Hi,
Can any one please send me some docs/links regarding the upgradations of process chains in NW2004s.
Thank You.
Vaishu

Hi Vaishu,
sorry, but there is nothing to upgrade for process chains in particular. What are you referring to.
If you looking for new features, please search the forum with the terms Upgrade, SAP NetWeaver 2004s, master guide, installation guide, etc.
   Cheers
     SAP NetWeaver 2004s Ramp-Up BI Back Office Team

Similar Messages

  • Issue with Process chains in BI (NW2004s)

    Hi,
    Recently we have done the system refresh (From Production to Quality Environment) for our BI Environment.
    After the refresh, our basis team has performed all the post activities like Source system conversion (BDLS), etc.
    But now, we are not able to open any process chains.The system is given the information message "<b>Variant &0000000XXXXXX does not exist</b>"
    "Message no. DB612
    Diagnosis
    You selected variant &0000000XXXXXX for program RSPROCESS.
    This variant does not exist.
    Procedure
    Correct the entry."
    Is this because of some post-processing steps got missed out?
    Do we have to create the Variants (Or can we copy the variants from the old Quality env? as we have the copy of Quality env. database).
    If we can create the variants, please let us know the procedure for the same.
    Please advise. Points will be awarded for your solution.
    Thanks,
    John.

    I have checked for the variants in the production system for the program RSPROCESS(in transaction SE38). But nothing exists.
    When I checked with the Basis team, they mentioned that the tables VARI, VARIT and VARID are copied from the (old)QA system and now they have imported these tables into the QA system after the refresh.
    I have never created any variants. Please let me know the procedure to create the variants in SE38.
    The process chains are working fine in our Dev and Prod environments. Will copying the tables(VARI, VARID and VARIT) from  production will help us?
    Is this due to some transports need to be moved from Dev to QA again? How can I find the requests?
    Please let me know your suggetion.
    -John.

  • How to define process chain in BI 7.0

    HI All
    How can i define process chain in bi 7.0 .Please help me .If any step by step documentation is available please send me.
    Thanks in advance

    Hi,
    For questions related to BI 7 , pls. post in NW2004s section under 'Business Intelligence'.
    For your question, use TCode RSPC to create process chains.
    For mor info : http://help.sap.com/saphelp_nw04s/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm
    Best Regards

  • Reg: Process Chain, query performance tuning steps

    Hi All,
    I come across a question like,  There is a process chain of 20 processes.out of which 5 processes are completed at the 6th step error occured and it cannot be rectified. I should start the chain again from the 7th step.If i go to a prticular step i can do that particular step, How can i start the entair chain again from step 7.i know that i need to use a function module but i dont know the name of FM. Please somebody help me out.
    Please let me know the steps involved in query performance tuning and aggregate tuning.
    Thanks & Regards
    Omkar.K

