this,,
oss note 511475-Scheduling jobs with BW background users
Symptom
You cannot schedule or perform any batch jobs with the BW or source system background user.
The error RSPC 065 occurs in the process chains:"Job could not be scheduled, termination with return code 8"
Other terms
RSPC065
Reason and Prerequisites
The user type is
"CPIC" up to 4.6B
"Communication" as of 4.6C
This user type may not execute or start any batch jobs, irrespective of the user authorizations.
Solution
Set the type of background user to
"Background" up to 4.6B
"System" as of 4.6C
This user type corresponds to the "Communication" type and may also perform background functions
Hope this helps u..
Best Regards,
VVenkat..
Edited by: Venkata Narayana Jakkampudi on Jan 7, 2009 4:52 PM

Similar Messages

  • Process chain is not triggering

    Hi All
    We have around 4 process chains. these are triggering by an event and these are triggeing since 1 month.
    We have checked and tried to run them direc scheduling with immediate option. But no use and the process chain will show in yellow and no log.
    Can you please help us regarding this isssue.
    Thanks in advance
    Sravani

    Hi All,
    You do not have authorization for scheduling system commands
    Message no. RSPC078
    Diagnosis
    You do not have authorization for authorization object XXXXXXXXX, command ZZZZZZZZZ, operating system 'Windows NT', host 'ZZZZZZZZz'.
    System Response
    You cannot schedule the process chain.
    Procedure
    Contact your system administrator.
    This is the error am getting now and I tried to execute the through the event also. But am getting this message!!!
    Thanks in advance

  • Process chain is not triggering through event after BW Upgrade

    Many of our process chains are event based.
    After BW upgrade 7.0  to BW 7.31 we tried to trigger the event through  SM64 Tcode. But the process chains are not getting triggered.
    Could anyone please guide me what might be the issue.

    Hi Bharan,
    Can you please check once the start variant of process chain which are based on event.I think it should trigger after event is triggred.
    Regards,
    Ganesh Bothe

  • Process chain load not triggered automatically

    Dear Experts,
    I have created a process chain which goes like
    Start >> Create Index >> Load Infopackage 1 >> Load 2 >> Load 3 >> followed by 3 more load infopackages...followed by Delete Index and subsequent process like Rollup and DB stats.All the infopackages loaded into same data target.
    When the chain gets triggered first Load infopackage is succesfull later subsequent jobs did not trigger.
    But if i Right click on next process and click "Repeat" the job starts and load gets succesfull. The same case with rest of the loads.
    why arent they getting triggered automatically one after other.
    is there any solution to the problem ?
    Thanks in Advance
    EDA

    Hi Ellora,
       In your scenario, I strongly suggets you to use the "Delete Index" only once since the data target is the same for all Infopackages. Again use "Create Index" only use. You can accomplish this by using the AND process greatly.
       The flow may be like this...
                         START
                       DELETE INDEX
                      LOAD1     LOAD2   LOAD3
                          AND
                           |
                         CREATE INDEX
    Ensure that you have scheduled the process chain in the START Variant.
    Hope this helps...
    Thanks,
    Raj

  • Infopackage in process chain is not scheduling

    Hi All
    One of infopackage in process chain is not scheduling and showing error message like "<b>Attributes are not yet maintained
    Entire chain now has status 'R'</b>     
    what do we mean about this
    can anyone will let me know in detail and how to correct this?
    Regards
    balaji

    Hi balaji,
    how big is your process chain ? I got a similar problem when I build a metachain with a lot of processes in the chain (more than 60). In this case, the error message is deceiving. If your process chain has similar numbers of processes, check OSS 942804 (Jobcount handling).
    Kind regards,
    Jürgen

  • Process Chain : 0PM_INIT_P01 - Not Shown in RSPC

    Dear Friends
    I have installed 0PM_INIT_P01 (Initialisation:MTTR / MTBR) Process chain.
    It installed successfully.
    But i could not able to see in RSPC.
    Can anybody tell me why it is...?
    Some where i found authorization object  S_RS_PC is needed for my user id. Is it so...?
    Than how i can map to my user id...?
    Points will be awarded for right answers
    Regards
    Raju Saravanan

