Hello Experts!
This is an urgent requirement.
I have 2 process chains to load master data, and i want them to run one after the other. How can i do it?
I read something abt local chains and meta chains, but couldnt make out how to implement that.
Please help me out. Reward points will be alloted.
Thanks.

Kindly use BI forum for BI related queries.
/community [original link is broken]
Regards
Raja

Similar Messages

  • BI IP Executing planning sequence via process chain not possible

    Hi,
    we use BI IP and have defined a process chain (RSPC) with value type process planning sequence. When we execute it, we get error message
    "Inconsistent input parameter (parameter: <unknown>, value <unknown>)"
    When we execute this planning sequence via the modeller or via SE38 RSPLS_PLSEQ_EXECUTE everything works fine. I thougt the cause could be the user of the job itself (job is executed with different user, and variant of planning sequence is user-dependent!), but I changed the user in the job itself as well without results.
    any thoughts?
    regards
    D
    null

    Hi,
    I executed with my user and have a SAP_ALL authorization. Perhaps it could be because we use authorisation with the old method (4.0) (-> I'm not sure on this). I also think it has to do with authorization. I'll check this out with our authorization consultant.
    D

  • Error in execute planning sequence variant in process chain

    Hi ,
    While creating an Execute planning sequence variant in process chain in Quality system , i am getting an error" variable variant not selected ' though i created a variable variant and selected it in execute planning seq variant.
    Transporting it from development system didnt work therefore i am trying to create it directly in Quality .
    Any idea what could be the issue.

    Hi,
    Variable variant can be saved for planning sequence in modeler and then cab be used in process chains.
    In process chain you can choose "Execute planning sequence"( separate process type) and add planning sequence with variant.
    [http://help.sap.com/saphelp_nw2004s/helpdata/en/43/1d000c41130bd5e10000000a422035/frameset.htm]
    Thanks
    Pratyush

  • Planning sequence in Process chain

    HI,
        I have used Planning sequence in process chain, But while executing it, it throws a following message
    "Inconsistent input parameter (parameter: <unknown>, value <unknown>)""
    Any Guess??
    Regards,
    Meiy

    HI,
          I have created a planning sequence in IP. I wanted to execute it in Process chain. While executing in process chain it throws a error which is mentioned above.
    Regards,
    meiy

  • IP: Error in packaged planning sequence in process chain

    Hi all,
    We run a planning sequence from within a process chain. As the data transferred are quite a lot, we have packaged with setting "automatically" and with 30 packages to be built. Now the function returned (it ran already successfully before!) an error message stating:
    Master cannot read return value from subprocess 2
    and another error:
    An error occurred with the maintenance of the query directory.
    Do you have any idea what this could be?
    Many thanks in advance,
    Andreas

    Hi Rakesh,
             It's a BASIS problem. After transport during process chain activation, the background user tries to logon with the password and if it fails the chain will not be activated. The contents will be transported though. You can manually activate the chain. You can request the Basis guys to fix this.
    - Ram

  • Sequence of process types in process chains

    Hi all,
    Can any one help me in listing down the sequence of process types we must have when we are using process chains. Like If I am loading data from R/3 to ODS and to cube then what all things should be included (creating indexex, deleting indexes..)and most importantly what sequence they should be in. ?
    Also what are the types you need to include in master data load process chain, where does the change run fit in the process chain.?
    Thanks alot in advance,

    Hi KM,
    The steps would be as follows:
    1. Start Process
    2. Load any master data - attributes.
    3. Change run .
    4. Text load.
    5. Load the ODS.
    6. Activation of ODS data.
    7. Delete indexes of Cube.
    8. Further processingof ODS data to Cube.
    9. Create indexes.
    10. Refresh Statistics.
    The delete index can be after the "further processing step" also.
    Bye
    Dinesh

  • Using Planning Sequence in a Process Chain With input variants

    Hi,
    I have a COPY planning function which has multiple FROM and TO options like (From:Fiscal Year To Fiscal Year, From Version TO Version). In the layout they select the options for which they want to COPY and execute the function.
    How can I replicate the same approach in a process chain with the varaints, how can i create the FROM and TO variables in the process chain.
    Thanks
    Rashmi.

    Hi.
    You can save variable variant for planning sequence in modeler and then use it in process chain.
    In process chain you choose "Execute planning sequence" and add planning sequence with variant.
    All this if you using IP instead BPS.
    Regards.

  • Planning Sequence: Error when runnning in a Process Chain

    When trying to run a planning sequence in a process chain (with the correct variable input variant) I receive the following error message:
    Inconsistent input parameter (parameter: <unknown>, value <unknown>
    When running this planning sequence in the modeler, it runs without errors.
    Any help greatly appreciated.
    Many thanks,
    Matt

    Hi,
    Can you pls explain your requirement..
    1)Are you trying to  trigger this proces chain in the background?
    2)Does the planning sequence which you are trying to execute in the process chain contains a planning function that is expecting some variables to be passed by the user?
    Rgds
    Shyam

  • What's the attribute change run? and the common sequence of a process chain

    The BW consultants of our company were gone and they used to create a complicated process chain, and we can see the sequences in the process chain is:
    Load different Master data attributes -> Attribute Change Run -> Load different master text data -> Load different transaction data.
    The sequence of the above process chain is pretty common, right?  We are pretty new to process chain and we are appreciated if someone could elaborate this and please also let us know the functionality of the Attribute Change Run variant here.
    We will reward your points and Thanks in advance!

