Process Flow Error

I ran into a problem with one of my process flows, within my staging area. I have not had this problem before. My process flow looks as follows:
--- > Map2
--- > Map3
--- > Map4
Map1 --- > Fork --- > Map5 --- > AND --- > Map 9 --- > Map10 --- > Map11 …
--- > Map6
--- > Map7
--- > Map8
Mappings 1 through 8 ran successfully and populated their staging tables. The process flow showed success of mappings 9 through 16 (the last one) and successful completion of the process flow. However Mapping 9 was still extracting data and had not yet loaded its staging table. I was watching the execution in OEM. Mappings 10 through 16 did not execute after completion of Mapping 9.
This is a weekly large data load into our data warehouse so I will not be able to run this process flow again until this weekend. Map 9 was running with a degree of parallelism of 16, if it matters, and did not fail.
Has anyone run into this issue before?
Thanks.
Scott

user10483084 wrote:
I ran into a problem with one of my process flows, within my staging area. I have not had this problem before. My process flow looks as follows:
--- > Map2
--- > Map3
--- > Map4
Map1 --- > Fork --- > Map5 --- > AND --- > Map 9 --- > Map10 --- > Map11 …
--- > Map6
--- > Map7
--- > Map8
Mappings 1 through 8 ran successfully and populated their staging tables. The process flow showed success of mappings 9 through 16 (the last one) and successful completion of the process flow. However Mapping 9 was still extracting data and had not yet loaded its staging table. I was watching the execution in OEM. Mappings 10 through 16 did not execute after completion of Mapping 9.
This is a weekly large data load into our data warehouse so I will not be able to run this process flow again until this weekend. Map 9 was running with a degree of parallelism of 16, if it matters, and did not fail.
Has anyone run into this issue before?
Thanks.
Scottperhaps there's an error at MAPPING before MAPPING10, but it's not detected
I suggest you to add 2 transitionto COMPLETE ERROR and COMPLETE WARNING
from MAP1; AND; MAP9, MAP10, MAP11, ...
and fill the transition; enumerate ERROR for ERROR, enumerate WARNING for WARNING,
and the other line; enumerate SUCCESS
--- > Map2
--- > Map3
--- > Map4
Map1 --- > Fork --- > Map5 --- > AND --- > Map 9 --- > Map10 --- > Map11 …
--- > Map6
--- > Map7
--- > Map8
so you can know what MAPPING that doesn't success, and you can test it manually with control center, to know the error message
Thanks

Similar Messages

  • Owb process flow error handling

    Hi,
    I am using OWB 10gR2.
    I have 2 process flows that each call a series of mappings. Then I have one "master" process flow that calls the two aforementioned proecess flows. When a mapping errors, I want my whole master process flow to abort. I put error handling in, but it doesn't seem to work. For example, if I get an error in the first process flow, I get my email notification that something is wrong. The process ends. However, the master process flow continues to go. I want it to stop. It continues to go because there wasn't an error in the first process flow. The error was handled, and the process flow ended successfully. Does anyone have any tips or tricks on how to handle this type of situation? I'm not doing anything revolutionary. I'm just new to these process flows.
    Thanks,
    Tim

    hmm ok this sounds a bit weird to me.
    I've created similar processflows with customers and never had similar problems like you describe.
    Just to verify your design, here is how I would solve your master1 processflow.
    _______________________END_WARNING
    w w
    start----PF1----------s---------------PF2------s---- END_SUCCESS
    e e
    \___________________\____END_WARNING
    where the conditions for the transitions is indicated with w for warning, s for success and e for error.
    Some poorly made ascii art there but hopefully you get the idea...:p
    This also sounds like what you've done already and with extra email functionality.
    Are you sure that pf2 starts after pf1? Or can it actually run in parallel with pf1 but just finishes after pf1 so it seems like it its done afterwards? The reason I ask is that I experienced that in one of my processflows with around 30+ mappings, one of the mappings that was supposed to be executed almost at the end, executed before everything else and messed everything up. It was quite the annoying little bug and took a long time for me to discover. If you have noticed on the transitions, there is a little number next to the line on the canvas, indicating in which order the operators are to be executed. In my case, two transitions had the same number and that caused one of the mappings to just start as soon as the processflow was told to start. If this is the case there is a way to set these, but I don't remember right now. Delete and recreate the transitions also do the trick I think.
    Hope you figure it out!
    Ragnar
    edit: seems like my ascii art got a bit messed up... :(
    Message was edited by:
    rhaug

