Process chain issue in production server
hAI
I created the process chain to load the transaction data . Then i transported to Quality and Production server.
1) When i try to open the my process chain in RSPC in Production System. Then im not getting the process chain . But im getting black just.
But when i press 'change' button in Production Server then it says that "changes are carried out in original system" and then im getting my process chain .
2) When i try to schedule my process chain in production server then it asking for new transport request . Why it is like that . Once i transport the process chain from development server to production server. Then it shouldn't ask for new request.
Pls help in these secarios. I need urgent help .
kumar
Hi Kumar,
I don't know what the problem is but you can copy in PRODUCTION environment the process chain to a new one.
Please follow the steps:
1. Open the problematic process chain (display or change mode).
2. In the command line write the word "copy" .
3. A popup will appear, insert a new name for the new process chain and confirm.
4. The new process chain is now opened but it is not active yet.
5. Delete the "old" START event and insert a new one.
6. Activate and schedule the chain.
While activating the new chain, no transport request should appear in PRODUCTION.
Hope it helps, Amir.
Similar Messages
-
Process chains issue:very urgent
Hi All,
This issue is related to process chains.Last weekend our Basis team changed the BW PRD from BWBPRD to BWBPRD1.The process chains were schedlued previously on BWBPRD, so after the server change none of the process chains were triggered.
We have rescheduled our process chains in the new server yesterday, but no success.
We could not find any log in the SM37 also.
Kindly suggest how to overcome this issue
Thanks,
ManjulaHi,
Check do you have connection with this new system( BWBPRD1) to your source system (R/3), and check the changed server is reflecting in SM66 or SM50. try to execute the job immediate and check chain is running or not. at the time of execution you can assign the new server to run this particular chain.
as for as your problem concerned i think your application is not active. -
If Process Chain Fail in Production?
Hi to all,
Please can anyone tell me, if there is process chain running in production and any process type fail or process chain fail ?.
Does we need to repair it, or repeat it or, restart it.
How to identify what should be done and how to do it.
I shall be thankful to you for this.
Regards
Pavneet RanaHi
Based on the error occur in process chain step, we have to monitor the error.
If the error or red color occur when you schdule and check the log view, then right click the error process step and select display messages, check the error clearly by using process monitor.
based on the error you have to react.
this links will helpful to you.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/502b2998-1017-2d10-1c8a-a57a35d52bc8?QuickLink=index&overridelayout=true
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00a1f389-ec7c-2c10-04bc-9d81b3084171?QuickLink=index&overridelayout=true
Edited by: Srikanth.T on Jan 23, 2012 11:29 AM -
Hello,
We loaded supplier(LSUPPLIER) from ECC to SPM. The data got loaded to PSA and info objects. But when I release the supplier load, the process chain is running for last 7 hours.
We had same issue in QA where it ran for almot 2 days and even after 2 days it did not finish - in fact there was no progress as well. When I checked in SM50, there was a process with sequential read on /BI0/PXALOCSUPP for almost 2 days.
Has anyone faced similar issue and any pointers for this issue?
Regards,
PrasannaWE have seen this happen if too many of local supplier point to the same cleansed supplier(generally a dummy cleansed supplier). Is that the case for you.
If not then try recuding the package size of the PSA. That might improve performance for you. -
Hi Gurus
When i am executing the Process chain which contains two loads(two local chain)- Master data and transaction load.
After trigger the master variant, it goes to the Master data local chain, but Its showing the yellow status for long time.
But, if we dig in to log and see the message.. its showing "Communication buffer deleted from previous run".
It did not trigger any load inside the master data. But, if i schedule the each processes manually, its successful.
Thanks in advance.
Variant settings:
First variant set to Immediate start
Master data load variant set to Start using meta chain or API
Transaction data load variant set to Start using meta chain or API
Note: Even i changed Master data load variant and Transaction data load variant to Immediate start. Still did not work.
I activated the chain many times too.
Error Message:
21.04.2010 07:59:21 Job started
21.04.2010 07:59:21 Step 001 started (program RSPROCESS, variant &0000000311437, user ID ALEREMOTE)
21.04.2010 07:59:22 Communication buffer deleted from previous run 4HKDQS42CV787C9IUWFGA5073 (status X)
21.04.2010 07:59:22 Version 'M' of chain MASTERDATA_DAILY was saved without checking
21.04.2010 07:59:22 Version 'A' of chain MASTERDATA_DAILY was saved without checking
Thanks & Rgds,
RRHi ,
Please check the below thread:
[Re: Procss chain issue;
Also try Re-activating both the local chains. -
Process Chain issue-Needs urgent Help
R/3 Master Data Main Chain
Problem Description:
When we trigger the process chain from SM64, the process chain fails at the step as shown below.
