Process chain remains in yellow for long hours

Hi friends,
My process chain remains in yellow state for many  hours.
when i check the the message , it shows as chain has been removed from scheduling. Is that a problem or what may be the problem?
generally if a problem of PC remaining in yellow for long time , what are the Tcodes to be looked into.
regards,
Rajesh

Hi Rajesh
GO to <b>RSPCM</b> check the sataus still its in yellow or green.If it is in yellow then
double clicjk on this it will takes to you in to the chain individually .Then check the
process ..
Or go to <b>RSPC</b> check wher exactly the chain is kicking.Then check the monitor
status of that particular process .This monitor u can achieve By double clicking on
the process-->it will show u a popup in that click on monitor.and then depends on t
the issue u can work and repeat .
Regards
R M K
***Assigning points is the only way of saying thanx in SDN ****

Similar Messages

  • How to stop process chain if it yellow for long time

    hello all,
    I see that my process chain is running for long time and is yellow for more than last 24 hours now. I can see where the chain is stuck(not going ahead).
    What do we normally do in such scenarios?
    Also one more question I have is about delete PSA request process variant. Can i use the same variant in two different process chains, is yes than do I have to include the name of the PSA tables that are in both the process chains. When the variant runs in 1st chain does it delete the PSA tables from the second chain as well..(i hope i made this clear)
    Thanks in advance

    Once you have done with your init load manually. Then in case it was just the start of the process in ur Process Chain then first remove the chain from schedule and then go to the start process of the process chain and save the setting for immediate, uncheck the periodic box and save and then come out of the screen and then execute and activate the chain.
    Note:
    1. Before changing the setting in the start process make a note of the start time and also its periodic value.
    2. Once the chain is completed then change the setting in the start process back to previous start time and periodic value.
    3. Don’t forget to save and activate the chain.
    Regards,
    Rohini

  • Datalogging using Waveform for long hours

    Hi all,
     Im logging the data using the waveform. The chart length size is given as 1024. I need to log the data for long hours (5 to 10 hours). How much i have to set in the chart length ? how it is calculated ? Is it the right way for extended period of data logging ?
    Naganatha Subramanian

    naganathas wrote:
    Hi all,
     Im logging the data using the waveform. The chart length size is given as 1024. I need to log the data for long hours (5 to 10 hours). How much i have to set in the chart length ? how it is calculated ? Is it the right way for extended period of data logging ?
    Naganatha Subramanian
    I'll assume you are asking about the "Wavefrom datatype" when used with charts.
    The history length is the "number of waveforms" and not the number of points. If you present an hours worth of data once every hour, it will display 1000 hours (in thoery, never tried it with those numbers and high sample rates will tax memory).
    If your app spec has a hard and fast req that it drop suff older then the code will have to regularly examine the time of what is in the history and explicitly remove the old stuff ( read history, toss old, redefine history).
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Process chain remains yellow even it is OK

    Hello,
    I have a process chain which contains many master data loadings.
    It can happen that when I log in the morning and check my process chain that have been executed during the night, I always have processes in yellow (not finished).
    However when I look these processes in yellow, I can see that the job and loading has been finished a long time ago (in green, everything ok) and I can see that a new event has been executed to follow the process chain.
    So why does the process doesn’t finish and take green color ?
    I didn't see any OSS note about that problem. Does anybody know about it ?
    Regards
    Vanessa R.

    Hi,
    Activate the process chain once and schedule it again.
    Hope this helps.

  • Process in Process chain that shows yellow inspite of being  green

    Hi,
    I have a process chain where one of the processes shows yellow when I look at it in RSMON log view. In the process monitor however it has status 'green'. also the chain is set up in such a manner that the next process does not start unless this current process has a status of red or green. But the next process started  and has green status in both RSMON and process monitor. When i click on the context menu for the process that shows Yellow, I get an extra option of 'End process again'. Could anybody please tell me what this option does and why the process which is completed still showing yellow.
    Thanks.
    Jaya

    Hi Stefan,
    Check if there are any other infopackage/DTp loads for this DSO/ info cube was running at the same time or may be a bit earlier due to which load into the Data target was not being successful and remained in YELLOW status forever.
    try using the FM  RSPC_PROCESS_FINISH to manually change the status of the PC to green.
    Regards
    KP

  • Status remains as Yellow, for no data

    hi ,
    in our master data load process chain, a datasource which has 0 records in the sourcesystem returns 0 records in BI. but the status remains as yellow , instead of green.
    since the status is yellow the next process is not getting triggered. only if we manually change the status to green, the process chain continues. wht shall we do to change the status to green automatically.