    Hi,
    Process Chain
    Method 1 (when it fails in a step/request)
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    How is it possible to restart a process chain at a failed step/request?
    Sometimes, it doesn't help to just set a request to green status in order to run the process chain from that step on to the end.
    You need to set the failed request/step to green in the database as well as you need to raise the event that will force the process chain to run to the end from the next request/step on.
    Therefore you need to open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    Now the actual process will be set to green and the following process in the chain will be started and the chain can run to the end.
    Of course you can also set the state of a specific step in the chain to any other possible value like 'R' = ended with errors, 'F' = finished, 'X' = cancelled ....
    Check out the value help on field rspcprocesslog-state in transaction se16 for the possible values.
    Query performance tuning
    General tips
    Using aggregates and compression.
    Using  less and complex cell definitions if possible.
    1. Avoid using too many nav. attr
    2. Avoid RKF and CKF
    3. Many chars in row.
    By using T-codes ST03 or ST03N
    Go to transaction ST03 > switch to expert mode > from left side menu > and there in system load history and distribution for a particual day > check query execution time.
    /people/andreas.vogel/blog/2007/04/08/statistical-records-part-4-how-to-read-st03n-datasets-from-db-in-nw2004
    /people/andreas.vogel/blog/2007/03/16/how-to-read-st03n-datasets-from-db
    Try table rsddstats to get the statistics
    Using cache memoery will decrease the loading time of the report.
    Run reporting agent at night and sending results to email.This will ensure use of OLAP cache. So later report execution will retrieve the result faster from the OLAP cache.
    Also try
    1.  Use different parameters in ST03 to see the two important parameters aggregation ratio and records transferred to F/E to DB selected.
    2. Use the program SAP_INFOCUBE_DESIGNS (Performance of BW infocubes) to see the aggregation ratio for the cube. If the cube does not appear in the list of this report, try to run RSRV checks on the cube and aggregates.
    Go to SE38 > Run the program SAP_INFOCUBE_DESIGNS
    It will shown dimension Vs Fact tables Size in percent.If you mean speed of queries on a cube as performance metric of cube,measure query runtime.
    3. --- sign is the valuation of the aggregate. You can say -3 is the valuation of the aggregate design and usage. ++ means that its compression is good and access is also more (in effect, performance is good). If you check its compression ratio, it must be good. -- means the compression ratio is not so good and access is also not so good (performance is not so good).The more is the positives...more is useful the aggregate and more it satisfies the number of queries. The greater the number of minus signs, the worse the evaluation of the aggregate. The larger the number of plus signs, the better the evaluation of the aggregate.
    if "-----" then it means it just an overhead. Aggregate can potentially be deleted and "+++++" means Aggregate is potentially very useful.
    Refer.
    http://help.sap.com/saphelp_nw70/helpdata/en/b8/23813b310c4a0ee10000000a114084/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/60/f0fb411e255f24e10000000a1550b0/frameset.htm
    4. Run your query in RSRT and run the query in the debug mode. Select "Display Aggregates Found" and "Do not use cache" in the debug mode. This will tell you if it hit any aggregates while running. If it does not show any aggregates, you might want to redesign your aggregates for the query.
    Also your query performance can depend upon criteria and since you have given selection only on one infoprovider...just check if you are selecting huge amount of data in the report
    Check for the query read mode in RSRT.(whether its A,X or H)..advisable read mode is X.
    5. In BI 7 statistics need to be activated for ST03 and BI admin cockpit to work.
    By implementing BW Statistics Business Content - you need to install, feed data and through ready made reports which for analysis.
    http://help.sap.com/saphelp_nw70/helpdata/en/26/4bc0417951d117e10000000a155106/frameset.htm
    /people/vikash.agrawal/blog/2006/04/17/query-performance-150-is-aggregates-the-way-out-for-me
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/1955ba90-0201-0010-d3aa-8b2a4ef6bbb2
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ce7fb368-0601-0010-64ba-fadc985a1f94
    http://help.sap.com/saphelp_nw04/helpdata/en/c1/0dbf65e04311d286d6006008b32e84/frameset.htm
    You can go to T-Code DB20 which gives you all the performance related information like
    Partitions
    Databases
    Schemas
    Buffer Pools
    Tablespaces etc
    use tool RSDDK_CHECK_AGGREGATE in se38 to check for the corrupt aggregates
    If aggregates contain incorrect data, you must regenerate them.
    Note 646402 - Programs for checking aggregates (as of BW 3.0B SP15)
    Thanks,
    JituK

  • Transporting Process Chains-includes the ERROR DTPs in the Target System

    Hello Gurus,
    Iam facing an issue in version NW2004s while transporting the Process Chains from DEV to QA. The Process Chains in the Target system are including the ERROR Dtps as parallel loads along with the regular DTP.This happens when there exists an ERROR DTP in the Target system at the time of Transport.
    This will cause a problem
    1.these would run parallel to the regular DTPs.
    2.no of back ground processes running at any point will be beyond our limit.
    Let me know if you have faced the same issue and how you resolved it.
    Thanks
    Jagadish