    Friends
    Problem is, the installed process chain is not getting displayed in RSPC for further operations.
    Before that, I have installed the Process Chain through business content (0PM_INIT_P01), and it got successfully installed. I had seen in SM37.
    For testing purpose i have given the same name (0PM_INIT_P01) for another chain creation.
    But system telling the name is already available.
    My confusion, why it is not getting displayed in anywhere in RSPC.
    Regards
    Raju Saravanan

  • Process chain is not getting scheduled

    Hi all ,
    Process chain is not getting shceduled , i have saved , checked and wanted to activate but its going to a loop and its not getting activated . please suggest some solution
    Regards
    Akhilesh

    Hi Akhilesh,
    Can you check that your user has the necessary authorizations to schedule a job? Can you also check if there
    is an error message generated in sm21 or dump in st22? You say as well that the scheduling is looping, in sm50 what
    table/statement is the process looping over?  Can you also let us know your BW release and support package level.
    Best Regards,
    Des

  • Process chain was not getting trigerred

    Hi Experts,
    Chain "Weekly MSA Loads - Full Process" is not getting triggerred.
    This chain is set to run after completion of ABAP program.
    On 16th Jan, ABAP ptogram was successfully completed.Then ""Weekly MSA Loads - Full Process"" chain status was set to running (yellow). But no job was created. It got hung for more than a hour.
    So we tried to trigger that chain with immedaiate option. We got an option "Server for scheduling". We didnt provide any server name. Then pressed Ok button. From then onwards, server went to refreshing state, but no job was created(BI_PROCESS_TRIGGER) and chain is not at all getting trigered.
    We got the follwwing messages:
    01/24/2009     06:49:48     Job started     S     00     516
    01/24/2009     06:49:48     Step 001 started (program RSPROCESS, variant &0000000655878, user ID BWREMOTE)     S     00     550
    01/24/2009     06:50:05     Communication buffer deleted from previous run 4CIS92GCZ3HQ5WVXKADF85TFQ (status X)     I     RSPC     87
    01/24/2009     06:50:05     Version 'M' of chain ZPC_MSA_FULL_PROCESS was saved without checking     S     RSPC     19
    01/24/2009     06:50:05     Version 'A' of chain ZPC_MSA_FULL_PROCESS was saved without checking     S     RSPC     19
    So we cancelled that step (STOP transaction). From that day onwards this chain is not all getting trigerred in any way. We have checked the status of last log in RSPROCESSLOG table, its status is 'X'.
    Please let us know to trigger this chain.

    Hi........
    U told a program gives trigger to this Chain.............that means the Process chain is event based..........just right click on the Start process >> Change Selections >>  Click on After event.......just cross check.......
    Now copy the event from there..........Just to cross check that whether this event is a part of any Event collector or not.............this may be one of the possibilities............bcoz........if this Event is a part of an event collector..........then until all events get regisretered..........this chain will not trigger........So......Go to SE16 >> table name RSEVENTHEAD >> there in the EVENT field give the event name >> execute............if it is a part of a event collector..............Copy the event collector name from there........
    then go to RSA1OLD(if u r in BI 7.0 .....otherwise RSA1)............in the top TOOLS tab >> Event collector >> Press F4 in the Event Chain(Name) field........search for the event collector name here...............now check whether all the events got registered or not...........
    Now look..........BI_PROCESS_TRIGGER is the trigger job............after completion of this job only the  chain will trigger......How u checked that the job was not started...........in SM37?..........look if so ..then there will be many BI_PROCESS_TRIGGER jobs............it is quite difficult ti identify the right job..........So the best way is.............right click on the Start process >> Display messages >> BacKg tab >> Click on Batch Monitor.................there u will be able to find the BI_PROCESS_TRIGGER which is going to trigger that particular chain..............u r saying the job did'nt started.............was the Start process in release state............this may happen.............if load is huge at that time in the system............I mean if many jobs trigger at a time..........there will be no free work process........
    Sometimes the chain may start when the loads will reduce.............otherwise u should contact the basis people................
    Anyways............u trigger the JOb manually right.........here I want to tell u one thing..............never Scedule a time based or Event based chain by right clicking on the Start process........and from there Change selection..............I mean to say never change the Start variant..............What u should always do...............go to the Planning mode of the chain.......Right click on the stsrt process >> Display scheduled Jobs >> Take one Released job..........in the top Job tab >> Repeat scheduling >> Immedite >> Uncheck the periodic job Check box >> Check and save.........
    If u do in this way.............the original settings of the chain will never change............what I guess .........that the Event is removed fro the Settings of the Start Variant..........again u hav to schedule the Chain.......
    Hope this helps.........
    Regards,
    Debjani......