  • Process Flow Error: nonexistent LOB value

    Hi,
    I would like to send an email of all mapping statuses of the day. I created function to retrieve all messages from OWB$WB_RT_AUDIT_MESSAGE_LINES. Sometimes it works and another time it fails. After a little investigation I got the cause of this failure: length of the message exceed the limitation of VARCHAR2 (4000 bytes).
    Then I created another function for testing as follows:
    CREATE OR REPLACE FUNCTION FTEST_VAR RETURN CLOB IS
    tmpVar CLOB;
    BEGIN
    tmpVar := 'test';
    RETURN tmpVar;
    END FTEST_VAR;
    From SQLPlus I was able to query this function:
    SQL>select ftest_var tst from dual;
    TST
    test
    Then I created a process flow like this:
    START1->FTEST_VAR->EMAIL->END_SUCCESS
    In the process flow I created a variable EMAILBODY to bind to the output of FTEST_VAR and then bind EMAILBODY to the MESSAGE_BODY of the EMAIL.
    I deployed and run the process flow. It failed with this error message:
    ORA-22922: nonexistent LOB value
    ORA-06512: at line 1                                        
    Could anybody please shed a light on this?
    TIA
    Prat

    I am trying to setup pretty much the same type of flow to email job messages using a CLOB.  Were you able to find a solution?
    Thanks!

  • Process Flow errors - how do you see them

    Hi there
    Created and deployed a process flow but when run it either comes up with warnings or errors. Really simple process flow to run two mappings which, individually run fine. when run the process flow in Conrol Cenetr has error or warning symbol, click job details but can't see what the error, warning message is.
    Any ideas how to see them - this is the first process flow I've created?
    Many Thanks

    Hi
    You can either;
    * use the repository browser and view the audit trail there (must start the browser listener first).
    * use the OWB SQL Developer reports that use the public views on the exchange, the error details are recorded in the public views.
    http://www.oracle.com/technology/products/warehouse/htdocs/Experts/owb_sqldeveloper.zip
    I created these for a quicker turnaround time in building/debugging process flows. The browser is the official mechanism.
    This is fixed in 10.2.0.3 - you will see the errors in the control center manager, where you might have expected them in the first place!
    Cheers
    David

  • Process Flow errors in OEM Scheduler

    Hi
    I'm using OWB 10.1.03. I've created 2 process flows that load data from different sources. I have also set up a job schedule on Oracle Enterprise Manager (OEM) that runs a stored procedure. This procedure comprises two steps:
    (1) Start a loop and check for a table flag. If flag set then Run Process Flow 1 (using
    ret:= wh_runtime.wb_rt_api_exec.run_task('TARGET_LOC','PROCESS','WF_NAME','','',1)). Else keep looping until flag is set.
    Then immediately after Process Flow has run,
    (2) Start a loop and check for a different table flag. If flag set then Run Process Flow 2. Else keep looping until flag is set.
    If there has been an error in Process Flow 1, the mapping completes with error and an email notification is sent. However, according to the stored procedure, Process Flow 1 has completed and it therefore moves onto Process Flow 2.
    Is there a way of identifying if a Process Flow has completed with an error or warning, and therefore preventing the procedure moving onto step 2?
    Thanks
    GB

    Hi
    I managed to solve this by using part of the oem_exec_template.sql script within my stored procedure. I used l_audit_result to check the status of the workflow run and raised an exception if it was not a success.
    GB

  • Process Flow error- RPE 01003

    Hello,
    We are facing a very strange problem while running process flows in OWB. We are getting followig error when we execute process flows.
    InfrastructureException: RPE-01003: An infrastructure condition prevented the request from completing.
    - Io exception: The Network Adapter could not establish the connection
    It's strange because we are able to connect to source and target database outside owb. Also, the location test is successful. Any idea why it fails to connect while running process flow only. We tested the db links created by owb. They work as well.
    We are using OWB 10.2 on Oracle 10G installed on Linux RAC machines.
    Any help is appreciated.
    Thanks
    Madhavi