    Hi DPN,
    Check oout this thread. This might solve yuor problem.
    Errors in Transportation
    Thanks and Regards
    Subray Hegde

  • Reg - Process chain

    Hello Gurus,
    I am working in Process chain and I am new to this.
    I am having some basic doubts.Can any one of them,clarify my doubts.
    1.Whats the difference between event and job.
    2.How,we can find out the particular chain is a meta chain or local chain.
    3.Incase,If the chain is failed,how we can start the process.whats the step.
    4.Where,we can findout the process chain status..(i.e,its successfully running or unsucessfull. like this)..any transaction code is there to know the status
    5.Tell me,what are the things,i shouldnt do.(as a precautionary steps)
    Thanks in advance and It will be great help,if somebody clarify my doubts and forward docs to my email id...if u r having any realtime doc.
    I will assign points.
    email id - [email protected]
    Brgds
    Kumar

    hi,
    1. an event can trigger a job. After a job has finished, an event is raised and a new job is triggered (or not)
    2. check for the starter. locla chains have the option "strated by other chain" an can only be started directly whe having changed the starter.
    3. depends: in NW2004 process the chain manually or restert the chain completely. only few processtypes are able to be repaired. to recall the setting where the chain crashed is not possible (with the standard types ...)
    In NW2004s with BW7.0 its possible to start a chain from where it failed.
    4. you have 3 views for process chains in rspc: create, check and protocol (this paperlike button) here you can see the protocols for your chain. even when it has been activated, if it runs etc. you can also go to trc SLG1 to look for ProcessChain protocols.
    5.
    Transportiation fails in most cases. allow maintenance in
    Production.
    Never set a processchain live, untested. Especially monitor the number of processes allocated.
    (only basic rules)
    hth
    cheers
    sven

  • Creation of process chains  in 2004s

    Dear friends
    Does anybody as a step by step guide on how to create a process chain in 2004s . as this is new  i am bit confused on creating them . we are useing standard business content. but while creating the process chains they are bit different and i am unable to create process chians . so can one help on this by sending some example screen shot of the process chain created and steps how to create process chain for standard business content in 2004s . if possible please send it to (email address removed by moderator) or  mention steps how to or atleast example screenshot .  please look forward toyour replies . thankyou friends .
    raghavendra
    Message was edited by:
            Ronald Silberstein

    Same as BI 3.x
    http://help.sap.com/saphelp_nw04/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm
    However enhanced features available with NW2004s as below-
    http://help.sap.com/saphelp_nw2004s/helpdata/en/58/9c6c4251e4c153e10000000a1550b0/content.htm
    Hope it Helps
    Chetan
    @CP..

  • Loading from PSA with different process chains at a different time

    Hi,
    We currently have an issue regarding loading the same data from 2 separate Process Chains from the same datasource at a different time.
    Simplified what is happening :
    Process Chain 1:
    Step 1a = Load 2LIS_13_VDITM into ODS "A"
    Step 1b = Load 0FI_GL_4 into ODS "B"
    At a later time, (PC1 is ready) =>
    Process Chain 2:
    Step 1 = Load ODS "A" to ODS "C"
    Step 2 = Load 0FI_GL_4 (from PSA) to ODS "C"
    Because of dependencies, step 2 from PC2 has to be loaded AFTER Step 1 (with activation) from PC2.
    We cannot change Process Chain 1.
    What i want to do is load the data from 0FI_GL_4 only to PSA in Process Chain 1 and pick it up again in Process Chain 2. This functionality is available in NW2004S, but not in our version BW 3.0B.
    Does anyone have an idea how to do this ?
    Thanks,
    Pascal

    Hi Dinesh,
    Thank you for your quick answer.
    The problem is i cannot change PC1, but 0FI_GL_4 is loaded with the option into PSA and then immediatly to the target. So data is available in the PSA.
    When I try to load data from PSA into ODS "C" in PC2, i get an error saying that the belonging infopackage (from PC1) is not available in this PC and thus cannot be loaded from PSA.
    Regards,
    Pascal

