Process of Inventory count blocks one other plant

hi.,
If i  understand correct, you can create PI documents at Plant(1) /Storage location ( S.Loc Say A) .level.
Until the Physical Inventory Count documents are posted, SAP will not allow any kind of movement of that material say X at that  Plant(1) /Storage location level (S.loc A).
For the same Plant (1) ,if there are more than one storage location say B,C or D, the Physical Inventory count process would not affect the movement ,GR, GI of Material X in S.loc B, C or D. (Right ?)
Situation (1) :What is happening is, when PI documents are created for Plant (1), S.Loc (A) , Material (X) and the count is in process,  the system is not allowing the GI, GR , movement of Material (X) containted in Storage location B, C or D. Message is Material is blocked by User (who has generated the PI document.)
Situation(2): Material (X) in different Plant (2) under the same company code  are also denied any movement while the Count is in process in Plant (1).
I was wondering if anyone has come across this kind of scenario and the solution for the same.
All assistance is much appreciated.
Thanks

Hi Mahesh,
For your situation 1 question- the error message is due to the material is also processing by other person, not necessarily the person who created the PI doc, by the time your trying to use the Material (X) somebody is using also.
(Blocking of Movements like GR/GI is set separetely, if you try to use this material like GR, error message will promt like Material is blocked due to PI)
For situation 2- most likely you are able to do blocking of this material for posting when you created the PI docs. So, it also not allowed you to do GR or any kind of posting.
Hope this clear your doubt.
Regards,
Maia
Edited by: Maia on Apr 18, 2008 11:05 AM

Similar Messages

  • Stock Transfer order Block one supplying plant

    Hi,
    We are using standard Stock transfer Orders (UB) for transfer the stock from one Plant to another plant.
    Our receiving plant is 1000 and others plants available in the organization structures are 1100, 1200 and 1300.
    Standard SAP allows to order from 1000 to all the plant 1100, 1200 and 1300.
    We want to restrict to a user to create STO for 1300 plant. Means when the receiving plant is 1000, any user must not able to create any UB type Stock Transfer Order to supplying plant 1300.
    Please suggest, how we can achieve it without doing the Enhancements.
    Regards,

    Hi,
    Isn't it a help if you block the vendor master of that plant? This might be solution based on your organisational structure in SAP.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Nov 3, 2008 1:42 PM
    Edited by: Csaba Szommer on Nov 3, 2008 1:43 PM

  • Block Shipping dates from calendar to assist Inventory count

    Hi Experts,
    This is in regard with blocking 3 days for shipping. Client wants to do an inventory count (for a particular plant) and so he wants that no shipment should happen on those 3 days from the plant (in SAP also). So he wants to block those 3 days for shipping.
    However, orders can be placed on these days.
    Can you please guide me how to proceed on this? Is this related to any change in shipping calendar or factory calendar or any other setting?
    Kindly advise,
    Thanks,
    Anurag.

    Hi Rishi,
    Thanks for the help !
    Yes we use GATP, and yes we want to prevent committed date/ planned PGI date fall between these 3 days.
    I went to customizing in APO MAster data > Maintain Planning Calendar (Time Stream).
    It is maintained - working time calendar (with gaps) & interval as weeks (Mon-Fri each week).
    Could you please guide me which setting should I do do block these 3 days here? Shall I remove these days from Buckets or how?
    Kindly advise. And thanks again !
    Thanks,
    Anurag.

  • Process steps for Capital goods transfer from one exciseable plant to another exciseable plant

    Please guide me about below mention process :
    Capital goods transfer from one exciseable plant to another exciseable plant with updation of RG23C register.
    Goods purchase in prev month.

    Company code to company code u have to treat the another company as Vendor/Customer in each company code books. Then the process is same.  Sale order, delivery and billing to the Customer(2nd company code i.e. stock receiving company code).  Then in receiving company code based on the delivery document of other company code GR can be made. and IV.

  • Can you Please Tell Me the Process for service/operation  provide by one plant to other plant.

    Can you Please Tell Me the Process for service/operation  provide by one plant to other plant.
    In My Company No Of Plants Like 1000,2000,3000,4000
    Plant 1000 Provide the service/operation  like (welding ,cutting, painting ) to other plants (eg 2000,3000,4000)
    We want to give the profit for plant 1000 and book the service or operation charge in plant 2000 or 3000.
    We don’t want  to use material code in this process.
    Can you help me it is possible or not through SAP PP.

    Krishnendu,
                   Actually in my company we have one plant 1000 that plant provide the service like (CUTTING (SHAFT),WELDING,MACHINING,PAINTING)
    actually plant already made one material xyz and supply 2000 plant .
    we  can use STO in this scenario and set special procurement key  80.
    But my requirement is after some time plant 1000 provide few operation in xyz material that material already supply to 2000 plant.
    in this case we dont  use to produce any material.