    Hi DOLLY,
    you need to cofigure  a small setting at Infopackage for this.
    RSA1-> infopackage -> scheduler -> Trafic light color for Empty request -> select green and save it.
    for 0 to 0 records load will show as Green.
    Regards
    Daya Sagar

  • How to schedule Process Chain with Full Update for the past closed month

    Hello,
    I have an HR-BN benefits transactional data extractor - http://help.sap.com/saphelp_nw70/helpdata/en/08/b01d3cf8aa101ce10000000a11405a/frameset.htm
    One of the selection fields for that extractor is calendar year/month 0CALMONTH and it is a full update extractor.
    SAP recommends running this extractor once a month after the month has been closed.
    If I were to include this update/extract into my process chain, would it be possible to automate the process in a way where the process chain is scheduled to execute once a month (I know how to do that), but that also only pulls values for the past/closed CALMONTH (as if it had a variable value of which would be automatically set to the last closed month when pchain is run)? As I mentioned 0CALMONTH is one of the selection criterias in the infopackage for that extractor.
    let me know how I might be able to do that.
    P.S. we are on BI 7.0/2004s
    Thank you

    For Calmonth selection in infopackage you can use the SAP-Exit OLAP Variable 0CMLMON (Last Month)
    select Type "7" ("OLAP Variable")
    and in Details of Type screen, Select OLAP Variable "0CMLMON" Which is SAP-Exit variable for Calmonth, that returns the last month from the current system-date.
    If variable 0CMLMON is not active, you need to activate it from Business content.
    Assign pts if helpful.

  • Process chain hangs on Yellow , no process no data load, nothing happens...

    Hi friends  ,
    I have a  problem on one of our Meta chain . We have a meta chain , and it have some sub chains .  It is a daily scheduled meta chain.
    One day some thing happened and one of the sub chain begun to hang on . One of the sub chain of meta Chain I see Yellow light, which means on process . But while I enter into this sub chain I see nothing processed .  Meta chain finish previous chain but besides nothing .
    I tried to remove this sub chain from schedule , I tried to reactivate , and to schedule again , but all of my attems didn't solve anything . All of them get an short dump because of maximum time
    I need your helps .
    Thanks

    hi  dear,
    I guess u already got so many solutions and none of them working try these out.....
    1.Try activating the chain ...is there some issue in that??
    2.Now go to the top...menu..execution tab...remove from schedule...Now schedule again...
    3.If you want to run the chain immediately...after doing remove from schedule go to the start variant and change the option as start immediately.
    Since the chain is not triggering ,moving forward after start variant then may be the load on the system is too much or else the chain has activation issues...
    Regards,
    rocks

  • Execute Process chain after infopackage run for a PC file

    Hello all.
    The scenario I need to solve is the following.
    I have several files to be load to ODS from P users PC. I will do this with an info package. But after this load there are some more process that have to be run whoch are created in a process chain.
    I would like to automate the execution of the precess chain right after the load from PC file is done.
    Any sugestions?
    Thanks and regards,

    Hello Javier Alvarado,
    If you use process chains, the automatically integrated processes are ignored and have to
    be implemented using the process chain. If you schedule a specific process in a chain,
    you support the automatic insertion of additional, relevant standard processes with the
    consideration of such automatic actions.
    For example, if you have selected the processing types Only PSA and Subsequently in
    Data Targets in the InfoPackage from the tabstrip Processing, and you are using this
    InfoPackage in a process chain, then the further processing into the data target does not
    automatically happen. Instead, it only happens if the process Update PSA is scheduled in
    the respective process chain after the loading process. Thus, the process chain
    maintenance supports the automation in this case. In this way, you generate a process
    variant for updating from the PSA in the chain when inserting the loading process with the
    process types Only PSA and Subsequently in Data Targets automatically into a chain.
    Well i am talking about 30B Version
    Regards,
    Mohan.

  • Error in Mass process chain DP background job for Deinitialize version

    Hi,
    When I execute the process chain for DP background job to delete the planning area version, it gives error message
    "Process DP Background Processing, variant DELETE XXXXXXX has status Ended with errors (instance D973YTQRSF0FRPV5TCR28L"
    It is working well, when I tried the same manually with the same input parameters used in background job variant.
    What could be the cause for the background job problem.
    Thanks and regards
    Murugesan

    Hi Datta,
    I am not deleting the planning version, I am using Macro in the DP background job to delete or make the key figure values to 0.
    Thanks and  regards
    Murugesan

  • Get process id and task id for long-lived process?

    Scenario:
    I have created a long-lived process that will assign a task to a user. The user then has two options to Accept or Reject. Accept route saves the data to the database. Reject does not save. 
    I want to invoke this process in .Net and need to know how to get the current task id of the process invoked. I know that invoking the async method returns an invocation id. How do I use this value to get to the current task id of the process?
    I then want to be able to call a method to complete this task outside of workspace. For example, on my form I would have an Approve and Reject button. If user clicks Approve it would choose the approve route in the process and if Reject button clicked it would take the reject route. What would be the API call to do this in .Net that would trigger the appropriate route given the button clicked on the Form?
    Any help would be appreciated.