  • Data load Error using Process chain

    Hi,
    In NW2004s when I schedule delta loads for 2LIS_11_VAITM using process chains, when there is zero delta, the manage screens of the infocubes show green light with zero records correctly whereas the process chain log display shows red. The details of the process monitor show zero records. Is this right? I assume that even if there is zero delta, the log must show green and all the subsequent processes like activation of ODS, deleting of PSA, construction of indexes must be carried out. Please confirm. Is this a bug?
    Thanks.
    Param

    Hi Victor,
    Can you please advice how you solved issue as we are having similar issue where it works fine when loaded manually but throws communication error when process chain runs, following is error message..
    Communication error: call FM RSSDK_DATA_REMOTE_GET
    Thanks in advance for your help!!
    Sandeep

  • Process chain: scenario on Interupt process

    Hello,
    currently I'm exploring a BI in NW2004s.
    In the area of process chain I found a process type
    called Interrupt process.
    Can someone give we a scenario on that process type?
    Regards & Thanks,
    Guido

    Hi...
    go to RSPC and now click Process Types button--under General Services node is interrupt process
    Application scenario:"
    Apply multiple start conditions in a process chain
    With the process type Interrupt, you can interrupt the processing of a process chain until a given condition has been satisfied. In this way you can, for example, define conditions that need to be satisfied in addition to the start condition defined in the start process so that the entire process chain or parts of it can be processed."
    refer thread:
    http://help.sap.com/saphelp_nw70/helpdata/en/58/9c6c4251e4c153e10000000a1550b0/frameset.htm

  • Process Chain - Delete File from Application Server

    Hi Gurus,
    Im working with Process chain, and i have a load from a flat file, so my question is :
    How can i delete that file from the application server after was loaded ?
    THANKS IN ADVANCED !!! I REALLY APRECCIATE YOUR HELP.
    Marcos

    hi,
    I have gone through the forum you have posted for deleting files from application server through process chain.
    I have similar reuirement in my project.
    Can you please provide me the solution?
    Your inputs will be highly appreciated.
    Thanks in advance.
    Regards,
    Lavanya.

  • Questions on Multiprovider and Process Chain

    Hai All,
              I have two questions. One on Multiprovider and the other on Process chain.
    1. Multiprovider:
              For example, I have 2 ODSs. ODS1 has Objects ORDER NUMBER, COUNTRY and PRODUCT, ODS2 has objects ORDER NUMBER, DELIVERY STATUS, CREATION DATE.
    Now if I make a multiprovider on ODS1 and ODS2, then as ORDER NUMBER is common in both the ODSs, can I make a report like this:
    ORDER NUMBER - DELIVERY STATUS, CREATION DATE?
             I have a problem here bacuase its not getting those details from the other ODS even though the ORDER NUMBER(value) is same. Am I making nay mistake or is it a system problem.
    I beleive thats how a Multiprovider works.
    2. Process chain:
                    I have an END connector in my process chain that connects 3 processes and lets the following task start only after the success of all the above 3 processes.
    The system is displaying the END connector seperately under each process. But the name and everything else is same. Is this a setting somewhere in the process chain?
    Thank you.

    Hi,
    1. Those fields are in ODS2, you don't need to make a multiprovider.
    2. You mean an AND connector. Maybe you need to refresh the screen. if this doesn't work, delete the three and connectors and insert a new one.
    Hope this helps.
    Regards,
    Diego