  • Process chain Failed while triggering the job

    Hi All,
    Actually everyday delta request has been loading to the dataTarget of same data source through process chains thrice with different timings.
    Today Problem is only once delta request  has been loaded into data Target without error. It has not triggered furtherly (two more times)
    When i have checked in the processchain its showing delta has been failed.
    Generally in this scenario how i have to investigate for know the details of the problem? anybody can tell step by step?
    Regards,
    C.V.
    Message was edited by: P.C.V.

    Hi
    Right click on the failed process type and display messeges and go to the Process monitor push botton
    if will take u to the Monitor screen
    The best thing is go to the
    1) SM37 and select the job in R3 and see the job log
    2) RSMO and see the error messeges in the monitor for the request
    give here the error messeges so that it will better to everybdy to  help
    regards
    AK

  • Process chain notification gets triggered on Success?

    Hi,
    I have enabled the process chain failure notification for our key process chains. However we have noticed that the process chain gets triggered even if the process chain is run successfully.
    I am ONLY using the notification on ERROR message and NOT on success message.
    Any idea why the process chain gets triggered when the process chain is run successfully? am i missing something?
    Cheers

    Hi there,
    Why don't use another functionality of sending messages through the transaction RSPCM
    In there, you can add the chains you wish to monotorize and click on "Plan Monitoring (F7)" and schedule a job.
    With this method only chains with errors gets triggered.
    Diogo.

  • Data Manager Packeage and Process chain si not working

    Hi All,
    I executed a data manager package which contain a process chain to revaluate the one of my Account dimension meneber Say  "Revenue". I am working on BPC NW 7.0
    steps I followed:
    1. I created a script logic file and created a custom process chain.
        process chain steps:
      a) Start variant
      b) Modify dynamically
      c) Run Logic
      d) Or and Clear BPC tables
    2. This process chain was included in data manager package.
    3. Data manager package was modyfied to include parameters and scipt logic file name.
    4. executed data package
    The issue is " when I execute Data manager Package" I dont get any error but when I View status I dont see any pachage running or completed. If I see Process chain, It is failing at first step of Modify dynamically..no clue?
    Could you please let me know what could be a issue?
    Cheers,
    SAC

    I encounter this problem, Do this Steps:
    I. First,check if your process chain is existing in the Library.
    II.If yes,follow the steps below:
    1. Edata - organize Package - Modify your Package.
    2.Check if you had the correct process chain.
    3.IF yes, Click View package at its right side.
    4.Expand the Task Folder and take note of the Task Name (e.g. ZBPC_PROT_RUN_LOGIC)
    5.click Advance,Compare the task name that you noted in the syntax TASKS
    (e.g. TASK(ZBPC_PROT_CF_RUN_LOGIC,SUSER,%USER%)
    6. It should be the same.
    Running package but not appearing any status happens when the system cannot find your process chain.
    hope this helps,