There are no logs for the local chain i.e. the local chain fails without linking.
If we manually schedule the local chain it runs successfully.
The error message changed as and when we tried fixing the defects. Each of them with the solutions tried for them is explained below.
ERROR 1:
The error message which we got was as Cannot Activate Job BI_PROCESS_LOADING (return code 8).
Solution tried:
1. Replicating Data Sources and activating the transfer and communication structures by running the programs RS_COMSTRU_ACTIVATE_ALL and RS_TRANSTRU_ACTIVATE_ALL.
ERROR 2:
Later we found that the released job was missing for failed local chain.
Solution tried:
1. We created a new job by copying a previous job.
ERROR 3:
When we re-scheduled the process chain, we got the error message as shown below.
Solution tried:
1. Deleted all the logs which were in running status.
ERROR 4:
After re scheduling the process chain we are getting the error message as shown below. This is the error message we are getting now.
Solutions Tried:
1. Saving the variant and reactivating the process chains.
2. Replicating Data Sources and activating the transfer and communication structures by running the programs RS_COMSTRU_ACTIVATE_ALL and RS_TRANSTRU_ACTIVATE_ALL.
3. Changing the scheduling options of the failed local chain to Start using Meta Chain or API from Direct Scheduling.
4. We searched for locked entries in SM12. There are no locked entries.
5. We ran attribute change run with variant for info object Profit Center from the following path
RSA1-> Tools-> Apply Hierarchy/ Attribute Change Run. We created a new variant for the info object.
We still could not find a solution. do let us know if you have any inputs.
Thanks,
MayuriHi All,
Please reply ASAP. Its critical.
We created a new process chain and when we do a check on it,we are getting a warning message.
We just upgraded our Dev box from 3.5 to 7.0. Our master data process chains, which reflect samples delivered by SAP, are giving warnings saying "too many parallel processes" for chosen server. It refers us to note 621400.
I am curious to know if others have run into this, and if they have changed their MD process chains to run in a serial fashion.
Prior to the upgrade, we had no deadlocks with process chains.
Thanks. -
Performane related issue in Production Server
Hi,
when i deploy the whole application in development server (by remotely logging into client server through vpn) it works fine .
But when it is run at client side for system testing, user acceptance testing and
integration testing it becomes very slow .
Due to this performance related issue , we are not able to transfer the DCs to production server .
We are sure it is not coming from R3 side (BAPIs etc) . It is coming either from the Webdynpro or Portal side .
Can anybody help out regarding how to solve this issue .
Thanks .Hi Narendra,
Please elaborate what is QAS customization and production customization.
TR has been done properly.
Let me give you an overview of the project.
In Organisational Assignment a Zprogram has been written which captures additional information like Grade Code, Designation Code & Pay Sheet Code
Its a govt. client. Combination of Grade Code & Designation Code is Pay Scale Grouping
e.g if Grade Code is A01 & Designation Code is A005
Pay Scale Grouping is A01-A005
If we put the values in 0001(Org Assignment) for Grade Code(A01) & Designation Code(A005), A01-A005 comes automatically in Pay Scale Grouping for a particular Pay Scale Structure.
But now the problem is Pay Scale Type doesn't come get defaulted in 0008 for a Personnel Area & Personnel Subarea.
I have maintained PST in Tariff & Check Assignment of Pay Scale Structure in Enterprise Structure.
But in 0008, We have to put PST manually. Since client is having only 1 Pay Scale Area for all Personnel Area & Personnel Subarea, so we don't have to bother for it
Please tell me where can be the error
Regards,
Usha -
Hi,
I am a BASIS Con, What are the common issues we will face in Process Chain for BASIS part and How can we solve those. Can you please help me regaring this.
Thanks,
KishoreWe will have connectivity with source system issue.
Data base unavailability issue.
Jobs that need to schedule on perticular time which is not doing the same.
if any perticular user want to load on-deman in that situation if that perticular user does not have proper permission to do the same.