    I have a MATERALIZED VIEW in the process flow and it fails. the erros i get are as follows? can any one tell me what wrong with it?
    RPE-01003: An infrastructure condition prevented the request from completing.
    RPE-01038: Failed to evaluate expression null. Please modify the expression, redeploy and retry again.
    RPE-01003: An infrastructure condition prevented the request from completing.
    RPE-02226: Cannot test Control Center user null. This user must match the login credentials of the deployment location.
    RPE-01003: An infrastructure condition prevented the request from completing.
    no rows found for select into statement

  • Process flow errors

    Hi all,
    I am upgrading owb from 10g R1 to 10g R2. Now, I can deploy and loading data for every mapping. When I am testing the process flow, I get the error message like this :
    ORA-01924: role 'OWB_O_OWBRTR2' not granted or does not exist
    ORA-06512: at "SYS.DBMS_SESSION", line 132
    ORA-06512: at line 1
    RPE-02215: Failed to test synonym QREGODSL_WB_RTI_WORKFLOW_UTIL.
    RPE-02260: Database User OWF_MGR must be a Control Center User.
    When I doing the upgrading, I did reporsitory upgrads, but nothing for process flow. Do I need to take some steps for process flow upgrades? If yes, how can I do it or where can I find the related document? If no, then what does the error message above mean?
    thank you so much

    The Process Flow Database User should be created as Target User before you deploy the process flow.
    i.e OWF_MGR should be created as a target user

  • Process flow errors while deploying

    Hi all,
    The following error occurs while deploying a simple process:
    RPE-02085: Failed to test wb_rti_workflow_util.initialize through deployed Workflow Database Link
    CF.US.ORACLE.COM@WB_LK_F_IMP_BB. Please check that "EXECUTE ANY PROCEDURE" privilege is set and
    that the OWB Runtime is available.
    - ORA-04052: error occurred when looking up remote object
    [email protected]@WB_LK_F_IMP_BB
    ORA-00604: error occurred at recursive SQL level 1
    ORA-12545: Connect failed because target host or object does not exist
    OWF_MGR has been given execute any procedure grants. My opinion is that the database link has an error. This is how Oracle creates the DB link:
    create database link CF.US.ORACLE.COM@WB_LK_F_IMP_BB connect to RUNTIME_OWNER identified by RUNTIME_OWNER using'
    (DESCRIPTION=(ADDRESS_LIST=(ADDRESS=(PROTOCOL=TCP)(HOST=demo.SMS)(PORT=1521)))(CONNECT_DATA=(SERVICE_NAME=CF)))';
    When i create another DB link manually without the '.sms'-part in the HOST then the DB-link works fine. Where can i find the parameter that tells OWB to put .sms behind the hostname? I have tried numerous possibilities in sqlnet.ora, listener.ora and tnsnames.ora, but nothing seems to work. I have read the previous articles on this subject but havent found the solution.
    Thankz in advance,
    Eric

    I am getting the same problem, The problem was caused by the domain suffix (.KC.RR.COM).
    when I deploy a processflow package, owb creating bd_link with following description. Actually my host name is NG.
    (DESCRIPTION=(ADDRESS_LIST=(ADDRESS=(PROTOCOL=TCP)(HOST=NG.KC.RR.COM)(PORT=1521)))(CONNECT_DATA=(SERVICE_NAME=ORCL)))
    How can I avoid creating domain suffix as part of db_link. Please let me know the steps you have taken to correct this.
    Your help is greately appreciated.
    Thanks,
    Reddy

  • Trigger admin e-mail on process flow error in real time

    I currently have an e-mail sent (success, warning, error) at the end of a workflow, and somewhere in the middle at the end of larger collection of mappings. However, now I am looking into triggering e-mails at any error or warning in the middle of the workflow. Is this possible?

    The major challenge on your stated information is that you are going to work with Windows.
    Windows is not a deterministic OS. That means that you can have any kind of timing jitter at any time. The common jitter does not exceed 1-10ms in average, but you can have spikes of up to even several seconds at any time (e.g. if virus scanner scans or hard drive is indexed, ...)!
    So regarding the hard limits of your timing requirements, you might want to switch to a deterministic system, either Real Time (RT) or even FPGA (which seems to overblow the requirements....).
    Norbert
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • Process Flow Transistion dissapears

    Hello!
    Some of the created transitions are not created in the actual Process Flow. This is obvious when looking in the Process Monitor. When I redraw the one missing, deploy and execute the process flow again. I get more transitions but not all of them!
    Does anyone know how to solve this issue?
    Best regards,
    Tina