  • Error in process chain DTP not executed

    Hello,
    Sorry tried to find the most appropriate forum, not sure it is the one. Am a newbee
    In a process chain we have a event passing information from one cube to another that stops and do not go until the end of the job. But it doesn't happen all the time, which is rather strange.
    Here is the log when everything goes well:
    2007-11-16                                                    Dynamic List Display                                                           1                              
         Job log     Job log     Message text uncoded     Msg.typ     Message ID     Msg.no.
         16/11/2007     10:46:44     Job started     S     0     516
         16/11/2007     10:46:44     Step 001 started (program RSPROCESS, variant &0000000006327, user ID ALEREMOTE)     S     0     550
         16/11/2007     10:46:52     Performing check and potential update for status control table     S     RSM1     490
         16/11/2007     10:46:52     Performing check and potential update for status control table     S     RSM1     490
         16/11/2007     10:46:53     Status 'Executable' (user ALEREMOTE)     S     RSBK     223
         16/11/2007     10:46:53     Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIDTPR_16322_1 with ID 10465300     S     RSM     703
         16/11/2007     10:46:58     Status 'Active' (user ALEREMOTE)     S     RSBK     223
         16/11/2007     10:46:59     Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIDTPR_16322_1 with ID 10465800     S     RSM     703
         16/11/2007     10:46:59     Job finished     S     0     517
    And here is the one when it stops:
    2007-11-16                                                    Dynamic List Display                                                           1                              
         Job log     Job log     Message text uncoded     Msg.typ     Message ID     Msg.no.
         16/11/2007     10:48:27     Job started     S     0     516
         16/11/2007     10:48:27     Step 001 started (program RSPROCESS, variant &0000000006327, user ID ALEREMOTE)     S     0     550
         16/11/2007     10:48:35     Performing check and potential update for status control table     S     RSM1     490
         16/11/2007     10:48:36     Performing check and potential update for status control table     S     RSM1     490
         16/11/2007     10:48:36     Status 'Executable' (user ALEREMOTE)     S     RSBK     223
         16/11/2007     10:48:36     Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIDTPR_16328_1 with ID 10483600     S     RSM     703
         16/11/2007     10:48:41     Status 'Active' (user ALEREMOTE)     S     RSBK     223
         16/11/2007     10:48:42     EXTRACTION OF DATAPACKAGE 000001     S     RSAR     51
         16/11/2007     10:48:42     Processing of data package 000001 started     S     RSBK     244
         16/11/2007     10:48:43     All records forwarded     S     RSM2     730
         16/11/2007     10:48:44     SQL: 16.11.2007 10:48:44 ALEREMOTE     I     DBMAN     99
         16/11/2007     10:48:44     ALTER TABLE "/BIC/FZHREMPL" ADD PARTITION     I     DBMAN     99
         16/11/2007     10:48:44     /BIC/FZHREMPL0000000430 VALUES LESS THAN     I     DBMAN     99
         16/11/2007     10:48:44     (0000000430 ) TABLESPACE "PSAPCAR"     I     DBMAN     99
         16/11/2007     10:48:44     SQL-END: 16.11.2007 10:48:44 00:00:00     I     DBMAN     99
         16/11/2007     10:48:44     SQL: 16.11.2007 10:48:44 ALEREMOTE     I     DBMAN     99
         16/11/2007     10:48:44     ALTER TABLE "/BIC/FZHREMPL" MODIFY PARTITION     I     DBMAN     99
         16/11/2007     10:48:44     /BIC/FZHREMPL0000000430 REBUILD UNUSABLE LOCAL     I     DBMAN     99
         16/11/2007     10:48:44     INDEXES     I     DBMAN     99
         16/11/2007     10:48:44     SQL-END: 16.11.2007 10:48:44 00:00:00     I     DBMAN     99
         16/11/2007     10:48:44     SQL: 16.11.2007 10:48:44 ALEREMOTE     I     DBMAN     99
         16/11/2007     10:48:44     ANALYZE TABLE "/BIC/FZHREMPL" PARTITION (     I     DBMAN     99
         16/11/2007     10:48:44     /BIC/FZHREMPL0000000430 ) ESTIMATE STATISTICS     I     DBMAN     99
         16/11/2007     10:48:44     SAMPLE 10 PERCENT     I     DBMAN     99
         16/11/2007     10:48:44     SQL-END: 16.11.2007 10:48:44 00:00:00     I     DBMAN     99
         16/11/2007     10:48:45     Job BIDTPR_16328_1 no longer exists     S     BT     127
         16/11/2007     10:49:45     Technical status 'Green' (user ALEREMOTE)     S     RSBK     224
         16/11/2007     10:50:45     Status transition 8 / 8 to 8 / 8 completed successfully     S     RSBK     222
         16/11/2007     10:50:46     Overall status 'Green' (user ALEREMOTE)     S     RSBK     225
    Can anyone help and tell me where i could search to improve performance...I don't want a plain vanilla answer but some leads to an answer would already be very helpfull
    Thanks a lot in advance