Like this we will have somany.
Please let me know if you need any more information.
Thanks,
Areef.Sd -
PI Interface Posting Files - Trigger Process Chain Issue
Dear Reader,
Situation -
We get multiple flat files from source system via PI interface. To process this in BW 7.0 side we have created the web service interface. In the function module we have written a code to trigger process chain, once a data is posted.
Issue -
As there are multiple files being posted, the PC runs on completion of the every single post, which is not desired. We need to run the process chain only once at the end of all the files being posted.
Notes -
1. Number of files keep varying.
2. Clubbing all the files in a single file and then posting it would cause performance issues.
Request your help in find a way like -
1. A file being posted of name, say 'START PC', which can be trapped in the funciton module and controll the PC call.
2. <any Other idea>
regards,
vinay guptaHi Dhanya,
This is the code i have in the ABAP program in the process chain. I just included the API_SEMBPS_POST part, but still it doesn't work. Please give me your email address so that i can send some screenshots.
REPORT ZHTEST.
DATA: l_subrc TYPE sy-subrc.
DATA: ls_return TYPE bapiret2.
CALL FUNCTION 'API_SEMBPS_POST'
IMPORTING
E_SUBRC = l_subrc
ES_RETURN = ls_return.
CALL FUNCTION 'RSAPO_CLOSE_TRANS_REQUEST'
EXPORTING
I_INFOCUBE = 'ZMAP_TAB'
EXCEPTIONS
ILLEGAL_INPUT = 1
REQUEST_NOT_CLOSED = 2
INHERITED_ERROR = 3
OTHERS = 4
IF SY-SUBRC <> 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF. -
Hi Guys,
When i Excute Process Chain I am getting error in AND process, The AND process is not wating for event. So previously we used 30 sec now i changes 200 also i am getting same issues, always job cancelled at AND process. Any solution or suggestions Guys,
Thank you
DSTDST
It seems some of the jobs before the END Process are not completing successfully. Please check them
Thnaks
Sat -
Frequest process chain issue - Database selection was interrupted
hi experts,
we are running master data meta chains daily, and we have PP,SD,MM,LO,FI,PS masterdata meta chains running daily, and everyday 2-3 process chains are failing, it is extracting only 50000 records and the requests becomes RED.
if i check the long text of the error message, it is giving the below error message.
Database selection was interrupted (see long text)
Message no. RSBK072
Diagnosis
You are extracting data from a DataSource or an InfoProvider. The selection is made with an open database cursor. This cursor has been invalidated by one of the following ABAP statements:
COMMIT WORK
ROLLBACK WORK
CALL TRANSACTION
SUBMIT
The ABAP statement responsible for termination probably ran in a transformation routine programmed by you.
System Response
Request processing has ended with errors.
Procedure
Change the code for the transformation in which one of the specified ABAP statements is executed. If you are using statement COMMIT WORK, replace it with:
CALL FUNCTION 'DB_COMMIT'.
again if i delete the request from the target and repeat it is working fine but taking lot of time. but there are no routines in the transformations.
please provide us the solution to rectify the issues as it is causing lot of reporting issues.
regards
venuscmhi experts,
here is the source 0MAT_PLANT_TEXT and the target is 0MAT_PLANT.
info package load is very fast, but DTP it is taking lot of time if i execute the DTP Manually.
The data packets are processed very fast, but after that at the bottom
Set technical status to green and
set overall status to green in yellow very long time, due to this DTP Load for above master data is taking long time.
how to resolve this?
any solutionz pl.
Regards
venuscm
Edited by: venu WAD on Oct 24, 2011 6:37 AM -
203 Invoice Process chain Issue
Greetings All!
We have been facing an issue where the standard 203 Invoice PC has become cleint dependent .The client which it is pointing is not even existing in BI system configs.Due to this we are not able to open this process chain for editing as well..We tried to delete this process chain and re-instaal from the Business content,but when we are trying that still teh issue of client dependency is coming.The ssyetem gives an error stating
"Chain 0ASA_P041 can only be edited in client 300"
The extended message also shows the follwoing
Object 0ASA_P041 (Process Chain) could not be collected for object ()
Message no. RSO296
Diagnosis
You have collected objects in the BI Metadata Repository. Associated objects for object of type have also been collected. Object 0ASA_P041 of type Process Chain was among these objects.