    Hi,
    When ever u load the masterdata then it has to be activated so that the data will be available for the reporting. The Attribute change run will does the same thing. This will be applied to the Attributes and Hierarchies.
    for creation of process chains u can refer the link..
    follow the steps which is given by me..
    Re: Process chain in Generic extracter
    and refer these also..
    http://help.sap.com/saphelp_bw32/helpdata/en/65/163d3873130057e10000009b38f842/content.htm
    http://help.sap.com/saphelp_bw32/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm
    And u can refer some of the links in help.sap.com
    Regards-
    MM
    Dont forget to assign points if it helps, it is the right way to say thanks.
    Message was edited by: vishnuC

  • How to use master locks in a process chain with planning sequence

    Hi,
    when I start a process chain which contains a planning sequence there is no master lock set. The chain stops and I get the message "Data in InfoProvider XYZ is locked by user TIMMAY". What can i do to enable the master locks?
    Thanks for your help!

    Hello,
    When a planning sequence is triggered via process chain system first first tries to set a normal lock and if this is possible, these selections are stored as master locks and then the normal locks are released.
    In your case if some data is already locked by another user the lock conflict will occur in teh first step only where system tries to create a normal lock before creating master locks.
    If Administrator wants to trigger the process chain he should ask other users to come out of the planning layouts so that all the locks are released and then trigger the chain and after this the system will set the master locks. Packaging in planning sequence process type won't help in setting master locks even if the data is locked by other user.
    Also, after master locks are deleted in RSPLSE, the transaction data remains protected by normal data locks during runtime. Nevertheless, without master locks it is no longer guaranteed that parts of planning sequences can be carried out without encountering lock conflicts with other users.
    Regards,
    Deepti

  • Issues with a program,that exetutes SEM BPS sequence, into a Process Chain

    We have a process chain with a step which launches a program. That program executes a SEM BPS sequence. To set that request into green we have a step with other program which changes the planning cube to batch.
    Our two problems are:
    1) We cannot check in the process chain monitor if sequence finished all right because the step always finishes ok even if the sequence falls.
    2) Our SEM BPS sequence takes a long time and the process chain continues its execution without SEM BPS sequence is ended.
    Thanks a lot!
    Mario

    I am not sure if there is a solution to this in BW 3.x or SEM BPS. But if you can model the same planning sequence in BI-IP, then you can excute it in a process chain using a process chain variant.

  • Correct Process Chain Sequence

    Hi, I was reviewing some SAP Help on Process Chains and noticed that the Sequence Graphic they provide for Process Chains does not include the very import step of "Compression"  (see the link below)
    Does anyone think this should be in there or is there a reason it is not included?
    Thanks for your opinions.
    http://help.sap.com/saphelp_nw04/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm

    Hi
    Compression is also one of the important task in Info Provider Administration. Once you do compression, you can not do request based deletion in Info Cube.
    Lets take a situation, after one week or 10 days you found one request was wrongly loaded to your cube. If you compress your cube daily, then you have to go for selective deletion which difficult activity.
    for this reason, generally compression will be performed after 15 days or 1 month.
    It again depends on how much data you are getting daily as delta, because if you have huge uncompressed data in your cube this will decrease the report performance.
    Regards,
    Venkatesh

  • Error in process chain variant when executing BI IP planning sequence

    Hi All,
    I am trying to execute a planning sequnce as a background job using a process chain. Here one of the variant failed giving an error as : Overflow occurred when calculating <Key figure name> with value  6.5231044352058409E18+.
    I tried executing that process chain variant separately using the ABAP program RSPLS_PLSEQ_EXECUTE as a background job, but still its not working.
    At last I tried executing the individual planning step in the planning modeler, but again the same error.
    Earlier such case was resolved by compressing the planning cube requests and executing the failed variant using the ABAP program, but this time even compression is not helping to solve this.
    Can anyone please help on this issue ?

    Hi Andrey,
    This Key figure is created of the data type CURR (Stored as decimal) for Amount type. Now the length of CURR is maintained by SAP as 17 with 2 decimal places, so do you mean that I have to switch to other data type to hold the large value that is getting generated.
    My concern is : the error is coming for just one of the variant of the chain and not for other variants. If it has something to do with the KF data type, then certainly all others variants must have thrown the same error.