    Hi Tina,
    it is an OWB bug. For more details and workarounds look at these threads
    [owb process flow error handling|http://forums.oracle.com/forums/message.jspa?messageID=2138808#2138808]
    [10GR2 - Process Flow executes in wrong order...|10GR2 - Process Flow executes in wrong order...
    Also on Metalink is registered a lot of bugs for different releases (including 10.2.0.4 and 11.1.0.7, for example bug 7603716)
    Regards,
    Oleg

  • OWB 11.2.0.4: Process flows execute in parallel instead of serial

    Hi all,
    we migrated a 10gR2 repository (Linux) onto 11.2.0.4 and noticed a heavy error: the sub-processes which are supposed to execute serially (and did this in 10g) are started in parallel, so, that the whole dependency concept is destroyed. Prior to raise a SR I'm asking the community if such a behavior has been seen already. The process flow deployment was done with the brand new Windows client for 10.2.0.4.
    best regards
    Thomas

    Hi Thomas,
    Have you checked if you have problems with the transition order property? It was still present on 11.2 when the process flow was migrated from 10.2. Check this thread:
    Re: owb process flow error handling
    Regards
    Ana GH

  • Problem Running Process Flow When Database Objects Deployed Outside of OWB

    Hi
    I am having a few problems running process flows that I'm deploying through OMB.
    My set up is as follows:
    All database updates are done outside of OWB (for version control purposes).
    Each object within OWB is exported to an MDL file, which is then imported into the production repository using an OMB Script.
    Once everything has been imported into my production version, I'm then deploying the process flows from within the OMB script.
    When I then go to run the process flow, I get the following error ...
    RPE-02075: Oracle Workflow failed to process the execution request for Activity LOAD_COUNTRY_PF:LOAD_COUNTRY. This may be because dependent objects have not yet been deployed.
    I can see through the Control Center, that the status of all the objects that the process flow is going to use are set to having a Design Status of 'New'. So obviously OWB doesn't realize that these objects already exist in the database, which is why the process flow errors.
    Is there any way around this? Can I somehow set the Design Status of all the objects to 'Unchanged' through OMB? Is there a way to fool the process flow into thinking that the objects do exist? Can I run the process flow outside of OWB?
    Any help would be appreciated.
    Thanks
    Liffey

    Hi Liffey,
    Is there any way around this?
    Can I somehow set the Design Status of all the objects to 'Unchanged' through OMB?
    Is there a way to fool the process flow into thinking that the objects do exist?of course you must deploy mappings before deploying processflow
    and as I know there is no legal method for avoiding this.
    Regards,
    Oleg
    PS. Look at this thread [Deploying without Deploy|http://forums.oracle.com/forums/thread.jspa?messageID=2655726&#2655726]
    It seems for OWB10gR1 exists method for manual modification OWB runtime repository tables for mark mappings as deployed

  • URGENT:error while deploying a process flow

    EMP_COUNT is a mapping which i have deployed .
    when i try to deploy a process flow i get the following error:
    OMB05602: An unknown Deployment error has occured for Object Type API8028: No signature is available for mapping EMP_COUNT because the generation language is undefined. Please set the generation language property of this mapping, or generate this mapping to set the generation language property to a default value..
    thnx in advance

    OMB+> OMBALTER MAPPING 'EMP_COUNT' SET PROPERTIES (GENERATION_LANGUAGE) VALUES ('PLSQL')
    Fast enough? ;-)
    Regards,
    Detlef

  • Error in using External Process in the Process Flow

    I Created a Process Flow with an external process to Move the file from one location to another location,
    I gave the below parameters for the External Process
    COMMAND: move
    PARAMETER_LIST: ?F:\\FlatFiles\\in\\company.txt?F:\\FlatFiles\\error\\company.err
    SUCCESS_THRESHOLD: 0
    SCRIPT:
    The environment is
    Windows 2003
    OWB 9.2.0.8
    OWF Builder 2.6
    When I deploy and execute using Deployment Manager, it gave me the below error
    Starting Execution TEST
    Starting Task TEST
    Starting Task TEST:EXTERNALPROCESS
    CreateProcess: move move F:\FlatFiles\in\company.txt F:\FlatFiles\error\company.err error=2
    Completing Task TEST:EXTERNALPROCESS
    Completing Task TEST
    Completing Execution TEST
    What am I missing something here?
    Is my Parameters correct?
    GIve me the link where I can find more on using External process.
    Please...please...help me..
    Shree