    Dear friends
    I am also facing the same issue :
    Below is the job log when the DTP is completed successfully,
    Job started
    Step 001 started (program RSPROCESS, variant &0000000391261, user ID BWREMOTE)
    Performing check and potential update for status control table
    Status 'Executable' (user BWREMOTE)
    Status 'Active' (user BWREMOTE)
    Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIDTPR_335754_1 with ID 06532200
    Job finished
    But when its yellow forever or failed, I get the below Job log
    Job started
    Step 001 started (program RSPROCESS, variant &0000000391306, user ID BWREMOTE)
    Performing check and potential update for status control table
    Status 'Executable' (user BWREMOTE)
    Status 'Active' (user BWREMOTE)
    EXTRACTION OF DATAPACKAGE 000001
    EXTRACTION OF DATAPACKAGE 000002
    Job finished
    Can anyone help, is this happening because there is no resouce available to schedule "RSBATCH_EXECUTE_PROZESS".
    Any help is appreciated!
    Regards
    MultiABAP

  • Process Chain status not becomeing green even if all loads are successful

    Hi,
    The porcess chain status is not becoming green even if all loads are successful.  How can I make it GREEN.
    One more doubt I have.
    Suppose I have 6 processes in my process chain and the 3rd process failed. If I run the function module RSPC_PROCESS_FINISH will start loading from the beginging or from the failed process.
    I wish to load from the failed process onwards..what should I do ??
    Kindly give the details.
    Bill

    Using that FM.. u will be providing the Instance and Variant of the failed process.. and hence the reload will start from the failed process but not the entire chain...
    In general the process status shud finish then or based on the link combination  the change from one process to other will happen...
    try to maintain a wait time between the process atleast 2 to 4 secs..
    thanks
    hope this helps..

  • Process Chain alerts not visible in UWL

    I have carried out the weblog test that Ginger published at
    /people/ginger.gatling/blog/2005/06/16/integrating-alerts-into-uwl--its-no-problem
    and everthing worked fine.
    We are, however, trying to use Process Chain alerts from CCMS.  These alerts are visible if we run transaction RZ20 in the back end system but the UWL does not see them.
    Is there a guide or something showing how to configure this?
    Thank you

    Hi Bernard,
    I've checked out a couple of systems - you can create alert categories for process chain alerts, and once you have the category you can of course assign recipients.
    In fact you should see some existing categories in your system for process chains in transaction ALRTCATDEF.
    The UWL essentially reflects what is in the BSP ALRTINBOX as it is using the same/similar routines to derive the alert inbox worklist.   So if you don't have anything in ALRTINBOX then it is correct that nothing is showing in UWL inbox as well. 
    You need to set up the categories and recipients against your process chain alerts.
    I'm not all that familiar with BI Process Chains but a couple of minutes looking at the IMG in transaction SPRO showed that in transaction RSPC when you select a process chain you can use menu option Settings > Maintain Alert Categories to make the link between the process chain and the alert categories.  You'll probably know what to enter here better than I do.
    Regards,
    Jocelyn

  • Process chain is not visible in Quality after TR transport

    Hi,
    I have transported process chain to Qua, but its not visible, only the technical id of process chain is displayed in RSPC tcode. I've tried activating through RSPC_CHAIN_ACTIVE_REMOTE, but still, its not visible in rspc tcode.

    Thru not assigned nodes you have issue.
    All objects are at prod not in place or not inactive.
    So first transport your data flow objects(one by one as suggested at another thread) one by one again to prod and make them proper activation.
    at final you can transport your process chain into prod and check it.
    With out info pack/dtps at prd, connected process chain how will display the chain.
    One the data flow you have issue, please try understand the issue and re transport whole data flow.

Maybe you are looking for