  • Valuation category showing for one plant but blocked for other

    Hello all,
    I have two plants both belongs to different companies. For one plant i am able to assign valuation category in mm01 but for other plant val cat is blocked in mm01. I have checked setting and they are active and similar. Any other solution please.
    Regards,
    Diptanshu gupta

    The other plant belongs to other company. For that when i am creating a new material in mm01 it is allowing me to post entry in valuation category.

  • STO from one plant to other plant

    Hi,
       Can some one send me the various  way's one can send a stock from one plant to other plant with complete flow's.

    Hi,
      Usually sotck transfers are of two types one is
    1. intercompany stock transfer between two plants of differnt company codes again in this two types are there 
       i) direct step process Or one step: in this the quantity of the supplying plant is directly posted into the inventory of receving plant.movement type of supplying plant is 645
      ii)Two step proces:in this the receiving plant has to do the MIGO i.e., goods receipt.movement type of supplying plant is 643
    2.intra company stock process i.e., stock transfer between two plants of the same company code.in this again two process
    i) direct step process Or one step: in this the quantity of the supplying plant is directly posted into the inventory of receving plant.movement type of supplying plant is 647
      ii)Two step proces:in this the receiving plant has to do the MIGO i.e., goods receipt.movement type of supplying plant is 641
    For stock transfer configuration process make a small search in this forum u can get lot of stuff.
    If it helps reward me .
    Regards,
    kishore.

  • Which movement type use for return stock form one plant to other plant  in

    HI friends i am working on STO PROCESS
    i need to transfer return stock from one plant to other plant as a return stock i am using Mvt type 455
    but system shows  following error
    Update control of movement type is incorrect (entry 455 X X _ L)
    Message no. M7226
    Diagnosis
    The system could not find entry 455 X X _ L in any of the movement type control tables.
    Procedure
    Cancel current processing.
    Contact your system administrator.
    Action to be taken by the system administrator
    Check in Customizing for Inventory Management under Copy, Change Movement Types whether the entry is contained in the Update control view for the movement type.
    If the entry is missing, proceed as follows:
    For standard movement types, this means that the given process is not supported using the present data combination. Do not create any entries without prior arrangement with your SAP consultant. Otherwise, incorrect postings may result.
    For customer-defined movement types (beginning with 9, X, Y, or Z), this may mean that they have not been fully defined. Delete the movement type and re-create it by copying a standard movement type.
    thanks in advance

    Hello,
         I think there is a standard STO movement type you can use. But I can't remember. Why don't you try to find it and test if it fit your requirement?
         There are some information for your reference. Please check on website:
    http://www.sap-img.com/materials/difference-for-stock-transfer-and-transfer-posting.htm
    Using STO without delivery: 
      doc.type: UB
      GI:351, GR:101
      STO with delivery:
      GI:641, GR:101
      delivery type:NL
      STO with delivery and billing:
      GI:643, GR:101
      delivery type:NLCC , billing type:IV
         And if you want to use the way to return the goods replenishment, try to flag the return checkbox while you create purchase order item. Of course, corresponding configuration is required.

  • Inspection Lot Not Triggered for STO - One Plant to other Plant in same Company

    Dear SAP Gurus,
    We have a scenario of STO for one plant to other plant with in the same company code.
    The process is being followed as follows ;
    1. We create stock transfer by creating P.O thru ME21N
    2. Create Outbound delivery thru VL10B
    3. Doing PGI & Picking thru 'VL02N. Thru movement type '641'
    The QM settings are as follows to trigger an inspection lot
    1. Inspection lot origin '08' activated in MM.
    2. Quality plan is defined and task list is released.
    3. 'VL02N' is defined thru 'OMJJ' for movemrnt type '641'.
    But while doing PGI no inspection lot is created.
    Our requirement is to trigger a inspection lot and Invoicing / Billing only possible after inspection lot Approval.
    Please advice.
    Thanks

    Hi
    As per my understanding  inspection type 10 should be activated in QM view material master.
    Can you please check the below thread and also check some similar threads.
    QUALITY INSPECTION FOR OUTBOUND DELIVERY
    I hope your problem will be resolved or else revert with your observation.
    Regards
    D Mohanty

  • Regard the physical inventory  counting  process

    Hi Experts,
    Can any body lhelp me to  know the process of how to create the physical inventory counting process from begining to end
    i will appreciate your help if you provide with screen shots also thanks.

    Hi,
    [Physical Inventory Counting Process|http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIM/MMIM.pdf]
    Regards
    GK.