    Nikolai,
    I have created a simple process flow which only calls the external process. The script is on the same host as the process flow is deployed to.
    I have used two diffent values for the command parameter.
    1. I placed the full path of the file in the command parameter and left the script parameter blank:
    COMMAND: /edwftp/ppas/scripts/ClearPPAS.sh
    PARAMETER_LIST:
    SUCCESS_THRESHOLD: 0
    SCRIPT:
    2.I placed the bash command in the command parameter and the full path in the script parameter.
    COMMAND: /usr/bin/sh
    PARAMETER_LIST:
    SUCCESS_THRESHOLD: 0
    SCRIPT: /edwftp/ppas/scripts/ClearPPAS.sh
    Both of these appear to work as they print out the statements inside the script but the files that are supposed to be removed still remain.
    Starting Execution EXTER_FILE
    Starting Task EXTER_FILE
    Starting Task EXTER_FILE:EXTERNALPROCESS
    Removing ActivatedAudit.dat...
    Removing ActivatedCustomers.dat...
    Removing ActiveAudit.dat...
    Removing ActiveCustomers.dat...
    Done!
    Create the Activated Customers data file...
    Create the Active Customers data file...
    Done!
    WARNING: Log file truncated - see RAB for further information.
    /edwftp/ppas/scripts/ActivatedCustomers.sh: /edwftp/ppas/log/ActivatedCustomers.log: cannot create
    /edwftp/ppas/scripts/ActiveCustomers.sh: /edwftp/ppas/log/ActiveCustomers.log: cannot create
    WARNING: Log file truncated - see RAB for further information.
    Completing Task EXTER_FILE:EXTERNALPROCESS
    Completing Task EXTER_FILE
    Completing Execution EXTER_FILE
    The permissions on the /log direcotry are 775. The user I register the file location with owns this directory.
    Can't think of anything else I have missed. I really appreciate your help :)
    Ryan

  • Error while deploying process flow

    hi All,
    i am getting below error while deploying 1 process flow.
    Description : Runtime User : OWBPC Started : 2011-06-02 19:18:06.0
    Name Action Status Log
    None Error ORA-00942: table or view does not exist
    None Error RPE-02053: The Oracle Workflow version cannot be retrieved. This may have been caused by an incomplete or incorrect installation of Oracle Workflow or the schema may not contain an Oracle Workflow repository. Please check the location details, reinstall Oracle Workflow, if necessary and try again
    i added only 1 mapping in process flow and mapping containing both tables in taret schema.
    kindly tell me how to fix it.?
    rgds,
    Pc

    hi..thnx for replying..
    i have already installed owf manager from below location in my pc..
    D:\app\pc\product\11.1.0\db_1\owb\wf\install
    and installation was successful..then too I am getting same error while deploying process flow.. im using oracle 11g.. direct me now plz..
    Edited by: PC on Jun 3, 2011 3:48 PM

Maybe you are looking for

  • Auto brightness not working in ios8

    Anyone else have this issue with ios8? Doesn't matter how dark or light  it gets my iPhone 5 and iPad wont change display brightness.

  • Move rejected to trash changes aspect ratio of a clip

    I just switched from iMovie HD to iMovie '11. I imported all old projects that I did not yet work on into the new version. This worked fine and I created my first movie successfully. For the current movie I have a lot of raw material in the format of

  • Dvd are not recognized

    Hi there in many communities iMac users report the same problem I have, but no clear solution found so far. My specs: - iMac 27" (from mid 2010) - 3.2 Ghz Intel Core i3 OS:  OS X 10.9.1 (13B42) DVD-ROM OPTIARC DVD RW AD-5680H, Revision: 3AHB Issue: -

  • Parse form variable to insert in my query

    I have a report where I want to group my output. The only problem is the field I want to group by comes in as a comma deliimeter from the form. If I use the in() function it doesnt group the output correctly. <cfoutput>#form.id#</cfoutput><br><br> <c

  • I want to download Firefox for my Mac Powerbook G4, os X, older version please.

    Firefox no longer works or opens on my desktop computer