  • Help me to Create this Process Chain

    Hi Gurus,
    We have 3 Process chains,
    1) Region 1
    2) Region 2
    3) Region 3
    These three process chains were start at differt times and end time will depends upon the load of data. Now i want to do some manual calculations after the successful execution of this chains. So i have written three ABAP programs to do that calculations for 3 chains.
    My scenerio is to create a new chain only so I have created a new chain with Start variant -> Decision variant -> 3 Program variants (For 3 chains)
    Now i want to write the condition in decision variant to attach the respective program variants below it. ie,
    Start -> Decision (Condition for successful execution of Chain Region 1) -> Program Variant 1
                 Decision (Condition for successful execution of Chain Region 2) -> Program Variant 2
                 Decision (Condition for successful execution of Chain Region 3) -> Program Variant 3
    So i don know what exact logic to write in Decision variant...Please help me here...
    Thanks & Regards,
    Balaji.S
    Edited by: sbalajigupta85 on Aug 26, 2010 7:47 AM

    HAI ,
    A process chain is a sequence of processes that are scheduled to wait in the background for an event. Some of these processes trigger a separate event that can, in turn, start other processes. It looks similar to a flow chart. You define the list of Infopackages / DTPs that is needed to load the data, say delta or Full load. Then you schedule the Process chain as hourly, daily, monthly, etc, depending on the requirement 
    process chains for which info providers ?? i mean to say... for cube or? DSO?
    ok now below i explained for DSO... try it out it will work.. 100%
    Step 1: Go to RSPC transaction. Click on Create. Give Process chain name and Description.  
    Step 2:  Give the Start process name and description and click on Enter  
    Note: Each process chain should start with a Start Process  
    Step 3: The next screen will show the Scheduling options.  
    There are two options:
    Direct Scheduling:
    Start Using Meta Chain or API  
    In my example I have chosen Direct Scheduling as I am processing only one chain i.e DSO. Click on u201CChange Selectionsu201D  
    In the below screen shot, you can give the scheduling details i.e the Immediate, Date& time etc. and click on SAVE  
    The Screen shot below indicates that we have started the process. 
    Step 4:
    Click on the icon process types as shown in the below figure. You will get a list of options.
    In my example I am scheduling for DSO. To process we need to have InfoPackage, DTPu2019s for the corresponding DSO
    Open the tree Load Process and Post Processing, We need to drag and drop u201CExecute InfoPackageu201D  
    Step 5: Once you drag and drop the u201CExecute infopackageu201D we get the below Popup. We need to keyin the Infopackage name. To do this click on F4 and chose your Infopackage and click on ENTER
    Step 6: Save + Activate and Execute the Process.

  • Toggle Option in Process Chain not working

    Hello SDNers,
    I am experiencing the below scenario with one of my process chain.
    Process Chain FLow
    Start
    |
    |
    Local Chain (To delete the already existing file from Application Server(ZFTP))
    |
    Local chain to rename the file
    |
    |
    Local chain (Load data to cube)
    |
    |
    Local chain to backup a file from Appl. Server
    In the above flow, the step 2 has been set to proceed further even if there are no files to delete in the application server. To achieve this I am using a toggle option between the step 2 and 3.
    At times, the chain progress further when there are no files to delete as expected but not all the times.
    I am trying to figure why the step which is supposed to progress further is not progressing some times even though it has been set to move further.
    Any advice would be helpful.
    Regards,
    Vinoth

    Hello Venkatesh,
    Thank You for your Patience.
    I have BW systems both running in the SAP_BW Versions 730 & 701.
    I have checked the folders " Other BW Processes " & "Other" and below are the process types.
    Other BW Processes
    Attribute Change Run
    Adjustment of Time-Dependent Aggregates
    Deletion of Requests from PSA
    Deletion of Requests from the Change Log
    Execute Planning Sequence
    Switch Realtime InfoCube to Plan Mode
    Switch Realtime InfoCube to Load Mode
    Reorganize Attributes and Texts for Master Data
    Execute Analysis Process
    Update Explorer Properties of BW Objects
    Other
    Event in SAP CPS
    Job in SAP CPS
    Last Customer Contact Update (Retraction)
    Regards,
    Vinoth V

Maybe you are looking for

  • Resultset in the same order as saved in the database

    Hi Folks! I'm having some trouble with an old development, because for some really strange reason, the same select statement i'm getting the same records but in different order from time to time randomly. For example in day 1 i can get: 1 Text1 2 Tex

  • How to remove duplicate phone numbers under iMessage settings?

    I've been using iMessage for a while now and a lot of my friends have brought to my attention that every iMessage I sent showed it came from my email rather than my phone number. So I signed out of iMessage and tried logging back in using my phone nu

  • Trying to send photo via share/send button in iphoto

    Having problems, possible due to being a newbie, with sending a photo via the share/send button in iphoto. A message comes up "The email server didn't recognize your username/password combination". I have checked all preferences in mail and all seem

  • What is the equation for a Low-Sidelo​be Window Function (in Power Spectrum VI)?

    I am trying to find out what is the equation for the Low Sidelobe Window which is mentioned in the Power Spectrum VI. Hanning second sidelobe is around -32dB of the first. What is that for Low Sidelobe?

  • User logins fail; admin login is okay

    I'm running 10.3.9 all the latest updates on a 1 Ghz DP G4 with 1Gig RAM. Admin login works fine; three user logins go nowhere... beachball just spins and I have to power off the comp to get out. If I log in as Admin user and switch to another login,