  • BPM Process chain takes long time to process

    We have BI7, Netweaver 2004s on Oracle and SUN Solaris
    There is a process chain (BPM) which pulls data from the CRM system into BW. The scheduled time to run this chain is 0034 hrs. This chain should ideally complete before / around 0830 Hrs. <b>Now the problem is that every alternate day this chain behaves normally and gets completed well before 0830 hrs but every alternate day this chain fails…</b> there are almost 40 chains running daily. Some are event triggered (dependent with each other) or some run in parallel. In this, (BPM) process chain, usually there are 5 requests with 3 Delta and 2 full uploads (Master Data). The delta uploads finishes in 30 minutes without any issues with very few record transfers. The first full upload is from 0034 hrs to approximately 0130 hrs and the 2nd upload is from 0130 hrs to 0230 hrs. Now if the 1st upload gets delayed then the people who are initiating these chains, stop the 2nd full upload and continue it after all the process chains are completed. Now this entire BPM process chain sometimes takes 17 -18 hrs to complete!!!!!
    No other loads in CRM or BW when these process chains are running
    CRM has background jobs to push IDOCS to BW which run every 2 minutes which runs successfully
    Yesterday this chain got completed successfully (well within stipulated time) with over 33,00,000 records transferred but sometimes it has failed to transfer even 12,00,000 records!!
    Attaching a zip file, please refer the “21 to 26 Analysis screen shot.doc” from the zip file
    Within the zip file, attaching “Normal timings of daily process chains.xls” – the name explains it….
    Also within the zip file refer “BPM Infoprovider and data source screen shot.doc” please refer this file as the infopackage (page 2) which was used in the process chain is not displayed later on in page number 6 BUT CHAIN GOT SUCESSFULLY COMPLETED
    We have analyzed:--
    1)     The PSA data for BPM process chain for past few days
    2)     The info providers for BPM process chain for past few days
    3)     The ODS entries for BPM process chain for past few days
    4)     The point of failure of BPM process chain for past few days
    5)     The overall performance of all the process chains for past few days
    6)     The number of requests in BW for this process chain
    7)     The load on CRM system for past few days when this process chain ran on BW system
    As per our analysis, there are couple of things which can be fixed in the BW system:--
    1)     The partner agreement (transaction WE20) defined for the partner LS/BP3CLNT475 mentions both message types RSSEND and RSINFO: -- collect IDOCs and pack size = 1 Since the pack size = 1 will generate 1 TRFC call per IDOC, it should be changed to 10 so that less number of TRFCs will be generated thus less overhead for the BW server resulting in the increase in performance
    2)     In the definition of destination for the concerned RFC in BW (SM59), the “Technical Setting” tab says the “Load balancing” option = “No”. We are planning to make it “Yes”
    But we believe that though these changes will bring some increase in performance, this is not the root cause of the abnormal behavior of this chain as this chain runs successfully on every alternate day with approximately the same amount of load in it.
    I was not able to attach the many screen shots or the info which I had gathered during my analysis. Please advice how do I attach these files
    Best Regards,

    Hi,
    Normally  index  creation or deletion can take long time in case  your database statistics are not updated properly, so can check  stat  after your data loading is completed and index generation is done,  Do creation of database statistics.
    Then try to recheck ...
    Regards,
    Satya

  • Error while activating Process Chains

    Hi all,
    while activating the Process Chains, i am getting the following error "Job BI_PROCESS_PSAPROCESS could not be scheduled. Termination with returncode 8"
    when i double click on the error msg, i got the following help msg: "
    <i>Message no. RSPC065
    Diagnosis
    Program RSPROCESS is to be scheduled as job BI_PROCESS_PSAPROCESS under user ALEREMOTE.</i>
    Can any one please show some way to solve this problem? please do this favor, i have been suffering with error for a long time.
    Points will be given
    Thanks
    Ganesh