However, this object 0ASA_P041 of type Process Chain is not available in the metadata repository.
System Response
Object 0ASA_P041 of type Process Chain is ignored in further collections. The links for object of type are incomplete. This may result in you not being able to activate this object.
Procedure
If this error occurs while you are installing BI Content, an error may have occurred during the delivery. Inform SAP. In all other cases, check that the object has not been deleted by another user during collection, for example.
Please assist,this issue is existing in both Dev as well as Quality enviroment.
Kind Regards,
SurbhiHi Surbhi,
Not sure what might have caused this. Please also try posting the query in BI forums since they might have a better idea on this.
As a quick workaround you can try to create a copy of the process chain 0ASA_P041 and in the table OPMDM_TYPES for the entries INVOICE and C_INVOICE use this new process chain instead of 0ASA_P041. Then the data management UI will automatically pick the new process chain.
Thanks,
Divyesh -
I WANT TO KNOW SOME PROCESS CHAIN ISSUES
HI ALL,
WHAT IS PROCESSCHAIN?IN THIS WHAT THE PROBLEMS OCCURED? WHEN WE R EXECUTING PROCESSCHAIN WHAT THE ISSUES WILL COME?Hi
Go through these links...
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
Business Intelligence Old Forum 1 (Read Only Archive)
http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
Restarting Processchains
Siggi's weblogs for data load error and how to restart process chain
Data load errors - basic checks
Restarting Processchains
Restarting Processchains
GTR -
Changes to process chain in the Production?
Hi,
I have process chain which is running hourly from 4 AM to 7 PM.We have made emial alert in the process chain at each event level.Now I have change some text in the email alert.As we dont tranfer the infopackage we have created the process chain i production itself.
Please clarify my doubt:
1.I will go ahead and change the text in email alert and again I will save it.
2.Do I need to save and activate the process chain as a whole.
3.Also do I need to schedule it again as it is running allredy succssfulyy.(in production)Hi Vasu,
As you said this process chain has a hourly run between 4.00 am to 7.00 pm. Since for every run of this chain there will be a job scheduled, so if you wanna make any changes to your mail alert message and want those changes to be applicable from the next hour run, then you have to make this changes well prior this next run ( in between the current & next hour run). Before making those changes please do de-activate the chain, make the required changes & again Activate the chain. I hope this should solve your problem.
Regards,
Syed. -
Need help with BW Process chain issue
Hi Gurus,
I had made a copy of the existing process chain so that I can work on the changes. Its a metachain and I tried to copy a sub chain.
But at a later point of time, I have realized that the process chain had got into a nested loop in the meta chain, for the sub chain, I had copied. How do I rectify it?
Kindly suggesthi,
use the bottom up approach.
Looking at the attached file it has many PCs.
Just note down all list of all PC and then do the copy of individual PCs, later you can copy the complete meta chain.
If you want give one more chance and try to copy meta chain again.
Thank-You.
Regards,
VB
Maybe you are looking for
-
My HP office jet pro 8600 won't connect to my macbook pro or my iPad
My HP Officejet pro 8600 at work will no longer connect to my macbook pro or my ipad, yet it still connects to my bosses ipad just fine. I had tried uninstalling it on my mac, and then when i try to reinstall it its not there. I have tried unplugging
-
Using Oracle "Import PDF" Extension in Open Office Draw to Edit pdf Files
I am a fairly new Mac user with OS X 10.6. For several months, I have been trying to find something which would edit pdf files better than Preview does (for example, the content of a text box in Preview can only be "center aligned"). Skim and Formula
-
Userexits or BADIs or BTE's during payment proposal
Hi, I am looking for Userexits or BADIs or BTE's during payment proposal (F110) I want to do some checks based on currency and payment method. Thanks, Krishna.
-
Connection / Permission Problems with PI System to Solman
I have 3 PI Systems (7.4) who are connection to a Solman 7.1. The abap solman connection/configuration works fine. In the java configuration assistant at diagnostic agent, test status and Host Agent status are green. On the next,next,next step create
-
Failed to open the wallet [Hint: incorrect path, incorrect password, bad wa
Hello all! May be someone could help me.. I have: Server - oracle 10g+apex, oracle AS , etc... ssl - port 443 - IIS (some certificate (sever authentication)) - port 4443 - Oracle Http Server (Apache) – worked with default certificate up till now.