  • Standard procedure to transfer Inventory Items from one Warehouse to other

    Dear All,
    Please let me know what is the standard procedure to be followed while transferring Inventory Items from one warehouse to other warehouse through SDK. Right now I am using sql statements to deduct and add the items to and from warehouse. Its not working properly.  Please let me if any business object is provided by SAP to achieve this functionality.
    Regards,
    Noor Hussain

    Hello Noor,
    You can use stocktransfer object:
    Private Sub PostStockTransfer()
            Dim oDoc As SAPbobsCOM.StockTransfer = oCompany.GetBusinessObject(BoObjectTypes.oStockTransfer)
            oDoc.DocDate = Date.Today()
            oDoc.FromWarehouse = "01"
            oDoc.Lines.ItemCode = "A0001"
            oDoc.Lines.WarehouseCode = "02"
            oDoc.Lines.Quantity = 10
            If oDoc.Add = 0 Then
                sbo_application.MessageBox("Stock transfer Issued")
            Else
                sbo_application.MessageBox(oCompany.GetLastErrorDescription)
            End If
        End Sub
    Regards
    János

  • MRP consider other plant inventory before procuring from vendor

    Hello All,
         Is it possible to have standard R/3 (5.0) consider inventory of other plants before creating a schedule line to procure from a vendor?
    Example:  We have inventory in two plants. 
    <b>In plant 1000</b>,
    requirements of 500 pieces
    inventory of 100 pieces
    <b>In plant 2000</b>,
    requirements of 50
    inventory of 200 pieces
    In plant 1000, I would like the MRP result to create a stock transfer requirement of 150 from plant 2000 and then a schedule line from a vendor of 250 pieces.
    Is this possible?  If so any suggestions on how to setup my plants/materials?
    Thank you,
    Jerry

    Hi,
    If Plant 1000 regularly receives supplies from Plant 2000 apart from the Vendor, I think it would better if you can maintain Special Procurement Type (Ref SPT 40) for transfer from 2000 to 1000. Then maintain Quota between Plant and Vendor (MEQ1).
    However if your scenario is such that stock transfer reqmt should get generated only if when there is surplus inventory at Plant 2000, I am not sure if this can be achieved in Std R/3.
    Raj

  • MIC from one plant to be Extend in other Plant Codes

    Dear SAPians,
    I want to extend the MIC from one plant to other 7 plant codes. Please guide how can i do it?
    Thanks in Advance.

    Hi Atul,
    As suggested by Kundan, it is recommended to use the MICs created in one plant in other plants, to reduce the duplication of master data.
    If  the MIC parameters / control indicators are different in other plant, then you can change in the inspection plan or create new MIC by copying the MIC from other plant, but you cannot extend MIC from one plant to other plant.
    If your business  says all the MICs should be plant specific, then create MICs in all the plants by copying from the existing plant. You can use master data uploading tools for large volume of data.
    With Best Regards,
    Vithal

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • StockTransfer Finished product of one plant to other plant as a packingmate

    HI,
      CAN ANY ONE PLEASE HELP ME AS TO IS IT POSSIBLE THROUGH   STO    TO TRANSFER A FINISHED PRODUCT OF
      ONE PLANT AS A  PACKING MATERIAL TO OTHER PLANT .
      WE ARE DOING THIS TO AVOID THE SALE AND PURCHASE ENTRIES. WE WANT ALSO THE PROPER EXCISE ENTRIES TOBE
    GENREATED.
    PLEASE REPLY IF IT IS POSSIBLE.
    REGDS
    MS PUSHPI BOSCO

    Hello
    As per my knowldge, it is not possible to maintain same material code in this scenario.
    All you can do is to make 2 matrial codes for finished and semifinshed material and at the time of STO betweem the plants, Do material to material transfer (movement type 309) either before issuing for STO from plant 1 or after receiving in plant 2.
    Will explain the steps:
    Material code M0001- finished good (handle) in plant A.
    Material code M0002- Semifinished goods (handle) to be maintained in plant A and plant B.
    STO (material code M0002) for stock to be transferred from Pant A to Plant B.
    Material to material transfer (M0001 to M0002)in plant A using movement type 309.
    GI (Material M0002) from Plant A against STO.
    GR (Material M0002) at Plant B.
    Hope it is clear.
    Regards

Maybe you are looking for

  • Playing an iMovie using a DVD player

    What format (if any) is needed in order to play an iMovie (burned onto a DVD) on a regular DVD player that would then show on a television? Is this something that is possible?

  • Regarding user name and password for database

    hi     i need to connect webdynpro apllication to oracle database. i installed the jdbc drivers and i need to know the super admin id and pass word

  • Is it possible to set the cell height in a cell style?

    In the attached screenshot, the cell height is set to exactly 0.125. I put my cursor in the cell, then opened the cell styles panel and created a new cell style based on this cell. But when I apply the cell style to other cells, it does not apply the

  • Can previous emails be transferred to a new iPhone?

    We recently bought a new iPhone 5S to replace an older iPhone 5 for one of our employees.  He has a lot of business emails that he keeps on his phone for reference.  Is there any way to transfer those old emails to the new phone?  He is getting new b

  • CD Drive keeps ejecting

    I have a 13 Early 2011 MacBook pro and everytime I put a disc into the cd drive it just keeps ejecting, any solutions?C