    Hi,
    Just analyze the error message that you get while activating the PC, don't give any server name.If you are trying to run process chain using Flat file, it won't work,
    and you should have source system R/3 or you have own datasources in BW system itself at that toime you can use PC to extract data. If your source system is Flat ile, it won't work. other wise you should place your flat file in application server, using AL11 tcode.
    <b>OSS : 511475</b>
    <b>Symptom</b>
    You cannot schedule or perform any batch jobs with the BW or source system background user.
    The error RSPC 065 occurs in the process chains:"Job could not be scheduled, termination with return code 8"
    <b>Other terms</b>
    RSPC065
    <b>Reason and Prerequisites</b>
    The user type is
    "CPIC" up to 4.6B
    "Communication" as of 4.6C
    This user type may not execute or start any batch jobs, irrespective of the user authorizations.
    <b>Solution</b>
    Set the type of background user to
    "Background" up to 4.6B
    "System" as of 4.6C
    This user type corresponds to the "Communication" type and may also perform background functions.
    Through the Customizing, the BW user is automatically created by mistake as a communication user.Depending on your BW system release, you can solve this problem as follows:
    BW 2.0B
               Import Support Package 24 for 2.0B (BW2.0B patch24 or SAPKW20B24) into your BW system. The Support Package is available once note 456551 with the short text "SAPBWNews BW 2.0B Support Package 24", which describes this Support Package in more detail, has been released for customers.
    BW 2.1C
               Import Support Package 16 for 2.1C (BW2.1C patch16 or SAPKW21C16) into your BW system. The Support Package is available once note 456566 with the short text "SAPBWNews BW 2.1C Support Package 16" has been released for customers.
    BW 3.0A
               Import Support Package 8 for 3.0A (BW3.0A patch08 or SAPKW30A08) into your BW system. The Support Package is available once note 452632 with the short text "SAPBWNews BW 3.0A Support Package 08" has been released for customers.
    <b></b>

  • Error while Activating a process chain

    Hi,
    I have just modified the existing process chain with the new info package for loading into ODS and then delta update into the Info Cube.
    when i am clicking on the option schedule and activate.
    Its giving error as :
    "InfoPackage ZPAK_49RJW545FSO2MB3NF1MIZ9NJ9 is
    generated; NOT able to be used as loading variant"
    This is a IP, which is used for delta update from ODS to cube.
    I have checked the IP, its fine like i can do the delta through this pacakge manually.
    Please help, points will be rewarded....

    Dear himanshu arora  ,
    Go and check whether the Info Package exist ,
    You can check in Rsa1 and give IP name and find it.
    If your IP is not there please create it,
    If tehre please check the all parameter associated with it.
    Also go through these
    Process Chain Errors
    /people/mona.kapur/blog/2008/01/14/process-chain-errors
    Process chain creation - step by step
    /people/juergen.noe/blog/2008/01/11/process-chain-creation--step-by-step
    Data Load errors and Process chains
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    ope the following links will give u a clear idea about process chains and clear ur doubts.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Siggi's weblogs for data load error and how to restart process chain
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Hope it helps
    Regards
    Bala

Maybe you are looking for

  • Monitoring/Alerting Set up options in SM - System Monitoring

    Comrades When configuring Solution monitoring in SM 4.0 for our lanscape the customised CCMS monitor set (created in RZ20 of Target Sysem) needs to be imported during set-up system monitoring process 1.Is it possible to import the customised CCMS con

  • After format crisis. I can't get things out of my ipod

    I've formatted my computer after lots of issues on my HP with Vista. I figured I can just sync back to iTunes so I didn't back up any of the media in my 32gig ipod touch. Well, I've reinstalled windows and itunes and trying to sync my media back into

  • Batch embed image in illustrator CS4

    I am working on about thousands ai files, each file have one image need to embed. My question is: Is there a way to embed the images at once? I usually open one ai files and select "embed image" in the links palette, is there a easy way to do this? T

  • Reading txt file

    Assume a file contains these values, one per line, as below: 100 50 200 300 30 70 Write a code snippet that reads the values and uses a method named drawLine() to draw the line segments. Assume drawLine() accepts the four arguments (x1, y1, x2, y2) ,

  • My ipad does not want to connect to my home wifi's, worthless. why has this just happened. is apple aware?

    In the last 2 days my Ipad does not want to connect to the internet via my home wifi's i have not done anything different so cany understand why this is happeniong. it just wont connect. Its a good job i have my 3g connection otherwise it would be wo