    Generally, the TaskManager service is used to query tasks. I've not used the wsdl for that service before so I can't help you much there.
    In the process, you can get the taskID if you use a custom render service. To externalize the taskID you'd have to do something like have the render service save the ID to a file, or call a web service and pass it to the service, or use JMS service, or email service.....

  • How to stop process chain, if it is taking too much time than expected.

    Some times if a process chain takes to much time to finish than expected, how I can stop the process chain and execute it again.
    Thanks in Advance.
    Harman

    how I can stop the process chain ??
    If the job is running for a long time ,
    1)GOTO RSMO and SM37 and check the long running job over there.
    2)There you can see the status of the job.
    3)If the job is still running you can kill that job
    4)delete the failed request from data target.
    for more details go to this below link
    how to stop process chain if it yellow for long time
    how I can execute it again ?
    GOto Function module  RSPC_API_CHAIN_START
    and give u r process chain name there.and execute.

  • Long running Process chain for less Number of records

    Hello Experts,
    I have a problem with a process chain which is taking very long time ( To load around 20 records)
    Problem Description:
    1) I have one base ODS and First level ODS and the data uo to this point is loaded with out any problem.
    2) When the data is moving from First level ODS to the Cube to load 20 records it is taking around 5 hrs of time and the load is successful.
    3) If I see the DTP monitor the exraction step from DSO to Cube is taking around 4.50 min
    4) The remaining stpes are like Error handling, transformations, updation are taking normal times (Around 5 secs).
    Could any one please help me to find out where the exact problem lies to make this extraction step so long time.
    Regards,

    Please check for start routines, field level routines. From DSO to Cube check for transformation. How each and every field is getting updated and you will be able to track the time taken for the load.
    thanks,

  • Process chain taking long time

    Hi,
        I developed a Process chain. In developemnt for Completion of the Update rules(Start routine) its taking 60m( for around 50,000 records).
    After transporting the Process chain to Production for Start routine completion (For 1,70,000 records) its taking 7hrs and sometimes its failing as the "Process is Over due" and sometimes due to "Short dump".
    How to handle this.........
    Thanks

    Hi js,
    Check the ST22... Any dumps
    Check out for the short dump in source system and try loading the delta again
    then
    I have got the problem when u have posted...but little later.Even I was about to post the issue.. Actually my issue was...
    My PC is like this
    1) Start Process
    2) Delete index
    3) Load IP
    4) delete overlapping request
    5) create Index
    6) ABAP program
    Process chain hangs at Overlapping requests process type but the status was yellow. And the previous step (3) was success. From there its not moving to next further steps.. But the Job in SM37 was canceled.
    I saw Ur post and saw the note 833168 and which matches exactly our issue.
    Like we run the PCs thru the TIDAL where due to some problems PC got triggered twice... I can see the two logs in the PC. (Log view) and two requests at RSMO.
    Everything was recovered again thru manual steps. This is the first time we encountered... the note helped us ... We now are very cautious about the Tidal runs...
    Now PC is running perfectly
    we have instructed the Supported team to make the necessary changes or fix this issues in TIDAL...
    i hope this is helpful to u
    bye now
    suresh

  • Long running process chains - No Dump / error message.

    Hello,
    We have defined some steps in process chain that contains default macros. We mainly included that to ensure calculations happens even when users dont open or access the DP Planning book.
    Issue is, these steps are running endless. normally it takes some 400 n odd seconds. But its running for the last 60000 secs.
    No. of Planning objects or CVC is 2027 only. I had to cancel them and tried to re run this step or the whole chain no luck....
    I have checked active jobs in SM37, there is none. So ideally there is no load on the system. Also no change to Macro or CVC's has been done. there was only one Transport that was moved and it was on the product master.
    Also I have done the time series, Live cache, PA  Consistency checks. only in Live Cache there was some Superflous time series and it was corrected.
    I am not getting a clue of why its happening nor where to start the analsysis.
    Any help or suggestion is greatly appreciated.
    Currently I have made the subsequent events as independent,&  the chain is running execpting this step.
    Many Thanks
    Aswath Ram.

    Thanks for the reply,
    These are custom macros. It adds two KF and copies to another.
    The no. of periods is 24 time periods and roughly no. of CVC is 2100.
    Another thing, this process chain has been running for last 5 to 6 months with no issues. Since sunday, its messing up....
    I am doubting if its taking time read data from table or live cache. or is it because of some indexing. Not sure how to check that.
    have asked Basis to check the system performance, if it might cause this issue.
    Many Thanks
    Aswath

Maybe you are looking for